Designing the Building of the Future
Practical Experience in IT Deployment
Collaborate to Accelerate
Panduit Confidential – Internal Use onlyFORM C2-0765 DATE 01JUL08
UPI Phase 2 Convergence Align
System Architecture
Converge
Systems & Software Integration
Optimize
Design Optimization Lifecycle Management
Deploy with Speed, guaranteed performance, maximize air flow, assist with cooling, recover space, provide tools to managed and increase value
PViQ DC Design
CO2 Emissions from Energy Use
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
1.2
1.4
1.6
1.8
2.0
2.2
2.4Buildings
Industrial
Transportation
Source: U.S. Energy Information Administration
(Bil
lio
n M
etri
c T
on
s o
f C
O2
)
Phase 1: 28,000m2
LEED Gold Building
World Class Implementation• Cisco Connected Real Estate (CRE) • Panduit Connected Building Solutions (CBS)• Panduit Data Center Solutions (DCS)
Phase 1 Capacity – >800 Employees
Key Features of Panduit WHQ
Industry Gap – Connected Building Solution
Internal Alignment External Alignment
Security Sustainability Operational Efficiency
Enhanced Experience
LEED Statistics &Technologies
5 Points
14Points
15 Points
13 Points
17 Points
Innovation 4 Points
RECOVERY
Making a Connected Building
Making a Connected Building
Traditional Solution - Security
Traditional Solution - BAS
Traditional Solution - All Systems Deployed
Think Differently Think UPI
Unified Physical Infrastructure
Information Technology Strategy
• Middleware and Software
• Connected Building Data Centers
• Telecommunications Rooms
• Pathways
• Consolidation and Endpoints
Converged Network Pathways
•Design Consolidation
•Contracting Simplification
•Construction Speed
•Operations and Maintenance
Head Quarters Benefits
Estimated Annual return of our Connected Building
$0.74/ft2 = $184,000 / year
White Paper (May 2009): “Achieving Financial and Functional Advantagesin Connected Building Solutions with the Unified Physical InfrastructureSM (UPI)”
Intelligent infrastructure
Think Differently
SM
Shorten Horizontal Cables Using Main Distribution Points
• Zone Distribution Areaso Reduces Cable Congestiono Reduces Power Consumptiono Rapid Deployment of
Connections
o Reduces deployment costs up by 16%
CONFIDENTIAL - For Internal Use Only
Smarter Physical DeploymentZone Cabling
www.fols.org
Move to Standard Ethernet/IP
Churn Rate 22.5%
Standard Cabling TopologyZone Cabling Topology
Telecommunication Enclosures
Connected Building Product Portfolio
FM
FM
X
IT
M
F
Warehouse
MDA
Data Center
NOC
PBX
UTILS
Elec. Rm
M
F
F
M
TC
DayCare
F
MCafeteria
Kitchen
Data Cabling Video SecurityHVAC Cabling
Backbone Cabling
Access Control Cabling
Zone Enclosures
Enterprise Solution
Quick Server Deployment
1. SAN Isolation
Data Centre -Zone Distribution Area Layout
Connected Building Brochure •Leverage real-time information •Reduce infrastructure and systems•Deployment of platform-agnostic, open architecture.•Deliver high degree of system availability and reliability•Converge and optimize critical systems•Maximize ROI.•Drive infrastructure and business process improvements•Reduce operational costs and mitigating risk.•Create a sustainable technology infrastructure
Integration Creates Value
Save $60,000 / annum for every 1000 users
Power 0ver EthernetIt is a Managed DC power distribution system
IEEE 802.3af 48volts 350mamps 15watts
IEEE 802.3at51volts 600mamps 24watts
Key is 30 watts per port
Powered Devices - Examples
VoIP Phones
Wireless Access Points
Security Cameras
Access Control
RFID Tracking Devices
Lighting Controllers
Industrial Devices
Smoke & Heat Detectors
Mobile Phone & PDA Chargers
Vending/Gaming Machines
Clocks
5- 8 watts8- 12 watts
10- 12 watts
8- 12 watts
AC UPS
AC
AC-DC
AC-DCDC-AC
DC UPS
AC
Panduit
AC-DC
33% power loss
7% power loss
Green PoE Deployment
Managing Power Distribution -PoE
Power On/Off
Power Off timed
Real Time
Pre- TimedEvent D
riven
UPS utilisation
Building Access
PanduitMidspan
Panduit Customer
800 Staff Call Centre400 Too Hot400 Too Cold
Route CauseDesk Top PC 200 WattsColour Monitor 70 watts
Managed POE reduces energy consumption
Data + POE
Data + POE
Power
Data
Building Access Security
Data
3.5 Watts
7 Watts
15 Watts
<30 Watts
Generic Thin Client solution
Data + POE AT Power+12volts
Data
Building Access Security
Data
3 -8 Watts 15- 18 Watts
Power+5volts
Splitter
Splitter
Data
Airbus A380
Think DifferentValueDC Power Distribution
Watch for OLED
LightingSignageDesk Tops