Opportunities
CAPITAL PROGRAMS
Strategic investments:
State-of-Good-Repair Rolling stock Infrastructure Technology Asset Management Portal Bridge
Resilience Program Strategic Resilience
Expansion TOC Opportunities Resilience Program
Substations Repairs Facilities Repairs
3
PROJECT ADVERTISE DATE PROJECT COST
SOGR North
Elizabeth Station
•Design In-House
$2M •CM In-House
•Construction 3Q17
Rail Stations Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR
New Brunswick
Station Platform Extension
•Design Awarded
$6M •CM TOC
•Construction 4Q18
PROJECT ADVERTISE DATE PROJECT COST
SOGR
New Brunswick
Station Escalator
•Design Awarded
$2M •CM In-House
•Construction 1Q18
4
Rail Stations Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR Princeton Junction
Safety
•Design In-House
$1M •CM In-House
•Construction 3Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR
New Brunswick
Station Elevator Upgrade
•Design Awarded
$3M •CM In-House
•Construction 3Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR Perth
Amboy Station
•Design Awarded
$45M •CM 1Q18
•Construction 2Q18
5
Rail Stations Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR Mahwah Station
•Design In-House
$2M •CM In-House
•Construction 3Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR Elizabeth Station
•Design In-House
$60M •CM 2Q17
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR Lyndhurst Station
•Design TOC/ In-House
$22M •CM 3Q17 •Construction 1Q18
6
Rail Stations Opportunities
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Long Slip Platforms
•Design Award Pending
$86M •CM TBD •Construction 3Q18
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Long Slip Fill
•Design Awarded $110M •CM 3Q17
•Construction 1Q18
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Hoboken Signal Power
•Design Awarded
$25M •CM TOC
•Construction 4Q17
7
Rail Infrastructure Opportunities PROJECT ADVERTISE DATE PROJECT COST
SOGR
Portal Bridge Early
Action
•Design Awarded
$20M •CM Awarded
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Raritan Yard
Environ. Upgrade
•Design TOC
$2M •CM TOC
•Construction 4Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR Port Morris
Environ. Upgrade
•Design TOC
$2M •CM TOC
•Construction 4Q17
8
Rail Infrastructure Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR Bridge Inspections
•Three Consultants per Contract
$3M •Contracts Bid Every Two
Years
PROJECT ADVERTISE DATE PROJECT COST
SOGR Culvert Program
•Designs In-House $3M •Two Contracts Bid per
Year
PROJECT ADVERTISE DATE PROJECT COST
SOGR Bridge
Painting Program
•Designs In-House
$10M •CM In-House •Three to Four Bridge
Contracts per Year
9
Rail Infrastructure Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR Mill Road Bridge
•Design 3Q17
$15M •CM In-House
•Construction 3Q20
PROJECT ADVERTISE DATE PROJECT COST
SOGR Roosevelt
Ave. Bridge
•Design Awarded
$8M •CM TOC
•Construction 2Q18
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Hacken-sack Street Bridge
•Design RFP 2Q18
$5M •CM In-House
•Construction In-House
10
Rail Infrastructure Opportunities
PROJECT ADVERTISE DATE PROJECT COST
EXPANSION Lacka-wanna Cutoff
•Design Awarded
$61M •CM 2Q17
•Construction D/B 2Q17
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Hoboken Boiler and
Ferry Terminal
•Design Awarded
$17M •CM TOC
•Construction Advertised
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Observer Hwy.
Switch House Repair
•Design Awarded
$4M •CM In-House
•Construction Advertised
11
Rail Infrastructure Opportunities
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Hoboken Terminal House Power
•Design Awarded
$24M •CM 2Q17
•Construction Advertised
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Henderson Substation
•Design Awarded
$21M •CM 2Q17
•Construction 3Q17
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Bay Head Substation
•Design Awarded
$24M •CM 2Q17
•Construction 3Q17
12
Rail Infrastructure Opportunities
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Maple-wood
Substation
•Design Awarded $1M •CM In-House
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Delco Lead S&I
•Design Awarded
$370M •CM 3Q17
•Construction 2Q17(EA) 1Q18
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Raritan Draw Bridge
•Design Awarded $595M •CM 2Q17
•Construction 2018
13
Rail Facilities Opportunities
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
MMC ROC Flood
Control
•Design Awarded
$23M •CM TOC
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
ROC Sub-
station
•Design Awarded $7M •CM TOC
•Construction 2Q18
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
ROC UPS Raising
•Design Awarded
$5M •CM TOC
•Construction 2Q17
14
Light Rail Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR NLR Track
Repair Phase I
•Design TOC
$10M •CM TOC/ In-House
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR NLR Track
Repair Phase II
•Design TOC
$15M •CM TOC/ In-House
•Construction 2Q18
PROJECT ADVERTISE DATE PROJECT COST
SOGR
NLR Norfolk Station Rehab
•Design Awarded
$2M •CM In-House
•Construction 4Q18
15
Light Rail Opportunities
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
Newark Light Rail
Flood Control
•Design Awarded
$2M •CM In-House
•Construction 2Q18
16
Bus Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR Market
Street Bus Garage
•Design Awarded
$30M •CM TOC/In House
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR Maple-wood
Generator Upgrades
•Design Awarded
$3M •CM In-House
•Construction 3Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Maple-wood
Parking Deck
•Design Awarded
$7M •CM TOC
•Construction 4Q18
17
Bus Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Orange Garage Environ.
Upgrade
•Design Awarded
$2M •CM TOC
•Construction 4Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR Avandale Park and
Ride
•Design In-House
$6M •CM TOC/ In-House
•Construction 2Q17
PROJECT ADVERTISE DATE PROJECT COST
SOGR WRTC Deck
Repair
•Design In-House
$2M •CM In-House
•Construction 2Q17
18
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Newark Garage
UST Upgrades
•Design TOC
$4M •CM TBD
•Construction TBD
Bus Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Newton Ave.
Garage UST
Upgrades
•Design TOC
$2M •CM TBD
•Construction TBD
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Meadow-lands
Garage UST
Upgrades
•Design TOC
$3M •CM TBD
•Construction TBD
19
Bus Opportunities
PROJECT ADVERTISE DATE PROJECT COST
SOGR
Howell Garage
UST Upgrades
•Design TOC
$3M •CM TBD
•Construction TBD
20
Multi-Modal Opportunities
PROJECT ADVERTISE DATE PROJECT COST
RESILIENCE PROGRAM
NJ TRANSIT-
GRID
•Design Awarded $577M •CM TBD
•Construction TBD
PROJECT ADVERTISE DATE
PROJECT COST
TASK ORDER CONTRACTS
• Bridge & Engineering 3Q17
TBD • Transit-Friendly Planning 3Q17
• Travel Demand Forecasting 3Q17
• Architectural Engineering 3Q17
PROJECT ADVERTISE DATE
PROJECT COST
TASK ORDER CONTRACTS
• AccessLink 4Q17
TBD • Community Transportation 4Q17
• Construction Management 4Q17
• Vertical Transportation 4Q17
21
Multi-Modal Opportunities
PROJECT ADVERTISE DATE PROJECT COST
TASK ORDER CONTRACTS
•Emergency Response/Resilience 4Q17 TBD
22
New Requirements
AUDIT AND INSPECTION OF RECORDS
The Contractor shall retain all Contract records and permit the authorized representatives of NJ TRANSIT, the State of New Jersey, the USDOT , the FTA and the Comptroller General of the United States and their duly authorized representatives, such as Project Management Oversight, Integrity Oversight Monitors, etc. to inspect and audit all financial data, operational data and other records including but not limited to disclosure forms, payment requests, change orders, invoices, certified payrolls, manifests, etc. relating to products, transactions or services provided under this Contract including its performance and the performance of its subcontractors under this Contract from the date of the Advertisement of the Invitation for Bid and for five years after final payment under this Contract has been made.
─ Subcontractors are required to meet the same standards.