Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

14
desigh by Parichat 1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

Transcript of Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

Page 1: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 1

JUST IN TIME

LIMIT

JUST IN TIME

JUST ON TIME

JUST OUT TIME

TIME

1.

2.

3.

Page 2: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 2

DEFINITION OF : JUST IN TIME

TO PRODUCE ONLY WHAT CUSTOMER WANT,

IN ONLY A NEEDED QUANTITY AT THE TIME THEY

REQUIRE.

Page 3: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 3

JUST IN TIME IS A WORLD’S FAMOUS MANUFACTURING SYSTEM

AND SO CALLED : LEAN MANUFACTURING SYSTEM

KEY ELEMENT OF SYSTEM :

1. WASTE ELIMINATION

2. TAKT TIME

3. ONE PIECE FLOW

4. SMED.

5. PULL SYSTEM

6. VISUAL CONTROLS

7. 5 S.

8. WORK STANDARD

Page 4: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 4

WASTE DEFINITION

EVERYTHING WE DO THAT COSTS SOMETHING

WITHOUT ADDING VALUE TO THE PRODUCT

MAXIMIZE VALUE ADDED ACTIVITIES

VA = MAX.

MINIMIZE NON-VALUE ADDED ACTIVITIES

NVA = MIN.

Page 5: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 5

SEVEN TYPES OF WASTE

1. OVER PRODUCTION

2. DELAYS ( WAITING TIME )

3. TRANSPORT

4. PROCESS WASTE

5. INVENTORIES

6. MOTIONS

7. DEFECTIVE PRODUCTS

Page 6: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 6

TAKT TIME

THE TAKT TIME IS :

450 Minutes available

225 Units of customer’s need

= 2 Minutes per unit

2 MINUTES IS A PRODUCTION TAKT TIME

Page 7: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 7

ONE PIECE FLOW

TO MAKE THE PRODUCT FLOW IN PIECE BY PIECE

AS TO ELIMINATE ALL KIND OF WASTE

SUB-ASSEMBLING MAIN-ASSEMBLING

ONE PIECE FLOW

BATCH FLOW

SUB-ASSEMBLING

BUFFER STOCK

MAIN-ASSEMBLING

OVER PRODUCTION

FRESSNESS !

LOSS COST

FLEXIBILITY

FLOOR SPACEUNSAFE WORK PLACE

Page 8: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 8

SMED.

SINGLE MINUTE EXCHANGE OF DIES , TOOLS

OBJECTIVE

<> OPTIMIZE MACHINE TIME

<> REDUCE LEADTIME

<> INCREASE EFFICIENCY

SMED. TRICKS

TO REDUCE INTERNAL TASK WHILE INCREASE EXTERNAL TASK

INTERNAL = TASK DONE BY HUMAN WHILE THE MACHINE MUST STOP PRODUCING

EXTERNAL = TASK DONE BY HUMAN WHILE THE MACHINE IS IN THE PRODUCTION MODE

Page 9: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 9

PULL SYSTEM

PULL = A MANUFACTURING SYSTEM CONTROLLED

BY THE CUSTOMER.

MANUFACTURER CUSTOMER

PULLING BY CUSTOMER

JUST IN TIMECHAI-YO

TOO MUCHTOO EARLY

PUSH BY MANUFACTURER

Page 10: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 10

BASIC RULE OF PULL SYSTEM

THE SUPPLIER REPLACES WHAT THE CUSTOMER CONSUMED

THE CUSTOMER ONLY PULLS WHAT HE CONSUMES

STOCKS ARE MAINTAINED AT THEIR MINIMUM LEVELS AT

ALL TIMES

Page 11: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 11

VISUAL CONTROL

TECHNIC TO ACKNOWLEDGE AT A GLANCE OF :

<> WHAT’S RIGHT

<> WHAT’S WRONG

<> NORMALITY

<> ABNORMALITY

<> WHAT’S DONE

<> WHAT’S LEFT TO BE DONE

<> MANY OTHERS

Page 12: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 12

5 S.

A DAILY ENGINEERING OF THE WORK PLACE BY DOING :

1. SORTING

2. STRAIGHTENING

3. SWEEPING

4. SIMPLIFYING & STANDARDIZING

5. SUSTAINING

5 S. IS AN ACTIVITY WHICH IS A FOUNDAMENTAL OF

QUALITY , COST , SAFETY

ACTIVITY

Page 13: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 13

STANDARD WORK

OBJECTIVE :

<> TO MAINTAIN THE SAME QUALITY LEVEL

<> MEETING THE TAKT TIME

<> ENSURE HUMAN WORK EFFECTIVENESS

<> INCREASE HUMAN EFFICIENCY

<> BETTER ASSOCIATION OF HUMAN AND

MACHINE

TO STANDARDIZE THE WORK WHICH DONE BY HUMAN

Page 14: Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME 1. 2. 3.

desigh by Parichat 14

THANK YOU