DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL....

23
CONVERSION AND/OR FUEL FABRICATION PLANTS OVERALL PROCESS PARAMETERS INTERNATIONAL ATOMIC ENERGY AGENCY DEPARTMENT OF SAFEGUARDS AND INSPECTION CONFIDENTIAL WHEN COMPLETED DESIGN INFORMATION QUESTIONNAIRE * IAEA USE ONLY CONFIDENTIAL N-73 (11-2017) PROCESS DESCRIPTION (indicating type of conversion, method of fabrication, sampling methods, etc., indicating also the modification of physical and chemical forms) 14. DATE: FACILITY DESCRIPTION (indicating all process stages, storage areas and feed, product and waste points as pertaining to the measurement control and accountancy of nuclear material) 13. 3 (CONTINUED) GENERAL FLOW DIAGRAM(S) ATTACHED UNDER REF. NOS. (The diagram(s) should also indicate equipment, hoods, cells, and those areas which contain nuclear material as those specific areas where hold-up of nuclear material can occur) CONVERSION AND/OR FUEL FABRICATION PLANTS * Questions which are not applicable may be left unanswered. The "Confidential" marking on this form is for IAEA purposes only. It indicates that the IAEA considers the information in the completed form to be 'safeguards confidential' and is not to be confused with any U.S. security classification. Estimated burden per response to comply with this mandatory collection request: 360 hours. NRC is required to collect this information for reporting to IAEA from facility licensees appearing on the U.S. Eligible List. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to [email protected], and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0056), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. APPROVED BY OMB: NO. 3150-0056 EXPIRES: 08/31/2020

Transcript of DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL....

Page 1: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

CONVERSION AND/OR FUEL FABRICATION PLANTS OVERALL PROCESS PARAMETERS

INTERNATIONAL ATOMIC ENERGY AGENCY DEPARTMENT OF SAFEGUARDS AND INSPECTION

CONFIDENTIAL WHEN COMPLETED

DESIGN INFORMATIONQUESTIONNAIRE *

IAEA USE ONLY

CONFIDENTIALN-73 (11-2017)

PROCESS DESCRIPTION(indicating type of conversion, method offabrication, sampling methods, etc., indicatingalso the modification of physical and chemicalforms)

14.

DATE:

FACILITY DESCRIPTION(indicating all process stages, storage areasand feed, product and waste points aspertaining to the measurement control andaccountancy of nuclear material)

13.

3

(CONTINUED)

GENERAL FLOW DIAGRAM(S) ATTACHED UNDER REF. NOS.(The diagram(s) should also indicate equipment, hoods, cells, and those areaswhich contain nuclear material as those specific areas where hold-up of nuclearmaterial can occur)

CONVERSION AND/OR FUEL FABRICATION PLANTS

* Questions which are not applicable may be left unanswered.

The "Confidential" marking on this form is for IAEA purposes only. It indicates that the IAEA considers the information in the completed form to be 'safeguards confidential' and is not to be confused with any U.S. security classification.

Estimated burden per response to comply with this mandatory collection request: 360 hours. NRC is required to collect this information for reporting to IAEA from facility licensees appearing on the U.S. Eligible List. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to [email protected], and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0056), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

APPROVED BY OMB: NO. 3150-0056 EXPIRES: 08/31/2020

Page 2: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

OVERALL PROCESS PARAMETERSDESIGN CAPACITY(in weight of principle products per annum)

15.

ANTICIPATED ANNUAL THROUGHPUT(in the form of a forward programme (ifapplicable), indicating the proportion of variousfeeds and products)

16.

CONVERSION AND/OR FUEL FABRICATION PLANTS DATE:

OTHER IMPORTANT ITEMS OF EQUIPMENTUSING, PRODUCING, OR PROCESSINGNUCLEAR MATERIAL, IF ANY(such as testing and experimental equipment)

17.

4CONFIDENTIALN-73 (11-2017)

Page 3: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL DESCRIPTION AND FLOW18.

CONVERSION AND/OR FUEL FABRICATION PLANTS DATE:

5CONFIDENTIAL

MAIN MATERIAL DESCRIPTION

Main Types of Accountability Unitsto Be Handled in the Facility

i)

FEED PRODUCTINTERMEDIATE PRODUCT (1)

Chemical and Physical Form(for product include types of fuel element/assemblies, give detailed descriptionindicating general structure and overallstructure and overall dimensions of fuelelement/assemblies, including nuclearmaterial content and enrichment)Attach drawing(s)

ii)

Throughput, Enrichment Ranges andPu contents(for normal flow sheet operation indicatingif blending and/or recycling takes place)

iii)

Batch Size/Flow Rate and CampaignPeriod, Means of Batch Identification

iv)

(1) For example, powder, pellets, etc., separately stored or shipped.

N-73 (11-2017)

Page 4: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL DESCRIPTION AND FLOW18.

CONVERSION AND/OR FUEL FABRICATION PLANTS DATE:

6CONFIDENTIAL

MAIN MATERIAL DESCRIPTION(Continued)

Storage and Plant Inventory(indicating any change with throughput)

v)

FEED PRODUCTINTERMEDIATE PRODUCT (1)

Frequency of Receipt or Shipment(batches/units per month)

vi)

WASTE MATERIAL(including contaminated equipment,measured discards, and retainedwaste).

Describe for each waste stream:

i) Major Contributions (sources)

20.

ii) Type of Waste

SCRAP MATERIAL19.

(1) For example, powder, pellets etc., separately stored or shipped.

N-73 (11-2017)

Page 5: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL DESCRIPTION AND FLOW20.

DATE:

7CONFIDENTIAL

WASTE MATERIAL (Continued)

Chemical and Physical Form(liquid, solid, etc.)

iii)

Estimated Enrichment Ranges andUranium/Plutonium Content

iv)

Estimated Quantities Per Year,Period of Storing

v)

Waste Generated Rates(as % of input/throughput, quantitiesper month)

vi)

Store Inventory Range andMaximum Capacity

vii)

Method and Frequency ofRecovery/Disposal

viii)

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 6: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL DESCRIPTION AND FLOW21.

DATE:

8CONFIDENTIAL

WASTE TREATMENT SYSTEM

OTHER NUCLEAR MATERIAL IN THEFACILITY AND ITS LOCATION, IF ANY

22.

DIAGRAM(S) ATTACHED UNDER REFERENCE NUMBERS:SCHEMATIC FLOW SHEET FORNUCLEAR MATERIAL(identifying sampling points, flow and inventorymeasurement points, accountability areas,inventory locations, etc.)

23.

DIAGRAM(S) ATTACHED UNDER FIGURE NUMBERS:

DIAGRAM(S) ATTACHED UNDER REFERENCE NUMBERS:

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 7: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL DESCRIPTION AND FLOW24.

DATE:

9CONFIDENTIAL

TYPES, FORM, RANGES OF ENRICHMENT,PU CONTENT, RANGES OF QUANTITIES OFNUCLEAR MATERIAL FLOW FOR EACHNUCLEAR MATERIAL HANDLING AREA,i.e.:

-- process area-- storage area-- other locations

(Also indicate maximum quantities of nuclearmaterial to be handled in accountability areasat the one time.)

DIAGRAM(S) ATTACHED UNDER REFERENCE NUMBERS:RECYCLE PROCESSES(briefly describe any such processes givingsource and form of material, method ofstorage,normal inventory, frequency of processing,duration of temporary storage, schedules forany external recycling, measurement methodof fissile content of recycle material)

25.

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 8: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL HANDLING(FOR EACH ACCOUNTABILITY AREA)

NUCLEAR MATERIAL DESCRIPTION AND FLOW26.

DATE:

10CONFIDENTIAL

INVENTORY

In-Process(within plant and equipment duringnormal operation; indicate quantity, rangeof enrichment, Pu content, form andprincipal locations and any significantchange in time or throughput; indicateanticipated residual hold-up andmechanism, e.g., plate out,condensation)

i)

Feed and Product Storageii)

Other Locations(quantity, range of enrichment, Pucontent, form and location of inventorynot already specified)

iii)

DRAWING(S) ATTACHED UNDER REFERENCE NUMBERS:CONTAINERS, PACKAGING, ANDSTORAGE AREA DESCRIPTION

27.

SEPARATE NOTE TO BE ATTACHED.Describe for feeds, products, and wastes: the type and size of storage andshipping containers and packaging used, (including nominal capacity andcapacity for normal operation, and type of material); method of storage orpacking, filling and emptying procedures, shielding; and any specialidentification features.

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 9: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL HANDLING(FOR EACH ACCOUNTABILITY AREA)

METHODS AND MEANS OF TRANSFER OFNUCLEAR MATERIAL(Describe also equipment used for handling offeed, product, and waste.)

28.

DATE:

DRAWING(S) ATTACHED UNDER REFERENCE NUMBERS:TRANSPORTATION ROUTES FOLLOWEDBY NUCLEAR MATERIAL(with reference to plant layout)

29.

SHIELDING(for storage and transfer)

30.

11CONFIDENTIAL

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 10: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

PROTECTION AND SAFETY MEASURES

PLANT MAINTENANCESEPARATE NOTE TO BE ATTACHEDMAINTENANCE, DECONTAMINATION,

CLEAN-OUT31.

DATE:

BASIC MEASURES FOR PHYSICALPROTECTION OF NUCLEAR MATERIAL

32.

12CONFIDENTIAL

Describing plans and procedures for decontamination and clean-out ofequipment containing nuclear material, defining all sampling and measurementpoints associated with:

i)

ii)

iii)

iv)

Normal Plant Maintenance;

Plant and Equipment Decontamination and Subsequent NuclearMaterial Recovery;

Plant and Equipment Clean-out Including Means of Ensuring VesselsAre Empty;

Plant Start-up And Plant Shutdown(if difference from normal operations)

(In cases where clean-out and/or sampling is not possible, indicate how thehold-up of nuclear material is measured or calculated.)

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 11: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL

PROTECTION AND SAFETY MEASURES

SPECIMEN FORMS USED IN ALL PROCEDURES ATTACHED UNDERREFERENCE NUMBERS:

SYSTEM DESCRIPTIONGive a description of the nuclear materialaccountancy system, the method of recordingand reporting accountancy data andestablishing material balances, frequency ofmaterial balances, procedures for accountadjustment after plant inventory, mistakes, etc.,under the following headings:

i) General

34.

DATE:

13CONFIDENTIAL

SPECIFIC HEALTH AND SAFETY RULESFOR INSPECTOR COMPLIANCE(if extensive, attach separately)

33.

(This section should also state what generaland subsidiary ledgers will be used, theirform (hard copies, tapes, microfilms, etc.), aswell as who has the responsibility andauthority. Source data (e.g., shipping andreceiving forms, internal transfer documents,physical inventory forms, the initial recordingof measurements and measurement controlsheets) should be identified. The proceduresfor making adjustments; the source data andrecords should be covered as well as howthe adjustments are authorized andsubstantiated).

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 12: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROLSYSTEM DESCRIPTION (Continued)

i) General (continued)

34.

DATE:

14CONFIDENTIAL

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 13: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL34.

DATE:

15CONFIDENTIAL

SYSTEM DESCRIPTION (Continued)

Receipts(including method of dealing with shipper/receiver differences and subsequentaccount corrections, the checks andmeasurements used to confirm nuclearmaterial content and the personsresponsible for those determinationsshould be defined.)

ii)

Shipments(products, waste, measured discards)

iii)

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 14: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL34.

DATE:

16CONFIDENTIAL

SYSTEM DESCRIPTION (Continued) LIST OF MAJOR ITEMS OF EQUIPMENT REGARDED AS NUCLEARMATERIAL CONTAINERS ATTACHED UNDER REFERENCE NUMBERS:

Physical InventoryDescription of procedures, scheduledfrequency, estimated distribution ofnuclear material, methods of operator'sinventory taking (both for item and/or bulkaccountancy, including relevant assaymethod), accessability and possibleverification method for nuclear material,expected accuracy, and access tonuclear material.(In particular, the description ofprocedures should also provide the basicinventory approach to be used, i.e.,planning, organizing, and conducting theinventory, pre-listing, use of priormeasurement data; who has primaryresponsibility for the inventory; howprocess clean-out is accomplished; theaccountancy of process residual hold-up.)

iv)

Measured Discards.(Methods of estimation of quantities peryear/month, method of disposal.

v)

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 15: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL34.

DATE:

17CONFIDENTIAL

SYSTEM DESCRIPTION (Continued)

Retained Waste(Method of estimation of quantities peryear, method and envisaged period ofstorage; indicate also possiblesubsequent uses of retained waste)

vi)

Unmeasured Losses(Indicate the methods used to estimateunmeasured losses)

vii)

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 16: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROLSYSTEM DESCRIPTION (Continued)34.

18CONFIDENTIAL

viii) Operation Records and Accounts(Including log books, general ledgers,internal transfer forms, method ofadjustment or correction and retentionlocation, and languages; controlmeasures and responsibility for records)

FEATURES RELATED TO CONTAINMENTAND SURVEILLANCE MEASURES(General description of applied or possiblemeasures in reference to floor plan or plantlayout)

35.

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 17: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROLFOR EACH FLOW AND INVENTORYMEASUREMENT POINT, AND SAMPLINGPOINTS OF ACCOUNTABILITY AREAS,IDENTIFIED IN PARTICULAR UNDER QS. 13,23, 24, GIVE THE FOLLOWING*

36.

19CONFIDENTIAL

i) Description of Location, Type,Identification

Expected Types of Inventory Change atThis Measurement Point

ii)

iv) Physical and Chemical Form ofNuclear Material(including enrichment range, Pu content,and cladding materials description)

* For each measurement point, fill in separate sheet.

Possibilities to Use This MeasurementPoint for Physical Inventory Taking

iii)

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 18: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL

FOR EACH FLOW AND INVENTORYMEASUREMENT POINT, AND SAMPLINGPOINTS OF ACCOUNTABILITY AREAS,IDENTIFIED IN PARTICULAR UNDER QS. 13,23, 24, GIVE THE FOLLOWING* (Continued)

36.

20CONFIDENTIAL

v) Nuclear Material Containers, Packaging,and Method of Storage

Sampling Procedure and EquipmentUsed(including number of samples taken,frequency and rejection criteria)

vi)

vii) Measurement/Analytical Method(s) andEquipment Used and CorrespondingAccuracies

* For each measurement point, fill in separate sheet.

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 19: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROLFOR EACH FLOW AND INVENTORYMEASUREMENT POINT, AND SAMPLINGPOINTS OF ACCOUNTABILITY AREAS,IDENTIFIED IN PARTICULAR UNDER QS. 13,23, 24, GIVE THE FOLLOWING* (Continued)

36.

21CONFIDENTIAL

viii) Source and Level of Random andSystematic Errors for Feed, Products,Scrap, Waste(weight, volume, sampling, analytical)

Calculative and Error PropagationTechniques

ix)

x) Technique and Frequency of Calibrationof Equipment Used, and Standards Used

* For each measurement point, fill in separate sheet.

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 20: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROL

FOR EACH FLOW AND INVENTORYMEASUREMENT POINT, AND SAMPLINGPOINTS OF ACCOUNTABILITY AREAS,IDENTIFIED IN PARTICULAR UNDER QS. 13,23, 24, GIVE THE FOLLOWING* (Continued)

36.

22CONFIDENTIAL

xi) Programme for the Continuing Appraisalof the Accuracy of Weight, Volume,Sampling and Analytical Techniques andMeasurement Methods

Programme for Statistical Evaluation ofData from (x) and (xi)

xii)

xiii) Method of Converting Source Data toBatch Data(standard calculative procedures,constants and empirical relationshipsfor feed, products in sub-accountingareas, waste and scrap)

* For each measurement point, fill in separate sheet.

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 21: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROLFOR EACH FLOW AND INVENTORYMEASUREMENT POINT, AND SAMPLINGPOINTS OF ACCOUNTABILITY AREAS,IDENTIFIED IN PARTICULAR UNDER QS. 13,23, 24, GIVE THE FOLLOWING*

36.

23CONFIDENTIAL

xiv) Means of Batch Identification

Anticipated Batch Flow Rate Per Yearxv)

xvii) Anticipated Number of Items Per Flowand Inventory Batches

* For each measurement point, fill in separate sheet.

Anticipated Number of Inventory Batchesxvi)

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 22: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

NUCLEAR MATERIAL ACCOUNTANCY AND CONTROLFOR EACH FLOW AND INVENTORYMEASUREMENT POINT, AND SAMPLINGPOINTS OF ACCOUNTABILITY AREAS,IDENTIFIED IN PARTICULAR UNDER QS. 13,23, 24, GIVE THE FOLLOWING* (Continued)

36.

24CONFIDENTIAL

xviii) Type, Composition and Quantity ofNuclear Material Per Batch(with indication of batch data, totalweight of each element of nuclearmaterial and form of nuclearmaterial)

Features Related to Containment-Surveillance Measures

xix)

OVERALL LIMIT OF ERROR

Describe procedures to combine individualmeasurement error determination to obtain theoverall limit of error for:

* For each measurement point, fill in separate sheet.

DATE:

37.

S/R Differences

Book Inventory

Physical Inventory

MUF

i)

ii)

iii)

iv)

CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)

Page 23: DESIGN INFORMATION QUESTIONNAIRE · QUESTIONNAIRE * IAEA USE ONLY. N-73 (11-2017) CONFIDENTIAL. PROCESS DESCRIPTION (indicating type of conversion, method of. fabrication, sampling

OPTIONAL INFORMATIONOPTIONAL INFORMATION(that the operator considers relevantto safeguarding the facility)

38.

25CONFIDENTIAL

Signature of Responsible Officer:

Date:

DATE:CONVERSION AND/OR FUEL FABRICATION PLANTS

N-73 (11-2017)