Designer/Contractor JV- Apron Services Projects- A Winning Case
The KAIA project Case Study
![Page 2: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/2.jpg)
Introduction
The purpose of this presentation is to demonstrate :
• How early Engineer( designer/ Contractor coordination and cooperation can overcome the difficulties encountered
• Highlight unforeseen and foreseen difficulties and challenges encountered in the KAIA project
![Page 3: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/3.jpg)
IntroductionAME- DEP JV KAIA back Ground and Scope of WorkProject Constraints Project Deliverables Project Procurement PlanSystems Design Conclusion
![Page 4: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/4.jpg)
Designer / Contractor JV
• AME Background• DEP Background• AME-DEP JV and history of cooperation• DEP Role in KAIA:DEP is doing design – shop dwgs –
technical procurement submittals – construction management and cost control
![Page 5: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/5.jpg)
Project Background and Scope of Work
• Client : GACA• Main Contractor : Saudi Bin Ladein Group – SBG• Apron Subcontractor – Al Mabani AGC• Apron Services Subcontractor – AME/DEP
![Page 6: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/6.jpg)
Project Background and Scope of Work
1. Potable water treatment plants and potable water piping network from Tech. rooms to pits.
2. Blue water treatment plants and blue water piping from Tech. rooms to toilet pits.
3. Vacuum receiver plants and piping network.
4. PCA air handling units and corresponding under-gound ducting and PCA pits
5. Glycol chilled water plant rooms and networks.
6. GPU 400 Hz system and pits
Scope of Work:
![Page 7: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/7.jpg)
Project Background and Scope of Work
Aprons 17-18-19 and PTB Area in scope
![Page 8: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/8.jpg)
Project Deliverables
• Material Submittals• Design and shop drawings • Method statements• Monthly Progress Reports• O & M manuals • As Built Drawings • Testing and Commissioning Reports• Training • Warranties
![Page 9: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/9.jpg)
Project Constraints
The main constraints challenging AME at this project are the following:
1. The short project duration which is by any standards is very tight for the scope of work at hand .
2. The different layers of upstream parties, mainly the CM and designers , and at a second level Main Contractor and Subcontractors
3. The Various unforeseen changes from the original tender design due to site conditions / project updated requirements / cost and time constraints
4. The delays in design / approvals / material
![Page 10: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/10.jpg)
Project Constraints 5. The difficulty of direct communication between many of
the parties due to contractual constraints
6. The peculiarity of some of the specified items such as:• Vacuum drainage system • Glycol sub cooling method• SS PCA Duct for mobile ACU
7. The interface with other contract packages which could increase the number of unforeseen problems.
![Page 11: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/11.jpg)
Why a Designer on Board is a Winning Case
1. The Complexity of the modern airport systems makes it necessary to do every bit of study and calculations and drawings to achieve a coordinated installation
2. To get seamless relations with the CM which is himself is an engineer
3. The various changes in design during construction due to site conditions requires a designer on board during the construction to find the proper solutions
4. When a Designer is in direct contact with the specialists / suppliers the design will be more customized and more understanding to the equipment strengths and weaknesses.
![Page 12: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/12.jpg)
Examples of Unforeseen Difficulties1. Changes in the Client Requirements2. Suppliers uncontrolled supply delays3. Site level changes and various obstructions4. Differences in Contract requirements interpretations
![Page 13: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/13.jpg)
Project Procurement Plan
AME has prepared a procurement plan relating to time and cash flow to suit the project schedule and technical requirements. The basic elements of this plan are :
1. Establishing a basket of reputable suppliers 2. Providing proper material submittals for approval3. Identifying long lead items and placing orders on time4. Delivering the material on site as per project schedule
![Page 14: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/14.jpg)
H-Project Manpower Histogram
![Page 15: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/15.jpg)
I-Communication Plan
• --
![Page 16: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/16.jpg)
Why Centralized Apron Services
16
tTypical Service– B-777
![Page 17: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/17.jpg)
The Solution….Apron Services
LavatoryBlue H2090 KVA90 KVA PCAirPCAir
Note: Fuel Trucks shown Removed (Hydrant Fueling)
H2O
![Page 18: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/18.jpg)
MARS GATES
• Multi • Aircraft • Ramp• System
![Page 19: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/19.jpg)
Systems Design
19
Vacuum System
![Page 20: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/20.jpg)
Systems Design
Vacuum System
![Page 21: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/21.jpg)
Systems Design
Toilet Pit
![Page 22: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/22.jpg)
Systems Design
Vacuum Lines Profile
![Page 23: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/23.jpg)
Systems Design
Glycol Chilled Water System
![Page 24: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/24.jpg)
Systems Design
Glycol System Configuration
![Page 25: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/25.jpg)
Systems Design
PCA Unit Installation Detail
![Page 26: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/26.jpg)
26
PCAir and Potable Water Pits
PW ReelPit AccessPCA HosesValves
![Page 27: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/27.jpg)
– Thermal Design– Civil works design and installation– Distribution Network– Responsible for Performance– Chiller Supply
Central Glycol Plants
27
![Page 28: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/28.jpg)
Systems Design
Potable Water System
![Page 29: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/29.jpg)
Systems Design
Potable Water System
![Page 30: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/30.jpg)
Systems Design
Blue Water System
![Page 31: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/31.jpg)
Systems Design
Valve Chamber Detail
![Page 32: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/32.jpg)
Service Pits (400 Hz) 32
Systems Design
![Page 33: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/33.jpg)
Systems Design
33
The GPU ApproachPBB Mounted Reels or……Pits
![Page 34: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/34.jpg)
Conclusion
An early designer intervention and close cooperation with the specialist / contractor is a key factor in the project success
![Page 35: Designer/Contractor JV- Apron Services Projects- A Winning Case The KAIA project Case Study.](https://reader036.fdocuments.us/reader036/viewer/2022062315/5697c0101a28abf838ccafe9/html5/thumbnails/35.jpg)
Thank You