DESIGN-BID-BUILD VS. DESIGN-BUILD - Horst Construction...Preliminary cost estimate is prepared. As...
Transcript of DESIGN-BID-BUILD VS. DESIGN-BUILD - Horst Construction...Preliminary cost estimate is prepared. As...
D E S I G N - B U I L D - - - - - - - B E S T VA L U E . FA S T E R C O M P L E T I O N . R E D U C E D C O S T.
DESIGN-BID-BUILD DESIGN-BUILD VS.
PP
SD SD
DDDD
CDCD
GMP
BID
TIME AND DOLLARS LOST
PROJECT COMPLETE
GUARANTEEDMAXIMUM
PRICE ESTABLISHED
CO
NST
RU
CT
ION
CO
NST
RU
CT
ION
BID In Design-Bid-Build this is the point when a project cost is established
through a rigid contractor bidding process.
CONSTRUCTION DOCUMENTS (CD)Coordination and Completion of Drawings for Permitting.
In Design-Build this is the point when construction begins with prepared drawings and specifications.
DESIGN DEVELOPMENT (DD)Design is developed in collaboration with engineers.
In Design-Build this is the point when the Guaranteed Maximum Price is established. As the Design Builder, Horst invites 4-5 prequalified subcontractors to “bid” every
trade to ensure the Owner is receiving competitive pricing and quality workmanship.
SCHEMATIC DESIGN (SD)Project requirements are graphically defined.
Preliminary cost estimate is prepared. As the Design Builder, Horst guarantees that a consistent message is communicated to everyone on the project.
PROGRAMMING (P)Establish project vision, budget, and schedule requirements.
PROJECT COMPLETE
HOW GMP BENEFITS THE OWNER
This model allows an owner to confirm budgetary certainty early in the process and the benefit of
any cost savings.