DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdfexam room b-382 exam room b-378 nurse...
Transcript of DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdfexam room b-382 exam room b-378 nurse...
DESIGN & CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZA ALBANY, NY 12242
ADDENDUM NO. 2 TO PROJECT NO. 45436
CONSTRUCTION WORK MAMMOGRAPHY SUITE ALTERATIONS
UNIVERSITY HOSPITAL OF BROOKLYN 450 CLARKSON AVENUE
BROOKLYN, NY
April 4, 2019
BIDDING REQUIREMENTS 1. SECTION 004313 FORM OF BID BOND - BID SECURITY STATE OF NEW YORK OFFICE
OF GENERAL SERVICES - DESIGN & CONSTRUCTION: Add “45436-C” to Project No. in the footer.
SPECIFICATIONS 2. Page 096516-2, ARTICLE 2.01 MATERIALS: Add the following Paragraph: “K. Vinyl Sheet Flooring SF-1: Shaw Contract Biolife.
1. Color: Sea Salt 01001 w/ WEL1003. 2. 72"W Homogeneous Plus sheet with Exoguard finish w/ intergral coved base”
3. SECTION 101423 SIGNS: Delete this Section in its entirety. DRAWINGS 4. Drawing No. A-103, GENERAL NOTES: Add the following Note:
“G11. All provided walls within the work area without partition designation shall be type S13 drywall partitions.”.
5. Drawing No. A-106, FLOOR PLAN: Provide a total of six (6) locker units designated LC in
Furniture, Furnishings, Equipment + Technology Schedule. Provide three (3) in Gowned Waiting Room 2-605A, and three (3) in Gowned Waiting Room 2-610A located within the framed alcoves of 3’-2” by 1’-8” clear. 6. Revised Drawings:
a. Drawing Nos. G-002, G-003 and A-171, noted “REVISED DRAWING 4/3/2019” accompany this Addendum and supersede the same numbered originally issued drawings.
END OF ADDENDUM
Erik T. Deyoe, P.E. Director, Division of Design Design & Construction
Updated 05/24/2018 Printed 03/21/2019 Page 1 of 1 Project No. 45436-C
NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.Acknowledge receipt of this Addendum in the space provided on the Bid Form.
2-620B
RECEPTION/SCHED.
2-620D
VIEWING ROOM
B-397
COBALT ROOM
B-366
CORRIDOR
B-400
STAIR
B-396
DRESSING ROOM
B-392
TOILET
RADIOGRAPH
B
-
3
9
8
B
-
3
9
9
2-620B
RECEPTION/SCHED.
2-620D
VIEWING ROOM
B-397
COBALT ROOM
B-366
CORRIDOR
B-400
STAIR
B-396
DRESSING ROOM
B-392
TOILET
RADIOGRAPH
B
-
3
9
8
B
-
3
9
9
NORTH
CALLED
PH
AS
E 1
- B
AS
EM
EN
T W
OR
K
3/3
2" =
1
'-0
"
PHASE 1 - SECOND FLOOR
PHASE 1 - BASEMENT FLOOR
PH
AS
E 2
- F
IR
ST
&
S
EC
ON
D F
LO
OR
W
OR
K
3/3
2" =
1
'-0
"
PHASE 2 - SECOND FLOOR
FINAL - BASEMENT FLOOR
WORK
ROOM
RECEPTION
OFFICE
VIEWING ROOM
VIEWING ROOM
EXAM EXAM
DARKROOM
SHARED OFFICE
TEMPORARY
MAMMO ROOM
(CURRENT)
· RENOVATION WORK RELATING TO THE RELOCATION OF THE
READ ROOM / VIEWING ROOM FUNCTION TO BASEMENT FLOOR
· RELOCATE SHARED OFFICE (NOT IN PROJECT SCOPE)
· READ ROOM / VIEWING ROOM RELOCATED AND FUNCTIONING
· SHARED OFFICE RELOCATED AND FUNCTIONING
· RENOVATION WORK RELATING TO THE FUTURE
(2) MAMMO ROOMS, GOWNING ROOMS,
GOWNED WAITING AND CORRIDOR
· RENOVATION WORK RELATING TO THE FUTURE
OFFICES AND MD READ/ WORK ROOM
· RENOVATION WORK RELATING TO EMERGENCY EQUIPMENT
ALCOVE
· RENOVATION WORK RELATING TO RELOCATION OF VIEWING
ALCOVE
EXISTING
TO REMAIN
AREA OF
CONSTRUCTION
FORMER
LIN ACETRA
U/S ROOM
(CURRENT)
I.T. ROOM I.T. ROOM
WORK
ROOM
RECEPTION
OFFICE
EXAM EXAM
DARKROOM
FORMER
LIN ACETRA
READ
ROOM
READ
ROOM
· SHARED OFFICE WILL CONTAIN TEMPORARY
RECEPTION/SCHEDULING. INSTALL TEMPORARY DOOR FRAME
AND HARDWARE FROM CORRIDOR TO SHARED OFFICE
VIEWING
ROOM
TEMPORARY
MAMMO ROOM
(CURRENT)
U/S ROOM
(CURRENT)
PHASE 1 - FIRST FLOOR
· NO FIRST FLOOR WORK THIS PHASE
DESIGN & CONSTRUCTION
1
PHASE 2 - FIRST FLOOR
· REMOVE PARTIALLY SUSPENDED ACOUSTIC CEILING EXISTING
IN ROOMS FOR WORK, REINSTALL CAREFULLY THE ELEMENTS
REMOVED. COORDINATE WITH DIRECTOR'S REPRESENTATIVE
PRIOR TO ANY REMOVAL WORK
AREA OF WORK
WITH NO SCOPE
ON THIS PHASE
1 ALLOW THE FOLLOWING TIME FRAMES BETWEEN PHASES FOR RELOCATIONS. COORDINATE WITH DIRECTOR'S REPRESENTATIVE :
PHASE 1;1 WEEK - PHASE 2; 2 WEEKS - PHASE 3; 1 WEEK.
2 RELOCATION OF TEMPORARY PARTITIONS SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH FACILITY AND DIRECTOR'S
REPRESENTATIVE
PHASING NOTES
1
1
1
1
Phasing Plan Legend
APPROXIMATE LOCATION OF TEMPORARY PARTITIONS
1
AD
DE
ND
UM
D
RA
WIN
G 4/2/19
2-620B
RECEPTION/SCHED.
2-620D
VIEWING ROOM
B-397
COBALT ROOM
B-366
CORRIDOR
B-400
STAIR
B-396
DRESSING ROOM
B-392
TOILET
RADIOGRAPH
B
-
3
9
8
B
-
3
9
9
NORTH
CALLED
TEMP WAITING
MD OFFICE
MGR.
OFFICE
PH
AS
E 3
- F
IR
ST
&
S
EC
ON
D F
LO
OR
W
OR
K
3/3
2" =
1
'-0
"
PHASE 3 - SECOND FLOOR
FIN
AL
- B
AS
EM
EN
T A
ND
S
EC
ON
D F
LO
OR
W
OR
K
3/3
2" =
1
'-0
"
FINAL - SECOND FLOOR
HC GOWN 1
MAMMO 1
GOWNED
WAITING
MAMMO 2
HC GOWN 2
GOWNED
WAITING
· (2) MAMMO ROOMS, GOWNING ROOMS,
GOWNED WAITING FUNCTIONING
· OFFICES AND MD READ/ WORK ROOM FUNCTIONING
· TEMP WAITING FUNCTIONING
· RENOVATION WORK RELATING TO FUTURE
RECEPTION AND WAITING
· RENOVATION WORK RELATING TO FUTURE CONSULT
· RENOVATION WORK RELATING TO FUTURE PATIENT TOILET
AND ULTRASOUND ROOM
· RENOVATION WORK RELATING TO FUTURE
EQUIPMENT ROOM
· COMPLETION OF WORK
RECEPTION
WAITING
ULTRASOUND
PATIENT
TOILET
CONSULT
EQUIP.
ROOM
FINAL - BASEMENT FLOOR
EXISTING
TO REMAIN
AREA OF
CONSTRUCTION
I.T. ROOM
MD READ/WORK
MD
OFFICE
MGR.
OFFICE
HC GOWN 1
MAMMO 1
GOWNED
WAITING
MAMMO 2
HC GOWN 2
GOWNED
WAITING
I.T. ROOM
READ
ROOM
READ
ROOM
MD READ/WORK
U/S ROOM
(CURRENT)
EMERG.
EQUIP.
ALCOVE
EMERG.
EQUIP.
ALCOVE
PHASE 3 - FIRST FLOOR
· REMOVE PARTIALLY SUSPENDED ACOUSTIC CEILING EXISTING
IN ROOMS FOR WORK, REINSTALL CAREFULLY THE ELEMENTS
REMOVED. COORDINATE WITH DIRECTOR'S REPRESENTATIVE
PRIOR TO ANY REMOVAL WORK
DESIGN & CONSTRUCTION
1
AREA OF WORK
WITH NO SCOPE
ON THIS PHASE
1 ALLOW THE FOLLOWING TIME FRAMES BETWEEN PHASES FOR RELOCATIONS. COORDINATE WITH DIRECTOR'S REPRESENTATIVE :
PHASE 1;1 WEEK - PHASE 2; 2 WEEKS - PHASE 3; 1 WEEK.
2 RELOCATION OF TEMPORARY PARTITIONS SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH FACILITY AND DIRECTOR'S
REPRESENTATIVE
PHASING NOTES
1
Phasing Plan Legend
APPROXIMATE LOCATION OF TEMPORARY PARTITIONS
1
1
1
AD
DE
ND
UM
D
RA
WIN
G 4/2/19
B-397
COBALT ROOM
B-390
EXAM ROOM
B-366
CORRIDOR
B-400
STAIR
B-396
DRESSING ROOM
B-392
TOILET
B-391
RADIOGRAPH
B-389
STORAGE
B-388
TOILET
B-387
TOILET
B-385
HOT LAB
B-383
EXAM ROOM
B-382
EXAM ROOM
B-378
NURSE
STATION
PTD-1
LVT-1
RB-1
PTD-1
LVT-1
RB-1
124122 123
R
Q
P
EXISTING
DRINKING
FOUNTAIN
2-588B
ELEV. 10
LOBBY
2-588
CORRIDOR
2-633
CORRIDOR
2-654A
OFFICE
EXISTING
DRINKING
PTD-3
PTD-3
PTD-3
PTD-3
CH
-1
WP
-1
WM
-1
PT
D-3
PTD-3
CH-1
WP-1
PTD-3
PT
D-3
2-605A
GOWNED
WAITING
2-610A
GOWNED
WAITING
2-612
EM. EQUIP
ALCOVE
2-605B
HC GOWN 1
2-605C
MAMMO 1
2-602B
CORRIDOR
2-610B
GOWN 2
2-610C
MAMMO 2
2-620A
OFFICE
2-620B
MD OFFICE
2-620C
MD READ
2-647B
RECEPTION
2-607
ULTRASOUND
2-609
EQUIP.
ROOM
2-612A
TRANS
CLOS.
2-647A
WAITING
2-606
PAT. TOILET
2-608A
CORRIDOR
2-608
CONSULT
PTD-3
LVT-1
RB-1
PTD-1
LVT-1
RB-1
PTD-1
LVT-1
RB-1
PTD-1
LVT-1
RB-1
--
PLAM-3
SS-1
CASE
PTD-1
LVT-2
RB-1
RB-2
LVT-2
CH-1
PTD-1
PTD-1
LVT-2
RB-2
RB-1
LVT-1
WP-1/CH1
PTD-1RB-2
LVT-2
WP-1/CH1
PTD-1
RB-2
LVT-2
CH-1
PTD-1
PT-1
LVT-2
RB-2
SF-1
SF-1
EPOXY
PTD-3
--
PLAM-2
SS-1
PLAM-3
--
--
PLAM-3
--
--
CASE
PLAM-2
PLAM-3
SS-1
CASE
PLAM-2
PLAM-3
SS-1
CASE
--
PLAM-2
SS-1
RB-1
LVT-1/2
WP-1/CH1
PTD-1
--
PLAM-3
SS-1
CASE
PLAM-2
PLAM-3
SS-1
CG
CG
CG-2
CG
CG-2
CG
CG
CG
CG-2
CG-2
CG-2
CG
CG-2
CG-2
CG
CG
CG-2
CG2
PTD-3
LVT-1
RB-1
CG-2
CG-2
CG-3
CASE
CASE
CASE
--
PLAM-3
--
CASE
--
PLAM-3
SS-2
CASE
SS-2,
TYP
--
PLAM-3
SS-2
CASE
SS-2,
TYP
PTD-1
LVT-1
RB-1
PTD-1
LVT-1
RB-1
PTD-1
LVT-1
RB-1
2-620f
RECEPTION/SCHED.
2-620E
MD OFFICE
2-620D
VIEWING ROOM
SOFFIT PTD-2
LVT1
ACCENT
PAINT TYP.
AT COLUMN
DESIGN & CONSTRUCTION
1
Second Floor Pattern Detail
1/4" = 1'-0"
NORTH
CALLED
Basement Finishes Plan
1/8" = 1'-0"
NORTH
CALLED
Finishes Schedule
Finishes Plan Notes
FN1. SEE ENGINEERING DRAWINGS FOR AREAS OF PATCH AND REPAIR WORK NOT OTHERWISE
SHOWN. WHERE WORK IS REQUIRED BEYOND INDICATED AREAS OF FINISH WORK, INCLUDING, BUT
NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, TEL/DATA OR SECURITY
WORK, PROTECT, PATCH, REPAIR AND/OR REPLACE FINISHES AND WALL PROTECTION, IF ANY TO
PROVIDE A LIKE NEW APPEARANCE. AT AREAS OF PATCH AND REPAIR WORK BEYOND THE
ARCHITECTURAL SCOPE OF WORK, MATCH EXISTING ADJACENT FINISHES FOR PRODUCT, PATTERN
AND COLOR INCLUDING BUT NOT LIMITED TO FLOORING, WALL BASE, WALL PAINT, TRIM PAINT, WALL
PROTECTION OR DECORATIVE ELEMENTS AND CEILING PRODUCTS AND FINISHES. BLEND REPAIRS
AND NEW FINISH WORK SEAMLESSLY WITH ADJACENT UNDISTURBED FINISHES.
FN4. PROTECT, PATCH AND REPAIR FINISHES WITHIN SPACES ADJACENT TO AREAS OF WORK
UNLESS NOTED OTHERWISE. MATCH EXISTING FINISHES IN EACH SPACE FOR PRODUCT, PATTERN
AND COLOR INCLUDING BUT NOT LIMITED TO FLOORING, WALL BASE, WALL PAINT, TRIM PAINT, WALL
AND CORNER PROTECTION OR DECORATIVE ELEMENTS.
FN5. USE ALL NEW COMPONENTS AND MATERIALS, UNLESS NOTED OTHERWISE. REUSE OF
EXISTING COMPONENTS SHALL NOT BE PERMITTED UNLESS SPECIFICALLY APPROVED BY THE
ARCHITECT. PATCH HOLES IN FLOORS AND WALLS AT DAMAGED AREAS DUE TO REMOVALS AND
PREVIOUSLY EXISTING DAMAGE. PATCH, REPAIR, AND PREP TO RECEIVE NEW FINISHES TO PROVIDE
A FINISHED LIKE-NEW APPEARANCE.
FN7. PROVIDE NEW FINISHES ON ALL EXPOSED SURFACES WITHIN AREAS OF WORK UNLESS
NOTED OTHERWISE. DO NOT PAINT LABELS, PREFINISHED ITEMS NOT INTENDED TO BE PAINTED, OR
FINISHED WOOD NOT INTENDED TO BE PAINTED. PAINT ALL NEW AND EXISTING STEEL DOORS AND
FRAMES WITHIN AND ADJACENT TO AREAS OF WORK UNLESS NOTED OTHERWISE.
FN6. UNLESS INDICATED OTHERWISE BY KEYED NOTE, PAINT ALL NEW AND EXISTING VISIBLE
WALLS WITHIN AREAS OF WORK.
FN7. PAINT ALL NEW STEEL DOOR FRAMES WITHIN AREAS OF WORK.
FN8. PROVIDE NEW FINISHED FLOORING ON ALL FLOOR SURFACES WITHIN AREAS OF WORK
UNLESS NOTED OTHERWISE. EXTEND FLOOR FINISH INDICATED ON FINISH PLANS AT ALL EXPOSED
FLOOR AREAS BELOW CASEWORK COUNTERS AND AT RECESSES BETWEEN AND AT EXPOSED ENDS
OF CABINETS.
FN9. UNLESS NOTED OTHERWISE FLOORING CONTRACTOR TO PROVIDE RESILIENT BASE ON ALL
FIXED CASEWORK AT FRONT, SIDE AND RECESSED BASE AREAS FOLLOWING CASEWORK
INSTALLATION. SEE CASEWORK ELEVATIONS FOR EXTENTS.
FN10. UNLESS NOTED OTHERWISE PROVIDE A SMOOTH AND EVEN TRANSITION WITHOUT A
TRANSITION STRIP AT ALL TRANSITIONS BETWEEN VCT AND SHEET FLOORING TYPES. FLOOR FINISH
TRANSITIONS SHALL BE CENTERED BENEATH CLOSED DOORS, AT THE MIDPOINT OF CASED OR
UNCASED OPENINGS, AND ABUT TO THRESHOLDS. ABUT TRANSITIONS TIGHT WITH NO GAP.
Finish And Wall Protection Plan Symbol Legend
LIMITED WALL/TRIM FINISH EXTENTS: WITHIN AREAS TO RECEIVE
MORE THAN ONE WALL TREATMENT, PROVIDE THE WALL OR TRIM
TREATMENT INDICATED BY THE FINISH ABBREVIATION AND TO THE
LIMITED EXTENT INDICATED BY THE LINES.
ROOM FINISH SYMBOL DESIGNATIONS:
UPPER SECTION: WALL FINISH (PAINTED FINISH)
MIDDLE: WALL BASE
BOTTOM: FLOOR FINISH
CORNER GUARD. 90° OUTSIDE CORNER
WP1-X WALL PROTECTION SHEET.
CORNER GUARD. END WALL WRAP
PTD-1
CPT-1
RB-1
"X" INDICATES WALL PROTECTION COLOR NUMBER,
SEE FINISH SCHEDULE
TRANSITION STRIP
CASEWORK FINISH SYMBOL DESIGNATIONS:
UPPER SECTION: WALL CABINET
MIDDLE: COUNTER
BOTTOM: BASECABINET
--
--
--
CASE
VB-1
CPT-1
WP-1
PTD-1
ROOM FINISH SYMBOL DESIGNATIONS:
WALL FINISH (PAINTED FINISH)
WALL PROTECTION
WALL BASE
FLOOR FINISH
2
A-171
3
A-171
EXISTING BUILDING.
LIMIT OF ARCHITECTURAL WORK FOR THIS CONSTRUCTION
NEW CASEWORK
OVERHEAD SHELF OR BELOW COUNTER CASEWORK ITEM
Second Floor Finishes Plan
1/4" = 1'-0"
1
A-171
SYMBOL MATERIAL MANUFACTURER/STYLE/ COLOR TYPICAL APPLICATION
AG-1 ART GLASS SKYLINE DESIGN LIGHT & SHADOW SHIMMER S, SO#135450-070, ETCHED
PATTERN STOPPED FROM 4’-6”-5’6” SO THAT DEPARTMENT NAME CAN BE
ETCHED PER DRAWING PROVIDED
ON THE STAFF SIDE OF THE RECEPTION AREA
CG CORNER GUARD ACROVYN #253 PARCHMENT PER PLAN. FULL HEIGHT, TYPICAL
CG-2 CORNER GUARD ACROVYN #100 EGGSHELL PER PLAN. VARIES
CG-3 CORNER GUARD STAINLESS STEEL. FULL ADHERED. PER PLAN. FULL HEIGHT.
CH-1 CHAIR RAIL JOHNSONITE, RAMPART, CHR-27-C MIST 4”H PER PLAN
DG DECORATIVE GLASS (DOORS)
DP-1 DOOR PROTECTION ACROVYN CLAD DOOR PROTECTION, #372 CLASSIC MAPLE SUEDE DOORS THROUGHOUT
LVT-1 LUXURY VINYL TILE SHAW CONTRACT UNCOMMON GROUND 6, STYLE #0188V,
COLOR NAME: ZEN, COLOR
NUMBER: 02520, SIZE: 6” X 36” NOMINAL, 20 MIL LVT
ENTRY, CORRIDOR. OFFICE
LVT-2 LUXURY VINYL TILE SHAW CONTRACT JEOGORI, STYLE #0215V, COLOR NAME: MUSLIN,
COLOR NUMBER: 90120, SIZE: 18” X 18” NOMINAL,20 MIL LVT
TREATMENT ETC.
PLAM-1 PLASTIC LAMINTE NEVAMAR CLEAR MAPLE,WM-8340T
PLAM-2 PLASTIC LAMINATE NEVAMAR, COOL CHIC, VA7002T
PLAM-3 PLASTIC LAMINATE NEVAMAR, LUMINARY TEAK, WT0005T
PTD-1 PAINT BENJAMIN MOORE OC-31, FOG MIST GENERAL WALL COLOR
PTD-2 PAINT BENJAMIN MOORE ,2111-40, TAOS TAUPE DOOR FRAMES
PTD-3 PAINT BENJAMIN MOORE, 2114-50, VICTORIAN MAUVE ACCENT WALLS
RB-1 RESILIENT BASE JOHNSONITE MANDALAY PROFILE 6'' COLOR T.B.D. FROM
MANUFACTURES STANDARD COLOR OPTIONS
RECEPTION, WAITING, GOWNED WAITING AND CORRIDORS
RB-2 RESILIENT BASE JOHNSONITE MANDALAY PROFILE 6'' COLOR T.B.D. FROM
MANUFACTURES STANDARD COLOR OPTIONS
ALL OTHER AREAS
SF-1 SHEET FLOORING SHAW CONTRACT BIOLIFE TOILET ROOM
SS-1 SOLID SURFACE MATERIAL CORIAN 'LINEN'
SS-2 SOLID SURFACE MATERIAL CORIAN 'GLACIER WHITE'
WM-1 WALL MURAL LEVEL DIGITAL WALLCOVERING, L325762LV X RAY VISION COOL HUES
CUSTOM M1 V0620,
ON NON PVC SMOOTH VINYL WITH WALL MAX COATING OR RIGID WALL
PROTECTION
CORRIDOR
WP-1 WALL PROTECTION WOLF GORDON RAMPART, ASHLAR GOH 10866488, ASH 5073 WAINSCOT TREATMENT AREA
WP-2 WALL PROTECTION ACROVYN PATTERN: SQUIGGLES, COLOR: BLUSH WAINSCOT RECEPTION DESK
VCT-1 VINYL COMPOSITION TILE MATCH EXISTING CORRIDOR
ALIGN CURVE OF FLOOR
FINISH WITH LINE OF
CURVED SOFFIT ABOVE
LVT-1
PATTERN INDICATES DIRECTION
OF PATTERN 'GRAIN'
LVT-2
1
1
1
1
1
SF-1
1
PATCH EXISTING VTC AS
REQUIRED BY NEW WORK
1
1
AD
DE
ND
UM
D
RA
WIN
G 4
/2
/1
9