deakinprime.com Deakin University CRICOS Provider Code: 00113B DPW_DES-DEV-PROCESS-FLOWCHART—060613 DESIGN AND DEVELOPMENT PROCESS FLOWCHART FOR EXTERNAL USE DELIVERY MEASUREMENT ANALYSE DESIGN Focus on CONTENT Focus on STYLE DeakinPrime consults with clients on learning and development needs using our Solutions Consulting model. Project team (e.g. ID, SME, Project Manager, etc.) identified, contracted; stakeholders briefed; project plan created Assign and brief development resources, incl: — content writer/s — publishing — production etc. Develop: — courseware templates(s) — sample draft content — Publishing design (binders, covers, etc.) Scope meeting Client contracting initiated When need identified and clarified, DeakinPrime submits proposal, including details of proposed solution, associated assumptions and indicative costs. Client approval to process Unless full needs analysis needs to be done Consultation to define scope of needs analysis— treated as separate project. Clarification sought on issues such as: The training gap — Aims and objectives — Timeframes — Organisational stakeholders — Indicative budget — Issues/constraints — Target audience — Implementation issues — Risks and assumptions — Links to other initiatives — Existing materials/programs Design specifications to include: Development strategy — Assessment strategy — List of deliverables —Learning outcomes — Pilot roll out strategy — Assessment strategy — Evaluation strategy — Client specific info to be included Note: Number of draft reviews in development stage to be defined within the design stage. At this stage DeakinPrime provides: Firm costs for design — indicative costs for (a) development and (b) delivery Contract signed Contract and brief facilitator and make arrangements for delivery of pilot program Instructional Designer to attend as per evaluation strategy Client approval of Design Specifications Client Preliminary approval Design team drafts design specifications Content writing begins (copyright checking as required) Any revisions agreed and incorporated into final design specifications Desktop publish, edit and final copyright checks for 1st PROOF COPY Initial draft created for client review Conduct pilot program Revise draft content, if and as required, checking if these vary initial design specifications (variations) Client 1st review of CONTENT Final draft of content prepared and submitted with list of other deliverables Sign-off by client on CONTENT (DRAFTS) and FINAL list of deliverables Sign-off by client on 1st PROOFS and approval of any changes Amend contract (if needed) and set up ongoing delivery. Evaluation conducted, feedback collated and analysed Present findings to client and agree revisions to Pilot with client Sign-off by client on FINAL PROOFS Confirmation of costs for development, delivery stages (and management of variations thereto) Contract revised where necessary Client approval of variations Amendments made and final proofs created Amendments made and final proofs created DESIGN DEVELOP DELIVERY DEVELOP Need defined size/scope of drafts (e.g. Day 1, one topic,) Project plan informs deliverables and associated milestones Deliverables informed by design specifications and amended durning development of content phase. Client sign-off

Transcript of DESIGN AND DEVELOPMENT PROCESS FLOWCHART FOR EXTERNAL...

deakinprime.com Deakin University CRICOS Provider Code: 00113B

DPW_DES-DEV-PROCESS-FLOWCHART—060613

DESIGN AND DEVELOPMENT PROCESS FLOWCHARTFOR EXTERNAL USE

DEL

IVER

Y

MEA

SUR

EMEN

T

ANAL

YSE

DES

IGN

Focu

s on

CO

NTE

NT

Focu

s on

STY

LE

DeakinPrime consults with clients on learning and development needs

using our Solutions Consulting model.

Project team(e.g. ID, SME, Project

Manager, etc.)identified, contracted; stakeholders briefed; project plan created

Assign and brief developmentresources, incl:— content writer/s— publishing— production etc.

Develop:— courseware templates(s)— sample draft content— Publishing design (binders, covers, etc.)

Scope meeting

Client contracting

initiated

When need identified and clarified, DeakinPrime submits proposal, including details of proposed solution,

associated assumptions and indicative costs.

Client approval to process

Unless full needs analysis needsto be done

Consultation to define scope of needs analysis— treated as separate project.

Clarification sought on issues such as:The training gap — Aims and objectives — Timeframes — Organisational stakeholders — Indicative budget — Issues/constraints — Target audience — Implementation issues — Risks and assumptions — Links to other initiatives — Existing materials/programs

Design specifications to include:Development strategy — Assessment strategy — List of deliverables —Learning outcomes — Pilot roll out strategy — Assessment strategy — Evaluation strategy — Client specific info to be included Note: Number of draft reviews in development stage to be defined within the design stage.

At this stage DeakinPrime provides:Firm costs for design — indicative costs for (a) development and (b) delivery

Contract signed

Contract and brief facilitator and make arrangements for

delivery of pilot program

Instructional Designer to attend as per evaluation strategy

Client approval of Design

Specifications

Client Preliminary

approval

Design team drafts design specifications

Content writing begins

(copyright checking as

required)

Any revisions agreed and incorporated into final design specifications

Desktop publish, edit and final copyright checks

for 1st PROOF COPY

Initial draft created for

client review

Conductpilot

program

Revise draft content, if and as required, checking if these vary initial design

specifications (variations)

Client 1st review of CONTENT

Final draft of content prepared and submitted with

list of other deliverables

Sign-off by client on CONTENT (DRAFTS)

and FINAL list of deliverables

Sign-off by client on1st PROOFS and approval of any

changes

Amend contract (if needed) and set up ongoing delivery.

Evaluation conducted, feedback collated

and analysed

Present findingsto client and

agree revisionsto Pilot with client

Sign-off by client onFINAL PROOFS

Confirmation of costs for

development, delivery stages

(and management of variations

thereto)

Contract revised where

necessary

Client approval of variations

Amendments made and final proofs created

Amendments made and final proofs created

DESIGN

DEVELOP

DELIVERY

DEVE

LOP

Need defined size/scope of drafts(e.g. Day 1, one topic,)

Project plan informs deliverables and associated milestones

Deliverables informed by design specifications and amended durning

development of content phase.

Clientsign-off