Grain LNG The UK’s Foremost LNG Terminal Ofgem LNG Seminar 11 February 2009.
Design and Safety Considerations for existing LNG Peak ...
Transcript of Design and Safety Considerations for existing LNG Peak ...
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 1
Design and Safety Considerations for existing LNG Peak Shaving Plants
Hans – Joachim GrossmannGOC Engineering GmbH
Gastech 2005 March 13-17, Bilbao Spain
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 2
Design and Safety Considerations for existing LNG Peak Shaving Plants
-A Project Example-
The plantBrief plant descriptionProject phasesPre-StudiesConformity studyCosting study
The projectDesign aspectsProject executionProject statusProject organizationSummary/conclusions
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 3
The Plant
LNG Peak Shaving PlantLocated at DormagenNievenheim, GermanyPart of ~ 4,000 km HP Gas Pipeline Grid of RWE EnergyMainly cavern storage
Start up in 1976Built by CBI GermanyOnly two cryogenic LNG installations in Germany
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 4
Brief Plant Description
Gas Treatment and Liquefaction
Gas treatment with two adsorber systemsTo remove moisture, aromatics, CO2Liquefaction with MRL cycleMRL Methane/PropaneLiquefaction capacity2,400 Nm³/h
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 5
Brief Plant Description
LNG Storage
Double wall steel tank (API 620 Q)Inner tank 9% nickel suspended deckOuter tank CSBottom/shell penetrationsGeo. V. 22,700 m³
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 6
Brief Plant Description
BOG Handling (exist.)Partly re-circulated back to tankPartly send to pipeline
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 7
Brief Plant Description
NG Send Out SystemTwo HP Pumps , outside tanks, 2 x 80m³/h LNGTwo submerged combustion vaporizersSend out rate: 2 x 50,000 Nm³/hConditioning with LN2Truck loading system
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 10
Pre- Studies
I. First Study to check the Compliance of the plant with actual rules & regulationsE.g. EN 1473/NFPA 59ASafety Study to review actual installed safety featuresActive & passive safety equipment
II. TargetLife Extension of the plantIncreased level of automation Alternative peak shaving concepts
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 12
Pre- Studies
III. ResultsEN 1473 allows no penetrations of the primary and secondary container walls ( >> submerged tank pumps)NFPA 59A allows penetrations, however the design spill shall be defined as the full liquids content of the tank ( >> with submerged pumps the design spill reduced to 10min. Nom. Pump capacity)Entire revamping needed instrumentation & control system Partly revamping needed for mechanical equipment
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 13
Pre- Studies
IV. Costing studyCosting of various alternatives
Revamping of plant + submerged pumpsRevamping of plant with additional safety features ( water curtains, foam systems, thermal insulation of impoundment area )
Other alternatives such as close down of plant
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 14
The Project Overview
Client decided to take out the plant for one winter season to: Empty and warm up the LNG tank
Install submerged pumpsInstall new instrumentation &control systemRevamp partly mechanical equipment/ piping, control building etc. Install new BOG handling system ( was added to the project 2Q/2004)
Project duration 1Q/04 – 4Q/05
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 15
Design Aspects Process
Process simulation Change in gas compositionOptimization due to input from operatorsE.g. gas treatment &liquefaction process Level of automation New BOG System
SafetyHazop StudySIL Allocation
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 16
Design Aspects LNG Tank
Tank Decommissioning Data assessment after 30 years operation
Static calculations of existing tankInstall new pumps/pump platformRecalculated the tank due to change in rules & regulationsInstall additional outer shell stiffeners
Local authorities/ Environmental Change in Rules & RegulationsSafety Report
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 20
Project Execution Emptying Tank
Decommissioning of tank starts at approx. 2,5 m liquid level ( April 2004)Temporary connection between RT Loading pumps and HP send out pumps Result : Tank more or less 100 % liquid emptied Warming upPurging with nitrogenPurging with air Opening the tank
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 22
Project Execution Tank Opening – Suspend. Deck
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 26
Project Execution -Laser Scanning (Test Project)
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 27
Project Execution -Laser Scanning (Test Project)
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 28
Project Execution -Laser Scanning (Test Project)
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 29
Project Execution -Laser Scanning (Test Project)
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 30
Project Execution -Laser Scanning (Test Project)
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 31
Project Organisation
Entire project execution with one Engineering company including:
pre studiesbasic, detailed engineeringprocurement assistancesupervision and start up
Direct procurement of equipment
Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 32
Summary /Conclusions
Detailed Pre Studies requiredClose cooperation between Client/ Engineering companyDetailed planning of activities Tailor made solutions requiredNo critical findings after 30 years of useFindings/results can be used for other projects too ( LNG/LEG)