DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light...

5
Updated 05/24/2018 Printed 06/28/2019 Page 1 of 1 Project No. 45743-C DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER EMPIRE STATE PLAZA ALBANY, NY 12242 CONSTRUCTION WORK PROVIDE LEAD MITIGATION TROY STATE ARMORY 99 SOUTH LAKE AVENUE TROY, NEW YORK ADDENDUM NO. 1 TO PROJECT NO. 45743 July 11, 2019 NOTE:This Addendum forms a part of the Contract Documents.Insert it in the Project Manual. Acknowledge receipt of this Addendum in the space provided on the Bid Form. 1. Revised Drawing: Drawing Nos. H-201 through H-204 noted “REVISED DRAWING 06/20/2019” accompany this Addendum and supersede the same numbered originally issues drawings. END OF ADDENDUM Erik T. Deyoe, P.E. Director, Division of Design Design & Construction

Transcript of DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light...

Page 1: DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light Fixtures - 217E - - - - 217F - - - 217G - - - - Third Floor 301 - - - Provide New Window

Updated 05/24/2018Printed 06/28/2019 Page 1 of 1 Project No. 45743-C

DESIGN & CONSTRUCTION GROUPTHE GOVERNOR NELSON A. ROCKEFELLER

EMPIRE STATE PLAZAALBANY, NY 12242

CONSTRUCTION WORK PROVIDE LEAD MITIGATION

TROY STATE ARMORY99 SOUTH LAKE AVENUE

TROY, NEW YORK

ADDENDUM NO. 1 TO PROJECT NO. 45743

July 11, 2019

NOTE:This Addendum forms a part of the Contract Documents.Insert it in the Project Manual.Acknowledge receipt of this Addendum in the space provided on the Bid Form.

1. Revised Drawing: Drawing Nos. H-201 through H-204 noted “REVISED DRAWING 06/20/2019”accompany this Addendum and supersede the same numbered originally issues drawings.

END OF ADDENDUM

Erik T. Deyoe, P.E.Director, Division of DesignDesign & Construction

Page 2: DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light Fixtures - 217E - - - - 217F - - - 217G - - - - Third Floor 301 - - - Provide New Window

UNEXCAVATED

UNEXCAVATED

PROVIDE CONCRETE INFILL IN THIS

AREA OF ROOM B9 TO MATCH

EXISTING CONCRETE FLOOR LEVEL.

DESIGN & CONSTRUCTION

45743-C

H-201

PHASE 1 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 10'

BASEMENT FLOOR

H-201

1

LEGEND

PHASE LIMITS

Phase 1 - Finish ScheduleRoom Room Function Floor Wall Ceiling Window Systems Miscellaneous

B1 NYG Supply Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell

B3 NYG Supply Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell

B4 Female Locker Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell

B6 Boiler Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell

B7 Storage Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell

B8 Storage Rm Epoxy Floor with Grit Additive* Encapsulant Encapsulant Paint Sill and Entire Interior WindowWell

B9 Storage Closet Infill with Concrete, Epoxy withGrit Additive*

Encapsulant Encapsulant -

B10 Stairs Epoxy Floor with Grit Additive* Paint - -B10A Corridor Epoxy Floor with Grit Additive* Paint Paint -B10B Corridor Epoxy Floor with Grit Additive* Paint Paint -B10C Outside Stair (Not in Contract)

B10D Corridor Epoxy Floor with Grit Additive* Paint Paint -*In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application ontobrick or concrete block walls, provide epoxy cove base up to the horizontal grout seam closest to 4".

Page 3: DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light Fixtures - 217E - - - - 217F - - - 217G - - - - Third Floor 301 - - - Provide New Window

RUBBER

FLOOR THIS

AREA ONLY

DESIGN & CONSTRUCTION

45743-C

H-202

PHASE 2 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 10'

FIRST FLOOR

H-202

1

LEGEND

PHASE LIMITS

Phase 2 - Finish ScheduleRoom Number Room Function Floor Wall Ceiling Window Systems Miscellaneous

A-1 Drill Hall

Entire Floor - Epoxy with GritAdditive*

- - Provide (3) EntranceRunners at DoorwaysArea With Exercise Equipment -

Interlocking Rubber Tiles - 700square feet (as shown)

A-2 Provide Wax on Existing VCT - - -A-2.1 - - - -A-3 - - - -

A-3.1 - - - -A-4 - - - -A-5 - - - -A-6 - - - -

A-7 - - Provide Drop Ceiling andReattach all Light Fixtures - Provide (3) Entrance

Runners at Doorways

Corridor Outside Rm A-2 - - Provide Drop Ceiling andReattach all Light Fixtures - Provide (2) Entrance

Runners at Doorways

A-8 - - - - -A-9 - - - - -

A-10 Epoxy with Grit Additive* - - - -*In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or concreteblock walls, provide epoxy cove base up to the horizontal grout seam closest to 4".

Page 4: DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light Fixtures - 217E - - - - 217F - - - 217G - - - - Third Floor 301 - - - Provide New Window

DESIGN & CONSTRUCTION

45743-C

H-203

PHASE 3 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 10'

FIRST FLOOR

H-203

1

LEGEND

PHASE LIMITS

Phase 3 - Finish ScheduleRoom Number Room Function Floor Wall Ceiling Window Systems Miscellaneous

102 - - - -103 - - - -

103-1 Carpet Tile and 4" Rubber Cove Base - - Provide New Window Blinds103-2 - - - -103-4 - - - -104 - - - -

104-1 - - - -104-2 - - - -105 Carpet Tile and 4" Rubber Cove Base - - Provide New Window Blinds

106 - - - -Provide (1) Entrance

Runners at Stair Landing/ Entrance

106-A - - Provide Drop Ceiling andReattach all Light Fixtures -

Provide (1) EntranceRunners at Main

Entrance106-B - - - -106-C - - - -107 - - - -108 - - - -109 - - - -110 Carpet Tile and 4" Rubber Cove Base - - Provide New Window Blinds

Page 5: DESIGN &CONSTRUCTION GROUP THE GOVERNOR ... 01 C.pdfProvide Drop Ceiling and Reattach all Light Fixtures - 217E - - - - 217F - - - 217G - - - - Third Floor 301 - - - Provide New Window

DESIGN & CONSTRUCTION

45743-C

H-204

PHASE 4 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 10'

SECOND FLOOR

H-204

2

SCALE: 1" = 10'

THIRD FLOOR

H-204

3

LEGEND

PHASE LIMITS

Phase 4 - Finish ScheduleRoom Number Room Function Floor Wall Ceiling Window Systems

First Floor106 - - - -

Second Floor201 - - - -

201A - - - -201B - - - -202 VCT and 4" Rubber Cove Base - - -

203 - - Provide Drop Ceiling andReattach all Light Fixtures -

203A VCT and 4" Rubber Cove Base - - Provide New Window Blinds203B - - - -204 VCT and 4" Rubber Cove Base - - Provide New Window Blinds205 VCT and 4" Rubber Cove Base - - Provide New Window Blinds206 VCT and 4" Rubber Cove Base - - Provide New Window Blinds

206-1 VCT and 4" Rubber Cove Base - - -207 VCT and 4" Rubber Cove Base - - Provide New Window Blinds

208 VCT and 4" Rubber Cove Base - Provide Drop Ceiling andReattach all Light Fixtures Provide New Window Blinds

208-A VCT and 4" Rubber Cove Base - - Provide New Window Blinds209 VCT and 4" Rubber Cove Base - - Provide New Window Blinds210 - - - -211 - - - -212 - - - -213 VCT and 4" Rubber Cove Base - - Provide New Window Blinds

213A VCT and 4" Rubber Cove Base - - -214 VCT and 4" Rubber Cove Base - - Provide New Window Blinds215 - - - -

215A - - - -215B - - - -216 - - - -217 - - - -

217A VCT and 4" Rubber Cove Base - - -217B - - - -217C - - - -

217D Provide Wax on Existing VCT - Provide Drop Ceiling andReattach all Light Fixtures -

217E - - - -217F - - -217G - - - -

Third Floor301 - - - Provide New Window Blinds

301-A Provide Wax on Existing VCT - Provide Drop Ceiling andReattach all Light Fixtures -

301-B - - - Provide New Window Blinds302 - - - Provide New Window Blinds303 - - - Provide New Window Blinds304 - - - Provide New Window Blinds305 - - - Provide New Window Blinds

305.1 - - - -306 - - - Provide New Window Blinds307 - - - Provide New Window Blinds

SCALE: 1" = 15'

FIRST FLOOR

H-204

1