Design Portfolio

52
K A R A WETZEL P o r t f o l i o

description

Design Portfolio

Transcript of Design Portfolio

Page 1: Design Portfolio

KA

RA

WETZEL

Po

rt

fo

li

o

Page 2: Design Portfolio
Page 3: Design Portfolio

Table Of

Contents

1. Market 2. Housing 3. Construction Tech 4. NICU 5. Incubator 6. Modular Ecology 7. Critical Care Tower 8. Final Study 9. Fabrication10. Professional Work11. CV

Page 4: Design Portfolio

Market- Fall 2009Using a pattern develop a canopy system for the Bidwell Farmer’s Market. A system of canopy’s and floors/seat-ing/ shelving that takes over site by connecting to trees. As Trees die the site opens up once again for soccer and frisbee. Develop a masterplan for million Sq ft site in pitts-burgh. Design the market for the site. Using one surface to create the walls and celing developed from the pattern and translated into the floor.

1. Pattern, floor and roof plan2,3. Photo collages4,5,6. section model

2 3 1 4

5 6

Page 5: Design Portfolio

1. Pattern, floor and roof plan2,3. Photo collages4,5,6. section model

2 3 1 4

5 6

Page 6: Design Portfolio

1. Hourly usage diagram2. Seasonal Usage Diagram3. Weekly Usage Diagram4. Model5. Slice Model6. Model

1 4 2 5 3 6

Page 7: Design Portfolio

1. Hourly usage diagram2. Seasonal Usage Diagram3. Weekly Usage Diagram4. Model5. Slice Model6. Model

1 4 2 5 3 6

Page 8: Design Portfolio

Housing- Fall 2010On a parkinglot in downtown buffalo create 24 units of housing and a public program. Skating rinks were the public program with housing lifted 40 feet off the ground to allow visual acsess to both rinks and complete the urban square the already existed. The stair towers frame the view of the rink from street level. The thinness allows for passive solar heating and maximum natural light on the south facade.

1. Site Plan2. Floor Plans3. ground plan 04. Ground Plan -205. Ground Plan -406. Partial Floor Plan 17. Partial Floor Plan 2

2 3 4 5 1 6 7

Page 9: Design Portfolio

1. Site Plan2. Floor Plans3. ground plan 04. Ground Plan -205. Ground Plan -406. Partial Floor Plan 17. Partial Floor Plan 2

2 3 4 5 1 6 7

Page 10: Design Portfolio

1. Partial Elevation2. SE Render3. E/W Section4. South Elevation5. Partial Section6. South Night Render7. NW Render 1 2 3

4 5 6 7

Page 11: Design Portfolio
Page 12: Design Portfolio

1. Structural Drawings2. South Facade Study Model3. South Facade Study Model4. Construction Details 5. North Facade Model6. Structure Model

4 1 2

3 5 6

Page 13: Design Portfolio

A. Wall Detail1” Floor Finish8” concrete slabSteel I Beam5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200

B. Window jamb Detail5/8” Interior Gypsum Board6” Metal Studs6” Window Frame1/2” Sliding Glass Panels1/8” Galvanized Steel Sill5/8” Exterior Gypsum Board3” rigid Insulation

C. Wall DetailDrop Ceiling5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200

D. Window header Detail5/8” Interior Gypsum Board6” Metal Studs6” Window Frame1/2” Sliding Glass Panels5/8” Exterior Gypsum BoardWeep Hole3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200

E. Wall Detail1” Floor Finish8” concrete slabSteel I Beam8” Mechanical Space1” GirtsDrop Ceiling5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts

L. Wall DetailCMU Party Wall5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200

K. Window Detail5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum BoardVapor Barrier3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-2001/8” Galvanized Steel End Cap6” Window Frame

J. Wall Detail5/8” Interior Gypsum BoardFire Proofed Steel I Beam6” Metal Studs5/8” Exterior Gypsum BoardVapor Barrier3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-2001/8” Galvanized Steel Corner

H. Wall Detail4” Double Layer Poly Carbonate Wall Panel 5/8” Interior Gypsum BoardFire ProofedSteel I Beam6” Metal Studs5/8” Exterior Gypsum BoardVapor Barrier3” rigid Insulation1” Vertical Girts

G. Stair DetailFire Proofed Steel I Beam4” Double Layer Poly Carbonate Wall Panel

F. Roof Detail2” Dirt4” Gravel10” Concrete Slab8” Mechanical Space1” GirtsDrop Ceiling7/8” Metal panel CS-6604” Double Layer Poly Carbonate Wall Panel

Page 14: Design Portfolio

Construction tech - Spring 2010Draw an Axonometric construction detail of a ma-sonry building and a steel framed building from a set of construction documents include a specifica-tion list.

1. Coniber Shel House2. Menefee Cabin

1 2

Page 15: Design Portfolio
Page 16: Design Portfolio

NICU- Fall 2011Design an open bay and Single Family Room Neo-natal Intensive Care Unit by remodeling the exist-ing unit. - Provide spaces for single family units and open bay areas- Provide positive distractions for the family- Decrease nurse stress

1. Single Family Room Layout2. Family social Area- render3. Single Family Room- render4. Floor Plan5. View from nurses station

4 1

2 3 5

Page 17: Design Portfolio

1. Single Family Room Layout2. Family social Area- render3. Single Family Room- render4. Floor Plan5. View from nurses station

4 1

2 3 5

Page 18: Design Portfolio

Incubator- Fall 2011Redesign the incubator working in groups with industrial engi-neering students for General Electric.

Features- telescoping arms - moveable tray - sound monitor - gesture recognition - Smart Glass Hood - UV Sanitation - Live Video Feed - Moveable screen - Storage -Touch Screen Display

1. Right Elevation2. Rear Elevation3. Current Incubator4. Telescope boom render5. Screen Render6. Render7. Preemie in incubator

3 6

5 1 2 4 7

Page 19: Design Portfolio
Page 20: Design Portfolio

Modular Ecology- Fall 2011Ecological design creates a building that not only generates its own power in a responsible manner, but also deals with its waste products responsibly allowing it to be completely self-sufficient. Designing with a module allows for a non-site specific building enabling everyone to live sustainably. The module is an easily repeatable, manufactured unit thatallows for multiple configurations. For the Earth to sustain life in the future, we must adopt this concept of building. As architects this approach should be reflected in all of our projects.

1,2,3,10,11,12. Floor Plans4. Section e/w5. SW perspective Render6. Site Analysis7. South Facade Render8. Section N/S9. West Facade Render

1 6 10 2 4 8 11 3 5 7 9 12

Page 21: Design Portfolio
Page 22: Design Portfolio

Lake Bryan, TX 1,2,8,9. Floor Plans3. Section E/W4. Site Analysis5. East Facade Render6. Section N/S7. SE Perspective Render

6 1 8 3 4 2 5 7 9

View to Woods

Noise From Parking Lot

Noise Camping Area

Page 23: Design Portfolio

View to Lake

Noise From Camping Area

Wind Flow

Page 24: Design Portfolio

Critical Care Tower- SPRING 2012An addition to an exisiting hospital in Katy, TX. The idea was to create a stepped building that connected to exist-ing Hospital.

1. Site Plan2. Floor Plan3. ne perspective

2 1 3

Page 25: Design Portfolio
Page 26: Design Portfolio

1. Section2. PT Room Plan3. PT Room

2 1 3

Page 27: Design Portfolio
Page 28: Design Portfolio

Final Study- Spring 2013The MORGAN CENTER- A pre-school for immune compromised children located in the medical center district of Houston, Texas. This is a place for these children to go to when they are healthy enough to leave the hospital, but not attend school. This is a place for cognitive, social, and gross motor develop-ment to occur. The other half of the site is a park that can be used by the public and is an extension of the Bayou park system.

1. First floor plan of Preschool2. Site Plan

2 1

Page 29: Design Portfolio
Page 30: Design Portfolio

1. NW-SW Section2. Perspective3. Interior4. Program Diagram

1 3 2 4

Page 31: Design Portfolio
Page 32: Design Portfolio

1. Reading Room2. Park across Bayou View3. Park to Campus view4. Nightshot

1 4 2 3

Page 33: Design Portfolio
Page 34: Design Portfolio

Fabrication- Fall 2011“BLACK NARCISSUS”- Group Design Project that was in-stalled in a local restaurant. I helped with the packing of files and fabrication of the 1,000 pieces and construction.

1. Middle Section2. Air Flow Diagram3. Closeup 4. Flowers5. Conifer6. Left Section7. Conifer

3 4 1 5 2 6 7

Page 35: Design Portfolio
Page 36: Design Portfolio

Fabrication- Fall 2012“Pop-Op”-Group Design Project that was installed in Texas A&M Bright Building. It is a kinetic piece of art. I helped with the packing of files and fabrication of the pieces, the wiring and construction.

1. Wall2. Flower Wiring3. Flower4. Wall5. Close-up of wall

4 3 1 2 5

Page 37: Design Portfolio
Page 38: Design Portfolio

Professional work - 2013 - 2015HHS Masterplans- Ben Taub and LBJ Hospitals The focus of these two projects was to to look at LBJ as a whole and determine the best utilization of space based on current volumes and future growth of the hospital depart-ments. At Ben Taub the focus was to determine the best use of the square footage on the second floor for an OR Suite.

My responsibilities included diagrams, forecasting, assembling the document and attending meetings with the clients.

1. Forecating Cardiology2. Space Projections for Cardiology3. Diagram of Second Floor Concept

2 1 3

Ben Taub General Hospital Master Plan, FKP Architects, Feb 2014

4141

Cardiac Catheterization LabCARDIOLOGY VOLUME – HISTORICAL AND PROJECTED

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

PatientsEnrolled inRemoteMonitoring

Clinic Visits

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Stress Test

Holter

Nuclear

ECHO

Department 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

ECHO Volume 6,616 8,177 8,825 9,106 10,211 11,022 11,834 12,646 13,458Nuclear Volume 2,614 3,037 2,853 2,346 2,466 2,367 2,268 2,169 2,070Holter Volume 208 865 1,095 1,172 1,346 1,712 1,970 2,229 2,487 2,745Stress Test Volume 158 632 921 3,960 3,620 3,280 2,940 2,600 2,260 1,920EKG Volume 8,547 37,921 65,259 66,685 67,410 93,111 99,837 111,090 122,343 133,596

Cath

Cardiac Cath Procedures 1297 1831 1769 1647 1,883 1,982 2,081 2,179 2,278

EP Cases Procedures 216 246 282 270 303 323 343 362 382

Clinic

Clinic Patients Visits 6,835 9,444 10,877 9,265 11,286 12,158 13,031 13,903 14,775Patients Enrolled in Remote Monitoring

Number90 180 375 480 623 759 896 1,032 1,169

Notes:

The volume includes Nuclear.

This volume includes Ben Taub inpatient units, Ben Taub EC, Baylor clinics and Quentin Mease

Key Driver Type

Future ProjectionsHistorical Volume

Page 39: Design Portfolio

1. Forecating Cardiology2. Space Projections for Cardiology3. Diagram of Second Floor Concept

2 1 3

Ben Taub General Hospital Master Plan, FKP Architects, Feb 2014

5656

Space Projections – Cardiology

5 Rooms

DGSF

2,000 Visits / 1,400 DGSF

1,500 Visits / 750 DGSF

High Throughput

Low Throughput

7 Rooms - 9,240 DGSF

9 Rooms – 6,729 DGSF

ECHO

Existing Conditions

Existing Conditions Industry StandardIndustry Standard 5 Year Need5 Year Need

NUCLEAR CARDIOLOGY

2 Rooms

996 DGSF

2,000 Visits / 1,000 DGSF

1,000 Visits / 800 DGSF

High Throughput

Low Throughput

1 Rooms – 1,035 DGSF

2 Rooms – 1,656 DGSF

1 Rooms

59 DGSF

6,500 Visits / 750 DGSF

3,500 Visits / 750 DGSF

High Throughput

Low Throughput

1 Rooms – 317 DGSF

1 Rooms – 588 DGSF

HOLTER

3 Rooms

DGSF

1,200 Visits / 1,400 DGSF

1,000 Visits / 1,000 DGSF

High Throughput

Low Throughput

6 Rooms – 8,477 DGSF

7 Rooms – 7,240 DGSF

STRESS TEST

1 Rooms

266 DGSF

6,000 Visits / 1,400 DGSF

3,500 Visits / 750 DGSF

High Throughput

Low Throughput

1 Rooms – 1,680 DGSF

2 Rooms – 1,543 DGSF

EKG

Ben Taub General Hospital Master Plan, FKP Architects, Feb 2014

6868

IR(4 PROCEDURE)

CATH LAB(3 CATH

1 EP)

CENTRAL PREP(20 STATIONS)

(Space for 26 stations)

CENTRAL RECOVERY(27 STATIONS)

(Space for 38 stations)

CENTRAL STERILE PROCESSING

SUPPORTSUPPORT

ORMD

OFF.

M.D.OFF.

M.D.CARDIAC

OFF.

WAITING WAITING WAITING

CONSULTCONSULT

TLT TLT

MECHMECH

MALE LOCKERS

FEMALE LOCKERS

STER.CORE

SUPP

PREP/HOLD

SUPPANESTH. SUPP.OR

CONTROL

MECHELEC

CARIOLOGY CLINIC

(7 EXAM RM)

MECH

ELEC. SWITCH

NUC. MED

(2 SPECT/CT4 STRESS

TESTS)

ELEC

NON-INVASIVE CARDIOLOGY(6 ECHO, 1 EKG,

1 HOLTER, 1 NUC CAM, 1 CT/SPECT)

TRAUMA

THORACIC / VASCULAR

NEURO

THORACIC/ VASCULAR

HYBRID

HYBRID??

ORTHO

ORTHO

TRAUMA

GENERAL+ GYN ONC

CONNECTION TO BT TOWER

GENERAL+ GYN ONC

SUPP

ST

AFF

PU

BLI

C

PU

BLI

C

RECEP.

Master Plan Recommendations Level 2

Level 2 – Concept Diagram

Page 40: Design Portfolio

HHS Ben Taub Specialty ClinicsThe program for this project was to move the current specialty clinics to allow for growth and better flow. The team and I worked with the users from programming through CD phases of the project.

My responsibilities included forecasting for future growth dur-ing programming, SD-CD drawings, and coordinating with MEP, equipment and signage consultants.

1. Elevations 2. Audiolgy Department Floor Plan3. Typical Clinic Exam Room Perspective4. Typical Clinic Exam Room Perspective5. Typical Clinic Exam Room Floor Plan

3 1 2 4 5

ALIG

N

4' -

8"

0' - 6" 2' - 0"

215

338

232EQ EQ

0' - 3"0' - 3"

5' -

0"

901

0' - 7"0' - 6" 2' - 0"

W1224 W1224 W1224

C1824C1824 C6024

EQ REFER TO PLAN EQ

216 255

254

260

0' - 6"0' - 6" 5' - 4"

1' - 3"0' - 6"1' - 2"0' - 6"1' - 3"0' - 6" 1' - 6" 2' - 3" 0' - 6"

333333333222

301301301

C1030

0' - 6"1' - 0"

1CB24

W1230 W1236

CEILINGENCLOSURE

14D

317

254312 255

261

901

0' - 9" 1' - 9" 4' - 6"

1' - 9"

222316314315310

318

2' - 10"

901

1' - 0"0' - 9"0' - 9" 2' - 11"

3' - 0" 3' - 9"

333333

901

0' - 6"0' - 10" 0' - 6"0' - 6"3' - 0"

214

255

334

C1833C6024

7CB24

W1224 W1233

CEILINGENCLOSURE

14D

254

901

1' - 7"

0' - 6" 2' - 0" 0' - 6" 2' - 2" 0' - 8"1' - 2" 2' - 2" 0' - 6"1' - 1" 2' - 2" 0' - 6"1' - 3"

2' - 6" 3' - 0" 3' - 0" 1' - 6" 3' - 0"

W1230V W1230V W1230V W1230V W1230V W1230V

221 221 221224224225 217

338338 338

221

901

229

254

221

901

5' - 0" 2' - 2"

0' - 6"0' - 8"0' - 6"

2' - 2" 3' - 0"

214 221 225

901

3' - 0" 0' - 6"0' - 6" 4' - 5" 0' - 6" 1' - 2" 0' - 6" 2' - 0" 0' - 6"

214229 216

217

1DB24

C1830C1830C1830

901

255

254305

312

333

261

901

1' - 2"2' - 11"

0' - 6"0' - 6" 4' - 5"

1' - 5" 0' - 6" 2' - 9" 0' - 6" 1' - 6"

222

301301301

333333

333333

901

F3248

CEILINGENCLOSURE

24D

333

901

0' - 6"0' - 6" 5' - 6"

0' - 6"0' - 6" 4' - 0" 0' - 6"0' - 6" 3' - 0"

310

333333

222

301301301

901

3' - 8"

310

333333

901

4' - 2"

317318

312 254 255338

261

W1230

CEILINGENCLOSURE

14D

901

1' - 8"1' - 5"5' - 0"

338

222

901

901

338

0' - 6" 3' - 6" 0' - 6" 2' - 8"

1' - 8" 0' - 6" 4' - 9" 0' - 6" 2' - 1" 1' - 0"

338

901

1' - 6" 0' - 6" 2' - 9" 0' - 6" 1' - 6" 2' - 0" 0' - 6"

901

338

EQEQ

0' - 3"0' - 3"

5' -

6"6'

- 0"

0' - 6" 6' - 6"

901

338

2' - 6"0' - 6"3' - 6"0' - 6"

901

338

337

1' - 8"

0' - 6" 1' - 9" 0' - 6"1' - 0" 3' - 3"

901

338

0' - 6"1' - 3"0' - 6"1' - 6"0' - 9"

901

338

333

W1230V W1230V

PROJECT NAME

PROJECT NUMBER

ISSUE

DATE

DRAWING TITLE

DRAWING NUMBER

2014 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©

A

B

C

D

E

6 5 4 3 2 1

|Houston Dallas

ARCHITECT OF RECORD

INTERIM REVIEW ONLY

Not to be used forregulatory approval,permit, or construction.

RICHARD M. HARRIS

DATE:

1502 TAUB LOOP, TEXASMEDICAL CENTER,HOUSTON, TX, 77030

35006.00

LEVEL 5ELEVATIONS

A6.8

BEN TAUB TOWERSPECIALTY CLINICS

50% CONSTRUCTIONDOCUMENTS

12/19/2014

12/19/2014

9240 KIRBY, HOUSTON,TEXAS 77064

3/8" = 1'-0"B6 542 TEAM ROOM D SOUTH

3/8" = 1'-0"D2 537F WORK AREA WEST

3/8" = 1'-0"A2 536 ENT EXAM SOUTH 3/8" = 1'-0"A3 536 ENT EXAM NORTH

3/8" = 1'-0"A4 536 ENT EXAM EAST 3/8" = 1'-0"A5 536 ENT EXAM WEST

3/8" = 1'-0"C3 531 NURSE STATION C SOUTH 3/8" = 1'-0"C4 531 NURSE STATION C NORTH

3/8" = 1'-0"C5 531 NURSE STATION C EAST 3/8" = 1'-0"C6 531 NURSE STATION C WEST

3/8" = 1'-0"D4 501A CHECK-IN SCHEDULING NORTH

3/8" = 1'-0"E3 SOILED UTILITY PLAN SOUTH

3/8" = 1'-0"A6 526 ENT EXAM SOUTH

3/8" = 1'-0"D3 531A CLEAN SUPPLY WEST

3/8" = 1'-0"B4 538 SPEECH/ENT EXAM NORTH 3/8" = 1'-0"B3 538 SPEECH/ENT EXAM EAST

3/8" = 1'-0"B2 538 SPEECH/ENT EXAM SOUTH 3/8" = 1'-0"B5 538 SPEECH/ENT EXAM WEST

3/8" = 1'-0"C2 542 TEAM ROOM D EAST

3/8" = 1'-0"D6 540 SPEECH CONSULT

3/8" = 1'-0"E6 543 TEAM ROOM E WEST 3/8" = 1'-0"E5 535 TEAM ROOM C NORTH

3/8" = 1'-0"E4 535 TEAM ROOM C SOUTH 3/8" = 1'-0"E2 537E CONTROL SOUTH

3/8" = 1'-0"D5 537B CONTROL SOUTH

214 FLOOR COPIER, SEE ELECTRICAL.215 PRINTER, MULTI-FUNCTION WITH FAXING CAPABILITIES, SEE

ELECTRICAL.216 PRINTER, HIGH VOLUME 5460 LASER, SEE ELECTRICAL.217 PRINTER, LABEL, SEE ELECTRICAL.221 COMPUTER WORKSTATION, THIN CLIENT, SEE ELECTRICAL.222 PROXIMITY STATION, PROVIDE BLOCKING PER DETAIL XX/XX.XX, SEE

ELECTRICAL.224 PHONE, SEE ELECTRICAL.225 EMERGENCY PHONE, SEE ELECTRICAL.229 CARD READER LOCATION, SEE ELECTRICAL AND DOOR HARDWARE.232 32" MONITOR, WALL MOUNTED, CENTER OF SCREEN AT 60" A.F.F.,

PROVIDE IN WALL BACKING, SEE XX/XX.XX AND ELECTRICAL.254 PAPER TOWEL DISPENSER, OFCI.255 SOAP DISPENSER, OFCI.260 SINK, SEE PLUMBING.261 SINK, ACCESSIBLE, SEE D2/A11.6 AND PLUMBING.301 OUTLETS, MEDICAL GAS, SEE INTERIOR ELEVATIONS AND PLUMBING.305 CLINICAL SINK. SEE PLUMBING.310 SHARPS. OFCI.312 GLOVE DISPENSER. OFCI.314 OTO./OPHTHALMOSCOPE SET, SEE EQUIP. DRAWINGS.315 OTOSCOPE TIPS, SEE EQUIP. DRAWINGS.316 BLOOD PRESSURE CUFF, SEE EQUIP. DRAWINGS.317 TRASH RECEPTACLE, SEE EQUIP. DRAWINGS.318 BIOHAZARD RECEPTACLE, SEE EQUIP. DRAWINGS.333 SCHEDULED EQUIPMENT, SEE EQUIP. DRAWINGS.334 PYXIS MACHINE W/UNDERCOUNTER REF.337 MARKERBOARD, SEE FURNITURE DRAWINGS.338 SCHEDULED FURNITURE, SEE FURNITURE DRAWINGS.901 SCHEDULED BASE.

A1 KEYED NOTES TO SHEET

3/8" = 1'-0"C1 531 NURSE STATION C

3/8" = 1'-0"D1 531 NURSE STATION C

UPUPUPUP

EXAM 5

530

SPEECH THERAPY

540

ENT/SPEECH

538

PATIENT TOILET

529

TEAM ROOM C

535

NURSE STATION C

531

SOUND BOOTH

537B

PATIENT TOILET

533

ADMIN. ASSISTANT

544

SOUND BOOTHCONTROL

537E

CLEAN SUPPLY

531A

DR. CHEN

541

SOILED HOLDING

539

SOUND BOOTHCONTROL

537A

WAITING (42)

512

EXAM 8

536

EXAM 7

534

EXAM 6

532

TEAM WORK

542

SOILEDEQUIPMENTCOLLECTION

545

STAFF LOUNGE

546

SOUND BOOTH

537D

SOUND BOOTH

537C

TEAM WORK

543

ELECTRICAL

504

IT/IDF

503

TOILET

548

TOILET

547

18

19

20

21

G K

I

J

TANK STORAGE

549

STAIR -G

500-G

CORRIDOR

537

VACUUM PUMP

550

A6.7A6

CORRIDOR

500.05

CORRIDOR

500.10

CORRIDOR

500.15

CORRIDOR

500.20

A6.8

A3

A4

A2

A5

A6.8

A6.8

C3

C4

C6 C5

DIRECTOR OFSPECIALTY CLINICS

544A

1

WORK AREA

537F

A6.8D2

2

8

4' -

0"

5' - 6"

A6.8

B6

W1230 W1236

W1230

C1030

F3248

B6

/MATCHLINE - SEE DRAWING A6 A2.5B

D3

A6.8B5

B4

B3

B2

542

543

544

544A

548

547

546

545

13.3

S

13.3 S

13.3

S

13.3 S

13.3 S

1.3

S

11.6

S

11.3

1.3

S

1.3 S

13.3

HOLD8' - 0"

CLEAR5' - 0"

500.10

537A

541

540

537E

539

535

536

538

1.3

1.3

1.3

S

1.3 S

1.3

S

1.3 S1.3 S

3.3

S

11.1

1.31.3

1.3

1.3

1.3

S

1.3 S

1.3

S

1.3 S

1.3 S

1.3

S

1.3 S

13.3

1.3

S

1.3

S

1.3 S

13.3 S

13.3

S

1.3

1.3

S

11.3

11.3

1.3

531A

A

531AB

13.3

13.3

S13

.3 S

13.6

S

13.6

S

13.6

S

13.6 S 13.3 S

13.3 S

13.3 S

534

532

1.6

S

1.3 S

3.3

S

13.3

1.3

1.3 S

530

529

1' -

1"

229 229

229

221221

3CB24

255254255

206

229

255

254

221

226

221 226

221226

216

231

221

220

221 221

221

252

221

221

221

220

233

215

261

260

201

214

229

220224

221 221224 224

255

254

261

312318

317

310301301301

1CB24

301301301 222

312 254255

261

317

318

310

316

314

315

245

245

245

338

222

333333333

338

338

338

338

215

221224

224

338

249

249

HOLD6' - 0"

214

334

254

2557CB24

W1224W1233

C1833 C6024

221221 221 221224224

224

225

217

W1230V W1230V W1230V W1230V W1230V W1230V

229

229

219

C18

33C

1833

C31

361C

B24

C1830

C18

33

W12

33W

1233

W12

36

333333333

255

254

260

333

333

A6.8 C1

A6.8

D1

A6.8

D6

A6.8

E5

E4

A6.8

E2

A6.8

D5

A6.8E6

C2

A6.9 D6

D5

A6.9

1

2

B

A

D

C

PLAN NORTH

EXISTING NOT IN CONTRACT

PROJECT NAME

PROJECT NUMBER

ISSUE

DATE

DRAWING TITLE

DRAWING NUMBER

2014 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©

A

B

C

D

E

6 5 4 3 2 1

|Houston Dallas

ARCHITECT OF RECORD

INTERIM REVIEW ONLY

Not to be used forregulatory approval,permit, or construction.

RICHARD M. HARRIS

DATE:

1502 TAUB LOOP, TEXASMEDICAL CENTER,HOUSTON, TX, 77030

35006.00

FLOOR PLAN LEVEL5 AREA A

A2.5A

BEN TAUB TOWERSPECIALTY CLINICS

50% CONSTRUCTIONDOCUMENTS

12/19/2014

12/19/2014

9240 KIRBY, HOUSTON,TEXAS 77064

1/4" = 1'-0"A6 LEVEL 5 A

A. INFORMATION SHOWN OR REFERENCED ON ENLARGED AND/OR 1/4”SCALE DRAWINGS WILL GENERALLY NOT BE SHOWN ON THE SMALLERSCALE DRAWINGS.

B. PARTITION TYPES ARE SCHEDULED ON PLANS BY NUMBER. SEE THE"GENERAL NOTES TO PARTITION TYPES" ON __/___ AND PARTITIONTYPES ON SHEET A___ FOR THE DEFINITION OF PARTITION TYPEREFERENCES KEYED ON PLANS.

C. FIELD COORDINATE ALL FIELD ROUTED PIPE, CONDUIT RUNS, ETC.,WITH LOCATIONS OF RECESSED ACCESSORIES AND EQUIPMENT. INTHE EVENT OF A CONFLICT, ACCESSORY LOCATIONS TAKEPRECEDENCE.

D. CLOSE ALL JOINTS BETWEEN PLUMBING FIXTURES/ACCESSORIES ANDDISSIMILAR MATERIALS W/SEALANT (I.E. BETWEEN SINKS ANDCOUNTERTOPS, TOILET FIXTURES AND ACCESSORIES TO WALL, ETC.)

E. CABINET NUMBERS NOTED ON ENLARGED PLANS REFER TO CABINETCOMPONENT NUMBERS, FIXTURES, ACCESSORIES, ETC. THAT AREDEFINED OR ELEVATED ON SHEET _____ UNLESS SPECIFIC DETAILREFERENCES ARE KEYED.

F. PLAN DIMENSIONS ARE TO FINISHED FACE OF PARTITIONS ANDGENERALLY ARE TIED TO A COLUMN CENTERLINE UNLESSSPECIFICALLY SHOWN CENTERED ON A PARTICULAR BUILDINGELEMENT I.E. A CHASE WALL, WINDOW MULLION, ETC.

G. FOR VERTICAL MOUNTING HEIGHTS OF SHOWER ACCESSORIES, SEEDETAIL _________.

H. FOR VERTICAL MOUNTING HEIGHTS OF TYPICAL TOILET STALLACCESSORIES, SEE DETAIL _________.

I. FOR VERTICAL MOUNTING HEIGHTS OF ACCESSIBLE TOILET STALLACCESSORIES, SEE DETAIL _________.

J. FOR VERTICAL MOUNTING HEIGHTS OF TYPICAL RESTROOMACCESSORIES, SEE DETAIL __________.

K. FOR VERTICAL MOUNTING HEIGHTS OF ACCESSIBLE ACCESSORIES ATRESTROOMS, SEE DETAIL __________.

L. FOR VERTICAL MOUNTING HEIGHTS OF SERVICE ACCESSORIES, SEEDETAIL __________.

M. FOR PARTIAL ENLARGED PLAN AT JANITOR CLOSETS, SEE DETAIL__________.

N. PUBLIC/HANDICAPPED RESTROOM GRAPHICS WILL BE FURNISHEDAND INSTALLED BY THE OWNER’S GRAPHICS SUPPLIER.

O. STANDARD EQUIPMENT WALL MOUNTING HEIGHTS, SEEDETAIL_______.

P. MEDICAL EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL_______.Q. FIRE PROTECTION EQUIPMENT WALL MOUNTING HEIGHTS, SEE

DETAIL_____.R. COMMUNICATION EQUIPMENT WALL MOUNTING HEIGHTS, SEE

DETAIL_____.S. EQUIPMENT MOUNTING HEIGHTS AT COUNTERTOPS, SEE

DETAIL_____.T. EQUIPMENT MOUNTING HEIGHTS AT DESKTOPS, SEE DETAIL_____.

D1 GENERAL NOTES TO PLANS

A1 KEY PLAN LEVEL 5

B1 LEGEND

C1 KEYED NOTES TO SHEET

201 FIRE EXTINGUISHER AND CABINET, SEE DETAIL B6/A11.3.206 EYE WASH AT SINK, SEE PLUMBING.214 FLOOR COPIER, SEE ELECTRICAL.215 PRINTER, MULTI-FUNCTION WITH FAXING CAPABILITIES, SEE

ELECTRICAL.216 PRINTER, HIGH VOLUME 5460 LASER, SEE ELECTRICAL.217 PRINTER, LABEL, SEE ELECTRICAL.219 COMPUTER WORSTATION CONNECTED TO 42" MONITOR220 COMPUTER WORKSTATION WITH CD-ROM DRIVE, SEE ELECTRICAL.221 COMPUTER WORKSTATION, THIN CLIENT, SEE ELECTRICAL.222 PROXIMITY STATION, PROVIDE BLOCKING PER DETAIL XX/XX.XX, SEE

ELECTRICAL.224 PHONE, SEE ELECTRICAL.225 EMERGENCY PHONE, SEE ELECTRICAL.226 TRANSLATOR PHONE, SEE ELECTRICAL.229 CARD READER LOCATION, SEE ELECTRICAL AND DOOR HARDWARE.231 42" MONITOR, WALL MOUNTED, CENTER OF SCREEN AT 60" A.F.F.,

PROVIDE IN WALL BACKING, SEE XX/XX.XX AND ELECTRICAL.233 32" MONITOR, WALL MOUNTED, TOP OF MONITOR AT 7'-8" A.F.F.,

PROVIDE IN WALL BACKING, SEE XX/XX.XX AND ELECTRICAL.245 TYPICAL ENT EXAM ROOM, SEE EXAM ROOM # 536, SHEET A2.5A FOR

TYPICAL/SIMILAR LAYOUT.249 SINGLE USER TOILET. SEE DETAIL XX/XX.XX FOR ACCESSORIES

ONLY.252 OUTLETS AT FLOOR LEVEL, PROVIDE ANODIZED ALUMINUM

RACEWAY, SEE ELECTRICAL.254 PAPER TOWEL DISPENSER, OFCI.255 SOAP DISPENSER, OFCI.260 SINK, SEE PLUMBING.261 SINK, ACCESSIBLE, SEE D2/A11.6 AND PLUMBING.301 OUTLETS, MEDICAL GAS, SEE INTERIOR ELEVATIONS AND PLUMBING.310 SHARPS. OFCI.312 GLOVE DISPENSER. OFCI.314 OTO./OPHTHALMOSCOPE SET, SEE EQUIP. DRAWINGS.315 OTOSCOPE TIPS, SEE EQUIP. DRAWINGS.316 BLOOD PRESSURE CUFF, SEE EQUIP. DRAWINGS.317 TRASH RECEPTACLE, SEE EQUIP. DRAWINGS.318 BIOHAZARD RECEPTACLE, SEE EQUIP. DRAWINGS.333 SCHEDULED EQUIPMENT, SEE EQUIP. DRAWINGS.334 PYXIS MACHINE W/UNDERCOUNTER REF.338 SCHEDULED FURNITURE, SEE FURNITURE DRAWINGS.

Page 41: Design Portfolio

Dept. Rep. Date As Shown As Noted

DESIGN DEVELOPMENT

PROJECT INFORMATION

Project #:

Date:

Scale:

INTERIM REVIEW ONLY.Not to be used for regulatory approval, permit, or construction.

RICHARD M. HARRIS

DATE:

ARCHITECT OF RECORD:

2014 FKP Architects, Inc. All rights reserved. No part of the document may be reproduced or utilized in any form without prior written authorization of FKP Architects,Inc.

C

35006.00EXAM OPTION 2BT TOWER SPECIALTY CLINICS

10/27/1410/27/14

2 OPTION 2 VIEW 2

3 OPTION 2 VIEW 31 OPTION 2 AXO

106 SFEXAM 12

387

GEN. SURG.

119 SFEXAM 13

389

GEN. SURG.

FAMILY CHAIRS

BIOHAZARD RECEPTACLE

EXAM TABLEOTOSCOPE TIPSOTOSCOPEBLOOD PRESSURE CUFF

A3.14 2

5

4

3

LINEN HAMPER

GLOVE DISPENSER

PRINTER CABINET

SOAP DISPENSERWALL MOUNTED SINKPAPER TOWEL DISPENSERTRASHSHARPS

PRINTER

3' - 4"3' - 4"

3' - 4"

FAMILY CHAIRS

WALL MOUNTED COMPUTER

CARD READER

BLOOD PRESSURECUFF

EXAM TABLE

WALL MOUNTEDCOMPUITER

EXAM TABLE

BLOODPRESSURE CUFFOTOSCOPEOTOSCOPE TIPS

BIOHAZARD RECEPTACLE

WALL MOUNTEDCOMPUTER

PAPER TOWEDISPENSER

LINEN HAMPER

WALLMOUNTED SI

PRINTERCABINET

BIOHAZARDRECEPTACLE

PRINTER

GLOVE DISPENSERSOAP DISPENSERWALL MOUNTED SINK

SHARPSPAPER TOWEL DISPENSER

TRASHRECEPTAC

Dept. Rep. Date As Shown As Noted

DESIGN DEVELOPMENT

PROJECT INFORMATION

Project #:

Date:

Scale:

INTERIM REVIEW ONLY.Not to be used for regulatory approval, permit, or construction.

RICHARD M. HARRIS

DATE:

ARCHITECT OF RECORD:

2014 FKP Architects, Inc. All rights reserved. No part of the document may be reproduced or utilized in any form without prior written authorization of FKP Architects,Inc.

C

As indicated

35006.00EXAM OPTION 2BT TOWER SPECIALTY CLINICS

10/27/1410/27/14

1/4" = 1'-0"1 TYPICAL EXAM OPTION 2

3/8" = 1'-0"2 EXAM NORTH WALL

3/8" = 1'-0"3 EXAM EAST WALL

3/8" = 1'-0"4 EXAM SOUTH WALL

3/8" = 1'-0"5 EXAM WEST WALL

Dept. Rep. Date As Shown As Noted

DESIGN DEVELOPMENT

PROJECT INFORMATION

Project #:

Date:

Scale:

INTERIM REVIEW ONLY.Not to be used for regulatory approval, permit, or construction.

RICHARD M. HARRIS

DATE:

ARCHITECT OF RECORD:

2014 FKP Architects, Inc. All rights reserved. No part of the document may be reproduced or utilized in any form without prior written authorization of FKP Architects,Inc.

C

35006.00EXAM OPTION 2BT TOWER SPECIALTY CLINICS

10/27/1410/27/14

2 OPTION 2 VIEW 2

3 OPTION 2 VIEW 31 OPTION 2 AXO

Page 42: Design Portfolio

Dayton Children’s HospitalThe program was to design a data center/ central plant for the campus and a new 7 story tower to go on the existng campus in a courtyard that had buildings on the three sides.

My responsibilities included exterior brick design on the data center and on tower, preliminary renders, SD and DD drawing sets for exterior package, interior floor patterns, and interior boards during SD.

1. S/W Extreior Render2. South Elevation3. Enlarged Elevation4. Wall Section

2 4 1 3

Page 43: Design Portfolio

LEVEL 1100' - 0"

LEVEL 2E112' - 8"

LEVEL 2119' - 0"

LEVEL 3E125' - 4"

LEVEL 4138' - 0"

LEVEL 5153' - 0"

LEVEL 6168' - 0"

LEVEL 7183' - 0"

LEVEL 8198' - 0"

LEVEL 9213' - 0"

ROOF233' - 0"

65432

BASEMENT84' - 0"

1 2.6 3.5 4.4 5.4

A5.13C6

A5.13A6

A5.13C3

A5.13A3

13a12a

11a10a

9a

8a1.7

A.B. LAST NAMELICENSE #

EXPIRATION DATE 00/00/0000

PRELIMINARYDRAWING

ONLY

NOT TO BEUSED FOR

CONSTRUCTION

ISSUANCES

t h i n k c h a m p l i n . c o m

4 S o u t h M a i n S t . , S t e 1 3 0 0D a y t o n , O H 4 5 4 0 2

T 937.224.4474

Drawn By

Checked By

ProjectNumber

ClientNumber

|Houston Dallas

1400 West Dorothy LaneDayton, OH 45409-1310Tel: 937.224.0861 Fax: 937.224.5777

6305 Centre Park DriveWest Chester, OH 45069Tel: 513.779.7851 Fax: 513.779.7852

3233 Newmark DriveMiamisburg, OH 45342Tel: 937.228.1225 Fax: 937.228.7443

222 Linwood StreetDayton, OH 45405Tel: 937.461.5390 Fax: 937.298.5732

2202 S. Patterson Blvd.Dayton, OH 45409Tel: 937.298.4631 Fax: 937.298.5732

8/26

/201

4 12

:45:

17 P

M

A5.07

NEW PATIENTTOWER

DD

Author

51001.0100

EXTERIOR ELEVATION

3/32" = 1'-0"A6 SOUTH ELEVATION

No. Description Date1 DESIGN DEVELOPEMENT 8/25/2014

1. S/W Extreior Render2. South Elevation3. Enlarged Elevation4. Wall Section

2 4 1 3

LEVEL 5153' - 0"

LEVEL 6168' - 0"

LEVEL 7183' - 0"

LEVEL 8198' - 0"

LEVEL 9213' - 0"

5432 2.6 3.5 4.4

ELEVATOR ROOF218' - 0"

GL-3 GL-3 GL-3 GL-3

GL-2GL-2 GL-2 GL-2

GL-3 GL-3GL-3GL-3

GL-2 GL-2 GL-2 GL-2

GL-3 GL-3

GL-2GL-2 GL-2 GL-2

GL-3GL-3

GL-3 GL-3

GL-2GL-2 GL-2 GL-2

GL-3GL-3

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1

ACM-1 ACM-1 ACM-1ACM-1

ACM-1ACM-1ACM-1 ACM-1

ACM-1ACM-1

ACM-1 ACM-1

A6A6.15

A2A6.15

A6A6.16

ACM-1A

ACM-1A

ACM-1A

ACM-1A

ACM-1A

GL-4

GL-1

GL-1

ACM-4 ACM-4

ACM-4

ACM-4ACM-4

ACM-4

GL-1

GL-1

GL-1

GL-1

ACM-1

ACM-1

ACM-1 11a10a

GL-4

GL-4

GL-4 GL-4

GL-4GL-4

GL-4 GL-4

GL-1

GL-1

LEVEL 1100' - 0"

LEVEL 2119' - 0"

LEVEL 4138' - 0"

54321 2.6 3.5 4.4

GL-2 GL-2 GL-2 GL-2 GL-2 GL-2

GL-2GL-2GL-2GL-2GL-2GL-2

ACM-3M-1

A5A6.15

A4A6.15

A5A6.16

M-1

CS-1 CS-1

10a

M-1 M-1 M-1

MASONARY SOLDIERCOURSE

PREFINISHED STEELOVERHEAD ROLL-UP DOORPREFINISHED STEEL

OVERHEAD ROLL-UP DOOR

MASONRY SOLDIERCOURSE

MASONRY SOLDIERCOURSE

CAST STONE BANDING

CAST IN PLACE CONCRETECURB

LEVEL 5153' - 0"

LEVEL 6168' - 0"

LEVEL 7183' - 0"

LEVEL 8198' - 0"

LEVEL 9213' - 0"

65 5.4

ACM-4 ACM-4

ACM-4

ACM-4

ACM-4ACM-4

ACM-4

ACM-4

GL-4GL-4

ACM-4 ACM-4

ACM-2

ACM-2

ACM-2

ACM-2

ACM-2

A4A6.16

ACM-4

ACM-4

ACM-4

12a

PREFINISHED METALCOPING SEE MATERIALLEGEND FOR FINISH

GL-1 GL-1

GL-1 GL-1

GL-1GL-1

GL-1 GL-1

GL-1 GL-1

GL-1 GL-1

EXTRUDED ALLUMINUMMULLION CAP WITHPREFINISHED COATING

EXTRUDED ALLUMINUMMULLION CAP WITHPREFINISHED COATING

GL-4

?

GL-4

GL-2

GL-4

GL-4

GL-4

GL-4

GL-4

GL-4

GL-4

GL-4

GL-2

GL-2

GL-2

LEVEL 1100' - 0"

LEVEL 2119' - 0"

LEVEL 4138' - 0"

65 5.4

ACM-2

ACM-2

GL-1 GL-1

GL-1GL-1

A3A6.16

M-1

M-1

ACM-3ACM-3

GL-2 GL-2

13a12a

M-1

REVEAL IN COMPOSITEMETAL PANEL

REVEAL IN COMPOSITEMETAL PANEL

CAST IN PLACE CONCRETECURB

MASONARY SOLDIERCOURSE

CAST STONE BANDING

PRE-FINISHED CURTAINWALL SYSTEM, SEEELEVATIONS FOR TYPE

SINGLE COARSE SOLIDBRICK ACCENT BAND

MASONRY SOLDIERCOURSE

thinkchamplin.com

937-224-4474Dayton, OH 45402

Suite 13004 South Main Street

PROJECT NAME

PROJECT NUMBER

ISSUE

DATE

DRAWING TITLE

DRAWING NUMBER

2014 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©

A

B

C

D

E

6 5 4 3 2 1

|Houston Dallas

51001.0100

PARTIALELEVATIONS

A5.13

NEW PATIENTTOWER

DD

08/25/14

1/8" = 1'-0"C6 SOUTH TOWER- SOUTHWEST ELEVATION

1/8" = 1'-0"A6 SOUTH BASE- SOUTHWEST ELEVATION

1/8" = 1'-0"C3 SOUTH TOWER- BEACON

1/8" = 1'-0"A3 SOUTH BASE- SOUTHEAST CORNER

CS-1

1 DESIGN DEVELOPEMENT 8/25/2014

LEVEL 5153' - 0"

LEVEL 6168' - 0"

LEVEL 7183' - 0"

LEVEL 8198' - 0"

LEVEL 9213' - 0"

2

7' -

0"7'

- 6"

7' -

6"7'

- 6"

7' -

6"7'

- 6"

7' -

6"7'

- 6"

10' -

0"

15' -

0"

15' -

0"

15' -

0"

15' -

0"

5' -

0"

5' - 0"

6' - 6"

5' -

6"2'

- 0"

5' -

0"2'

- 6"

5' -

6"2'

- 0"

5' -

0"2'

- 6"

5' -

6"2'

- 0"

5' -

0"2'

- 6"

5' -

6"2'

- 0"

A7.01C2

A7.01B5

A7.01A5

ROOF SYSTEM TYPE-1OVER TAPEREDINSULATION

COMPOSITE METALPANEL SYSTEM.SEE ELEVATIONSFOR TYPE

INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE

GROUND96' - 0"

LEVEL 1100' - 0"

LEVEL 2119' - 0"

LEVEL 4138' - 0"

LEVEL 5153' - 0"

21

STR

ETC

HER

CO

UR

SES

4' -

8" =

211'

- 4"

STR

ETC

HER

CO

UR

SES

2' -

8" =

12

19' -

0"

19' -

0"

15' -

0"

A7.01A5

A7.02D2

SIM

A7.02D3

A7.02C2

4' - 6"INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE

PRE-FINISHEDWINDOW WALLSYSTEM

MODULAR BRICK

13' -

0"

8' -

8"8'

- 0"

10' -

10"

8' -

0"

10' -

0" =

45

STR

ETC

HER

CO

UR

SES

10"

2' - 10"

SEE

ELEV

ATIO

NS

FOR

EXT

ERIO

R F

INIS

HIN

DEP

END

ENTL

Y SU

PPO

RTE

D 3

HO

UR

SEP

ERAT

ION

WAL

L,

4' - 6"

3' - 11 3/4"

5' - 6"

8a1.7

LEVEL 1100' - 0"

LEVEL 2119' - 0"

LEVEL 4138' - 0"

LEVEL 5153' - 0"

2

BASEMENT84' - 0"

13' -

0"

10' -

10"

8' -

0"

19' -

0"

19' -

0"

15' -

0"

A7.01A5

A7.02D3

A7.02D2

A7.02C3

8' -

8" R

OU

GH

OPE

NIN

G8'

- 0"

STR

ETC

HER

CO

UR

SES

4' -

8" =

21

1' -

4"ST

RET

CH

ER C

OU

RSE

S2'

- 8"

= 1

2 10

' - 0

" = 4

5 ST

RET

CH

ER C

OU

RSE

S10

"

4' - 6"

INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE

2' - 10"

4' - 6"

PRE-FINISHEDWINDOW WALLSYSTEM

MODULAR BRICK

5' - 6"

A7.03A6

POLYSTERENEBOARD INSULATION

WATERPROOFMEMBRANE

INSULATED ROLL DOWNDOOR

GROUND96' - 0"

LEVEL 1100' - 0"

LEVEL 2119' - 0"

LEVEL 4138' - 0"

LEVEL 5153' - 0"

2

26' -

8" =

120

STR

ETC

HER

CO

UR

SES

19' -

0"

19' -

0"

15' -

0"

A7.01A5

SEE

EXTE

RIO

R E

LEVA

TIO

NS

FOR

EXT

ERIO

R F

INIS

HIN

DEP

END

ENTL

Y SU

PPO

RTE

D 3

HO

UR

SEP

ERAT

ION

WAL

L.

MODULAR BRICK

5' - 6"

5' - 1 3/8"

2' -

6"

6' -

0"10

"1'

- 8"

4' - 6"

INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE

PRE-FINISHEDWINDOW WALLSYSTEM

27' -

6"

8' -

0"

WATERPROOF MEMBRANE

ROOF SYSTEM TYPE 1OVER TAPEREDINSULATION

A7.02D3

A.B. LAST NAMELICENSE #

EXPIRATION DATE 00/00/0000

PRELIMINARYDRAWING

ONLY

NOT TO BEUSED FOR

CONSTRUCTION

ISSUANCES

t h i n k c h a m p l i n . c o m

4 S o u t h M a i n S t . , S t e 1 3 0 0D a y t o n , O H 4 5 4 0 2

T 937.224.4474

Drawn By

Checked By

ProjectNumber

ClientNumber

|Houston Dallas

1400 West Dorothy LaneDayton, OH 45409-1310Tel: 937.224.0861 Fax: 937.224.5777

6305 Centre Park DriveWest Chester, OH 45069Tel: 513.779.7851 Fax: 513.779.7852

3233 Newmark DriveMiamisburg, OH 45342Tel: 937.228.1225 Fax: 937.228.7443

222 Linwood StreetDayton, OH 45405Tel: 937.461.5390 Fax: 937.298.5732

2202 S. Patterson Blvd.Dayton, OH 45409Tel: 937.298.4631 Fax: 937.298.5732

8/26

/201

4 12

:58:

28 P

M

A6.10

NEW PATIENTTOWER

DD

Author

51001.0100

WALL SECTIONS

1/4" = 1'-0"A6 TOWER SECTION -WEST 1/4" = 1'-0"A5 TYPICAL RATED WALL - WEST

1/4" = 1'-0"A4 SOUTH WEST AT ROLLING DOOR 1/4" = 1'-0"A3 MASONRY WALL - WEST

No. Description Date1 DESIGN DEVELOPEMENT 8/25/2014

Page 44: Design Portfolio

TCH OB/GYN Research LabThe program called for a lab to be designed in 5,000 sqft of shell space that had seperate spaces for animal and human culture testing.

My responsibilities included SD - CA phases of the project. I attended meetings with the users and helped make real time changes to the model based on their input. I was in charge of RFI’s, attended OAC meetings and helped punch the space.

1. Floor Plan2. Elevations

1 2

UP

REF.

A5.0

D6

A5.0

C6

A5.0

A5.0

C5

D3

A5.0

C3

D5

A5.0B6

A5.0

A6

A5.0B5B4

A5.0A5

A5.0

B3

OFFICEC.1850.32

OFFICEC.1850.34

WORK ROOMC.1850.46

OFFICEC.1850.48

CHASE DC.1800.00B

BREAK ROOMC.1800.24

C.E.C.C.1880.16

AUTOCLAVEC.1880.17

FREEZERC.1880.12

STORAGEC.1880.13

ANIMAL TISSUEC.1880.11

MICROSCOPYC.1880.04TISSUE CULTURE

1880.03

H ROOMC.1880.02

TISSUE CULTUREC.1880.01

OPEN LABC.1870.11

SHELLC.1890.00

DT18-30606CB30

SK-13CB30SK-1

DT18-3060

DT18-3060

DT18-3060

CAS

1-30

60

DAS1-3060

C3130

SK-2

VW15

72VW

1572

VW15

72

VW1360

VW13

482

CT1

8-30

72C

T15-

3072

DT1

5-30

72CT1

5-30

72C

T15-

3072

CT1

5-30

72

DT1

5-30

48

6CB30(2)

VW15

72VW

1572

VW15

72

VW1360

VW13

48

CT1

8-30

72C

T15-

3072

CT1

5-30

72CT1

5-30

72C

T15-

3072

CT1

5-30

72

DT1

5-30

48

DT1

5-30

48

C3130

SK-2

VW15

72VW

1572

VW15

72

VW1360

VW13

48

CT1

8-30

72C

T15-

3072

CT1

5-30

72

CT1

5-30

72C

T15-

3072

CT1

5-30

72

DT1

5-30

48

DT1

5-30

48

6CB30(2)

CT13-3060

VW1560VW1560

VW13

60

CT15-3060CT15-3060

CT15-3060 CT15-3060

VW1560VW1560

VW13

60

CT15-3060CT15-3060

CT15-3060 CT15-3060

CAS1-3048CAS1-3048

6CB30(2)

C3130

SK-2

C31306CB30

(2)CT13-3060

VW1360

6CB30(2)C3130

VW1360

CT13-3060

VW1360VW1360

SK-2

C31306CB30

(2)CT13-3060

VW1360

CT1

5-30

72

VW15

72

CT1

8-30

72C

T15-

3072

DT1

5-30

72D

T15-

3048

DT1

5-30

48C

T15-

3072

CT1

5-30

72

VW15

72VW

1572

VW13

48

SK-2SK-2

CT1

5-30

72

VW15

72

CT1

8-30

72C

T15-

3072

CT1

5-30

72D

T15-

3048

VW13

48VW

1572

VW15

72

CT1

5-30

72C

T15-

3072

DT1

5-30

48

CT1

8-30

72C

T15-

3072

CT1

5-30

72

DT1

5-30

48

CT1

8-30

72C

T15-

3072

DT1

5-30

72VW

1348

2

VW15

72VW

1572

VW15

72

CT1

5-30

72C

T15-

3072

CT1

5-30

72C

T15-

3048

VW13

48VW

1572

VW15

72VW

1572

CT1

8-30

72C

T15-

3072

CT1

5-30

72D

T15-

3048

CT1

5-30

72C

T15-

3072

CT1

5-30

72D

T15-

3048

CT1

5-30

72C

T15-

3072

CT1

8-30

72

VW15

72VW

1572

VW15

72VW

1348

2

CT1

5-30

72C

T15-

3072

CT1

5-30

72D

T15-

3048

CT1

5-30

72C

T15-

3072

CT1

5-30

72

VW15

72VW

1572

VW15

72VW

1348

2

OFFICEC.1850.36

OPEN OFFICEC.1850.27

OPEN OFFICEC.1850.38

B4030B3324

M13

18

M13

18B

3324

B33

24B

4030

B40

30

B33

24

B33

24

M13

18

M13

18B

3324

B33

24B

4030

B33

24

B33

24

M13

18

B33

24

B33

24B

4030

B33

24

B33

24

M13

18

M13

18B

3324

B33

24B

4030

B33

24

B33

24

M13

18

M13

18B

3324

B33

24B

4030

B33

24

B33

24

M13

18

B33

24

B33

24B

4030

B33

24

B33

24

M13

18

B33

24

B33

24B

4030

B33

24

B33

24

M13

18B

3324

B33

24B

4030

B33

24

B33

24

M13

18B

3324

B33

24B

4030

B33

24

B332

4B4

030

B40

30

B40

30

B40

30

B40

30

B40

30

B40

30

B40

30

C3130 C1848C1324

CT1

5-30

72C

T15-

3072

VW13

72VW

1372

VW13

72

B33

24B

4030

VW13

VW1360VW1360

6CB3

0C

3130

C42

36

C1330C1736C3130

B4030B3324

B3324B3324

B3324B3324

CO2 @ 96"N2

LVLA

LVLA

O2LVLA

O2LVLA

LVLA

LVLA

LVLA

LVLA

LVLA

CO2N2

LVLACO2N2

LVLA

LVLA

LVLA

LVLA

LVLA

LVLA

LVLA

LVLA

LVLA

CO2 @ 96"N2

CO2N2

CO2 REGULATORN2

LVLA

LVLA

LVLA

LVLA

LVLA

73224

F383

6C

1042

C10

42C

3142

3CB3

0SH 31

48SH 31

48

SH3160

SH3160

SH3160

SH3160

SH3136

SH3136

DAS1-3048

B4242

SH 3148

C.1870.06

C.1870.02

C.1870.03A1

C.1870.03A2

C.1870.03B1

C.1870.03B2

C.1870.04

C.1

870.

03 C.1

870.

11C

1

C.1

870.

11C

2

C.1

870.

11D

1

C.1

870.

11D

2

C.1

870.

11E1

C.1

870.

11E2

C.1

870.

11F1

C.1

870.

11F2

C.1

870.

11G

1

C.1

870.

11G

2

C.1

870.

11H

1

C.1

870.

11H

2

C.1

870.

11J1

C.1

870.

11J2

C.1

870.

11K1

C.1

870.

11K2

C.1

870.

11L2

C.1

870.

11L1

C.1

870.

11M

1

C.1870.12

C.1870.13C.1870.14

C.1870.16

C.1

870.

22

C.1870.21

C.1

870.

01

C.1870.22

C.1870.23

W3124

C13

18

LVLA

C31

30

M1318

CO2 REGULATOR

O2N2

CO2O2

O2N2

N2 FILLTANK

FLOORSINK

O2N2

MANIFOLD

O2LA

O2LA

O2LA

O2LA

MILLIPORE MILLIPORE

M1324 M1324

M1324M1324

DT18-3048

C10

30C

1030

C10

30C

3130

SK-2

A5.0C2

F384

2F3

842

F384

2

C18

42

6CB30

SH3148

SH3148

SH3148

W3124

A5.0A4

M33

24

C46

48

HW/CWDIEW-1

HW/CWDI

HW/CWDI

HW/CWDIEW-1

HW/CWDIEW-1

HW/CWDIEW-1

HW/CWROEW-1

HW/CWROEW-1

DIHW/CW

EW-1

HW/CWRO

EW-1

HW/CW

9' -

6 7/

8"

8' -

4 3/

4"1'

- 10

"

36.3

B

36.3

B

13.3

13.3

11.2

9 9

2.3 2.3

13.3

13.3

13.3

36.3 B

11.2

11.2

13.3

13.3

36.3

B

13.3 13.3

36.3

B

1.3

13.3

13.3

1.3

11.3

11.3

1.3

9

9

99

9

9

9

11.3

9

9

9

9

9

9

9

1.3

13.3

2.3

99

11.2

C1880.12B

C18

80.1

7

C1880.13

C1890.00

C18

80.1

2A

C1880.11C1880.04

C18

80.0

3

C18

80.0

2

C18

50.3

8

SK-1

SK-3

SK-2

HW/CWEW-1

C1880.01

73229

73227

7323

6

80051

7323

273

231

71216

8005

880

058

8005

880

058

8005

9

800398003980039

80039

7121

9X71

219X

7121

9X

7322

1

73237

1' - 10 3/4"

6' -

6 1/

8"

4' - 7 3/4"

1' -

8 3/

4"

DR

-2

DR

-2

DR-2

DR-2 DR-2 DR-2 DR-2

DR-2

DR-2

36.3 B

11.2

A

10' - 0"

TYP.5' - 0"

10

9

8

LJGFD K

72817 71221X 80060 72917

72891 72891 7289180049

72891 73230

7322

7 -

73227

7235

772

357

201 214

215 215

216

201

214

218217 218217

218217218218

217

216

218217

SH 3136

SH 3136

AS NEEDED

220 220

221221221 221

221221

221221221

SH 3148

215

10' -

6"

8' -

10 7

/8"

TYP.1' - 6"

7' - 8"11' - 0 1/8"10' - 5 3/8"

5' - 11"5' - 9 3/8"

1' -

7 7/

8"8'

- 9

3/8"

36.3 A

13.3 9' - 7 1/8" 10' - 11 3/4"

6' - 9 1/4"

10' -

11

3/8"

10' -

9"

3' -

7 7/

8"

1' - 0 3/4" 1' - 10 7/8"12' - 1 3/8"

2' -

9 3/

8"

4' - 3 3/4"TYP.

10' - 6"

LVLA

6' -

3 1/

2"

229

A11.2D5

A5.0

B2

222

A11.1D4

Sim

230

230 230230

231

C18

70.2

2

222 222

C18

70.0

1

EQEQ EQEQ

3CB30

36.3

S

36.3

S

232

7322

3

71760

7176

071

760

7176071760

7322

3

80032

76218

80032

PROPOSED

EXISTINGCONSTRUCTION

N

PROJECT NAME

PROJECT NUMBER

ISSUE

DATE

DRAWING TITLE

DRAWING NUMBER

2012 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©

A

B

C

D

E

6 5 4 3 2 1

|Houston Dallas

ARCHITECT OF RECORD

CYNTHIA WALSTON

03/13/14

8261.00

ARCHITECTURALFLOOR PLAN

A3.1

FEIGIN OB-GYNRESEARCH LAB

CONSTRUCTIONDOCUMENTS

3/13/14

1/4" = 1'-0"A6 Level 18

A. INFORMATION SHOWN OR REFERENCED ON ENLARGED AND/OR 1/4” SCALEDRAWINGS WILL GENERALLY NOT BE SHOWN ON THE SMALLER SCALEDRAWINGS.

B. PARTITION TYPES ARE SCHEDULED ON PLANS BY NUMBER. SEE THE "GENERALNOTES TO PARTITION TYPES" ON D1/A11.1 AND PARTITION TYPES ON SHEETA11.1 FOR THE DEFINITION OF PARTITION TYPE REFERENCES KEYED ONPLANS.

C. FIELD COORDINATE ALL FIELD ROUTED PIPE, CONDUIT RUNS, ETC., WITHLOCATIONS OF RECESSED ACCESSORIES AND EQUIPMENT. IN THE EVENT OF ACONFLICT, ACCESSORY LOCATIONS TAKE PRECEDENCE.

D. CLOSE ALL JOINTS BETWEEN PLUMBING FIXTURES/ACCESSORIES ANDDISSIMILAR MATERIALS W/SEALANT (I.E. BETWEEN SINKS AND COUNTERTOPS,TOILET FIXTURES AND ACCESSORIES TO WALL, ETC.)

E. CABINET NUMBERS NOTED ON ENLARGED PLANS REFER TO CABINETCOMPONENT NUMBERS, FIXTURES, ACCESSORIES, ETC. THAT ARE DEFINED ORELEVATED ON SHEET A5.0 UNLESS SPECIFIC DETAIL REFERENCES ARE KEYED.

F. PLAN DIMENSIONS ARE TO FINISHED FACE OF PARTITIONS AND GENERALLYARE TIED TO A COLUMN CENTERLINE UNLESS SPECIFICALLY SHOWN CENTEREDON A PARTICULAR BUILDING ELEMENT I.E. A CHASE WALL, WINDOW MULLION,ETC.

G. STANDARD EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL A4/A11.1.H. FIRE PROTECTION EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL A2/A11.1.J. COMMUNICATION EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL B6/A11.1.K. EQUIPMENT MOUNTING HEIGHTS AT COUNTERTOPS, SEE DETAIL A6/A11.1.L. EQUIPMENT MOUNTING HEIGHTS AT DESKTOPS, SEE DETAIL A5/A11.1.

A1 GENERAL NOTES TO PLANS

Architecturally Significant Equipment

CRYOSTAT, RESEARCH, FLOOR 73230 OFVICABINET, FLAMMABLE STORAGE, 60 GAL 73231 OFOICABINET, ACID STORAGE, 45 GAL 73232 OFOIINCUBATOR (N2) 73236 OFOIICEMAKER, DISPENSER, FLOOR, CHEWBLET, 400 LBS. CA 73237 OFCISTERALIZER, SCIENTIFIC, FREESTANDING 76218 OFVIREFRIGERATOR, FLOOR 80032 OFOIFREEZER, -20, UPRIGHT 80039 OFOICENTRIFUGE, REFRIGERATED, COUNTERTOP, MEDIUM 80041 OFOIREFRIGERATOR, CHROMATOGRAPHY, DOUBLE DRS, GLA 80049 OFOIINCUBATOR (NAPCO) 80051 OFOIFREEZER, -80, UPRIGHT (REVCO UFX) 80058 OFOIFREEZER, -80, UPRIGHT (REVCO ULTIMA II) 80059 OFOI

Architecturally Significant Equipment

FREEZER, UNDERCOUNTER, 4.9 CU FT, -30 C 71216 OFOIFREEZER, -20, UPRIGHT 71219X OFOICENTRIFUGE, REFRIGERATED, COUNTERTOP, SMALL 71221X OFOIHOOD, BIOLOGICAL, 4', NON VENTED 71760 OFOIINCUBATOR (CO2 AIRJACKET) 71880 OFOIMETRO SHELVING 72357 OFOICENTRIFUGE, REFRIGERATED, COUNTERTOP 72817 OFOIREFRIGERATOR, LAB, 20.3 CU FT, GENERAL PURPOSE 72891 OFOICENTRIFUGE, BENCH TOP, REFRIGERATED 72917 OFOICENTRIFUGE, ULTRA, FLOOR 73221 OFOIHOOD, FUME, 4' (WITH FLAMMABLE CABINET) 73223 OFOIINCUBATOR 73227 OFOIREFRIGERATOR 73229 OFOI

201 FIRE EXTINGUISHER AND CABINET. COORDINATE WITHFIRE RATING OF WALL. SEE DETAIL B5/A11.2.

214 SAFETY SHOWER.215 TELEPHONE.216 BLACKOUT CURTAIN.217 SOAP DISPENSER. OFCI.218 PAPER TOWEL DISPENSER. OFCI.220 VISUAL DISPLAY BOARD.221 CORNER GUARD.222 SUBSTITUTE FOR 90 MIN RATED DOOR. SEE SCHEDULE.229 H-ROOM - PURPOSE OF H-ROOM IS TO STORE

CHEMICALS THAT EXCEED THE ALLOWABLE AMOUNTSFOR THE CONTROL AREA ACCORDING TO TABLE 307.1.

230 EXISTING EXTERIOR WALL. TYPICAL.231 WINDOW SHADES.232 EXISTING 2-HR RATED PARTITION

A2 NOTES TO SHEETA5 REFERENCE PLAN

N

A6 PLAN LEGEND

Page 45: Design Portfolio

C1848C1324C3130

6CB30

9' -

0"

DR-2

73229

SH3136

SH3136

911

912

SK-1

VW1360 VW1560

CT15-3060 B4030 B3324

VW1560

CT15-3060

SP1 SP2 SP1 SP2

DT18-3060DT18-3060

SH3160

SH3160

M1324 M1324

216

CT15-3072 B3324

VW1572

CT13-3060 CT15-3072 B4030

VW1572

CT15-3072 B3324

VW1572 VW1348

M1318DT15-3048EQUIPMENT

TACK BOARD

9' -

6"

9' -

0"

SP1 SP2 SP1 SP2 SP1 SP2

914

914 914

915

914

914 914

OPEN OPEN

SK-2

DR-2

VW1360

9' -

6"

912911

FC-1918

917

6CB30(2)

DAS1-3048 M131873227 71760

C3130

6CB30

C1318

SH3148

DR-2

73233

SK-1

913

C4236

CEILINGENCLOSURE

22D

918

911

917

912 FC-1

3CB30

C3130 C1330C1736

FC-1

SH3148

SH3148

SH3148

DT18-3048

DR-2

SK-1

71216

911

912

917

918O2N2

CO2N2

71760 71760 CAS1-3060 M3324

7322773236

71880

SH3148

SH3148

C1042C3142C1042

3CB30

DR-2

SK-3

FC-1

917 918

912

911

B4242 CAS1-3048 CAS1-3048

D

916

C1030

C3130

C1030C1030

3CB30

C3130

SH3136

SH3136

SK-1

SH3148

VW13 VW1372 VW1372

C1842 C3130B4030B3324 CT15-3072

VW1372

CT15-3072

6CB30

VWEC

F3836C3130

SK-2

6CB30(2)

D2

A11.2

Sim

DR-2

917

F

901

221

905915

919

215

221908

920

921

221605 922 922

2' - 3"

3' -

0"2'

- 10

"

9' -

0"

PROJECT NAME

PROJECT NUMBER

ISSUE

DATE

DRAWING TITLE

DRAWING NUMBER

2012 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©

A

B

C

D

E

6 5 4 3 2 1

|Houston Dallas

ARCHITECT OF RECORD

CYNTHIA WALSTON

03/13/14

8261.00

ELEVATIONS

A5.0

FEIGIN OB-GYNRESEARCH LAB

CONSTRUCTIONDOCUMENTS

3/13/14

1/2" = 1'-0"D6 1880.01 TISSUE CULTURE

1/2" = 1'-0"C5 WEST ELEVATION BENCHES 1/2" = 1'-0"C6 MICROSCOPY

1/2" = 1'-0"D3 TYPICAL LAB BENCH

1/2" = 1'-0"C3 SINK WEST SIDE

1/2" = 1'-0"D5 1880.01 TISSUE CULTURE 2

1/2" = 1'-0"B6 H ROOM

1/2" = 1'-0"A6 ANIMAL TISSUE

1/2" = 1'-0"B5 1880.03 TISSUE CULTURE 1/2" = 1'-0"B4 1880.03 TISSUE CULTURE 2

1/2" = 1'-0"A5 AUTOCLAVE ROOM

1/2" = 1'-0"B3 SHARED EQUIPMENT SPACE

1/2" = 1'-0"C2 COLD ROOM

1/2" = 1'-0"A4 HOT LAB

215 TELEPHONE.216 BLACKOUT CURTAIN.221 CORNER GUARD.605 SCHEDULED CEILING.901 SCHEDULED BASE.905 SCHEDULED CABINET.908 ELECTRICAL OUTLET. SEE ELECTRICAL.911 SOAP DISPENSER. OFCI.912 PAPER TOWEL DISPENSER. OFCI.913 WALL MOUNTED FIRE EXTINGUISHER.914 OPEN.915 TACK BOARD.916 EXISTING GLASS FAÇADE.917 EYE WASH AT SINK. SEE PLUMBING.918 DI FAUCET.919 MARKER BOARD.920 MARKER TRAY.921 MAP RAIL.922 PAINT, ACCENT COLOR. SEE FINISHES PLAN

FOR TYPE.

A1 NOTES TO SHEET

3/8" = 1'-0"B2 ELEVATION AT COLUMN

Page 46: Design Portfolio

Colorado Children’s Executive Suite The program called for creating a space witihin the existing hospital that had a library, kitchen, lounge, conference space, and offices that could be used by the executives and physi-cians.

My responsibilities included work on sketch-up and revit mod-els through DD phase, producing elevations and helping with renders.

1. Elevations2. Render3. Prespective of Suite

2 1 3

Page 47: Design Portfolio

1. Elevations2. Render3. Prespective of Suite

2 1 3

Page 48: Design Portfolio

Interviews for future projects - The focus of this work was to earn the project through the interview phase.

My responsibilities included diagrams, schematic floor plans, boards for presentations, physical models, and 3d-printed models.

1. Site Forces Diagram2. Model 3. Model

2 1 3

Page 49: Design Portfolio
Page 50: Design Portfolio

Golisano Children’s Hospital of Southwest FloridaThe program of this project was the interior design of the new 7 story tower that connected to an existing hospital.

My responsibilities included elevations, ceiling plans, floor patterns, presentation boards for fundraising, and helping with finish material boards.

Level 3 – NICU Patient Corridor Elevation

Original Option

1. Corridor Elevation2. Floor Pattern3. Corridor Perspective

2 1 3

Page 51: Design Portfolio

Level 2 – DD Floor Pattern

Level 5 Hemo-Oncology– Corridor Intersection

Page 52: Design Portfolio

Kara [email protected](607) 229-9779

WK