Design, Construction and Implementation of a Statewide Real Time Kinematic GPS Network John A. Ray...
-
Upload
gerard-bates -
Category
Documents
-
view
220 -
download
1
Transcript of Design, Construction and Implementation of a Statewide Real Time Kinematic GPS Network John A. Ray...
Design, Construction Design, Construction and Implementation of and Implementation of a Statewide Real Time a Statewide Real Time Kinematic GPS NetworkKinematic GPS Network
John A. Ray AdministratorOffice of Aerial EngineeringOhio Department of Transportation
September 21, 2004
Design ConsiderationsDesign Considerations
Monument StabilityMonument Stability Signal QualitySignal Quality Continuous PowerContinuous Power Lightning ProtectionLightning Protection Vandal ResistantVandal Resistant Station LocationsStation Locations Network Network
ConnectionsConnections
Single Point Single Point ControlControl
UniformityUniformity ConnectivityConnectivity Environmental Environmental
FactorsFactors MaintenanceMaintenance
Monument Design
Form Design
Cabinet Design
Site Plan
Location Design(Phase 1)
Location Design(Phase 2)
Location Design(Phase 3)
Location Design(Phase 4)
Construction
We elected to construct the We elected to construct the entire system ourselves to entire system ourselves to ensure quality control, modify ensure quality control, modify the design as needed and have the design as needed and have a complete understanding of the a complete understanding of the system for maintenance system for maintenance activities.activities.
CORS Crew
L to R: L to R: Dave Beiter, Tim Burkholder, John Ray, Dave Dave Beiter, Tim Burkholder, John Ray, Dave Albrecht, Rick Hentz, Jim Stafa & Greg GerstAlbrecht, Rick Hentz, Jim Stafa & Greg Gerst
ConstructionConstructionTesting Location for Data QualityTesting Location for Data Quality
ConstructionConstructionTest HoleTest Hole
ConstructionConstructionDrilling HoleDrilling Hole
ConstructionConstructionSet Reinforcing SteelSet Reinforcing Steel
ConstructionConstructionDitchDitch
ConstructionConstructionElectrical BoxElectrical Box
ConstructionConstructionSet FormsSet Forms
ConstructionConstructionPouring ConcretePouring Concrete
ConstructionConstructionAntenna MountAntenna Mount
ConstructionConstructionPlacing Antenna MountPlacing Antenna Mount
ConstructionConstructionCompleted Monument (Classic)Completed Monument (Classic)
ConstructionConstructionCompleted Cabinet (Classic)Completed Cabinet (Classic)
ConstructionConstructionCORS Lite MountCORS Lite Mount
ConstructionConstructionCORS Lite CabinetCORS Lite Cabinet
ImplementationImplementationRover EquipmentRover Equipment
ImplementationImplementationTelecommunications SolutionTelecommunications Solution
ImplementationImplementationNetwork AdjustmentNetwork Adjustment
ImplementationImplementation
User Agreements Pending!User Agreements Pending!
ImplementationImplementationUser AccessUser Access
Each user will be assigned an “IP” address Each user will be assigned an “IP” address with a unique user log-on and password with a unique user log-on and password for authentication.for authentication.
ImplementationImplementationTraining / Public AwarenessTraining / Public Awareness
Numerous training sessions and public Numerous training sessions and public presentations are planned to make presentations are planned to make potential users aware of what is available.potential users aware of what is available.
ImplementationImplementationSystem ManagementSystem Management
Daily monitoringDaily monitoring Website updatesWebsite updates NGS coordinationNGS coordination Software UpgradesSoftware Upgrades Hardware UpgradesHardware Upgrades Future planningFuture planning Etc.Etc.
ImplementationImplementationCooperation with other entitiesCooperation with other entities
UniversityUniversity CityCity Private CompanyPrivate Company CountyCounty County (outside Ohio)County (outside Ohio)
ImplementationImplementationMaintenanceMaintenance
Preventative maintenance as well as Preventative maintenance as well as emergency repairs will be performed to emergency repairs will be performed to ensure maximum availability.ensure maximum availability.