Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin...

53

Transcript of Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin...

Page 1: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa
Page 2: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 2

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Acknowledgement

We wish to thank Mr. R. K. Verma, Principal Secretary cum Commissioner (Transport), Mr.

Joginder Sharma, Dy. Commissioner (VIU), Mr. Ramanuthan, Motor Licensing Officer, Taxi

unit, all officials of Transport Department, Government of NCT of Delhi, for their constant

cooperation and support in data collection and conducting of surveys.

We extend special gratitude to all operators and stakeholders who have provided their

inputs and suggestions in finalization of this study.

Page 3: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 3

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

TABLE OF CONTENTS ACKNOWLEDGEMENT .............................................................................................................................................. 2

CHAPTER 1. INTRODUCTION ......................................................................................................................... 5

1.1 INTRODUCTION ............................................................................................................................................. 6

1.2 SALIENT FEATURES OF GRAMIN SEWA SCHEME (AS SPELT OUT BY TRANSPORT DEPARTMENT) ...................................... 6

1.2.1 Delineation of Areas of Operation .................................................................................................. 7

1.3 SUBMISSION TILL DATE ................................................................................................................................... 9

CHAPTER 2. DATA BASE DEVELOPMENT AND ANALYSIS ............................................................................. 10

2.1 BACKGROUND ............................................................................................................................................ 11

2.2 DATA COLLECTION STAGE ............................................................................................................................. 11

2.2.1 Municipal Wards ........................................................................................................................... 11 Population as per Census 2001 ................................................................................................................................ 12 Population in 2011 (Projected) ................................................................................................................................ 12 Population in 2021 (Projected) ................................................................................................................................ 12 Total of MCD Wards under Gramin Sewa Scheme ................................................................................................... 12

2.2.2 Transport Infrastructure Assessment ............................................................................................ 12

2.2.3 Access to Metro Network .............................................................................................................. 12

2.2.4 Passenger Origin Destination cum Opinion Survey for Metro Passengers .................................... 13

2.2.5 Passenger Origin Destination cum Opinion Survey for Bus Passengers ........................................ 14

2.2.6 Online Commuter Opinion Survey ................................................................................................. 14

2.3 PROVISIONAL ROUTES PROPOSED BY TRANSPORT DEPARTMENT ........................................................................... 14

2.4 STAKEHOLDER CONSULTATION ....................................................................................................................... 15

2.5 DATA ANALYSIS........................................................................................................................................... 15

2.6 IDENTIFICATION OF POTENTIAL ROUTES ........................................................................................................... 15

CHAPTER 3. PROPOSED ROUTES ................................................................................................................. 17

3.1 BACKGROUND ............................................................................................................................................ 18

3.1.1 Proposed Routes ........................................................................................................................... 18

3.1.2 Zonal Distribution ......................................................................................................................... 30

3.1.3 Estimation of Ridership and Fleet ................................................................................................. 31

3.1.4 Route Operation Strategy ............................................................................................................. 36

ANNEXURE ..................................................................................................................................................... 37

ANNEXURE 2.1..................................................................................................................................................... 38

ANNEXURE 2.2..................................................................................................................................................... 41

ANNEXURE 3.1..................................................................................................................................................... 52

Page 4: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 4

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

List of Tables

TABLE 1-1: ZONES OF DELHI .......................................................................................................................................... 7

TABLE 2-1: PRESENT AND PROJECTED POPULATION OF MCD WARDS UNDER GRAMIN SEWA SCHEME ....................................... 12

TABLE 2-2: LIST OF METRO STATIONS OUTSIDE INNER RING ROAD ...................................................................................... 12

TABLE 3-1: PROPOSED ROUTES .................................................................................................................................... 18

TABLE 3-2: DISTRIBUTION OF ROUTES IN EACH ZONE ....................................................................................................... 30

TABLE 3-3: PROPOSED GRAMIN SEWA FLEET SIZE ........................................................................................................... 33

TABLE 0-1: PROVISIONAL ROUTES ................................................................................................................................ 38

TABLE 0-2: SUGGESTIONS RECEIVED FROM VARIOUS STAKEHOLDERS .................................................................................... 41

TABLE 0-3: FURTHER SUGGESTIONS RECEIVED FROM VARIOUS STAKEHOLDERS....................................................................... 49

List of Figures

FIGURE 1-1: AREA OF OPERATION OF GRAMIN SEWA SCHEME 9

FIGURE 3-1: SOME GRAMIN SEWA ROUTES IN NORTH WEST ZONE 31

Page 5: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 5

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Chapter 1. Introduction

Page 6: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 6

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

1.1 Introduction

The city of Delhi has expanded significantly in the recent past to a city of 19 million persons

as per provisional totals published by Census of India in 2011. Over time, mobility patterns in

Delhi have undergone a paradigm shift with the expansion of urban areas and introduction

of new modes of public transport such as MRT and BRT. However, benefits of these systems

to rural areas as well as unauthorized, resettlement and JJ colonies have been limited.

A new para transit service called the “Gramin Sewa Scheme” have been initiated wherein

high capacity three-wheelers with seating capacity of six passengers excluding driver and/or

one helper have been given permits to ply in these areas. It is a point to point service

providing sustainable, efficient, effective and environment friendly transit service that serves

the needs of a locality by connecting local destinations and providing better access to

popular destinations such as transport nodes, commercial centres etc.

Transport Department, Government of NCT of Delhi has awarded the study on “Designing

Routes under Gramin Sewa Scheme” to Delhi Integrated Multimodal Transit System (DIMTS)

Ltd. to review the existing passenger demand and connectivity options available, and based

on the findings, propose certain routes on which Gramin Sewa may be plied. It would be a

shuttle service that would connect these areas with major nodes in the city.

1.2 Salient Features of Gramin Sewa Scheme (as spelt out by Transport Department)

1. The scheme is open only for New motor vehicles, such as high capacity three wheelers

and similar other vehicles with seating capacity of 6 (six) passengers excluding the driver

and having company fitted body duly approved by ARAI or any other agency as approved

by the Govt. of India for this purpose. These vehicles will be given permits to ply in rural

areas, unauthorized resettlement colonies and J.J. Clusters of Delhi.

2. The vehicle shall ply on clean fuel (i.e. CNG, O.E.) complying with Bharat Stage-III Norms,

fitted with Global Positioning System (GPS) and connect to the Control Room of the

Transport Department as may be decided by the Government.. These vehicles shall be

registered under separate series i.e. DL 2W and will be called as ‘Gramin Sewa’ and shall

be granted contract carriage permit as per provisions of MV Act and rules made

thereunder.

3. The vehicles will operate as ordinary transport vehicle on Contract Carriage Permits

(without fare meter).

4. The colour of the vehicle registered under Gramin Sewa scheme shall be white and it

should have two horizontal strips in the middle of the vehicle of 75 mm each, one in light

blue colour and another in green colour with inscription of ‘Gramin Sewa’ in between

the horizontal stripes.

Page 7: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 7

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

5. The vehicle will be eligible for registration as Transport Vehicle and grant of Contract

Carriage Permits, subject to fitness, payment of prescribed fees and taxes etc.

6. The vehicles registered as ‘Gramin Sewa’ will be allowed to ply only in rural areas,

unauthorized resettlement colonies and J.J. Clusters upto the Inner Ring Road and will

not in any case cross the boundary of the Ring Road.

7. The vehicles should have First-aid Box & Fire extinguisher.

8. The name, address and telephone number of permit holder shall be painted on the rear

exterior body of the vehicle.

9. The Helpline Number of the Transport Department shall also be displayed on both inside

and outside of the vehicle.

All vehicles shall be required to obtain certificate of fitness under Section 56 of the MV Act

and conform to the prevailing tail pipe Mass Emission Standards and safety norms and

mandatory compliance thereafter.

1.2.1 Delineation of Areas of Operation

The NCT of Delhi has been divided into 13 districts by Transport Department. The Gramin

Sewa scheme is applicable in all, except New Delhi and Central districts. The Inner Ring road

is used as a cordon line and Gramin Sewa would not be permitted to operate in areas that lie

within this screen-line.

Table 1-1: Zones of Delhi

Sl. Name of Zonal Office Area of Jurisdiction

2 Central District

Daryaganj, Lal Kuan, Prasha Nagar, Chandni Mahal, I.P. Estate,

Rajender Nagar, Turkman Gate, LNJP Hospital, Pusa Road, Jama

Masjid, Pahar Ganj, Sita Ram Bazar, Kamla Market, DBG Road,

Sangtrashan, Shahganj, Shadipura, Nabikarim, Hauz Qazi, Govt. Qr.

Dev Nagar, Ballimaran, Karol Bagh.

3 East District - I

Kalyan Puri, Laxmi Nagar, Preet Vihar, New Ashok Nagar,

Patparganj, Shakarpur, Trilokpuri, Mayur Vihar - I & II,

Karkardooma.

4 East District - II

Gazipur, Gandhi Nagar, Krishna Nagar, Anand Vihar, Old

Seelampur, Mandawali, New Shahdara, Geeta Colony Vivek Vihar,

Jheel.

5 New Delhi District

Tilak Marg, R.M.L Hospital, Chanakya Puri, Parliament St.,, Sucheta

Kriplani Hospital Tughlaq Road, Boat Club, Mandi House, North

Avenue Panchkuian Road, Bapa Nagar, South Avenue, Gole

Market, Rabinder Nagar, Malcha Marg, Connaught Place, Kaka

Page 8: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 8

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Name of Zonal Office Area of Jurisdiction

Nagar.

6 North - East District

Seelampur, Gamri, Nand Nagri, Gokalpuri, Shahdara, Ashok Nagar,

Khajuri Khas, Welcome colony, Sunder Nagar, Karawal Nagar,

Mansarover Park, Harsh Vihar, Bhajanpura, Seemapuri, Yamuna

Vihar, G.T.B. Nagar.

7 North - West District - I

Model Town, Jahangirpuri, Sangam Park, Adarsh Nagar, Vijay

Nagar, Keshav Puram, Ashok Vihar, Shalimar Bagh, Wazirpur,

Saraswati Vihar, Kingsway Camp, Pitampura, Mukherjee Nagar,

Rani Bagh, Azadpur, Rampura, Tri Nagar, Gujrawalan.

8 North - West District - II

Sultanpuri, Mangolpuri, Samaypur Badli, Prasant Vihar, Aruchandi

Border, Bawana, Alipur, Rohini, Kanjhavala, Narela, Kirari, Aman

Vihar, Mubarakpur, Qutub Garh, Jonti, Mungeshpur, Mukandpur,

Khera Kalan.

1 North District

Civil Lines, Pratap Bagh, Kotwali, Bela Road, Andha Mugal, Mori

Gate, Majnu Ka Tila, Gulabi Bagh, Red Fort, Sant Nagar, Sarai

Rohilla, Yamuna Bazar, Roop Nagar, Inder Lok, Lahori Gate,

Maurice Nagar, Sadar Bazar, Church Mission, Shakti Nagar, Ahata

Kedara, Town Hall, Subzi Mandi, Kashmere Gate, Chandni Chowk.

9 South - West District - I Inderpuri, Naraina, Mayapuri, Najafgarh, Kapasera, Dabri, Zafarpur

Kalan, Dwaraka

10 South - West District - II Vasant Vihar, R.K. Puram, Sarojini Nagar, Vasant Kunj, Delhi Cantt.

Dabri

11 South District

Hauz Khas, Amar Colony, C.R Park Malviya Nagar, Garhi, Ambedkar

Nagar, Saket, Okhla, Madangir, Pushp Vihar, Sunlight Colony,

Sainik Farm, Mehrauli, New Friends Colony, Kalkaji, Defence

Colony, Nehru Place, Gulmohar Park, Sukhdev Vihar, Badarpur,

AIIMS, Bharat Nagar, Sarita Vihar, Lodhi Colony, Hz. Nizammudin,

Sangam Vihar Pragati Vihar, Jangpura, East Kidwai Nagar, Khan

pur, Sarai Kale Khan, Lajpat Nagar, Greater Kailash, Panchsheel.

12 West District - I

Janakpuri, Vikaspuri, Keshopur, Tilak Nagar, Uttam Nagar, Mohan

Garden, Nawada, Kakrola, Paschim Vihar, Meera Bagh, New

Multan Nagar, Nangloi, Tikri Border, Nilothi, Nangloi jat, Mundka,

Baprola, Hari Nagar, Ashok Nagar, Prem Nagar, Subhash Nagar.

13 West District - II Anand Parbat, Moti Nagar, Patell Nagar, Punjabi Bagh, Kirti Nagar

Rajouri Garden

Source: Citizens’ Charter, Transport Department, GNCTD

Page 9: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 9

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Figure 1-1: Area of operation of Gramin Sewa Scheme

1.3 Submission till date

A Draft Report has been submitted on 27.04.2011 titled “Design of Routes under Gramin

Sewa Scheme- Draft Report”.

Suggestions of further routes had been received which have been reviewed on the basis of

the public transport model in Cube Voyager software and incorporated in this report as far

as possible.

Area of operation

Page 10: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 10

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Chapter 2. Data base Development and Analysis

Page 11: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 11

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

2.1 Background

A comprehensive database has been prepared by DIMTS from field studies and secondary

sources pertaining to existing city transport network, travel demand and related socio-

economic data.

Passenger Origin – Destination cum Opinion surveys were carried out among bus and metro

passengers wherein modes used in all legs of the journey were documented.

An online commuter opinion survey was also conducted wherein trip characteristics of the

citizens of Delhi have been documented.

2.2 Data Collection Stage

The following information have been compiled and studied for areas in which the Gramin

Sewa scheme is applicable:

a) Resident population,

b) Employment opportunities,

c) Details of road network,

d) List of city bus services available,

e) Accessibility to metro,

f) Para transit options available, etc.

Thus, data from secondary sources as well as extensive field surveys have been used in the

determination of routes for Gramin Sewa services.

2.2.1 Municipal Wards

There are 272 municipal wards (as on August 2010) under the jurisdiction of MCD, out of

which Gramin Sewa Scheme is applicable in 224 wards. The populations of each of these

wards have been documented from Census of India 2001, which is the latest published data.

The population projections for Delhi made by Census of India have been referred to in

conjunction with the report on Transport Demand Forecast Study done for NCT of Delhi, by

RITES dated April 2010. The same decadal growth rates have been used to forecast the

population of the individual wards for 2011 and 2021.

The population of wards under Gramin Sewa scheme constitutes about 80% of the total

population of Delhi. Maximum population is seen in Deoli Village, Sangam Vihar and

Dakshinpuri extension while Aya Nagar and Laxmi Nagar have the lowest resident

population.

The total population of wards as per Census 2001 and projected for 2011 and 2021 under

the purview of MCD where said scheme is applicable has been presented in Table 2-1.

Page 12: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 12

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Table 2-1: Present and Projected Population of MCD wards under Gramin Sewa Scheme

Population as per

Census 2001

Population in 2011

(Projected)

Population in 2021

(Projected)

Total of MCD Wards

under Gramin Sewa

Scheme

10,607,671 13,926,171 18,601,534

2.2.2 Transport Infrastructure Assessment

The transport infrastructure of a locality was studied in detail where in the major stage

carriage routes passing through each locality and popular modes of para transit have been

documented. Some areas have been found to have limited access to public transport and

rely heavily on para transit modes and personal modes. The tendency of opportunity cost

based charging by cycle rickshaw operators has been noted.

The road network and development pattern of newly developed areas and villages on the

outskirts of the city have also been surveyed. The road network suitable for operation of

Gramin Sewa services has been identified.

2.2.3 Access to Metro Network

Metro stations act as major attraction points. The road network leading to metro stations

from nearby rural, unauthorized colonies and JJ clusters have been studied. The metro

stations falling in the areas where Gramin Sewa Scheme is applicable is listed below in Table

2-2.

Table 2-2: List of metro stations outside Inner Ring Road

Red Line Yellow Line Blue Line Green Line Badarpur

Line Airport Line

Kohat Enclave

Jahangir Puri Rajouri Garden Shivaji Park Moolchan

d Dhaula Kuan

Pitampura Adarsh Nagar Tagore Garden Madipur Kailash Colony

Delhi Aerocity

Rohini East AIIMS Subhash Nagar Paschim Vihar

East Nehru Place

IGI Airport

Rohini West Green Park Tilak Nagar Paschim Vihar

West Kalkaji

Dwarka Sector 21

Rithala Hauz Khas Janakpuri East Peeragarhi Govindpuri

Shastri Park Malviya Nagar Janakpuri West Udyog Nagar Okhla

Seelampur Saket Uttam Nagar East Surajmal Stadium Jasola-Apollo

Welcome Qutub Minar Uttam Nagar

West Nangloi

Sarita Vihar

Page 13: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 13

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Red Line Yellow Line Blue Line Green Line Badarpur

Line Airport Line

Shahdara Chhattarpur Nawada Nangloi Railway

Station Mohan Estate

Mansarovar Park

Sultanpur Dwarka Mor Rajdhani Park Tughlakab

ad

Jhilmil Ghitorni Dwarka Mundka Badarpur

Dilshad Garden

Arjan Garh Dwarka Sector 14

Guru

Dronacharya Dwarka Sector 13

Sikandarpur Dwarka Sector 12

M G Road Dwarka Sector 11

IFFCO Chowk Dwarka Sector 10

HUDA City

centre Dwarka Sector 9

Dwarka Sector 8

Dwarka Sector 21

Yamuna Bank

Akshardham

Mayur Vihar

Phase I

Mayur Vihar

Extension

New Ashok

Nagar

Noida Sector 15

Noida Sector 16

Noida Sector 18

Botanical Garden

Golf Course

Noida City Centre

Laxmi Nagar

Nirman Vihar

Preet Vihar

Karkarduma

Anand Vihar

2.2.4 Passenger Origin Destination cum Opinion Survey for Metro Passengers

Passenger Origin Destination cum Opinion Surveys was carried out to document the profile of

metro users such as age, occupation, preferences, etc. The initial origin, boarding and

alighting stations and final destination of passengers, along with travel characteristics such as

distance covered, mode used, time taken, purpose and frequency of trip were also

Page 14: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 14

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

documented. The ticketing system used by a person has been covered to establish the

comparative popularity of smart cards and tokens.

These surveys have been conducted for one day at all individual metro stations. Surveys have

been done on an unbiased random sample basis, so that all types of metro users can be

represented.

Inputs from this survey were used to appreciate the user profile and their preferences and

also for delineation of the catchment area of metro stations.

2.2.5 Passenger Origin Destination cum Opinion Survey for Bus Passengers

The Passenger Origin Destination cum Opinion survey was conducted on an unbiased random

stratified sample basis on most of the operational routes by trained enumerators. The

selection of routes have been done carefully so that the data captured is representative of the

travel pattern of the city.

Details have been collected pertaining to the origin, destination of passengers, modes used,

trip details such as trip frequency and purpose. The dispersal and access modes of users are

studied in order to understand the relationship of the bus system with other modes,

percentage of change over between routes, routes performing as substitutes between

particular sections.

About 10% of passengers on a particular trip have been covered.

2.2.6 Online Commuter Opinion Survey

An online survey was designed and uploaded in the website of DIMTS. The link was also

available on the websites of Transport Department, Govt of NCT of Delhi and UTTIPEC (DDA).

An advertisement was published in all leading English and Hindi newspapers inviting public

opinion, feedback and suggestions.

The questionnaire had been designed in a lucid and interactive manner. Moreover, a filled up

format was uploaded as a sample.

Travel characteristics of the citizens of Delhi have been captured in detail. Also commuter

feedback has been compiled.

2.3 Provisional Routes proposed by Transport Department

66 routes had been designed by Transport Department and 5060 permits have been issued

on a provisional basis. These routes have been placed in Annexure 2.1. Feedback from

operators, passengers and other stakeholders has been received pertaining to these. These

have been studied in detail.

Page 15: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 15

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

2.4 Stakeholder Consultation

A meeting was held with officials of Transport Department and DIMTS on 15th April, 2011 to

discuss the scheme in detail.

Several suggestions in the form of modifications to the temporarily allotted routes and new

routes have been suggested by different stakeholders. Some operators have met DIMTS

officials in person to discuss their suggestions and requests.

Each request has been examined minutely, checked for feasibility and have been

incorporated in the recommendations.

2.5 Data Analysis

The data from different field surveys and secondary information were collated together. The

travel demand matrix, computed from analysis of the survey data, was fed into the CUBE

VOYAGER software and the same have been analysed. The potential areas where there is

requirement of connectivity through Gramin Sewa have been identified in light of the

outputs from the model as explained below.

The existing city bus routes have been superimposed on the road network of Delhi and the

areas that require connectivity and mobility options have been selected.

2.6 Identification of Potential Routes

The objective of Gramin Sewa is to meet the needs of individual localities, improve general

circulation within a fixed influence zone and access to higher-capacity transit systems or

attraction centers.

Potential routes were generated for all origin and destinations based on shortest paths in

terms of distance. The demand data on travel pattern of public transport system and para

transit modes was compiled from household survey data and origin/destination surveys

conducted on various operational bus routes, as well as metro stations across the city. The

information on city transport network were collected from past studies and used after

updation.

The route generation process included assignment of the existing trip matrix to the existing

route network and calculation of shortest paths for public transport users, ensuring a

specified minimum number of passengers per road link. The network represented the

demand for para transit, public transport and two wheelers. In the route generation process

a large number of lines were generated between each pair of existing and potential origin

and destination zones in the study area subject to certain restrictions. Routes generated in

earlier stages were aggregated to merge subset routes. Some of the smaller routes were

grouped to form single viable route system. The aggregated route system was utilized for

further analysis.

Page 16: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 16

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

The routes have been checked for public transport connectivity. Those on which satisfactory

connectivity has not been found but have desirable demand levels, have been selected and

examined as a Gramin Sewa route.

Further, suggestions received from all stakeholders have been considered and a set of routes

have been compiled in the following section in Annexure 2.2.

Page 17: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 17

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Chapter 3. Proposed Routes

Page 18: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 18

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

3.1 Background

The outputs of the CUBE VOYAGER software have been compiled and compared with the

inputs received from different stakeholders. The suggestions have been examined in detail

in terms of road network availability and estimated demand levels. Also, availability of bus

routes on the links have been checked, so that there is no overprovision or competition

between the modes. The final set of proposed routes have been designed based on all inputs

and satisfies most of the routes requested and suggested by various stakeholders.

3.1.1 Proposed Routes

The proposed routes have been placed below.

Table 3-1: Proposed Routes

Sl. Route Name

Origin Destination Via Route length

1 GS-1 Laxmi Nagar Vasundhara Enclave

Laxmi Nagar, Mother Dairy, 13-Block Trilok Puri,

Vasundhara Enclave CGHS.

5.0

2 GS-2 Anand Vihar ISBT/Metro

Station Mayur Vihar Ph-III

Mayur Vihar Ph-III, Gharoli, Kondli, Kalyanpuri

crossing, Ghazipur Dairy farm, Ghazipur - NH-24

crossing, Ghazipur, Anand Vihar ISBT.

9.5

3 GS-3 Chander Nagar Yamuna Bazar

Jheel, Satnaam Road, Swamy Ganeshdutt Marg,

Gandhi Nagar, Kailash Nagar

6.0

4 GS-4 Dilshad Garden Metro Station

Baldev park

Baldev Park, New Rajdhani Enclave, Vikas Marg, Karkarduma Metro

Station, AGCR Enclave, Distt court, Vishwas

Nagar, Jhilmil Colony,Vivek Vihar, Surya

Nagar, Dilshad garden Metro Station.

8.0

5 GS-5 East End Apptt

New Ashok Nagar Lal Bhadur Shastri

Hospital

Vasundhara CGHS - Dharamshila Cancer Hospital - Kalyanpuri

3.5

6 GS-6 Gandhi Nagar Jhilmil Colony Jheel, Krishna Nagar, Karkarduma Court,

Vishwas Nagar 10.0

7 GS-7 Ghazipur Border Akshardham Gharoli, Mayurvihar P-3, Kondli, Kalyanpuri, sanjay

8.5

Page 19: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 19

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

park

8 GS-8 Kalyanpuri Anand Vihar Gazipur Dairy Farm 6.0

9 GS-9 Mandawali Shastri Park Metro

Station

Mandawli, Mandawaki Rd, Urjja Vihar Aptt, Ganesh

Nagar I, South L/T, Patpar ganj Rd, Ganesh Nagar Ext

II, Madhuban Enclave, Shakarpur Ext, Nirman

Vihar metro station, MadhubanChowk, Guru

Angad Nagar East, Khureji Khas, Geeta Colony, Jheel

Gandhi Nagar Market,Shastri Park Metro

Station.

8.0

10 GS-10 Mayur Vihar

Phase - I Metro station

Mayur Vihar Phase - II

Mayur Vihar Phase - II, Kalyan Vas, Chand

Cinema,Trilok puri 13 Block,Shahi Garden , Mayur Vihar Phase -

I,Mayur Vihar Phase - I metro station.

5.0

11 GS-11 Mayur Vihar

Phase-I Metro station

Mayur Vihar Phase - III

Mayur Vihar Phase - III, Gharoli,Kondli, Kalyanpuri, Chand Cinema, Trilokpuri

13 Block, Mayur vihar Phase - I,Mayur Vihar

Phase - I Metro station.

7.0

12 GS-12 New Ashok Nagar

Metro Station Mayur VIhar Phase-III

Mayur Vihar Phase - III, Gharoli, Kondli, DDA

Sports club, Dharam Shila Cancer hospital,

Vasundhara Enclave, New Ashok Nagar, New Ashok

Nagar Metro Station.

7.5

13 GS-13 Yamuna Bank Metro Station

Rajgarh Colony

Rajgarh Colony,Geeta Colony,khureji

khas,Gurunanak Nagar,Priyadarshni

vihar,bank enclave krishan kunj,Geeta Colony

road(pushta),Ramesh park,Lalita park, Yamuna

Bank metro station

7.0

Page 20: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 20

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

14 GS-14 Badli GT Road, Ghoga Village

Nangli Poonam, Budhpur, Khera Kalan, Khera Khurd,

Holambi Kalan, Sanout Crossing

12.5

15 GS-15 GTB NAGAR Gandhi Vihar

GTB NAGAR, BATRA COMPLEX, MUKHRJI

NAGAR BANDH, GANDHI VIHAR

4.5

16 GS-16 GTB NAGAR Burari Village./ Mukhmel Pur

Gtb Nagar, Nirankari Cly, Jharoda Dairy Crossing, Burari Village, Loniyan

Ind., Ibrahim Pur, Hiranki, Mukhmel Pur

12.0

17 GS-17 Hiran Ki Village Badli GT Road

Nangloi Poonam, Budhpur, Alipur, Bakoli

Crossing, Bakhtawarpur, Mohd. Pur

10.0

18 GS-18 Jagatpur Vishwavidhyalaya

Metro Station

Sangam Vihar, Waziarabad, Timarpur,

Lucknow Road 9.0

19 GS-19 Jyonti Border Kanjawala Jyonti village - Ladpur 5.5

20 GS-20 Khera Kalan Narela

Khera Kalan, Khera Khurd, Holumbi Khurd, Holumbi

Kalan, Shahpur Garhi, Bhore Garh, Narela

15.0

21 GS-21 Khera Kalan Ghoga Village

Khera Kalan, Khera Khurd, Holumbi Khurd, Holumbi Kalan, Sanoth Crossing ,

Ghoga Village

18.0

22 GS-22 Mukhmail pur Badli GT Road Jindpur, Alipur, Budhpur,

Nangli Poonam 7.0

23 GS-23 Bhajanpura Karawal Nagar Dayalpur 6.0

24 GS-24 Chauhan Patti Wazirabad Sonia Vihar E Block,

Nanaksar 7.5

25 GS-25 Dilshad garden Metro Station

Harsh Vihar

Harsh Vihar, Gagan Cinema, Sunder Nagari, Tahir pur Chowk, Tahir pur, New Seemapuri,

Dilshad Colony, J&k Block Dilshad garden, Dilshad Garden Metro Station.

6.0

26 GS-26 Indrapuri (Loni) Harsh Vihar Shiv vihar - Wazirabad

Road Crossing - HarshVihar

8

Page 21: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 21

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

27 GS-27 Indrapuri (Loni) Nandnagri Shiv vihar - Wazirabad

Road Crossing - Nandnagri 9

28 GS-28 Jhilmil Metro

Station Saboli/Mandoli

Saboli/Mandoli, Mandoli Ext Crossing, Bank Colony,

Gagan Cinema, Nand Nagri (T), GTB Enclave, GTB Hospital Crossing,

Dilshad Garden, Dilshad Garden GT Rd, Jhilmil

Metro station

7.0

29 GS-29 Old Mustafabad Seelampur Metro

Station

Bagirathi Vihar, Brijpuri, Mangal Pandey Marg, Gokulpuri, Ambedkar

College More, C-4 Yamuna Vihar, Jaffrabad Road,

Seelampur

6.0

30 GS-30 Seelampur Metro

Station Yamuna Vihar Depot

Yamuna Vihar depot, Atul Marg, Kardampuri, Kabir

Nagar, Babar pur,Jaffrabad,Subhash

Park, Seelampur, Seelampur Metro Station.

5.0

31 GS-31 Seelampur Metro

Station Karawal Nagar East

Karawal Nagar East, Dayal Pur, Mustafa bad, Brij

Puri, Yamuna Vihar Depot, Ghonda Chowk, Mauj Pur,

Gautam Puri, Chouhan Banger, SeelamPur Metro

Station.

7.0

32 GS-32 Shahdra Metro

Station Saboli/Mandoli

Saboli/Mandoli, Mandoli crossing, Nand Nagri Depot, Ashok Nagar,

Mandoli Road,Ram Nagar, Mansarover Park, Shahdra

Metro Station

7.5

33 GS-33 Shahdra Metro

Station Karawal Nagar East

Karawal Nagar East, Shiv Vihar, Johri pur, Loni Rd, LIG flats, Loni Rd, Durga puri, Ram Nagar, Kabul Nagar, Shahdra Metro

Station.

7.5

Page 22: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 22

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

34 GS-34 Shastri Park Metro

Station Karawal Nagar West

Karawal Nagar West , Sadatpur, Delhi Police

Training Complex, Viharipur, Rajeev Nagar,

Khajoori Khas, Wazirabad Crossing , Bhajan pura,

Gamri Ext, Pushta 5, Kartar Nagar, New

Usmanpur, zero pusta, Shastri park, Buland

masjid/J. Bridge East, Shastri Park Metro

Station.

7.5

35 GS-35 Wp Depot-I Raja Pur Prashant Vihar

Wp Depot-I, Kd Block Maurya Enclave, Raja Pur

(Prashant Vihar ), ESI Hospital Rohini

4.5

36 GS-36 Wp Depot-I Rohini Sector 25(Deep

Vihar)

W.P. Depot, KD-Block Pitam Pura, Rohini Sector-

7 & 8 Crossing, Rohini Sector-6 (T) (Rohini Depot-

I), Rithala Village Main Rd., Rohini Sector-25

5.5

37 GS-37 Wazirpur Depot-I Rohini Sector.18

Wazirpur Depot-I, KD Block Pitam Pura, Rohini

Sector-7,8,9 Crossing, Vidya Vihar Marg

Crossing, Rohini Sector-18.

7.5

38 GS-38 Aman Vihar Surajmal Stadium Shani Bazar Road, Harijan

Colony, Nangloi-Sultanpuri Road

3.5

39 GS-39 Badli GT Road Tikri Khurd

Alipur, Bakoli Crossing, Khampur, Tikri Khurd ,

Raja Harish Chandra Hospital , Narela (A-7)

14.5

40 GS-40 Badli Industrial

Area Rohini East

Rohini Suraj Park, Rohini Sector 18,15,13,9

5.5

41 GS-41 Bajit Pur Alipur Bawana JJ Colony, DSIDC, Holumbi Kalan JJ Colony

18.0

42 GS-42 Barwala Rithala Shiv Vihar, Shahbad Dairy,

Rohini Sector25,24 8.5

43 GS-43 Bawana JJ Colony Rithala Bawana DSIDC, Puth

Khurd, Bhagvan Mahaveer Marg

18.5

Page 23: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 23

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

44 GS-44 Bhalaswa J.J.

Colony. Jahangirpuri

Shraddhanand Park, New Swarup Nagar, GT Road

6.5

45 GS-45 Burari Timar Pur/Mall

Authority Sant Nagar, Gopal Nagar,

Wazirabad, Timar Pur 15.0

46 GS-46 Daulatpur Rithala Rohini Sector 11,12 5.5

47 GS-47 Delhi College of

Engineering Rohini West

Rohini Sector 16,17, Guru Nanak Dev Marg, Rohini

Sector10,12,9 5.0

48 GS-48 Ghewra More Nizampur Garhi Ghewra Village, Nizampur

Village 9.0

49 GS-49 Haiderpur Netaji Subhash Place Electronic Colony, Poorvi Shalimar Bagh, Singlapur

5.5

50 GS-50 Haiderpur Water

Tank Sultanpur Dabas

ESI Hospital, Rohini Sector-16, Shahbad

Daulatpur, St. Michael School, Prahladpur, Barwala, Puth Khurd

7.0

51 GS-51 Holumbi Kalan JJ

Colony Shahbad Dairy

Bawana JJ Colony, DSIDC, Rajiv Ratna Yojna,

Barwala, Prahladpur 9.5

52 GS-52 Kadipur Jahangirpuri

Nangli Poonam, Swarup Nagar, New Swarup

Nagar, Sanjay Gandhi Transport Nagar

6.0

53 GS-53 Kanjhawala Narela

Kanjhawala, Chandpur, Prem Pio, Bajitpur

Crossing, Bawana, Ghoga A/F Station, Sannoth Crossing, Vishal Bagh,

Narela

16.5

54 GS-54 Kirari Village Paschim Vihar Water

Tank

Kirari More, Ratan Vihar, Jalebi Chowk, Sultan Puri,

S-Block Mangolpuri, Q-Block Mangolpuri,

Peeragarhi, Paschim Vihar Water Tank

5.0

55 GS-55 Maharshi Balmiki

Hospital Qutubgarh

Bawana, Daryapur, Auchandi Border

12.0

56 GS-56 Mangolpur Khurd Rohini East Rohini Sector 2,3, Pradeep Bhatia Road, Rohini Sector

7,8 4.0

57 GS-57 Mangolpuri Rohini West Rohini Sector2,3, Avantika

Road 3.0

Page 24: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 24

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

58 GS-58 Meer Vihar Bhagwan Mahvir

hospital

Mubarakpur, Agar Nagar, Gorakh Nagar, Kirari

Nahar, Prem Nagar II, Kirari Village, Shani Bazar Road, Sultanpuri, Sanjay

Gandhi Hospital

8.0

59 GS-59 Mubarakpur Ambedkar Hospital

Agar Nagar, Inder Enclave-II, Kirari Nahar, Kirari Mor,

Pratap Vihar, Nithari Village, Inder Enclave Bus Stand, Sharma Enclave,

Vikas Vihar, Dhruv Enclave, Laxmi Ram Park,

Aman Vihar Police Station, Rohini Sector 20, Puth

Kalan, Rohini Sector 24, Rithala Metro Station

12.0

60 GS-60 Mukundpur Azadpur Azadpur Road, Majlis Park 4.5

61 GS-61 Nangloi Rajdhani Park Metro

Station

Nangloi, rly, Fatak, Kirari Mor, Station Block Metal

Chowk, July Public School, Dayanath Mishra Chowk, Janaki Vihar Mandir, Vakil

Chowk, Pandey Chowk, Hindu Vihar, Mundka

Phatak, Mundka Factory

8.0

62 GS-62 Nangloi Khanjawala

Nangloi, Nithari, Mubarakpur Dabas, Rani

Khera Crossing, Madanpur, Karala,

Kanjhawala.

10.5

63 GS-63 Nangloi Jj Cly Majra Dabas

Nangloi Jj Cly, Kamruddin Nagar Crossing, Mundka,

Hiran Kudna Crossing, Ghewar Village,

Kanjhawala School, Kanjhawala Village, Chand

Pur, Majra Dabas

16.5

64 GS-64 Nangloi Metro

station Rohini West

Sultanpuri, Puth Kalan,Budh Vihar P1,Vijay

Vihar Phase 1,2,Rohini Sector 5,6

7.5

65 GS-65 Narela Maharshi Balmiki

Hospital Sannoth, Bawana JJ

Colony, DSIDC 12.5

66 GS-66 Nathupura GTB Nagar Burari,Baba Nagar , Sant Nagar,Nirankari Colony,

7.5

Page 25: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 25

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

Bhai Parmanand Marg

67 GS-67 Peeragarhi metro

station Kohat Enclave

Outer Ring Road,Parwana Road, Saraswati Vihar

Road,Ashram Vihar Road 6.0

68 GS-68 Rama Vihar Rithala Rohini Sector22,21,23,24 8.0

69 GS-69 Rohini Sector-7&8 Sultan Puri

Rohini Sector-7&8, Rohii Sector-9/10 Sector-

3,4,5,6 Crossing, Mangol Pur Khurd, Mangolpuri Y-

Block, Mangolpuri Q-Block,Sultan Puri

9.0

70 GS-70 Rohini Sector 18 Adarsh Nagar Shalimar Village,Shalimar

Road,Sanjay Nagar 5.5

71 GS-71 Rohini Sector 11 Netaji Subhash Place

Metro Station

Guru Nanak Marg - Rohini Sector 13 - Pitampura

Road - Uttari Pitampura - Purvi Pitampura

7

72 GS-72 Siraspur Jahangirpuri Rana Park, Bhagat Singh

Park, Samaipur 6.5

73 GS-73 D-Block.Okhla

Industrial Estate Tughlakabad Railway

Colony

D-Block Okhla Industrial Estate, Hindustan Steel,

CWS-II , Prahladpur, Tughlakabad Railway

Colony

7.0

74 GS-74 DDA Flats Kalkaji Badarpur (New M. B.

Road)

DDA Flats Kalkaji, Hamdard Nagar,

Tughlakabad Village, Prahladpur, Badarpur New

MB Road

8.0

75 GS-75 Alaknanda Badarpur

Hamdard Nagar, Tughlakabad Fort,

Container Depot, Railway Colony, Pulpehladpur

7.0

76 GS-76 Bindapur Dwarka Sector-13 Viswas Park, Uttam Vihar,

Subhash Park, Dwarka Sector 4

5.5

77 GS-77 Dwarka

Sec16/17/18/19 Dwarka Sector-9

Dwarka Sector-16,17,18,19

4.0

78 GS-78 Hamdard Nagar Govindpuri Tughlakabad Extension,

Tara Apartment, Govindpuri, Giri Nagar

5.0

79 GS-79 Jaitpur Badarpur Jaitpur Pushta Road,

Kalindi Kunj - Meethapur Road

5.0

Page 26: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 26

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

80 GS-80 Kalkaji Nehru Place Chitta Ranjan Park, Kalkaji

Main Road 3.0

81 GS-81 Kapasera Border Dwarka Sector-9 Samalkha, Dwarka Link

Road, Dwarka Sector26,22,23,20

9.5

82 GS-82 Khijarabad

Bhogal/New Friends Colony

Jasola-Apollo

Zakir Nagar, New Friends Colony, Holy Family Hospital, Jamia Milia

Islamia Gate, Sukhdev Vihar, CRRI

5.0

83 GS-83 Madanpur Khadar

Extension. Sarita Vihar

Madanpur Khadar, Sarita Vihar

4.5

84 GS-84 Maude Lines Dwarka Sector-9

Shekhawati Lines, Dwarka Road, Raj Nagar, Palam

Extension, Dwarka Sector 9

8.0

85 GS-85 Meethapur Extension

Badarpur Meethapur, Om Nagar,

Tajpur, Tajpur Pahari 4.0

86 GS-86 Okhla Extension Jasola-Apollo Abul Fazal Enclave, Kalindi Kunj, Jasola Vihar, Sarita

Vihar 6.0

87 GS-87 Qutub Maidan Garhi Qutub, Neb Sarai, Maidan

Garhi 6.0

88 GS-88 Raj Nagar Extension

Dwarka Sector-9 Dwarka Sector-8, Palam

Extension 7.5

89 GS-89 Rajan

Enclave/Vikas Nagar

Dwarka Mor/ NSIT Vikas Nagar, Mohan Garden, Rama Park

5.0

90 GS-90 Rajpur Khurd

Colony Saket

IGNOU, Neb Sarai Road, Mehrauli Badarpur road

3.5

91 GS-91 Sadh Nagar Dwarka Sector-11 Mangolpuri-II, Palam -

Najafgarh Road, Madhu Vihar, Sector 5

4.0

92 GS-92 Sangam Vihar Saket Sangam Vihar, Hasthal

Mandir, Saket 4.0

93 GS-93 Sangam Vihar Qutub Minar Metro

Station Holi Chowk, MB Road 7.0

94 GS-94 Sangam Vihar I-

Block Badarpur

Lal Kuan, Tughlakabad Colony

8.0

95 GS-95 Shahbad

Mohammadpur Dwarka Sector 9 Dwarka Sector 21,8 5.5

96 GS-96 Shyam Enclave Dwarka Sector-9 Goela Khurd, Goela Dairy,

Samta Enclave, Dwarka Sector 19,20

7.0

Page 27: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 27

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

97 GS-97 South Campus Hauz Khas

Benito Juarej Marg, BalakRam Marg, Rao Tularam Marg, Major Somnath Marg, Tamil

Sangam Marg, Venkateshwara Marg,

Africa Avenue, IIT

7.5

98 GS-98 Virat Cinema,

Ambedkar Nagar Nehru Place

Hamdard Nagar, Govind Puri, Kalkaji

8.0

99 GS-99 R. K. PuramSec-I Vasant Kunj Sector.-A R.K.Puram –I, N.I.H.F.W, B-3 Vasant Kunj, Vasant

Kunj Sect-A 7.0

100 GS-100 R. K. Puram

Sector-I Vasant Kunj Sector.C-9

R. K. Puram Sector-I, S.M. Temple , V.V Depot,

Power House, Manav Sthali School, Vasant Kunj

C-9.

8.0

101 GS-101 Katarina

Sarai/Qutub Inst Area

Qutub Minar Shaheed Jeet Singh Marg, Aurobindo Marg, Qutub

Minar 7.0

102 GS-102 Bharthal Village Nangal Dairy

Bharthal Village , Bijwasan School, Kapasera

Crossing, Samalkha, Nangal Dairy

11.5

103 GS-103 Dhul Siras Palam Airport

Palam Air Port - Prahladpur -Palam Colony - Palam Village - Abraham Crossing - Barolo Crossing -Pochanpur - Dhul Siras

7

104 GS-104 Dwarka More DDU Hospital

Madhu Vihar - Mahavir Colony - Pankha Road - C3

Road - Lal Sain Mandir Marg - Hari Nagar Road - Hari Nagar Clock Tower

12

105 GS-105 Fatehpur Beri Chhatarpur Sat Bari, Rajpur Khurd,

Chhatarpur Mandir 7.5

106 GS-106 JNU Chhatarpur Vasant Kunj, Kishan Garh 7.5

107 GS-107 Kapasera Border Jhatikra village Bijwasan, Bamroli,

Chhawla Camp, Chhawla village, Jhatikra village

20

108 GS-108 Najafgarh Zafarpur Kalan Ghuman Hera Crossing ,

Mitral, Surerhra Crossing , Rawta Crossing

6.0

109 GS-109 Najafgarh Pandawla Kalan Roshanpura, Jhatikra

More, Rewla Khanpur, 6.5

Page 28: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 28

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

Oandwala Crossing

110 GS-110 Najafgarh Goela Dairy Roshanpura, Ghewra

Crossing 8.0

111 GS-111 Najafgarh Khera Dawar Ghuman Hera Crossing 9.0

112 GS-112 Najafgarh Ghalibpur

Najafgarh, Ghuman Hera Crossing, Kair Village

Kharkhari Nahar, Hasanpur, Ghuman Hera

Amaravati Piao

14.0

113 GS-113 Najafgarh Ishapur Temple

Ghuman Hera Crossing, Mitrau, Surerhra Crossing, Rawta Crossing, Mundela Crossing, Kadipur, Ishapur

M.C. School

16.0

114 GS-114 Palam Village Bijwasan Border

Palam Village, Amrohi Crossing, Bagrola Crossing,

Pochanpur, Dhul Siras Crossing , Bharathal

Village, Bijwasan Railway Colony Station, Bijwasan

Border.

12.5

115 GS-115 Shastri Bazar Kapasera Border

Shastri Bazar, More Line, Palam Air Port , N.H.W 8

Crossing, Mahipalpur, Rang Puri, Samalkha, Kapasera Crossing, Kapasera Border

17.0

116 GS-116 Bakarwala JJ

Colony Nangloi

Ranhola, Rishala Garden, Dhaka Colony, Naresh

Park 4.0

117 GS-117 Chander Vihar Uttam Nagar Nilothi, Syed Village, Meera Bagh, District

Centre 8.5

118 GS-118 D-Block Janakpuri Kakrola JJ Colony

D-Block Janakpuri, Dabri Village, Dwarka Crossing,

Madhu Vihar, Netaji Subhash Engineering

College, Kakrola JJ Colony

12.5

119 GS-119 Harijan Basti,

Rajokri Dwarka Metro Station

Samalkha, Under Pass, Sector 21,22, Geetanjali

Enclave 11.0

120 GS-120 Jai Vihar Kakrola More Nangli Extension., Nangli

Dairy 8.0

121 GS-121 Karala Nangloi Rama Vihar, Qutub Garh-Kanjhawala Road, Rohini

9.0

Page 29: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 29

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

Sector-22,21, Ratan Bagh

122 GS-122 Khyala Peeragarhi

Keshopur Road, Vishnu Garden, Paschim Vihar

GH-II, Paschim Vihar Water Tank

4.5

123 GS-123 Matiyala Nawada Subhash Park, Mansram

Park, Sukhram Park 4.5

124 GS-124 Mubarakpur

Dabas Nangloi

Inder Enclave, Mubarakpur Main Road,

Indira Gandhi Chowk, Friends Enclave

6.0

125 GS-125 Mundka Najafgarh Hiran Kudna Village 12.0

126 GS-126 Nangloi Uttam Nagar Nilothi Crossing, Ranhola

Village, Vikas Nagar, Kakrola Nala Village

13.0

127 GS-127 Najafgarh CRPF, Jharoda Kalan Jharoda Crossing, Jharoda

Camp 5.5

128 GS-128 Najafgarh Rao Tula Ram Hospital Mitrau, Surehra, Rawata

Crossing 7.5

129 GS-129 Nangloi Paschim Vihar East

Metro Station Naresh Park, Laxmi Park,

Nihal Vihar, Paschim Vihar 5.5

130 GS-130 Nangloi Rani Khera Rajdhani Park, Mundka

Railway Phatak 7.5

131 GS-131 Nangloi Janakpuri District

Centre

Adyapak Nagar, Shivram Park, 50 Foota road, Nihal

Vihar, Paschim Vihar 8.0

132 GS-132 Nangloi Nilwal Mundka, Ghewra Crossing 10.5

133 GS-133 Nangloi Raja Garden

Raja Garden, Raghubir Nagar, Gurudwara Road

No 29 &30 Crossing , Paschim Vihar W/T,

Peeragarhi, Jwala Puri, Nangloi

11.0

134 GS-134 Nasirpur Janakpuri West Geetanjali Park, Vaishali,

Janakpuri 5.0

135 GS-135 Nilothi Udyog Nagar Nangloi Syed, Sunder Vihar, Paschim Vihar,

Inder Enclave 6.5

136 GS-136 Nizampur Village Nangloi Ghewra, Mundka 9.0

137 GS-137 Paschim Vihar

East metro station Tagore Garden

Paschim Vihar Extension, Paschimpuri

5.0

Page 30: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 30

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name

Origin Destination Via Route length

138 GS-138 Qutub Garh Mundka

Qutub Garh, Punjab Khor, Jyonti, Garhi Randhala,

Nizampur, Saved, Ghewra Village, Hiran Kudna

Crossing, Mundka

19.5

139 GS-139 Raghubir Nagar,

Hari Kunj Tagore Garden

Khyala, Vishnu Garden, Shyam Nagar, Mukherjee Park, Meenakshi Garden,

Subhash Nagar, Hari Nagar Clock Tower

6.0

140 GS-140 Ranhola Uttam Nagar East Shiv Vihar, LIG Flats

Hastal, Vikaspuri C block, Uttam Nagar

5.0

141 GS-141 Sagarpur Janakpuri East C Block Janakpuri Road,

Virendra Nagar 5.5

142 GS-142 Tilak Nagar Sant Garh (Major

Bhupinder Singh Nagar)

Tilak Nagar, District Centre, C-Block Vikas Puri,

Sant Garh (M B Singh Nagar )

5.0

143 GS-143 Vikas Puri H-3 Uttam Nagar East Budhela, Krishna Park 4.0

144 GS-144 Vishnu Garden Paschim Vihar West Paschim Vihar, Jalap Heir Market, Ch. Balbir Singh

Marg 4.5

3.1.2 Zonal Distribution

The distribution of routes in each zone is provided below.

Table 3-2: Distribution of Routes in each Zone

Zone Number of Routes

North 9

South 26

East 13

West 29

North East 12

North West 38

South West 17

TOTAL 144

The maximum number of routes have been proposed in the North Western Zone. The

spread and coverage of some routes in the zone has been presented below in Figure 3-1 as

an example.

Page 31: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 31

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

The routes shown in this figure connect the nearby areas to the Red, Yellow and Green Lines

of the metro network.

Figure 3-1: Some Gramin Sewa Routes in North West zone

3.1.3 Estimation of Ridership and Fleet

The frequency of operation has been designed based on demand levels that have been

estimated for each of these routes. Routes with high demand have been proposed to be

operated with a frequency of 1.5 minutes, while a headway of 2 minutes and 4 minutes have

been proposed for routes with moderate and fair levels of demand. The fleet sizes that are

required for each route have been presented in

Page 32: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 32

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Table 3-3. The total fleet size requirement has been worked out as 6,167 Gramin Sewa

vehicles.

Page 33: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 33

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Table 3-3: Proposed Gramin Sewa Fleet Size

Sl. Route Name Operating Frequency

(Min) Fleet size Required

1 GS-1 4 15

2 GS-2 2 57

3 GS-3 2 36

4 GS-4 1.5 64

5 GS-5 2 21

6 GS-6 4 30

7 GS-7 2 51

8 GS-8 4 18

9 GS-9 2 48

10 GS-10 2 30

11 GS-11 1.5 56

12 GS-12 2 45

13 GS-13 2 42

14 GS-14 4 37

15 GS-15 4 14

16 GS-16 2 72

17 GS-17 4 30

18 GS-18 4 27

19 GS-19 2 33

20 GS-20 4 45

21 GS-21 2 108

22 GS-22 4 21

23 GS-23 2 36

24 GS-24 2 45

25 GS-25 1.5 48

26 GS-26 2 48

27 GS-27 2 54

28 GS-28 2 42

29 GS-29 2 36

30 GS-30 4 15

31 GS-31 2 42

32 GS-32 2 45

33 GS-33 2 45

34 GS-34 2 45

35 GS-35 2 27

36 GS-36 2 33

37 GS-37 2 45

38 GS-38 2 21

39 GS-39 2 87

40 GS-40 1.5 44

41 GS-41 2 108

42 GS-42 2 51

43 GS-43 4 56

44 GS-44 1.5 52

45 GS-45 2 90

Page 34: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 34

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name Operating Frequency

(Min) Fleet size Required

46 GS-46 4 17

47 GS-47 1.5 40

48 GS-48 4 27

49 GS-49 2 33

50 GS-50 2 42

51 GS-51 4 29

52 GS-52 1.5 48

53 GS-53 2 99

54 GS-54 4 15

55 GS-55 4 36

56 GS-56 1.5 32

57 GS-57 1.5 24

58 GS-58 4 24

59 GS-59 2 72

60 GS-60 2 27

61 GS-61 4 24

62 GS-62 4 32

63 GS-63 2 99

64 GS-64 1.5 60

65 GS-65 4 38

66 GS-66 1.5 60

67 GS-67 2 36

68 GS-68 2 48

69 GS-69 2 54

70 GS-70 2 33

71 GS-71 2 42

72 GS-72 1.5 52

73 GS-73 2 42

74 GS-74 2 48

75 GS-75 1.5 56

76 GS-76 2 33

77 GS-77 4 12

78 GS-78 2 30

79 GS-79 4 15

80 GS-80 2 18

81 GS-81 4 29

82 GS-82 1.5 40

83 GS-83 2 27

84 GS-84 2 48

85 GS-85 2 24

86 GS-86 1.5 48

87 GS-87 4 18

88 GS-88 2 45

89 GS-89 1.5 40

90 GS-90 1.5 28

91 GS-91 2 24

Page 35: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 35

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name Operating Frequency

(Min) Fleet size Required

92 GS-92 2 24

93 GS-93 2 42

94 GS-94 4 24

95 GS-95 2 33

96 GS-96 2 42

97 GS-97 2 45

98 GS-98 2 48

99 GS-99 2 42

100 GS-100 4 24

101 GS-101 2 42

102 GS-102 4 35

103 GS-103 2 42

104 GS-104 2 72

105 GS-105 1.5 60

106 GS-106 2 45

107 GS-107 2 120

108 GS-108 4 18

109 GS-109 4 20

110 GS-110 4 24

111 GS-111 4 27

112 GS-112 2 84

113 GS-113 4 48

114 GS-114 2 75

115 GS-115 2 102

116 GS-116 2 24

117 GS-117 2 51

118 GS-118 2 75

119 GS-119 4 33

120 GS-120 4 24

121 GS-121 2 54

122 GS-122 2 27

123 GS-123 2 27

124 GS-124 2 36

125 GS-125 2 72

126 GS-126 2 78

127 GS-127 2 33

128 GS-128 2 45

129 GS-129 4 16

130 GS-130 4 23

131 GS-131 2 48

132 GS-132 2 63

133 GS-133 2 66

134 GS-134 2 30

135 GS-135 4 20

136 GS-136 2 54

137 GS-137 1.5 40

Page 36: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 36

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Sl. Route Name Operating Frequency

(Min) Fleet size Required

138 GS-138 2 117

139 GS-139 1.5 48

140 GS-140 1.5 40

141 GS-141 2 33

142 GS-142 4 15

143 GS-143 1.5 32

144 GS-144 2 27

As per letter placed at Annexure 3.1, the total number of vehicles registered under the

Gramin Sewa scheme as on 16th May, 2011 is 6,153. Since the total fleet requirement has

been estimated marginally higher than the registered vehicles, a total of 14 permits may be

kept on hold temporarily on routes which have high assignment.

3.1.4 Route Operation Strategy

Following suggestions shall be considered while operating proposed routes

1. The origin and destination of a route should be displayed on a vehicle to avoid

deviations in operation.

2. All the routes identified in study shall be tested on the ground initially and necessary

modification can be made based on actual ridership data received during trial period

of few months in ramp up phase.

3. There should be proper marketing and awareness campaign launched while

implementing proposed routes. This will help in building of ridership.

4. Strong enforcement of rules is necessary pertaining to

a. Avoid overcrowding of a vehicle at any time of the day.

b. Adherence to design frequency.

c. Prescribed fare structure

5. On proposed feeder routes, 4 Gramin Sewa vehicles may be replaced by 1 RTV (18

seater + 6 standing) to provide same capacity.

Page 37: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 37

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Annexure

Page 38: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 38

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Annexure 2.1

Table 0-1: Provisional Routes

S.No. From To Route

1 Najafgarh CRPF, Jharoda Kalan Jharoda Crossing, Jharoda Camp

2 Rajokri, Harijan Basti Chattarpur Mandir Mahipalpur, Masoodpur, Vasant Kunj

3 Nangloi Uttam Nagar Nilothi Crossing, Ranhola Village, Vikas Nagar, Kakrola Nala Village

4 Madhu Vihar Uttam Nagar DPS School, NSIT, Dwarka More

5 Kakrola More Din Deal Hospital Uttam Nagar, Pankha Road, Janakpuri C-1, C-2B, Hari Nagar Depot, Hari Nagar Clock Tower

6 Chander Vihar Uttam Nagar Nilothi, Syed Village, Meera Bagh, Dist. Centre

7 Burari ISBT Nirankari Colony, Nirankari Bhawan, Sant Nagar

8 Burari Timar Pur/Mall Authority

Sant Nagar, Gopal Nagar, Wazirabad, Timar Pur

9 Najafgarh Rao Tula Ram Hospital Mitrau, Surehra, Rawata Crossing

10 Peeragarhi Swarn Park Metro Station

Inder Enclave, Surajmal Metro Station, Nangloi, Railway, Fatak, Kirari Mor, Station Block Metal Chowk, July Public School, Dayanath Mishra Chowk, Janaki Vihar Mandir, Vakil Chowk, Pandey Chowk, Hindu Vihar, Mundka Phatak, Mundka Factory

11 Nangloi Nithari Village Railway, Fatak, Kirari More

12 Kirari Village Peeragarhi Kirari More, Ratan Vihar, Jalebi Chowk, Sultan Puri, S-Block Mangolpuri, Q-Block Mangolpuri, Peeragarhi

13 Nangloi Budh Vihar Sultan Puri Fatak, Jalebi Chowk, C-Block, Sultan Puri, Puth Kalan Village Budh Vihar

14 Nangloi Punjabi Bagh (General Store)

Naresh Park, Laxmi Park, Nihal Vihar, Paschim Vihar

15 Nangloi Janakpuri District Centre Nihal Vihar, Paschim Vihar, Meera Bagh, Vikas Puri

16 Nangloi Janakpuri District Centre Adyapak Nagar, Shivram Park, 50 Foota road, Nihal Vihar, Paschim Vihar

17 Shahdara Apsara Border G.T. Road

18 Shastri Park, Metro Station

Karawal Nagar Usmanpur, Gamri Extension Pushta No.-5, Bhajanpura

19 Madhuban Chowk Avantika Rohini Metro Station East, Rajiv Gandhi Cancer hospital, Vishram Chowk

20 Ghewra More Nizampur Garhi Ghewra Village, Nizampur Village

21 Majlis Park School Burari Mukundpur, Sant Nagar

22 G.T. B Nagar Mukherjee Nagar Baandh

BBM Depot, Mukherjee Nagar

23 Peeragarhi Durga Chowk Prem Nagar-II

Inder Enclave, Surajmal Metro Station, Nangloi Railway Fatak, Kirari Mor, UGR Block, Nag Mandir, U Block. Transformer

Page 39: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 39

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

S.No. From To Route

24 Nangloi Rani Khera Rajdhani Park, Mundka Railway Phatak

25 Nangloi Nilothi Extension. Shivram Park, Nilothi Village

26 Kanjhawla Qutub Garh Ladpur, Jonti Village

27 G.T. B Nagar Nathupura Nirankari Colony, Jharoda Dairy Crossing, Kushak Enclave

28 Loni No.2 Bhajanpura Jawahar Nagar, Loni Crossing, Yamuna Vihar C4

29 Loni No.2 Seelampur Jawahar Nagar, Loni Crossing, Babarpur

30 Bhajanpura Karawal Nagar Dayalpur

31 Peeragarhi RG Cancer Hosp. Mangolpuri A Block, Mangolpuri School, Avantika, Vishram Chowk

32 Najafgarh Pandawla Kalan Roshanpura, Jhatikra More, Rewla Khanpur, Oandwala Crossing

33 Najafgarh Zafarpur Kalan Ghuman Hera Crossing , Mitrau, Surerhra Crossing , Rawta Crossing

34 Najafgarh Ishapur Temple Ghuman Hera Crossing, Mitrau, Surerhra Crossing, Rawta Crossing, Mundela Crossing, Kadipur, Ishapur M.C. School

35 Najafgarh Khera Dawar Ghuman Hera Crossing

36 Kakrola Crossing Ghalibpur Nangloi, Najafgarh, Ghuman Hera Crossing, Kair Village Kharkhari Nahar, Hasanpur, Ghuman Hera Amaravati Piao

37 Najafgarh Goela Dairy Roshanpura, Ghewra Crossing

38 Mundka Najafgarh Hiran Kudna Village

39 Nangloi Nilwal Mundka, Ghewra Crossing

40 Peeragarhi Durga Chowk Prem Nagar-II

B Block Mangolpuri, Q Block Mangolpuri, S Block. Mangolpuri Jalebi Chowk, Kakkar Market, Ratan Vihar, 70 Foota Rd, UGR Block, Mubarak Pur Rd, MO Block, Nag Mandir, U Block, Transformer

41 Badli GT Road, Tikri Khurd Nangloi Poonam, Budhpur, Alipur, Bakoli Crossing, Khampur

42 Hiranki Village Badli GT Road Nangloi Poonam, Budhpur, Alipur, Bakoli Crossing, Bakhtawarpur, Mohammadpur

43 Haiderpur Water Tank

Sultanpur Dabas ESI Hospital, Rohini Sector-16, Shahbad Daulatpur, St. Michael School, Prahladpur, Barwala, Puth Khurd

44 Badli GT Road Ghoga Village Nangloi Poonam, Budhpur, Khera Kalan, Khera Khurd, Holambi Kalan, Sannoth Crossing

45 Mandoli Shahdara Nathu Chowk, Indira Piao, Tikona Park

46 Chauhan Patti Wazirabad Sonia Vihar E Block, Nanaksar

47 Sabapur Village Seelampur Metro Station

Karawal Nagar, Govt. Model School, Pushta No.5, Gamri Extension., Pushta No.2, Usmanpur

48 Loni No.2 Shahdara Jawahar Nagar, Loni Crossing, Durgapuri Chowk, Rathi Mill

49 Mukhmelpur Badli GT Road Jindpur, Alipur, Budhpur, Nangli Poonam

Page 40: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 40

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

S.No. From To Route

50 Laxmi Nagar Mandawali Mother Dairy, Vinod Nagar, Kalyanpuri

51 Seemapuri Dilshad Garden GTB Hospital, Tahirpur

52 Shahdara Nand Nagri Loni road, Durgapuri Chowk, Nathu Chowk

53 Kalyanpuri Anand Vihar Gazipur Dairy Farm

54 Preet Vihar Metro Station

New Seemapuri Jagatpuri, Karkar Dooma Court, Yamuna Sports Complex, Vivek Vihar

55 Virat Cinema, Ambedkar Nagar

Nehru Place Hamdard Nagar, Govindpuri, Kalkaji

56 Sangam Vihar Badarpur Lal Kuan, Tughlakabad colony

57 Sangam Vihar Qutub Minar Metro Station

Ambedkar Terminal, Asian Market, Lado Sarai

58 Harijan Basti, Rajokri Dwarka Metro Station Samalkha, Under Pass, Sector 21,22, Geetanjali Encl.

59 Sangam Vihar Saket Ambedkar Nagar Terminal., Asian Market, Saket J Block

60 Madanpur Khadar Nehru Place Apollo hospital, Kalkaji Flyover, Kalkaji Mandir

61 Rohini East Metro Station

Rohini Sector-28,29 Tarun Vihar CGHS, Farmer, Goodwill Apartment, Sector-11, Shahbad Dairy

62 Rohini East Metro Station

DCE, Rohini Sector-17/19

Tarun Vihar CGHS, Farmer, Goodwill Apartment, Sector-18-19, Badli Industrial Area, Shahbad Dairy

63 Karawal Nagar Timar Pur Kauri Chowk, Nanaksar Gurudwara, Wazirabad Pul

64 Rohini East Metro Station

HMR Engineering College, Hamurpur

Tarun Vihar, Goodwill Apart,, Sector-11, Shahbad Dairy, Sector-18, Badli Railway Phatak, Nangli Poonam, Budhpur, Alipur

65 Seelampur Metro Station

North India Engineering College

Shastri Park, MCD Flats, North India Engineering College, Jag Parvesh MCD Hospital

66 Rithala Metro Station Maharaja Agrasen College

Pal Colony, Sector-24 Rohini, Sector-23, Sector-22

Source: Transport Department, GNCTD

Page 41: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 41

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Annexure 2.2

Table 0-2: Suggestions received from various stakeholders

Page 42: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 42

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 43: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 43

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 44: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 44

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 45: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 45

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 46: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 46

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 47: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 47

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 48: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 48

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 49: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 49

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Some further suggestions for routes have been received:

Table 0-3: Further Suggestions received from various stakeholders

Page 50: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 50

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 51: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 51

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Page 52: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 52

Design of Routes under Gramin Sewa Scheme Final Report

May 2011

Annexure 3.1

Page 53: Design of Routes Gramin Sewa Scheme in Dlhi- Draft ReportReport... · Design of Routes under Gramin Sewa Scheme Final Report May 2011 Figure 1-1: Area of operation of Gramin Sewa

Page 53

Design of Routes under Gramin Sewa Scheme Final Report

May 2011