Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1...

18
Serving Since 1987 s Torrance Victorville Suite 2 26 San Diego Oakland 1970 Broadway 110 0 Delta Engineering Group 8121 Georgia Ave,Suite#600 Silver Spring, MD 20910 (202) 243-8167 Ontario 5 Anaheim “Delta is the Difference” Design-Build

Transcript of Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1...

Page 1: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

Serving Since 1987

s

Torrance

Victorville

Suite 2 2 6

San Diego

Oakland1970 Broadway 110 0

Delta Engineering Group

8121 Georgia Ave,Suite#600 Silver Spring, MD 20910 (202) 243-8167

Ontario 5

Anaheim

“Delta is the Difference”

Design-Build

Page 2: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

www.delta-eg.org

WHO WE ARE

Delta is co ultieo ec cal a e ro e al e eer fir e e o ce loca e e cou tie of

, , San e o and Alameda.Our team consists of civil e eer environmental e eer e eer eolo laboratory and fiel ec c a e u ec or raft ec c a a r ll a u or er o el

ec al e in e r re ecti e fiel W e o er a broad ra e of services to serve e ee o our clients. GEOTECHNICAL ENGINEERING AND GEOLOGIC SERVICES

˜ Feasibility studies˜ u l la a e˜ r a la ou atio e˜ ar e a Structures e˜ Pavement e a˜ r or er al a ru a e˜ ar ua e and Fault Studies˜ eolo c a ar aluatio˜ era a e e a floo co rol la˜ e c e a ar e e˜ ro eolo c aluatio˜ a er u l e˜ Ground ro e e al e˜ a ora or e ti˜ lo e a l Landslide e ti atio

ti atio˜ ru e atio and rou o or

˜ Pile Drivabilit Load Tests˜ Seismic Retrofi n Desi˜ Geolo c econnaissance a in˜ Geo ysical Investi ations˜ Trenc in Investi ations

ENVIRONMENTAL SERVIC ES

˜ P ase I Initial Site˜ Assessments (ISAs) Environmental Site Assessments (ESAs)˜ Ha ardous aterials ana ement Industrial Hy iene

˜ Surveys and Investi ations˜ Tec ical Abatement S ecifications and W or Plans˜ Abatement and Remediatio onitorin Services

˜ P ase II Site Investi ations (SIs)˜ onstructio Environmental om liance˜ P ase III Site Remediation˜ Storm aterTan a ardous a erials Sam lin

Holly ood Fault Study

Page 3: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

www.delta-eg.org

FORENSIC SERVICES ˜ Earthq uake Damage Assessments: Causatio tudies and preparatio of repair recommendations.˜ Landslide Investi ations: Causatio tudies and/or development o tabilizatio c emes.˜ Constructio Vibrations: Vibratio onitoring and geotechnical testing.˜ Dam Investi ations˜ Settlement Analyses: Floor level surveys, causation studies and/or preparation o repair

recommendations.˜ Expansive So l : Subsurface investi ations, preparatio of repair recommendations.˜ Groundwater: Subsurface investi ations, preparatio of subsurface drainage recommendation.

TESTING AND INSPECTION SERVICES

Delta has o materials e ti la ora or e loca e in Anaheim and San e o or a Our la ora or e are licensed as an a ro e e ti facility by ar ou agencies including the o o the State Architect (DSA), City o o Angeles, Caltrans, CCRL and AASHTO. In a tio Delta’ s San e o laboratory has been awarded accreditatio to the technical competence and q uality assurance req uirements of ISO/IEC 170 2 5 :2 0 0 5 as determined by the Laboratory Accreditation Bureau (L-A-B).

Soils Testing ˜ Classificatio Index˜ Strength Tests˜ Volumetric Change˜ Permeability˜ Compaction˜ Aggregate/Subgrade

Materials Testing ˜ Asphalt Testing˜ Concrete Aggregate˜ Concrete Cylinders˜ Concrete Beams˜ Ma onry

˜ Ma onry Unit Cubes˜ Ma onry Prisms˜ Grout/Mortar˜ Dry Pack Blocks˜ Shotcrete˜ Batch Plant Inspections˜ Reinforcing Steel˜ Structural Steel˜ Chemical Physical

Propertie˜ AW S/CW I W elding˜ Post-Tensioning

˜ Epo y Do el / Drilled inAnchors

˜ Pull Testing˜ Non Destructi e Testing –

UT/MT˜ High Strength Bolting˜ Fireproofing Inspections

and Sampling˜ Concrete Masonry

Coring and Extraction˜ Mix Design Reviews

Trial Batched˜ Fiber W rap Inspectio˜ Vapor Emissions Testing

ng� Classi

g� Asph lt T

Direct Shear, Consolidation Sand Eq uivalent Testing

Asphalt -Value Testing

Page 4: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

www.delta-eg.org

Delta meets all the req uirements as an approved e ti a e c with the ollo local and atio al accreditin /certification authoritie ˜ ISO 170 2 5 (San Die o Laborator )˜ AASHTO er can Associatio of State

H hwa and Transportatio cials)˜ ACI er can Concrete Institute)˜ AMRL (AASHTO Materials Reference

Laborator˜ ANSI er can National Standards

Institute)˜ APW A er can Public W orks

oc ation)˜ ASNT (American Soc et of

Nondestructi e Testin˜ ASTM (Amer can Soc et for Testin

and Materials)˜ AW S/CW I (American W eldin

Societ ertified W eldin Inspector)˜ California Department of

Transportation (Caltrans)˜ CCRL (Cement and Concrete

Reference Laborator˜ Cit of Los An eles

˜ DSA (Division of the Staterchitect)

˜ ICBO (International Conference ofBuildin O cials)

˜ NICET ational Institute for Certificationin En neerin Technolo ies

˜ UBC (Uniform Buildin Code

Inspection

Earthwork ectio and e ti –Delta provides eo ec cal observation and testin services for all sta e of site radin Our field compaction testin services are provided b experience soils technicians

or u er e u er o o l ce e ro e o al e eer

Asphalt ectio and e ti – Delta provides co re e e asphalt e ti and AC e er ce

o cre e ectio and e ti – Delta’ s co cre e ectio and testin sta is re-certifie bi-annuall b the Cement and Concrete Reference Laborator (CCRL) and annuall b Caltran Our ACI certified concrete technicians perform field and batch plan samplin of concrete

a er al o a ure co l a ce ro ec ec ficatio

ec al o ructio ectio – Delta provides e er e ce ec al ec or l ce e the er atio al Code Counsel (ICC) for

Spra ed Applied Fireproofin , Structural Masonr Structural Steel Boltin and W eldin Pre-Stressed Concrete, and Reinforced Concrete Group Delta can also provide Certifie W eldin Inspectors (CW I) licensed b the Amer can W eldin Societ (AW S) and non-destructi e testin such as ma -particle and ultra-sonic testin

Delta ec c a & Inspectors hold the followin certification

ICC Inspectio ˜ Masonr˜ Structural

Steel/W eldin˜ Concrete˜ Fireproofin˜ Pre-Stressed˜ Concrete

Caltrans Certified ˜ Materials Testin˜ Soils Testin˜ Nuclear Gau e Safet˜ ACI Certified Concrete˜ Soils

Cit of LA Deput Inspector

p

Page 5: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

www.delta-eg.org

PROJECT EXPERIENCE

Page 6: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

REGIONAL CONNECTOR TRANSIT CORRIDOR Los Angeles, CA

˜ A 1.9-mile fully underground line will connectthe Metro Gold Line, Blue Line and Expo Lineand provide three new downtown LAunderground subway stations

˜ A massive cut and cover operation is proposedfor the construction of the tunnel due to theextensive underground utility lines

˜ Provided static and dynamic geotechnicalrecommendations for the stations and cut andcover structures

˜ Geomechanical numerical analyses performedfor the project to analyze seismic rackingbehavior of the underground structures

˜ Adjacent buildings settlement analyses due todeflection of the shoring. The analyses were usedin support of development of building projectionplan

Client: Skanska

Owner: Regional Connector Constructions (RCC)

Total Cost: $1.47 Billion

Completed: Ongoing

DESIGN-BUILD $1.47 BILLION

Page 7: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

GERALD DESMOND BRIDGE REPLACEMENT Port of Long Beach, CA

˜ Highest vertical clearance of all cable-stayedbridges in the United States (US)

˜ Gerald Desmond Bridge accounts for 15 % ofwaterborne cargo movement in US

˜ Higher clearance to accommodate the newestge eration of e cient cargo ships

˜ 2 nd tallest cable-stayed design in the US

˜ Performed site-specific non-linear time historyseismic analysis for main span structure

˜ Served as Environmental compliance manager˜ Contaminant plume modeling and analysis

during construction phase˜ Geotechnical Engineer of Record and review of

seismic and foundation reports

Client: Shimmick, FCC, Impregilo J V

Owner: Port of Long Beach-Caltrans

Total Cost: $1 Billion

Completed: Ongoing

DESIGN-BUILD $1 BILLION

Page 8: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

STATE ROUTE 91 IMPROVEMENT Riverside County, CA

˜ Corridor improvements focused on ex ting 14-miles of conge tion

˜ Improvements to 6-mile boundary that runsfrom SR-2 41 toll road to the SR-91

˜ Project includes major improvements to I-15Freeway Corridor

˜ Project to relieve major daily congestion

˜ Developed post advanced planning studygeotechnical data reports for bridges

˜ Provided daily review of design-buildcontractors submittals

˜ All work performed under formal Q A/Q Cprogram in accordance with ISO 90 0 0

˜ Provided q uality control materials te ti g andin ection

Client: Parsons

Owner: Riverside County Transportation Commission-Caltrans

Total Cost: $1.4 Billion

Completed: Ongoing

DESIGN-BUILD $1.4 BILLION

Page 9: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

MTA EXPOSITION LIGHT RAIL PHASE 2 Los Angeles, CA

˜ The 15 .2 -mile expo light rail line utilizing theexposition corridor with 19 stations

˜ Phase 2 includes 7 new stations along theW estside

˜ The Exposition Light Rail Transit (LRT) to SantaMonica is a significant and long-term publicinvestment in transit, city-wide and regionalmobility, and sustainability

˜ Materials evaluation of 192 0 ’ s brick arch tunnelunder light rail road

˜ Provided geotechnical recommendations forExpo LRT stations over Sepulveda Blvd. and

e tinela˜ Multiple Mechanical Stabilized Earth (MSE)

light rail walls

Client: Parsons Brinkerho Design- Skanska-Rados J oint Venture

Owner: Los Angeles MTA

Total Cost: $1.5 Billion

Completed: Ongoing

DESIGN-BUILD $1.5 BILLION

Page 10: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

www.delta-eg.org

Project Highlights Group Delta Highlights

Project Information

LAUSD DORSEY HIGH SCHOOL Los Angeles, CA

Picture # 1 Placed Here Size: 3 .5 4” Tall by 7.12 “ W ide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text”

Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front o f Text”

Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after

˜ First Los Angeles Unified School District(LAUSD) Design-Build Project which included anew gymnasium and ninth grade academyclassroom building

˜ Low noise/vibration pile installed on an activeschool campus

˜ First auger cast piles project for LAUSD

˜ Provided materials te ti g for Los AngelesUnified School District’ s First Design-BuildProject

˜ Geotechnical oversight provided throughconstruction

˜ Q uality control inspection services

Client: Los Angeles Unified School District

Owner: LAUSD

Total Cost: $2 8 Million

Completed: 2 0 14

DESIGN-BUILD $28 MILLION

Page 11: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

SOCIAL & BEHAVIORAL SCIENCE BUILDING San Diego, CA

˜ Three-story, 74,0 0 0 sf building which includesclassrooms, laboratory spaces, faculty andadministrative o ces located at San DiegoMesa College

˜ Project includes a complete on-site watermanagement system

˜ Classrooms assembled along a single-loadedexterior corridor

˜ Construction testing, materials testing andspecial inspection

˜ Provided geotechnical parameters forfoundation design

˜ Te ti g services for all reinforcing steel,reinforced concrete, post-tensioned concrete,structural steel, bolts, welding, masonry,anchors and fire proofing

Client: San Diego Community College District

Owner: Mesa College

Total Cost: $40 .5 Million

Completed: 2 0 14

DESIGN-BUILD $40.5 MILLION

Page 12: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.GROUPDELTA.com

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

LA METRO GOLD LINE ICONIC BRIDGE Los Angeles, CA

˜ Received Engineering News Record (ENR)Project of the Year Award for this 11.5 mileextension of the Metro Gold Line

˜ First mass transit crossing in California to bedesigned by an arti

˜ First design-build project for Gold LineAuthority

˜ Provided seismic design for the Iconic Bridge˜ Provided geotechnical engineering design

recommendations and support duringconstruction

˜ Provided foundation recommendations forlarge 10 ft. Cast In Drilled Hole (CIDH) piles

Client: Skanska USA & AECOM Technical Services

Owner: Los Angeles MTA

Total Cost: $2 0 Million

Completed: 2 0 12

DESIGN-BUILD $20 MILLION

Page 13: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.oeg

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

MATHEMATICS AND SOCIAL SCIENCE BUILDING SAN DIEGO, CA

˜ Associated support space along with 7 Tier,40 0 -car, parking garage

˜ Project includes classrooms, a health centerand corporate education center

˜ 5 -story, 73 ,0 0 0 gross sq uare feet building

˜ Provided te ti g services for reinforcing steel,reinforced concrete, post-tensioned concrete,structural steel, bolts, welding, masonry,anchors and fire proofing

˜ Geotechnical parameters for foundation design˜ Provided construction testing, materials testing

and special inspection

Client: San Diego Community College District

Owner: San Diego City College

Total Cost: $81 Million

Completed: 2 0 12

DESIGN-BUILD $81 MILLION

” Wide

=196

tions, the image is “In Front of Text

OTO DIRECTLY OVER THIS TEXT

PRIOR TO PASTING ITDOCUMENT. YOU WTO EDIT THE PICTUREBECAUSE THIS TEMPYOU MUST EDIT THE PHSEPARATE WORD DOCUTO PASTING IT INTODOCUMENT.

Page 14: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

LACCD OLIVE STREET PARKING STRUCTURE Los Angeles, CA

˜ First design-build project for Los AngelesCommunity College District (LACCD)

˜ The roof top was designed to carryphotovoltaic panels for future use

˜ New six-level, 2 5 0 ,0 0 0 sq . ft ar ing structurelocated across the street from the campus

˜ Served as the Inspector of Record˜ Construction support services including

material testing and q uality control inspectionservices

Client: Los Angeles Community College District (LACCD)

Owner: LACCD

Total Cost: $13 .4 Million

Completed: 2 0 0 7

DESIGN-BUILD $13.4 MILLION

Page 15: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www. delta-eg.org

Project Highlights Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

STATE ROUTE 22 IMPROVEMENTS Orange County, CA

˜ ACEC 2 0 0 6 Project of the Year

˜ Improvements were made for approximately12 miles and extended through four c tie

˜ Included 3 2 bridge structures, 83 retainingwalls and sound walls, 5 1 ramps and 3 17 utilitycrossings

˜ Developed 3 3 post advanced planning studygeotechnical data reports for 3 3 bridges

˜ W ork performed under a formal Q A/Q Cprogram in accordance with the ISO 90 0 0

˜ Provided construction support servicesincluding material testing and inspection

˜ Moderate seismic accelerations and shallowgroundwater

Client: Orange County Transportation Authority (OCTA) & Caltrans

Owner: Parsons

Total Cost: $490 Million

Completed: 2 0 0 6

DESIGN-BUILD $490 MILLION

Page 16: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

MTA ORANGE LINE BUS RAPID TRANSIT PHASE 1 Los Angeles, CA

˜ Project alignment is 14-miles long with a 2 6ftwide bus lane along the entire alignment

˜ Links to the Metro Red Line with a total of 12Bus Rapid Transit (BRT) stations

˜ Construction of a retaining wall where thealignment crosses below the I-40 5 freeway

˜ Approximately 3 0 ,5 0 0 linear feet of 12 ft. highsound walls

˜ Provided geotechnical inve tigation and coste c ent pavement section designrecommendations for the ÿrst dedicated BRTin California that saved MTA $10 million inproject cost

˜ Project included a petro-mat and tack coatsystem

Client: Shimmick/Obayashi

Owner: Los Angeles MTA

Total Cost: $3 2 4 Million

Completed: 2 0 0 5

DESIGN-BUILD $324 MILLION

Page 17: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

MTA PASADENA GOLD LINE Pasadena, CA

˜ Links Union Station in Downtown LA and SierraMadre Villa in East Pasadena

˜ This Light Rail Transit (LRT) line consists of adouble tracked system using electric currentoverhead wire

˜ The project is primarily at-grade following theabandoned Atchison Topeka & Santa Fe (ATSF)Railroad right-of-way

˜ Provided 10 segment reports, 13 stationreports, 2 seismic and 1 new pedestrianovercrossing report

˜ The reports provided recommendations forretaining walls, MSE walls, stations andpla orms, Caltrans structure foundations,static a d seismic earth pressures fortemporary shoring and permanent walls, etc.

Client: K iewit/W ashington

Owner: Los Angeles MTA

Total Cost: $3 0 0 Million

Completed: 2 0 0 3

DESIGN-BUILD $300 MILLION

Page 18: Design-Builddeltaeg.org/wp-content/uploads/2018/04/Delta-Brochures.pdf · PHOTO SPECS Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114,

PHOTO SPECS

Picture 1 Placed Here Size: 3.54” Tall by 7.12” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text

YOU CAN PASTE THE PHOTO DIRECTLY OVER THIS TEXT

Picture 2 Placed Here Size: 2.13” Tall by 4.61” Wide Border Format: Color – R=68, G=114, B=196 Outline – 1 Point Make sure in Layout Options, the image is “In Front of Text” Project Information Data Font is Calibri 11, Paragraph Spacing 6 before and after Every ÿeld needs to be completed. If the Client and Owner is the same write their name twice. No acronyms unless they are clearly identified. If there is information that is not available use N/A is acceptable.

www.delta-eg.org

Project Highlights Delta Highlights

Project Information

YOU FIRST NEED TO EDIT THE PHOTOS TO MEET THE PHOTO SPECS PRIOR TO PASTING IT INTO THIS DOCUMENT. YOU WILL NOT BE ABLE TO EDIT THE PICTURES IN THIS FILE BECAUSE THIS TEMPLATE IS LOCKED. YOU MUST EDIT THE PHOTO IN A SEPARATE WORD DOCUMENT PRIOR TO PASTING IT INTO THIS DOCUMENT.

CROUL HALL – EARTH SYSTEMS SCIENCE BUILDING University of California, Irvine, CA

˜ New science educational building that includeda full basement

˜ Major issue was the load bearing capacity ofthe underlying bedrock stratum

˜ Most energy e c ent laboratory building oncampus

˜ LEED Silver building and part of the campusSMART Labs Program

˜ Provided estimated elevation contours for thealluvial/bedrock

˜ Provided evaluation of the temporaryconstruction slopes req uired for basementconstruction and underground utilityin allation

˜ Provided geotechnical analysis and valueengineering to the Design-Build Team

Client: Hensel Phelps Construction

Owner: University of California Irvine

Total Cost: $42 Million

Completed: 2 0 0 1

DESIGN-BUILD $42 MILLION