Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.
-
Upload
kathlyn-fletcher -
Category
Documents
-
view
223 -
download
10
Transcript of Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.
desigh by Parichat 1
JUST IN TIME
LIMIT
JUST IN TIME
JUST ON TIME
JUST OUT TIME
TIME
1.
2.
3.
desigh by Parichat 2
DEFINITION OF : JUST IN TIME
TO PRODUCE ONLY WHAT CUSTOMER WANT,
IN ONLY A NEEDED QUANTITY AT THE TIME THEY
REQUIRE.
desigh by Parichat 3
JUST IN TIME IS A WORLD’S FAMOUS MANUFACTURING SYSTEM
AND SO CALLED : LEAN MANUFACTURING SYSTEM
KEY ELEMENT OF SYSTEM :
1. WASTE ELIMINATION
2. TAKT TIME
3. ONE PIECE FLOW
4. SMED.
5. PULL SYSTEM
6. VISUAL CONTROLS
7. 5 S.
8. WORK STANDARD
desigh by Parichat 4
WASTE DEFINITION
EVERYTHING WE DO THAT COSTS SOMETHING
WITHOUT ADDING VALUE TO THE PRODUCT
MAXIMIZE VALUE ADDED ACTIVITIES
VA = MAX.
MINIMIZE NON-VALUE ADDED ACTIVITIES
NVA = MIN.
desigh by Parichat 5
SEVEN TYPES OF WASTE
1. OVER PRODUCTION
2. DELAYS ( WAITING TIME )
3. TRANSPORT
4. PROCESS WASTE
5. INVENTORIES
6. MOTIONS
7. DEFECTIVE PRODUCTS
desigh by Parichat 6
TAKT TIME
THE TAKT TIME IS :
450 Minutes available
225 Units of customer’s need
= 2 Minutes per unit
2 MINUTES IS A PRODUCTION TAKT TIME
desigh by Parichat 7
ONE PIECE FLOW
TO MAKE THE PRODUCT FLOW IN PIECE BY PIECE
AS TO ELIMINATE ALL KIND OF WASTE
SUB-ASSEMBLING MAIN-ASSEMBLING
ONE PIECE FLOW
BATCH FLOW
SUB-ASSEMBLING
BUFFER STOCK
MAIN-ASSEMBLING
OVER PRODUCTION
FRESSNESS !
LOSS COST
FLEXIBILITY
FLOOR SPACEUNSAFE WORK PLACE
desigh by Parichat 8
SMED.
SINGLE MINUTE EXCHANGE OF DIES , TOOLS
OBJECTIVE
<> OPTIMIZE MACHINE TIME
<> REDUCE LEADTIME
<> INCREASE EFFICIENCY
SMED. TRICKS
TO REDUCE INTERNAL TASK WHILE INCREASE EXTERNAL TASK
INTERNAL = TASK DONE BY HUMAN WHILE THE MACHINE MUST STOP PRODUCING
EXTERNAL = TASK DONE BY HUMAN WHILE THE MACHINE IS IN THE PRODUCTION MODE
desigh by Parichat 9
PULL SYSTEM
PULL = A MANUFACTURING SYSTEM CONTROLLED
BY THE CUSTOMER.
MANUFACTURER CUSTOMER
PULLING BY CUSTOMER
JUST IN TIMECHAI-YO
TOO MUCHTOO EARLY
PUSH BY MANUFACTURER
desigh by Parichat 10
BASIC RULE OF PULL SYSTEM
THE SUPPLIER REPLACES WHAT THE CUSTOMER CONSUMED
THE CUSTOMER ONLY PULLS WHAT HE CONSUMES
STOCKS ARE MAINTAINED AT THEIR MINIMUM LEVELS AT
ALL TIMES
desigh by Parichat 11
VISUAL CONTROL
TECHNIC TO ACKNOWLEDGE AT A GLANCE OF :
<> WHAT’S RIGHT
<> WHAT’S WRONG
<> NORMALITY
<> ABNORMALITY
<> WHAT’S DONE
<> WHAT’S LEFT TO BE DONE
<> MANY OTHERS
desigh by Parichat 12
5 S.
A DAILY ENGINEERING OF THE WORK PLACE BY DOING :
1. SORTING
2. STRAIGHTENING
3. SWEEPING
4. SIMPLIFYING & STANDARDIZING
5. SUSTAINING
5 S. IS AN ACTIVITY WHICH IS A FOUNDAMENTAL OF
QUALITY , COST , SAFETY
ACTIVITY
desigh by Parichat 13
STANDARD WORK
OBJECTIVE :
<> TO MAINTAIN THE SAME QUALITY LEVEL
<> MEETING THE TAKT TIME
<> ENSURE HUMAN WORK EFFECTIVENESS
<> INCREASE HUMAN EFFICIENCY
<> BETTER ASSOCIATION OF HUMAN AND
MACHINE
TO STANDARDIZE THE WORK WHICH DONE BY HUMAN
desigh by Parichat 14
THANK YOU