Design Facility Layout

download Design Facility Layout

of 64

Transcript of Design Facility Layout

  • 7/28/2019 Design Facility Layout

    1/64

    Production Plant Layout (1)Production Plant Layout (1)

    Facility Layout Problem: designFacility Layout Problem: design

    problemproblem

    locations of activitieslocations of activities

    dimensionsdimensions

    configurationsconfigurations

    No overall algorithm existsNo overall algorithm exists

  • 7/28/2019 Design Facility Layout

    2/64

    Design problem

    Greenfield Location of one

    new machine

    Production Plant Layout (2)Production Plant Layout (2)

    Reasons:Reasons: new productsnew products

    changes in demandchanges in demand

    changes in product designchanges in product design new machinesnew machines

    bottlenecksbottlenecks

    too large bufferstoo large buffers

    too long transfer timestoo long transfer times

    Production Plant Layout (2)Production Plant Layout (2)

  • 7/28/2019 Design Facility Layout

    3/64

    DesignDesign

    Layout

    Product

    Logistics Process

  • 7/28/2019 Design Facility Layout

    4/64

    Production Plant Layout (3)Production Plant Layout (3)

    Goals (examples):Goals (examples):

    minimal material handling costsminimal material handling costs

    minimal investmentsminimal investments

    minimal throughput timeminimal throughput time

    flexibilityflexibility

    efficient use of spaceefficient use of space

  • 7/28/2019 Design Facility Layout

    5/64

    Production Plant Layout (4)Production Plant Layout (4)

    Restrictions:Restrictions:

    legislation on employees workinglegislation on employees working

    conditionsconditions present building (columns/waterworks)present building (columns/waterworks)

    Methods:Methods:

    Immer: The right equipment at the rightImmer: The right equipment at the rightplace to permit effective processingplace to permit effective processing

    Apple: Short distances and short timesApple: Short distances and short times

  • 7/28/2019 Design Facility Layout

    6/64

    Goals Production Plant LayoutGoals Production Plant Layout

    Plan for the preferred situation in thePlan for the preferred situation in the futurefuture

    Layout must support objectives of the facilityLayout must support objectives of the facility

    No accurate dataNo accurate data layout must be flexiblelayout must be flexible

  • 7/28/2019 Design Facility Layout

    7/64Selection

    Search

    Analysis

    Systematic Layout PlanningSystematic Layout Planning

    Muther (1961)Muther (1961)

    0 Data gathering

    10 Evaluation

    4 Space

    requirements

    5 Space

    available

    6 Space relationship

    diagram

    1 Flow 2 Activities

    3 Relationshipdiagram

    7 Reasons to

    modify8 Restrictions

    9 Layout alternatives

  • 7/28/2019 Design Facility Layout

    8/64

    0 - Data gathering (1)0 - Data gathering (1)

    Source: product designSource: product design

    BOMBOM

    drawingsdrawings

    gozinto (assembly) chart, see fig 2.10gozinto (assembly) chart, see fig 2.10

    redesign, standardizationredesign, standardization simplificationssimplifications

    machines

    product design

    sequence of assembly operations

    layout (assembly) line

  • 7/28/2019 Design Facility Layout

    9/64

    0 - Data gathering (2)0 - Data gathering (2)

    Source: Process designSource: Process design make/buymake/buy

    equipment usedequipment used process timesprocess times

    operations process chartoperations process chart (fig 2.12)(fig 2.12)

    assembly chartassembly chart

    operationsoperations

    precedence diagramprecedence diagram

    (fig 2.13)(fig 2.13)

  • 7/28/2019 Design Facility Layout

    10/64

    0 - Data gathering (3)0 - Data gathering (3)

    Source: Production schedule designSource: Production schedule design

    logistics: where to produce, how muchlogistics: where to produce, how much

    product mixproduct mix marketing: demand forecastmarketing: demand forecast

    production rateproduction rate

    types and number of machinestypes and number of machines continuous/intermittentcontinuous/intermittent

    layoutlayout scheduleschedule

  • 7/28/2019 Design Facility Layout

    11/64

    1/2 - Flow and Activity Analysis1/2 - Flow and Activity Analysis

    Flow analysis:Flow analysis:

    Types of flow patternsTypes of flow patterns

    Types of layoutTypes of layout

    flow analysis approachesflow analysis approaches

    Activity relationship analysisActivity relationship analysis

  • 7/28/2019 Design Facility Layout

    12/64

    1/2 - Flow analysis and activity1/2 - Flow analysis and activity

    analysisanalysisFlow analysisFlow analysis

    quantitative measure of movementsquantitative measure of movements

    between departments:between departments:

    material handling costsmaterial handling costs

    Activity analysisActivity analysis

    qualitative factorsqualitative factors

  • 7/28/2019 Design Facility Layout

    13/64

    Flow analysisFlow analysis

    Flow of materials, equipment andFlow of materials, equipment and

    personnelpersonnel

    Raw material Finished product

    layout facilitates this flowlayout facilitates this flow

  • 7/28/2019 Design Facility Layout

    14/64

    Types of flow patternsTypes of flow patterns

    P = receivingP = receiving

    S = shippingS = shipping

    R S

    R S

    R

    S

    long line

    Horizontal transportHorizontal transport

  • 7/28/2019 Design Facility Layout

    15/64

    LayoutLayout

    volumes of productionvolumes of production

    variety of productsvariety of products

    volumes: what is the right measure ofvolumes: what is the right measure of

    volume from a layout perspective?volume from a layout perspective?

    varietyvariety high/low commonalityhigh/low commonality

    layout typelayout type

  • 7/28/2019 Design Facility Layout

    16/64

    Types of layoutTypes of layout

    Fixed product layoutFixed product layout

    Product layoutProduct layout

    Group layoutGroup layout

    Process layoutProcess layout

  • 7/28/2019 Design Facility Layout

    17/64

    Fixed product layoutFixed product layout

    ProcessesProcesses product (e.g. shipbuilding)product (e.g. shipbuilding)

  • 7/28/2019 Design Facility Layout

    18/64

    Product layout (flow shop)Product layout (flow shop)

    Production line according to theProduction line according to the

    processing sequence of the productprocessing sequence of the product

    High volume productionHigh volume production

    Short distancesShort distances

  • 7/28/2019 Design Facility Layout

    19/64

    Process layout (Job shop)Process layout (Job shop)

    All machines performing a particularAll machines performing a particular

    process are grouped together in aprocess are grouped together in a

    processing departmentprocessing department Low production volumesLow production volumes

    Rapid changes in the product mixRapid changes in the product mix

    High interdepartmental flowHigh interdepartmental flow

  • 7/28/2019 Design Facility Layout

    20/64

    Group layoutGroup layout

    Compromise between product layoutCompromise between product layout

    and process layoutand process layout

    Product layouts for product familiesProduct layouts for product families cells (cellular layout)cells (cellular layout)

    Group technologyGroup technology

  • 7/28/2019 Design Facility Layout

    21/64

    Production volume and product varietyProduction volume and product varietydetermines type of layoutdetermines type of layout

    group layout process layout

    product variety

    production

    volume

    product

    layout

  • 7/28/2019 Design Facility Layout

    22/64

    Layout determinesLayout determines

    material handlingmaterial handling

    utilization of space, equipment andutilization of space, equipment and

    personnel (table 2.2)personnel (table 2.2)

    Flow analysis techniquesFlow analysis techniques

    Flow process chartsFlow process charts product layoutproduct layout

    From-to-chartFrom-to-chart process layoutsprocess layouts

  • 7/28/2019 Design Facility Layout

    23/64

    Activity relationship analysisActivity relationship analysis

    Relationship chart (figure 2.24)Relationship chart (figure 2.24)

    Qualitative factors (Qualitative factors (subjective!subjective!))

    Closeness rating (A, E, I, O, U or X)Closeness rating (A, E, I, O, U or X)

  • 7/28/2019 Design Facility Layout

    24/64

    3 - Relationship diagrams3 - Relationship diagrams

    Construction of relationships diagrams:Construction of relationships diagrams:

    diagrammingdiagramming

    Methods, amongst others: CORELAPMethods, amongst others: CORELAP

  • 7/28/2019 Design Facility Layout

    25/64

    Relationship diagram (1)Relationship diagram (1)

    Spatial picture of the relationshipsSpatial picture of the relationships

    between departmentsbetween departments

    Constructing a relation diagram oftenConstructing a relation diagram oftenrequires compromises.requires compromises.

    What is closeness? 10 or 50 meters?What is closeness? 10 or 50 meters?

    See figure 2.25See figure 2.25

  • 7/28/2019 Design Facility Layout

    26/64

    Relationship diagram (2)Relationship diagram (2)

    PremisePremise:: geographicgeographic proximityproximity reflects thereflects the

    relationshipsrelationships

    Sometimes other solutions:Sometimes other solutions: e.g. X-rating because of noisee.g. X-rating because of noise acousticalacoustical

    panels instead of distance separationpanels instead of distance separation

    e.g. A rating because of communicatione.g. A rating because of communication

    requirementrequirement computer network instead of proximitycomputer network instead of proximity

  • 7/28/2019 Design Facility Layout

    27/64

    Graph theory based approachGraph theory based approach

    closeclose adjacentadjacent

    department-nodedepartment-node

    adjacent-edgeadjacent-edge

    requirement: graph is planarrequirement: graph is planar

    (no intersections)(no intersections)

    region-faceregion-face

    adjacent faces: share a common edgeadjacent faces: share a common edge

    graphgraph

  • 7/28/2019 Design Facility Layout

    28/64

    Primal graphPrimal graph dual graphdual graph

    Place a node in each facePlace a node in each face

    Two faces which share an edge joinTwo faces which share an edge join

    the dual nodes by an edgethe dual nodes by an edge

    Faces dual graph correspond to theFaces dual graph correspond to the

    departments in primal graphdepartments in primal graph

    block layout (plan) e.g. figure 2.39block layout (plan) e.g. figure 2.39

  • 7/28/2019 Design Facility Layout

    29/64

    Graph theoryGraph theory

    Primal graph planarPrimal graph planar dual graphdual graph

    planarplanar

    Limitations to the use of graph theory:Limitations to the use of graph theory:it may be an aid to the layout designerit may be an aid to the layout designer

  • 7/28/2019 Design Facility Layout

    30/64

    CORELAPCORELAP

    Construction algorithmConstruction algorithm

    Adjacency!Adjacency!

    Total closeness rating = sum ofTotal closeness rating = sum of

    absolute values for the relationshipsabsolute values for the relationships

    with a particular department.with a particular department.

    =j

    iji rTCR

  • 7/28/2019 Design Facility Layout

    31/64

    CORELAP - stepsCORELAP - steps

    1.1. sequence of placements ofsequence of placements of

    departmentsdepartments

    2.2. location of departmentslocation of departments

  • 7/28/2019 Design Facility Layout

    32/64

    CORELAP step 1CORELAP step 1

    First department:First department:

    Second department:Second department:

    X-relationX-relation last placed departmentlast placed department

    A-relation with first. If noneA-relation with first. If none E-relationE-relation

    with first, etceterawith first, etcetera

    ii

    TCRmax

  • 7/28/2019 Design Facility Layout

    33/64

    CORELAP step 2CORELAP step 2

    Weighted placement valueWeighted placement value

    1st

    8

    1

    2 3

    7 6

    5

    4

    2nd

  • 7/28/2019 Design Facility Layout

    34/64

    4 - Space requirements4 - Space requirements

    Building geometry or building siteBuilding geometry or building site

    space availablespace available

    Desired production rate, distinguish:Desired production rate, distinguish: Engineer to order (ETO)Engineer to order (ETO)

    Production to order (PTO)Production to order (PTO)

    Production to stock (PTS)Production to stock (PTS)

    marketing forecastmarketing forecast productionsproductions

    quantitiesquantities

  • 7/28/2019 Design Facility Layout

    35/64

    4 - Space requirements4 - Space requirements

    Equipment requirements:Equipment requirements:

    Production rateProduction rate number of machinesnumber of machines

    requiredrequired

    Employee requirementsEmployee requirements

    rate

    machine operators

    machines employees

    assembly

  • 7/28/2019 Design Facility Layout

    36/64

    Space determinationSpace determination

    Methods:Methods:

    1. Production center1. Production center

    2. Converting2. Converting

    4. Standards4. Standards

    5. Projection5. Projection

  • 7/28/2019 Design Facility Layout

    37/64

    4 - Space determination (1)4 - Space determination (1)

    1. Production center1. Production center

    for manufacturing areasfor manufacturing areas

    machinemachinespace requirementsspace requirements

    2. Converting2. Converting

    e.g. for storage arease.g. for storage areas present space requirementpresent space requirement spacespace

    requirementsrequirements

    non-linear function of production quantitiynon-linear function of production quantitiy

    # machines per operator

    # assembly operatorsSpace requirements

  • 7/28/2019 Design Facility Layout

    38/64

    4 - Space determination (2)4 - Space determination (2)

    4.4. Space standardsSpace standards

    standardsstandards

    5.5. Ratio trend and projectionRatio trend and projection

    e.g. direct labour hour, unit producede.g. direct labour hour, unit produced

    Not accurate!Not accurate!

    Include space for:Include space for:

    packaging, storage, maintenance, offices, aisles,packaging, storage, maintenance, offices, aisles,inspection, receiving and shipping, canteen, toolinspection, receiving and shipping, canteen, tool

    rooms, lavatories, offices, parkingrooms, lavatories, offices, parking

    factor

    space

  • 7/28/2019 Design Facility Layout

    39/64

    Deterministic approach (1)Deterministic approach (1)

    n = # machines per operator (non-integer)n = # machines per operator (non-integer)

    a = concurrent activity timea = concurrent activity time

    t = machine activity timet = machine activity time b= operatorb= operator

    ba

    tan

    +

    +='

  • 7/28/2019 Design Facility Layout

    40/64

    Deterministic approach (2)Deterministic approach (2)

    ( )

    +

    +=

    bam

    taTc

    TTcc = cycle time= cycle time

    a = concurrent activity timea = concurrent activity time

    t = machine activity timet = machine activity time

    b = operator activity timeb = operator activity time

    m = # machines per operatorm = # machines per operator

  • 7/28/2019 Design Facility Layout

    41/64

    Deterministic approach (3)Deterministic approach (3)

    ( )m

    TmCCmTC c21)( +=

    TC(m) = cost per unit produced as a function of mTC(m) = cost per unit produced as a function of m

    CC11 = cost per operator-hour= cost per operator-hour

    CC22 = cost per machine-hour= cost per machine-hour

    Compare TC(n) and TC(n+1) for n < n < n+1Compare TC(n) and TC(n+1) for n < n < n+1

  • 7/28/2019 Design Facility Layout

    42/64

    Designing the layout (1)Designing the layout (1)

    Search phaseSearch phase

    Alternative layoutsAlternative layouts

    Design process includesDesign process includes Space relationship diagramSpace relationship diagram

    Block planBlock plan

    Detailed layoutDetailed layout

    Flexible layoutsFlexible layouts

    Material handling systemMaterial handling system

    PresentationPresentation

  • 7/28/2019 Design Facility Layout

    43/64

    Designing the layout (2)Designing the layout (2)

    Relationship diagram + spaceRelationship diagram + space

    space relationship diagramspace relationship diagram

    (see fig 2.56)(see fig 2.56)

    Different shapesDifferent shapes

  • 7/28/2019 Design Facility Layout

    44/64

    9 Layout alternatives9 Layout alternatives

    Alternative layouts by shifting theAlternative layouts by shifting the

    departments to other locationsdepartments to other locations

    block plan, also shows e.g.block plan, also shows e.g.

    columns and positions of machinescolumns and positions of machines

    (see fig 2.57)(see fig 2.57)

    selection

    detailed design

    detailed design

    selection

    or

  • 7/28/2019 Design Facility Layout

    45/64

    Flexible layoutsFlexible layouts

    FutureFuture

    Anticipate changesAnticipate changes

    2 types of expansion:2 types of expansion:

    1.1. sizessizes

    2.2. number of activitiesnumber of activities

  • 7/28/2019 Design Facility Layout

    46/64

    Material handling systemMaterial handling system

    Design in parallel with layoutDesign in parallel with layout

    PresentationPresentation

    CAD templates 2 or 3 dimensionalCAD templates 2 or 3 dimensional

    simulationssimulations

    selling the layout (+ evaluation)selling the layout (+ evaluation)

  • 7/28/2019 Design Facility Layout

    47/64

    10 Evalution (1)10 Evalution (1)

    Selection and implementationSelection and implementation best layoutbest layout

    cost of installation + operating costcost of installation + operating cost comparecompare futurefuture costs for both the new and thecosts for both the new and the

    old layoutold layout

    other considerationsother considerations

    selling the layoutselling the layout assess and reduce resistanceassess and reduce resistance

    anticipate amount of resistance for eachanticipate amount of resistance for eachalternativealternative

  • 7/28/2019 Design Facility Layout

    48/64

    10 Evalution (2)10 Evalution (2)

    Causes of resistance:Causes of resistance: inertiainertia

    uncertaintyuncertainty loss of job contentloss of job content

    Minimize resistance byMinimize resistance by

    participationparticipation

    stagesstages

  • 7/28/2019 Design Facility Layout

    49/64

    ImplementationImplementation

    InstallationInstallation

    planningplanning

    Periodic checks after installationPeriodic checks after installation

  • 7/28/2019 Design Facility Layout

    50/64

    Systematic Layout PlanningSystematic Layout Planning0 Data gathering

    10 Evaluation

    Analysis

    Search

    Selection

    4 Spacerequirements 5 Spaceavailable

    6 Space relationship

    diagram

    1 Flow 2 Activities

    3 Relationship

    diagram

    7 Reasons to

    modify8 Restrictions

    9 Layout alternatives

  • 7/28/2019 Design Facility Layout

    51/64

    Systematic Layout PlanningSystematic Layout Planning0 Data gathering

    10 Evaluation

    Analysis

    Search

    Selection

    4 Spacerequirements 5 Spaceavailable

    6a Space relationship

    diagram

    1 Flow 2 Activities

    3 Relationship

    diagram

    7 Reasons to

    modify8 Restrictions

    9 Layout alternatives

    6b Analytical analyses

  • 7/28/2019 Design Facility Layout

    52/64

    Automatic Guided Vehicles (AGVs)Automatic Guided Vehicles (AGVs)

    Unmanned vehicle for in-plant transportation onUnmanned vehicle for in-plant transportation onmanufacturing and assembly areasmanufacturing and assembly areas

    Two types of guidanceTwo types of guidance free rangingfree ranging

    dead reckoning + lasers or transpondersdead reckoning + lasers or transponders

    path restrictedpath restricted induction wires in the floorinduction wires in the floor

    AGVAGV fork lift truck with RF-communicationfork lift truck with RF-communication

  • 7/28/2019 Design Facility Layout

    53/64

    Design and operational control of anDesign and operational control of an

    AGV systemAGV systemAGV systemAGV system

    track layouttrack layout

    number of AGVsnumber of AGVs operational controloperational control

    Traffic control: zonesTraffic control: zones

    max. throughputmax. throughputcapacitycapacity

  • 7/28/2019 Design Facility Layout

    54/64

    Track layoutTrack layout

    infrastructureinfrastructure

    location of pick-up and drop-off stationslocation of pick-up and drop-off stations

    buffer sizesbuffer sizes

    congestion/blockingcongestion/blocking

    tandem configurationtandem configuration

  • 7/28/2019 Design Facility Layout

    55/64

    Determination of number of AGVsDetermination of number of AGVs

    h

    timetravelemptytotaltv

    AGVsi j

    ijij +

    =

    )min(

    #

    5 x

    6 x

    4 x LP-problem(i.e. a classical TP)

  • 7/28/2019 Design Facility Layout

    56/64

    Operational transportation controlOperational transportation control

    Job controlJob control

    (routing and scheduling of transportation tasks)(routing and scheduling of transportation tasks)

    Traffic controlTraffic control

    Traffic rulesTraffic rules

    Goal: minimize empty travel + waiting timeGoal: minimize empty travel + waiting time

    Single load:Single load: Performance indicators:Performance indicators:- Throughput- Throughput- Throughput times- Throughput times

  • 7/28/2019 Design Facility Layout

    57/64

    Operational controlOperational control

    production controlproduction control transportation controltransportation control flow shopflow shop

    job shopjob shop

    centralized controlcentralized control

    all tasks are concurrently consideredall tasks are concurrently considered

    or decentralized controlor decentralized control FEFS: AGV looks for work (suited for tandem configuration)FEFS: AGV looks for work (suited for tandem configuration)

    think-aheadthink-ahead combine tasks to routescombine tasks to routes

    or no think-aheador no think-ahead

  • 7/28/2019 Design Facility Layout

    58/64

    Relations between the issuesRelations between the issues

  • 7/28/2019 Design Facility Layout

    59/64

    Combination 1Combination 1

    Separated/no think-aheadSeparated/no think-ahead centralized controlcentralized control

    on-line priority rules:on-line priority rules:

    1.1. transportation task assignmenttransportation task assignmenttasks wait, ortasks wait, or

    2.2. idle vehicle assignmentidle vehicle assignmentidle vehicles waitidle vehicles wait

    Ad 1: push/pull (JIT), e.g. FCFS, MOQRSAd 1: push/pull (JIT), e.g. FCFS, MOQRS

    PushPush sometimes shop lockingsometimes shop locking

    Ad 2: NV, LIVAd 2: NV, LIV

  • 7/28/2019 Design Facility Layout

    60/64

    Combination 3Combination 3

    Separated/think-ahead (1)Separated/think-ahead (1) Centralized controlCentralized control

    a. without time windowsa. without time windows Only routingOnly routing

    Minimize empty travel time by simulated annealing:Minimize empty travel time by simulated annealing:

    2 options:2 options:

    determine optimal route each time a new taskdetermine optimal route each time a new taskarrivesarrives

    problem: a task may stay at the end of the routeproblem: a task may stay at the end of the route Periodic controlPeriodic control

    time horizon (length?)time horizon (length?)

  • 7/28/2019 Design Facility Layout

    61/64

    Combination 3Combination 3

    Separated/think-ahead (2)Separated/think-ahead (2) Centralized controlCentralized control

    b. with time horizonsb. with time horizons

    Simulated annealingSimulated annealing

    machine 1

    machine 2

    machine 3

    machine 1

    machine 2

    machine 3

    machine 1

    machine 2

    machine 3

    loaded trip

    empty trip

    loaded trip

    empty trip

    loaded trip

    empty trip

  • 7/28/2019 Design Facility Layout

    62/64

    Combination 4Combination 4

    Integrated/think-aheadIntegrated/think-aheadAGVs ~ parallel machinesAGVs ~ parallel machines

    empty travel time ~ change-over timeempty travel time ~ change-over time

    transportation time ~ machine timetransportation time ~ machine time

    Shop-floor schedulingShop-floor scheduling

  • 7/28/2019 Design Facility Layout

    63/64

    Basic conceptBasic concept

  • 7/28/2019 Design Facility Layout

    64/64

    Case studyCase study