![Page 1: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/1.jpg)
Design Guidelines and Detailing Update Related to Post-Tensioning
and Segmental Bridges
Teddy S. Theryo, P.E.
FDOT Structures Design Office
2019
![Page 2: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/2.jpg)
Background Behind the Flexible Filler PT Policy
❖ PT Grout - Crisis of Confidence
❖ An opportunity for Improvement
![Page 3: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/3.jpg)
THE FDOT STUDY TOUR MEMBERS AT PROJECT SITE IN FRANCE (October 16, 2013)
Background Behind the Flexible Filler PT Policy
![Page 4: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/4.jpg)
Learning Objectives
❖Status of FDOT Flexible Filler PT tendons
❖Flexible Filler project implementation in the state of Florida
❖Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges
❖Update on Structures Design Guidelines related to post-tensioned and segmental bridge design
❖Update on Structures Detailing Manual related to post-tensioned and segmental bridge detailing
❖Update on tendon filler injection mock-up test requirements
![Page 5: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/5.jpg)
Presentation Outline
1. Introduction
2. General Requirements
3. Superstructures
4. PT Spliced Girder Bridge
5. PT Tendon Mock-up Test
6. Closing
![Page 6: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/6.jpg)
Introduction
Major Changes in PolicyImplement Flexible Filler as PT Tendons corrosion protection for all tendons, except PT tendons in the deck, such as cantilever tendons, transverse tendons, slab tendons with maximum 2’-0” drape.
Tendon Replaceability is one of the major factors in changing the Policy toward flexible filler.
Focus of this PresentationStructures Design Guidelines and Structures Detailing Manual updates in implementing the Policy Changes in PT bridges since 2016Reference: Structures Manual – January 2019
![Page 7: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/7.jpg)
Introduction (cont.)Flexible Filler/ Replaceable Tendons - Status of Post-tensioned and Segmental Bridges in Florida April 2014: Revision to FDOT Policy for Post-Tensioned bridges was posted (Structures
Design Bulletin 14-06)
January and May 2015: Updated on the Revised Policy were posted (Structures Design Bulletin 15-01 & 15-03)
Since May 2015 Structure Design Office continue updating Structure Design Guidelines related Post-tensioned and segmental bridges
The Policy for PT Bridges was effectively implemented since January 1, 2016.
Projects implementation: two flexible projects have been completed, and several other major projects are under construction
Flexible filler injection Training in Tallahassee, sponsored by FDOT, ASBI & PTI (1st
training – May 2017, 2nd training – August 2018, 3rd training – August 2019).
![Page 8: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/8.jpg)
IntroductionProject Implementation
Project: Wildwood I-75 Turnpike Interchange Subject: Post-tensioned straddle pier cap with flexible fillerStatus: Completed constructionProject completion: Open to traffic 2018
Photo Courtesy of VStructural
![Page 9: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/9.jpg)
IntroductionProject Implementation
Project: I-295 Express in JacksonvilleSubject: Three straddle pier caps are post-tensioned with flexible filler tendonsStatus: Completed constructionProject completion: Open to traffic May 2019
![Page 10: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/10.jpg)
IntroductionProject Implementation
Project: Wekiva – Section 6Subject: Three 3 span CIP balanced cantilever bridges, post-tensioned tendons with flexible filler and grout Status: Under constructionExpected project Completion: Spring 2021
![Page 11: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/11.jpg)
IntroductionProject ImplementationProject: Selmon Expressway – West Extension (THEA Project)Subject: Post-tensioned Precast segmental superstructure, including some pier columns. PT tendons are flexible in combination with grout fillersStatus: Under constructionExpected completion: Fall 2020
Rendering courtesy of Kiewit
![Page 12: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/12.jpg)
IntroductionProject ImplementationProject: I-395 Project in MiamiSubject: Post-tensioned Precast Segmental Structures (Arches and box girders) Status: Under constructionExpected completion: 2022
I-395 Project Renderings - Courtesy of Connecting Miami (Archer Western De Moya Joint Venture)
![Page 13: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/13.jpg)
General Requirements
Corrosion and Tendon Redundancy
How is this Strategy # 5 applied to flexible filler?
![Page 14: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/14.jpg)
General Requirements
Tendon Replaceability/Redundancy
![Page 15: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/15.jpg)
General Requirements
Tendon Replaceability
![Page 16: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/16.jpg)
Maintenance / stressing spaces at Abutment (typical for bridges in Europe)
General Requirement
Abutment
End Diaphragm
![Page 17: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/17.jpg)
General Requirements
Tendon Replaceability
![Page 18: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/18.jpg)
General Requirements
Tendon Replaceability
![Page 19: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/19.jpg)
General Requirements
Tendon Replaceability
![Page 20: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/20.jpg)
General RequirementsTendon Replaceability
![Page 21: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/21.jpg)
Tendon Duct Geometry
General Requirements
![Page 22: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/22.jpg)
Superstructure
Background for switching to Diabolo Form
Conventional detail with bonded rigid steel pipe
Rigid steel pipe pulled out due to failed tendon
![Page 23: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/23.jpg)
SuperstructureBackground for switching to Diabolo Form
Diabolo was prohibited by Spec. 462. The winner of D/B Team for SR 826/SR 836 Interchange in Miami proposed to use Diabolos as Technical Innovation. FDOT would only accept the Diabolos provided two tests to be conducted:• Wear test per ETAG 13• Flexibility test per ETAG 13Both test results were satisfactory and the proposal was accepted. Diabolo Static Load Testing
![Page 24: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/24.jpg)
SuperstructureBackground for switching to Diabolo Form
Diabolo Static and Wear Testing
![Page 25: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/25.jpg)
Deviator
Diabolos form
Superstructure
External Tendon
Typical diabolos form for segmental bridges in Europe
![Page 26: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/26.jpg)
SuperstructureAnother form of diabolos (Germany)
![Page 27: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/27.jpg)
Superstructure
Rendering and diabolo basic geometry per FHWA Research Project, Draft Report “Replaceable Grouted External Pos-tensioned Tendon” by Parsons Brinckerhoff (WSP), April 2017.
Background for switching to Diabolo Form
![Page 28: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/28.jpg)
Superstructure
Advantages with Adopting Diabolos Form
1. Ease of tendon installation2. Ease of external tendons replacement3. Allow more tolerances in 3D tendon geometry control
between two points, e.g. from deviator to diaphragm
Background for switching to Diabolo Form
![Page 29: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/29.jpg)
Superstructure
SDG 1.11.4 (E)
Background for switching to Diabolo Form
![Page 30: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/30.jpg)
Superstructure
FDOT DiaboloForm Standard
![Page 31: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/31.jpg)
SuperstructureFDOT Diabolo Form Standard
Internal tendon
External tendon
![Page 32: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/32.jpg)
SuperstructureFDOT Diabolo Form Standard
![Page 33: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/33.jpg)
Superstructure
FDOT Diabolo Form Standard
![Page 34: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/34.jpg)
Superstructure
FDOT Diabolo Form Standard
![Page 35: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/35.jpg)
SuperstructureFDOT Diabolo Form Standard
![Page 36: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/36.jpg)
Superstructure
Duct Spacing
![Page 37: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/37.jpg)
SuperstructureDuct Spacing
![Page 38: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/38.jpg)
SuperstructureDuct Spacing
![Page 39: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/39.jpg)
Substructure
Duct Spacing
![Page 40: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/40.jpg)
Superstructure
• Shear Capacity Limit
• Support hinge locations
![Page 41: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/41.jpg)
Superstructure• External PT
unsupported length
![Page 42: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/42.jpg)
Superstructure
Based on Study: “Review of AASHTO LRFD Bridge Design Specifications and ACI-318 Unbonded PT Provisions for FDOT Implementation” by Parsons Brinckerhoff (WSP), Nov. 17, 2015
![Page 43: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/43.jpg)
Superstructure
Wide Beam Member
![Page 44: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/44.jpg)
Superstructure
Wide Beam Member
![Page 45: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/45.jpg)
Superstructure
On going research on Shear and Flexural strength of combined unbonded and bonded tendons
1. NCHRP 12-118: “Design Construction Specifications for Bonded and Unbonded Post-Tensioned Concrete Bridge Element”. Expected completion: 2021
2. FDOT Research projects(a.) “Flexural Capacity of Concrete Elements with Unbonded and Bonded
Presstressing”FDOT Contract No. BD31-977-93
(b.) “Shear Behavior of Webs Post-Tensioned with Tendons Containing Flexible Filler”
FDOT Contract No. BDV31-977-71
![Page 46: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/46.jpg)
PT Spliced Girder Bridge
Shear Detailing in Thin Web - SDG Figure 4.5.1-1
![Page 47: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/47.jpg)
PT Spliced Girder Bridge
Tendon Replaceability
Staggered Tendon Overlap
![Page 48: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/48.jpg)
PT Spliced Girder Bridge
Tendon Replaceability
![Page 49: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/49.jpg)
PT Spliced Girder Bridge
External Tendon OptionSDM 23.7-4 & 23.7-6
Elevation
Tendon Vertical Layout
Section – Plan View
A
A
![Page 50: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/50.jpg)
PT Tendon Mock-up Test
PT mock-up test required under Standard Specification 462-7.4 Filler Injection
Required full scale mock-ups both for flexible and grout filler tendons associated with PT system components, including filler materials proposed for the project (see Index 21800 Series and its IDS for guidance in preparing mock-up test plans)
Submit a Report of the test and findings
Repeat mock-up test if required by the Engineer
![Page 51: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/51.jpg)
PT Tendon Mock-up Test
The objectives of mock-up test
• To demonstrate that the proposed PT system, filler material, equipment used and injection method will be able to fully fill the ducts from end to end
• Opportunity for the contractor to train the workers• Opportunity to improve the quality of their products• For FDOT to provide opportunity to observe the
results, lessons learned and improve our specifications
![Page 52: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/52.jpg)
PT Tendon Mock-up TestProject: Wildwood – I-75 InterchangeFlexible filer: Fill Flex 100 (Trenton)Date: July 12, 2018
Photos courtesy of VStructural
Inlet port
Heated holding tank
![Page 53: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/53.jpg)
PT Tendon Mock-up TestProject: Wildwood I-75 Outlet port
Vacuum device
Photos Courtesy of VStructural
![Page 54: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/54.jpg)
PT Tendon Mock-up Test
Project: Wildwood I-75
Void
![Page 55: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/55.jpg)
PT Tendon Mock-up TestProject: Wekiva Section 6 BridgeFlexible filler: RENOLIN CL 4 RO (Fuchs Lubricants, Co)Date injected: April 22, 2019
Mock-up: two span continuous with draped tendon 2 @ 100’ = 200’ total length.
Wax leaking at inlet (top) and outlet (cap) ports connections
![Page 56: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/56.jpg)
Curtesy of Superior ConstructionPT Tendon Mock-up Test
![Page 57: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/57.jpg)
PT Tendon Mock-up Test
![Page 58: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/58.jpg)
PT Tendon Mock-up Test
Project: Wekiva Section 6
Void
![Page 59: Design Guidelines and Detailing 2019 Update Related to ......Update on the design aspect and detail requirements for post-tensioned and segmental concrete bridges Update on Structures](https://reader033.fdocuments.us/reader033/viewer/2022041621/5e3f21a912d9224249194bca/html5/thumbnails/59.jpg)
Closing
Thank you for your attention