Deploying I-ETMS:
“What do I need to know???”
2
• “Why should I care?” • I-ETMS Overview • “How hard can it be?”
Agenda
3
“Why should I care?”
Do you have to deploy PTC?
• Are you a Class 1 railroad?
– Required to deploy PTC on track and locomotives
• Do you host passenger traffic?
– Required to deploy PTC on track and locomotives
• Are you a tenant on track that is PTC required or operate
over a diamond where PTC is required (236.1005(a)(1)(i))?
– Deploy PTC on locomotive(s)
– Possible Office integration, servers, training, & configuration
management
– PTCSP submittals
4
PTC Server
I-ETMS Overview- Data Flow
5
PTC Information exchanged with
the I-ETMS Locomotive Office
• Crew Information
• Train Consist
• Bulletin Orders
– Speed
Restrictions
– Work Zone
Limits
5
Wayside
Signal aspect
Switch position
Other devices
Authorities (TWC)
Track Data updates
Software updates
Security Key updates
Challenge: System Integration and Interoperability. Each Railroad has different systems but the locomotive interface must be standard
Report Location
Report Violations
Report Events
6
I-ETMS Architecture and Interoperability
Paradigm
Black RR
Dispatching and Back Office
Systems
PTC Back Office
Server
PTC Back Office
Server
Yellow RR Dispatching and
Back Office Systems
Orange RR Dispatching and
Back Office Systems
Blue RR Dispatching and
Back Office Systems
IETMS Onboard System
Train Crew Wayside Interface
Unit (WIU)
PTC Back Office
Server
PTC Back Office
Server
Interoperability Scope
IETMS Interoperable/Specified Interface
IETMS Specified Behavior
Non-Interoperable Interface
7
I-ETMS Interoperability Scenario PTC Onboard System maintains unique conversation with each governing Back Office Server and
applicable WIUs along track segments on its route.
Red Sub-A Red Sub-B Blue Sub-A Blue Sub-B
M03
Red BOS 1 Sub A
Red BOS 2 Sub B
Red Road Dispatching System
M03
Green BOS 1 Sub A
Green BOS 2 Sub B
Green Road Dispatching System
M03
Blue BOS 1 Sub A, B
Blue Road Dispatching System
WIU WIU WIU WIU
WIU
WIU
Green Road Train Crew
8
“How hard can it be?”
• Integration
• Testing
• Installation
• Training
• Configuration Management
• FRA Compliance- PTCSP
9
Integration- PTC System Segments
Office
Locomotive Wayside
Communication
WIU
BOS
WSRS
TCSM
GIS KES
UTCS CAD
220 Radio
WMS
Cell
MDM
ITCMS PTC MR
MPLS WIFI Cell 220 Base
TMC/ CDU
IETMS
GPS/ Sensor
EM
CHM
220 Radio
WIFI LMS
Cell OBN
NS Example: 20+ PTC components and systems that have to integrate and come together for testing system
10
NS PTC Integration Test Lab- Atlanta
WAYSIDE
COMM LOCOMOTIVE PTC/LEADER
CAD/BOS
11
PTC System Segments Office
Locomotive Wayside
Communication
WIU
BOS
WSRS
TCSM
GIS KES
UTCS
220 Radio
WMS
Cell
MDM
ITCMS PTC MR
MPLS WIFI Cell 220 Base
TMC/ CDU
IETMS
GPS/ Sensor
EM
CHM
220 Radio
WIFI LMS
Cell OBN
12
PTC - Ongoing Testing
Segment (vendor)
Nearest Neighbor
(RR, Vendor)
End to End
(RR)
Field Tests
(RR)
Deployment
NS LAB
13
I-ETMS Architecture and Interoperability
Paradigm
Black RR
Dispatching and Back Office
Systems
PTC Back Office
Server
PTC Back Office
Server
Yellow RR Dispatching and
Back Office Systems
Orange RR Dispatching and
Back Office Systems
Blue RR Dispatching and
Back Office Systems
IETMS Onboard System
Train Crew Wayside Interface
Unit (WIU)
PTC Back Office
Server
PTC Back Office
Server
Interoperability Scope
IETMS Interoperable/Specified Interface
IETMS Specified Behavior
Non-Interoperable Interface
PTCMR
UTCS
XM
L
Cla
ss D
XM
L
SO
AP
/HT
TP
XM
L
Cla
ss D
XM
L
SO
AP
/HT
TP
XM
L
Cla
ss D
XM
L
SO
AP
/HT
TP
S
ATCS
TCP/IP
XML
SOAP/HTTPS
IDS
RBA
XML
SOAP/HTTPS
XM
L
JM
S/M
Q
XM
L
JM
S/M
Q
Back OfficePTC Architecture
XM
L
JM
S/M
Q
VisioDocument
XM
L
JM
S/M
Q
XM
L
JM
S/M
Q
Network
Time Server(s)
GIS
CI BOSGD BOS (1) GD BOS (2)
CAD
Codeline
XM
L
SO
AP
/HT
TP
S
XM
L
SO
AP
/HT
TP
S
XM
L
SO
AP
/HT
TP
S
SA BOS
© Norfolk Southern Corp. April 26, 2013
Domain
Name Server(s)
Routing
Auditing
Monitoring
Transformation
Logging
Security
Management
Messaging
(Local Queues)
Alerting
à Adapter (Class D, JMS, SOAP, …)
Inbound only -shape inside PTCMR block
Outbound only -shape outside PTCMR block
Inbound/Outbound -shape half inside & half outside PTCMR block
à Queue (jms, persistent)
PTCMR Legend
à Queue (jms, non-persistent)
BOS Notes
SA -Switch Awareness
GD -Geographic District
CI -Crew Interaction
MDM -Mobile Device Manager
SA, GD, CI & MDM are logical
functions of BOS
One or more BOS functions
may be collocated physically
EM
P
Cla
ss D
XM
L
Cla
ss D
MDM BOS
XM
L
SO
AP
/HT
TP
S
WSRS
ITCM
ITC
Ba
ck
Off
ice
Me
ss
ag
ing
EM
P
JM
S/A
MQ
P
TCSM
MIS
Base
Station
Locomotive
TMC OBN
Wi-Fi
(802.11)
220
IP
Wayside
WMS
ITCMWIU
IP
CELL
220
Satellite
IPLMS
ITCM
CSXT
Railroad A
IP
220
EM
P
15
Locomotive I-ETMS Installation
NS is installing:
• TMCs- Runs I-ETMS software
• CDUs- Crew interface to I-ETMS
• Cut-Out switches- Provides for failure bypass
• Sensor cabling- Provides loco data to TMC
• ITCMS- Provides interoperable message
routing
• Onboard Network- Provides IP Cell/Wifi
devices and CDUs
• 220 MHz Radio- Provides office/wayside
interoperable communications
• Antennas- 2xGPS, Cell, WiFi, 220MHz
16
Requires:
• Trained work-force (employee or contractor)
• Installation procedures for various loco types
• FRA witnessed installation
• PTC commissioning
• Maintenance standards
• Configuration Management
Locomotive I-ETMS Installation
17
Locomotive: Multiple Models & Configurations
Norfolk Southern has more than 250 different configurations of locomotives. Same model locomotives vary by year, previous owner(s), modifications made during the life of the locomotive, and by FRA standards at the time of manufacture or previous modification
Locomotive Model
SD40-2
D9-40CW
GP38-2
ES40DC
SD60
D8-40CW
SD70M-2
D9-40C
GP40-2
D8-40C
SD70
SD70M
GP60
SD60I
D8-32B
SD60M
GP38-3
GP59
ES44AC
SD40-E
18
Locomotive: CDU Display Installation
NS Objectives for CDU Installation • Must be readable from seat position • Must be able to reach buttons from
seat position • Must not block view out windows • Must not block other required
information • Must be maintainable • Must not cause an unsafe condition,
knee knocker • NS & BLE cab committee
19
Locomotive: CDU Display Installation
Some are easy
Some are more difficult
20
Locomotive: Space Constraints
Some units accommodate additional PTC technology onboard
21
Locomotive: Space Constraints
Some do not
22
Locomotive: Antenna Arrays
Each locomotive has its own array of antenna that must be installed. This array must also be retouched to add yet more antennae.
23
Configuration Management Overview
• Common Safety Plan: Configuration Management
Overview
• Development/Deployment/Track Data Change
• I-ETMS System Configuration Items
• Industry Coordination
24
Safety Plan: Configuration
Management
§ 236.1015 PTC Safety Plan content requirements …
Section (d)(9) A complete description of the configuration or revision
control measures designed to ensure that the railroad or its contractor
does not adversely affect the safety-functional requirements and that
safety-critical hazard mitigation processes are not compromised as a
result of any such change;
Development Change
Deployment Change
Track Data Change
Each railroad develops their own CM plan, which integrates with these processes
25
Change Management Processes
Development Change
Deployment Change
Track Data Change
Supports management of proposed I-ETMS system
changes, both Interoperable & Non-Interoperable, which
impact the functional or non-functional behavior of the
system.
Supports safe and reliable implementation of approved
Interoperable Development Changes into an operational
train control environment.
Supports safe and reliable implementation of changes
to Track Data, utilizing the railroads Track Data
Verification and Validation processes.
26
I-ETMS System Configuration Items
I-ETMSPTC System
220 Network
Interoperable PTC Network
Intra Consist Network
ITC Systems Management -
Office
Office Comms
Onboard Energy Management
Onboard PTC Comms
Onboard PTC System
PTC Apps-Comms
Interface
PTC Office Apps
Wayside Comms
Wayside Signals
Interop 802.11
MPLS Extranet
Base Station Location
Wayside Location
RF Propogation Results
ITC-Net CAI
Interop TNB
Class-C
Class-D
EMP
Config Parms Common
Config Parms Railroad
Onboard Software Version
ITC Onboard Radio
ITCM Remote - Locomotive
BOS Software
BOS MDM Software
ITC Wayside Radio
ITCM Remote - Wayside
WIU
Asset SubscriptionsE-bonded Ticket Systems
ITCSM Gateway
Key Exchange Service
Railroad Mgmt System
ITC Base Radio
ITCM Office
WSRS Office
Energy Mgmt Onboard Software
Intra Consist Addressing
Lead / Trail CDU Function
Lead / Train Radio Function
Geographic Data
Track Database Structure
Boundary Coordination
AMQP
Config Parms Common
Config Parms Common
Config Parms Common
Changes to many (but not all) of the components of the I-ETMS system
require Industry Coordination
27
Successful CM requires coordination
FRA
IndustryCommittees
Tenants and Interchange
Railroads
Vendors
I-ETMSRailroads
Development Change
Deployment Change
Interoperability Coordination
Track DataCoordination
RFA, Hazard & Deployment
Change Notification
Haz
ard
N
oti
fica
tio
n
Development Change
Hazard Notification
Hazard Notification
Deployment Change
28