DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS...ACCORDANCE WITH THE PROVISIONS OF NSCP 2010 SECTION...
Transcript of DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS...ACCORDANCE WITH THE PROVISIONS OF NSCP 2010 SECTION...
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NATIONAL CAPITAL REGIONMALABON - NAVOTAS DISTRICT ENGINEERING OFFICE
C-4 ROAD, BAGUMBAYAN NORTH, NAVOTAS CITY
BARRISTER J. REYES
CHIEF, PLANNING AND DESIGN SECTION DATE:
FERNANDO C. GARCIA
ASSISTANT DISTRICT ENGINEER DATE:
MARLO B. CORREA
DISTRICT ENGINEER DATE:
SUBMITTED: RECOMMENDED: APPROVED:
1
14
CONSTRUCTION OF RIVERWALL AND ROAD DIKE ALONG BATASAN RIVER
(PHASE XVI), BRGY. DAMPALIT
MALABON CITY
NET LENGTH = 107.00 l.m
GENERAL NOTESA. GENERAL1. ALL WORKS AND MATERIALS SHALL COMPLY WITH THE TECHNICALSPECIFICATIONS OF THIS PROJECT. ANY WORK OR MATERIAL NOTSPECIFIED IN THE TECHNICAL SPECIFICATIONS SHALL COMPLY WITHTHE FOLLOWING NOTES AND BUILDING CODE REQUIREMENTS FORCONCRETE AND REINFORCEMENT DETAILING.
2. CONSTRUCTION NOTES AND TYPICAL DETAILS SHALL APPLY TO ALLDRAWINGS UNLESS OTHERWISE SHOWN OR NOTED. MODIFY ONLY ASINSTRUCTED BY THE STRUCTURAL ENGINEER.
3. THE CONTRACTOR SHALL SUBMIT ALL NECESSARY FABRICATION/SHOPDRAWINGS INDICATING EQUIPMENT LAYOUT, SETTING PLANS, EMBEDDED ITEMS,APPROVAL OF THE ENGINEER PRIOR TO START OF CONSTRUCTION.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATEBRACING OF THE STRUCTURES FOR ALL LOADS THAT MAYBE IMPOSEDDURING CONSTRUCTION.
5. IN THE INTERPRETATION OF THESE DRAWINGS, INDICATED DIMENSIONSHALL GOVERN AND DISTANCES OR SIZES SHALL NOT BE SCALED FORCONSTRUCTION PURPOSES.
B. DESIGN CRITERIA1. DESIGN SPECIFICATION
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, VOLUME I, 2010
1.2 AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRASPORTATION OFFICIAL (AASHTO) SLRFD 2012 BRIDGE DESIGN SPECIFICATIONS 6TH ED (US)
1.3 ASSOCIATION OF STRUCTURAL ENGINEERS OF THE PHILIPPINES, STEEL HANDBOOK.
1.4 ACI-318R-014 AMERICAN CONCRETE INSTITUTE
2. DESIGN VALUES
C. MATERIALS
1. CONCRETE AND REINFORCEMENT
1.1 ALL CONCRETE SHALL DEVELOP A MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT THE END OF 28 DAYS WITH CORRESPONDING MAXIMUM SIZE OF AGGREGATES AND SLUMPS AS FOLLOWS.
STATION COMPRESSIVESTRENGTH
21 MPa (3000 psi)
21 MPa (3000 psi)
25 mm (1")
19 mm (3/4")
MAX. SIZEAGGREGATE
100 mm
100 mm
SLAB-ON-GRADE
FOUNDATION
CULVERT, FLOODWALLS ALL OTHERRETAINING WALLSTRUCTURES
21 MPa (3000 psi)
21 MPa (3000 psi)
25 mm (1")
19 mm (3/4")
MAX. SLUMP
100 mm
100 mm
SOIL ANGLE OF FRICTION = 28°IN SITU UNIT WEIGHT = 18 KN/M3
SATURATED UNIT WEIGHT = 20KN/M3
Ka = 0.361Kp = 2.77FPGA = 0.783 (NCR TYPE III SOIL)PGA = 0.60Kho = 0.47Kh = 0.235KAE = 0.544 (REF. SEED WHITMAN,1970)EL. OF DREDGE LINE = 10.0m
NOTE: THE ENGINEER OF RECORD SHALL BE NOTIFIED IN WRITING IN CASES
WHERE ACTUAL SITE CONDITIONS VARY FROM DESIGN VALUES
1.2 NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS AUTHORIZED IN WRITING BY THE STRUCTURAL ENGINEER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATION IS EXTREMELY DIFFICULT TO ACCOMPLISH.
1.3 UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR APPROVED, THE NOMINAL MAXIMUM SIZE AGGREGATE USED IN CONCRETE SHALL BE ASS FOLLOWS:
1.3.1 25 mm FOR CONCRETE IN WALLS, SLABS, FOUNDATION AND SECTIONS MORE THAN 600mm IN THICKNESS.
1.3.2 25 mm FOR CONCRETE IN WALLS, SLABS AND SECTIONS BETWEEN 350 mm AND 600 mm IN THICKNESS
1.3.3 19 mm FOR HEAVILY REINFORCED SECTIONS, PRECAST CONCRETE UNITS AND WALLS LESS THAN 250 mm THICKNESS.
1.3.4 12.5 mm FOR THIN SECTION PRECAST CONCRETE.
2. REINFORCING STEEL
2.1 ALL REINFORCING BARS SHALL CONFORM TO ASTM A615/A615 M, USE MINIMUM GRADE 60, fy = 414 MPa, ALL REINFORCING BARS SHALL BE FREE FROM MILL SCALES, OIL
OR ANY SUBSTANCE WHICH WILL TEND TO WEAKEN BOND WITH CONCRETE.
2.2 REINFORCING STEEL SHALL BE FREE OF MILL SCALES, OR ANY SUBSTANCES WHICH WILL WEAKEN THE BOND OF CONCRETE.
2.3 THE LATEST EDITION OF ACI-315 MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN OR NOTED.
2.4 SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN ACCORDANCE WITH THE FOLLOWING TABLE (TABLE OF LAP SPLICES AND ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS. SPLICES SHALL NOT BE MORE THAN 50% OF THE BARS AT ANY ONE POINT.
2016
28
350
580
1185
FOR GRADE 40 REBARS WITH CONCRETECOMPRESSIVE STRENGTH f'c = 21 MPa
FOR GRADE 60 REBARS WITH CONCRETECOMPRESSIVE STRENGTH f'c = 21 MPa
BAR DIAMETER (mm)
705880
2528
2.4.1 FOR BUNDLED BARS, SPLICED LENGTH Ld, SHALL BE MULTIPLIED BY 1.10
2.4.2 FOR THREE (3) - BUNDLED BARS, Ld SHALL BE MULTIPLIED BY 1.20.
2.4.3. FOR FOUR (4) - BUNDLED BARS, Ld SHALL BE MULTIPLIED BY 1.30
2.4.4 BARS SPLICING NOT INDICATED ON THE DRAWINGS SHALL BE REFERRED TO THE ENGINEER OF RECORD FOR THE FINAL APPROVAL
2.4.5 WELDED SPLICES, IF APPROVED BY THE ENGINEER, SHALL DEVELOPED IN TENSION IN TENSION AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE BARS.
2.4.6 NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL BE SPLICED.
2.4.7 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, THE CLEAR DISTANCE BETWEEN PARALLEL BARS IN A LAYER SHALL NOT BE LESS THAN 1.5 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25 mm NOR ONE BAR DIAMETER. THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER.
2.4.8 RECOMMENDED BAR CUTTING DETAIL WILL NOT BE REQUIRED TO BE FOLLOWED EXACTLY PROVIDED THAT ALTERNATIVE WORKMANSHIP IS IN COMPLIANCE WITH DESIGN CODES AND ADDITIONAL COST INCURRED WILL BE AT THE EXPENSE OF THE CONTRACTOR
2.5 HOOK AND BENDS
2.5.1 DIMENSION OF 90-DEGREES AND 180-DEGREES HOOKS
90° HOOK 180° HOOK
BAR DIAMETER (mm)
90° HOOK
SPLICE LENGTHLd (mm)
12
25
32
465
9251035
SPLICE LENGTHLd (mm)
530
137515401760
20
1216
32
PIN DIAMETER: D = 6d FOR 10Ø THRU 25ØD = 8d FOR 28Ø THRU 36Ø
135° HOOK
2.5.3 DIMENSION FOR HAUNCH REINFORCEMENT
2.6 WELDED SPLICES, IF APPROVED BY THE ENGINEER SHALL DEVELOP IN TENSION AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE BARS.
2.6.1 NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL BE SPLICED.
2
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
7. STRUCTURAL STEEL
7.1 STRUCTURAL STEEL SHALL CONFORM TO ASTM SPECIFICATION A-36. THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS FOR ALL STRUCTURAL STEEL WORK. THESE SHOP DRAWINGS SHALL BE APPROVED BY THE ENGINEER BEFORE ANY START OF FABRICATION.
7.2 TO PREVENT CORROSION BY MOISTURE BETWEEN STEEL SURFACES IN CONTACT, ALL SUCH CONTACTS SHALL BE SEALED WATERTIGHT BY RUNNING A CONTINUOUS 18" FILLET WELD ALONG ALL EDGES OF THE CONTACT, UNLESS OTHERWISE NOTED.
7.3 STRUCTURAL STEEL MEMBERS EXPOSED TO HIGH LEVEL OF OXIDATION ARE PROVIDED WITH NECESSARY CORROSION ALLOWANCE.
TYPES OF STRUCTUREMIN. % OFDESIGN
STRENGTH
SLABS/FOUNDATION
SIDES OF BEAMS ANDALL OTHER VERTICALSURFACES
14 DAYS
70%
TYPE OF RETAINING WALL SHALL BE AS FOLLOWS:
JOINT FILLER
DOWEL BARS D25 CTC 500L = 1000
PVC WATER STOP
5. FALSEWORK, TEMPORARY STRUCTURES
5.1 ALL FALSE WORK AND TEMPORARY STRUCTURES SHALL BE DESIGNED BY THE CONTRACTOR AND DETAIL ARE TO BE SUBMITTED TO THE ENGINEER.
6. FORMWORK
6.1 UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR APPROVED BY THE ENGINEER, THE FOLLOWING MINIMUM STRIPPING TIMES SHALL BE USED:
MIN. TIME
WALLS
COLUMNS
1 DAY
2 DAYS
1 DAY
80%
70%
70%
D. CIVIL WORKS
1. STRUCTURE EXCAVATION
1.1 DEPTH OF EXCAVATION SHALL BE AS SPECIFIED IN THE DRAWINGS. WHERE LOOSE/SOFT MATERIALS IS ENCOUNTERED AT DEPTH OF CULVERT ON - GRADE FOUNDATION, EXCAVATE TO FIRM LAYER AND REPLACE LOOSE/SOFT MATERIALS UNDERNEATH THE BOTTOM SLAB WITH IMPROVED/SELECTED GRANULAR BACKFILL TO 95% OF MAXIMUM DRY DENSITY.\
1.2 POST EXCAVATION SURFACE ON STRUCTURES, CONCRETE CANAL, MANHOLES, SIDEWALKS, GUTTERS, CURB SHALL BE COMPACTED TO THE REQUIRED 95% DEGREE OR AS SPECIFIED IN THE PLANS.
2. FILL/BASE
2.1 BASE MATERIALS SHALL BE PLACED IN LAYERS OF 150 mm MAX. COMPACTED AND PROPERLY WATERED TO ATTAIN THE 100% OF MAX. DRY DENSITY
2.2 TRUCK DUMPING OF MATERIALS IN HUGE LUMPS SHALL NOT BE PERMITTED. THE DUMP TRUCK SHALL UNLOAD THE MATERIALS BY SPREADING IT ON TOP OF THE FILL AREA SUFFICIENT TO ALLOW COMPACTION BY LAYERS AS SPECIFIED.
2.3 FILL OR SUBGRADE MATERIALS SHALL BE COMPACTED TO ATTAIN 95% OF MAXIMUM DRY DENSITY.
3. COMPACTION/SUBGRADE
3.1 EMBANKMENT MATERIALS SHALL BE FREE FROM STONES, TWIGS AND OTHER DELETERIOUS MATERIALS TO ENSURE COMPACTION AND COHESION. LUMPS OF FILLING MATERIALS SHOULD BE PULVERIZED PRIOR TO COMPACTION.
3.2 FIELD DENSITY TEST (FDT) FOR EACH COMPACTION LAYER SHALL BE UNDERTAKEN UNTIL THE REQUIRED DEGREE OF COMPACTION IS ATTAINED, AND UNDER THE SUPERVISION OF THE MATERIALS ENGINEER.
3. PILE DRIVING
3.1 PILES SHALL BE DRIVEN TO THE FULL LENGTH AS SHOWN IN THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE THE TYPE OF HAMMER TO BE USED AND ADDITIONAL COSTS DUE TO VARIATIONS FROM THE ORIGINAL METHODOLOGY SHALL BE DONE AT THE EXPENSE OF THE CONTRACTOR.
3.2 MANUFACTURED SPLICERS SHALL BE ALLOWED TO BE USED WHEN SPLICING IS REQUIRED IN THE PILE. FULL GROOVE WELD MAY ALSO BE ALLOWED IN LIEU OF THE FORMER PROVIDED THAT A BACKER PLATE IS PROVIDED AND IT IS DONE BY AN ACCREDITED WELDER WITH PROPER ENGINEERING SUPERVISION AND IN ACCORDANCE WITH THE PROVISIONS OF NSCP 2010 SECTION 510.2.1. ALL SPLICES SHALL DEVELOP 100% AXIAL STRENGTH AND 100% FLEXURAL STRENGTH OF THE PILE.
3.3 DRIVING STRESSES ON THE H-PILE SECTION SHALL NOT EXCEED 207 MPa. THE DESIGNER SHOULD BE NOTIFIED IN THE EVENT OF ABSOLUTE REFUSALS AT THE ALLOWABLE DRIVING STRESSES OR WHEN DYNAMIC LOAD TESTING INDICATES HIGHER STRESSES THAN THE ALLOWABLE STRESS.
3.4 MANUFACTURED PILE POINT ATTACHMENTS SHALL BE PROVIDED UNLESS IT IS DETERMINED THAT SUBSURFACE CONDITIONS WILL NOT PRODUCE INTOLERABLE DAMAGE, DEFLECTION, AND DEVIATION ON BARE H-PILE TOE DURING DRIVING.
3.5 TEST PILES SHALL BE DRIVEN WITH THE SAME HAMMER USED FOR PRODUCTION PILES AND MAY BE USED AS FOUNDATION AT THE APPROVAL OF THE ENGINEER.
3.6 STEEL DRIVEN PILES SHALL ARE PROVIDED CORROSION ALLOWANCE.
3.7 STRUCTURAL STEEL SHEET PILES SHALL CONFORM TO JIS A5528 SY295 AND IS PROVIDED WITH CORROSION ALLOWANCE. DIFFERENT STANDARDS MAY BE USED WITH WRITTEN PERMISSION FROM THE ENGINEER OF RECORD. WATER BLOCKING MATERIAL SHALL NOT BE REQUIRED TO BE APPLIED.
4. WELDING WORKS
4.1 WELDS SHALL BE INSPECTED BY PERSONNEL AS REQUIRED BY NSCP 2010 SECTION B-6 WELDING PROVISIONS.
4.2 NONDESTRUCTIVE TESTING PROCEDURES SHALL BE CONDUCTED IN IN ACCORDANCE TO NSCP 2010 SECTION B-6.3.3 AND B-6.4.
4.3 E70XX ELECTRODE SHALL BE USED FOR ALL WELDS.
3. CONCRETE MIX AND PLACING
3.1 DESIGN OF THE CONCRETE MIX SHALL MEET THE MINIMUM DESIGN OF CONCRETE STRENGTH REQUIREMENTS AS SPECIFIED IN THE TECHNICAL SPECIFICATION AND AS GIVEN UNDER ITEM 1 MATERIALS.
3.2 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, CONCRETE DEPOSITED AGAINST THE 50 mm PRIOR TO THE INSTALLATION OF STEEL REINFORCEMENT. THIS LEVELLING CONCRETE SHALL NOT BE CONSIDERED IN MEASURING THE STRUCTURAL DEPTH OF CONCRETE SECTION.
3.3 THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER THE PLACING SEQUENCES OF STEEL REINFORCEMENT FOR ALL CONCRETING WORKS.
3.4 CONCRETE REINFORCING BAR TESTS FREQUENCY AS STATED IN THE LATEST ACI CODE SHOULD BE DONE AT A REPUTABLE INSTITUTION AND MUST BE WITNESSED BY THE ON THE SITE PROJECT MANAGER AND A GOVERNMENT REPRESENTATIVE. ALL RESULTS MUST BE FORWARDED TO THE STRUCTURAL ENGINEER FOR THE EVALUATION AND APPROVAL.
4. CONSTRUCTION JOINT
4.1 THE POSITION AND FORM OF ANY CONSTRUCTION JOINT SHALL BE AS SHOWN ON DRAWINGS OR AS AGREED WITH THE ENGINEER.
4.2 THE INTERFACE BETWEEN THE FIRST AND SECOND POUR CONCRETE SHALL BE ROUGHENED WITH AN AMPLITUDE OF 6 mm MINIMUM.
4.3 UNLESS SPECIFIED ON THE DRAWING, EXPANSION JOINT FOR RIVER STRUCTURE EXCLUDING REVETMENT AND CONCRETE BLOCK
NOTE:
1. PRE-CONSTRUCTION SURVEY SHALL BE CONDUCTED JOINTLY BY THE REPRESENTATIVE OF THE CONSULTANT, IMPLEMENTING OFFICE AND THE CONTRACTOR. CORRESPONDING "AS STAKE" PLANS SHOWING ANY CHANGES FROM APPROVED DETAILED ENGINEERING DESIGN PLANS SHALL BE PREPARED AND SUBJECT FOR APPROVAL BE DESIGN CONSULTANT.
2. THE CONSULTANT SHALL VERIFY THE CONDITION AND STABILITY OF THE EXISTING STRUCTURE PRIOR TO THE CONSTRUCTION OF THE PROPOSED PROJECT.
3
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
VICINITY MAP
NOT TO SCALE
LOCATION MAP
NOT TO SCALE
SHEET INDEX
SHEET
NO.
SHEET CONTENTS
1 OF 14 TITLE SHEET
4
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
2 OF 14 GENERAL NOTES
3 OF 14 GENERAL NOTES
4 OF 14 VICINITY MAP
LOCATION MAP
SUMMARY OF QUANTITIES
SHEET INDEX
5 OF 14 GENERAL PLAN
PROFILE ALONG CENTERLINE
6 OF 14 DETAIL OF SECTION
7 OF 14 LONGITUDINAL ELEVATION
PLAN OF ROAD DIKE
DRIVEN H-PILE SPECIFICATIONS
DETAIL OF GROOVE WELD
8 OF 14 DETAIL OF SSP CONNECTION
9 OF 14 SHEET PILE SPLICE LAYOUT
TYPICAL WELD JOINT FOR U-SHAPE SSP
TYPICAL WELD JOINT FOR HAT-SHAPE SSP
10 OF 14 TYPICAL SECTIONAL ELEVATION
DETAIL OF PILECAP
DETAIL OF CONNECTION @ DRIVEN PILES
DETAIL OF CONNECTION @ ANCHOR BEAM
WHEEL GUARD DETAIL
BAR CUTTING DETAIL
11 OF 14 SPECIFICATION OF ANCHOR BOLT/WASHER
CONNECTION OF INTERMEDIATE BEAM
SPECIFICATIONS OF STEEL MEMBERS
DETAIL OF END PLATE CONNECTION
12 OF 14 STANDARD PORTLAND CEMENT CONCRETE PAVEMENT
13 OF 14 STANDARD PROJECT BILLBOARD
14 OF 14 DETAIL OF FIELD OFFICE
S U M M A R Y OF Q U A N T I T I E S
ITEM NO. D E S C R I P T I O NUNIT
PART I FACILITIES FOR THE ENGINEERS
A.1.1(3) CONSTRUCTION OF FIELD OFFICE FOR THE ENGINEER ( for 40 sq.m. ) l.s.
PART II OTHER GENERAL REQUIREMENTS
B.3 PERMITS AND CLEARANCES
B.5 PROJECT BILLBOARD/SIGNBOARD (DPWH)
B.5 PROJECT BILLBOARD/SIGNBOARD (COA)
B.7(1) OCCUPATIONAL SAFETY AND HEALTH
B.7(2) OCCUPATIONAL SAFETY AND HEALTH (SIGNAGES AND BARRICADES)
B.9 MOBILIZATION/DEMOBILIZATION
ea
ea
ea
mo.
l.s.
l.s.
PART IIICIVIL, MECHANICAL, ELECTRICAL, AND SANITARY/PLUMBING WORKS
PART A EARTHWORKS
1700(1) CLEARING & GRUBBING
1702(1)a STRUCTURE EXCAVATION, COMMON SOIL
1704(1)b EMBANKMENT FROM BORROW
sq.m
cu.m
cu.m
404(1)b REINFORCING STEEL, GRADE 60
405(1)a2 STRUCTURAL CONCRETE (20.68MPa) (CLASS "A") (14 DAYS)
kg
cu.m
PART D AGGREGATE SUBBASE COURSE
200(1) AGGREGATE SUBBASE COURSE cu.m
PART E SURFACE COURSE
311(1)f2 PCC PAVEMENT (UNREINFORCED) (0.30m THK) (7 DAYS) sq.m
PART F BRIDGE CONSTRUCTION
400(3) STEEL H-PILES, FURNISHED m
400(10) STEEL H-PILES, DRIVEN m
400(6) STRUCTURAL STEEL SHEET PILES, FURNISHED m
400(12) STRUCTURAL STEEL SHEET PILES, DRIVEN m
400(21)b SPLICING OF STEEL PILES ea
PART I MATERIAL DETAIL
712(1) STRUCTURAL METAL (ANCHOR BEAM) kg
712(1)a STRUCTURAL METAL (INTERMEDIATE BEAM) kg
PROJECT LOCATION
QTY.
1.00
1.00
2.00
1.00
8.00
1.00
1.00
963.00
671.60
1,158.33
43,479.80
292.00
79.20
791.80
864.00
864.00
6,432.00
6164.00
96.00
17,223.40
6,210.10
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
EXISTING ELEVATION ALONG
REFERENCE STAKE LINE
DESIGN ELEVATION OF PILE CAP
STATIONING
C 0
+3
12
.0
0
PROFILE ALONG CENTERLINE
ELEVATION 14.00
ELEVATION 12.00
ELEVATION 13.00
5
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
C 0+
340.00
C 0+
360.00
C 0
+3
80
.0
0
C 0
+3
90
.0
0
ELEVATION 1100
C 0
+3
20
.0
0
GENERAL PLAN
S C A L E 1 : 1 0 0 0 m
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
6
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
DETAIL OF SECTION
S C A L E 1 : 1 5 0 m
11.000
12.000
13.000
14.000
15.000ELEVATION
C 1+482.50
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
BEGINNING OF PROJECT
11.000
12.000
13.000
14.000
15.000ELEVATION
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
11.000
12.000
13.000
14.000
15.000ELEVATION
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
8.00
8.00
8.00
11.000
12.000
13.000
14.000
15.000ELEVATION
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
8.00
11.000
12.000
13.000
14.000
15.000ELEVATION
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
8.00
11.000
12.000
13.000
14.000
15.000ELEVATION
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
8.00
11.000
12.000
13.000
14.000
15.000ELEVATION
C
L-1-2-3-4-5-6-7 1 2 3 4 5 6 7
10.000
9.000
8.00
C 1+500.00
C 1+520.00
C 1+540.00
C 1+560.00
C 1+580.00
C 1+589.50
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
2.001.
50
1.00 1.00 1.00 1.00 1.00 1.002.002.00
0.40
LONGITUDINAL ELEVATION
SCALE 1:100
PLAN OF ROAD DIKE
SCALE 1:100
DRIVEN H-PILE SPECIFICATIONS
SCALE NTS
DETAIL OF GROOVE WELD
SCALE NTS
7
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
FITTING DETAIL
OF WATER BLOCKING
SCALE :
N.T.S.
APPLICATION TYPE FLOW TYPE
DEVIATION ANGLE FOR HAT-SHAPE SSP
SCALE NTS
DEVIATION ANGLE FOR U-SHAPE SSP
SCALE NTS
FITTING DETAIL OF WATER BLOCKING
SCALE NTS
CORNER SECTION FOR IRREGULAR SHAPE
SCALE NTS
APPLICATION OF WATER-BLOCKING MATERIAL DETAIL
SCALE NTS
CORNER SECTION FOR HAT-SHAPE SSP
SCALE NTS
CORNER SECTION FOR U-SHAPE SSP
SCALE NTS
8
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
Dw
WIDTH
Dw
WIDTH
HAT-SHAPE SSP
PL2 STEEL PLATEPL1 STEEL PLATE
PENETRATION WELDINGOR GOUGING AFTER WELD
PILE COPING
PENETRATION WELDINGOR GOUGING AFTER WELD
PL1 STEEL PLATE PL2 STEEL PLATE
U-SHAPE SSP
PILE COPING
HAT-SHAPE SSP
PL1 STEEL PLATEPL2 STEEL PLATE
PL1 STEEL PLATEPL2 STEEL PLATE
U-SHAPE SSP
1.52
0m(M
IN.)
o.c.
,STR
ANG
ER W
ITH
EL VARIES
EL VARIES
END
OF
STAG
GER
ING
END
OF
STAG
GER
ING
PLAN
PLAN
t E7018-X
JOINT
t1(PLATE THICKNESS)
PL1 (STEEL PLATE)
Lc
t E7018-X
JOINT
t1(PLATE THICKNESS)
PL2 (STEEL PLATE)
La
BASE METAL LESS THAN 6mm THK.
BASE METAL 6mm OR MORE IN THICKNESS
NOTED:
STEEL BASE METAL TO BE WELDEDSHALL BE OPEN-HEARTH OR ELECTRICFURNACE STEEL CONFIRMING TOAASHTO M183.
SECTION
SECTION
SCHEDULE OF STEEL SHEET PILE JOINTPL1 (STEEL PLATE) PL2 (STEEL PLATE)
Dwmm
B1mm
t1mm
Lamm
tmm
Lwmm
B2mm
t2mm
Lbmm
Lcmm
tmm
402.9402.9402.9402.9172.4172.4172.4172.4172.4218.5218.5264.6264.6264.6
280280280280120120120120120150150185185185
688
1268888
161668
12
2002002002008080808080
100100120120120
5668566661313468
402.9402.9402.9402.9172.4172.4172.4172.4172.4218.5218.5264.6264.6264.6
688
1268888
16166812
280280280280120120120120120150150185185185
5668566661313468
19024030030080100120140140160180100140170
13013013013080
100100120120120
80808080
STRUCTURAL PLATE: ASTM A36, Fy = 248 MPa, Fu = 400 MPaMILD STEEL COATED ELECTRODES: E7018-X, Fy = 400 MPa, FU = 490 MPa
PROPERTIES OF STEEL SHEET PILES
w mm(NOMINAL)
h mm(NOMINAL)
t mm(NOMINAL)
SECTIONMODULUS cm3/m
900900900900400400400400400500500600600600
230300368370100125150185170200225130180210
10.813.215.017.010.513.013.116.115.524.327.610.313.418.0
9021,6102,4502,760874
1,3401,5202,2502,2703,1503,8201,0001,8002,700
U-S
HAP
E SS
PH
AT-S
HAP
E
SS
P
MECHANICAL PROPERTIES GRADE 50,Fy = 345 MPa,FU = 450 MPa
MECHANICAL PROPERTIES GRADE 50,Fy = 345 MPa,FU = 450 MPa
t
t
W = WIDTH,h = HEIGHT t = THICKNESS, SSP = STELL PILE
SHEET PILE SPLICE LAYOUT
SCALE NTS
TYPICAL WELD JOINT FOR U-SHAPE SSP
SCALE NTS
TYPICAL WELD JOINT FOR HAT-SHAPE SSP
SCALE NTS
9
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
2.00
0.60
TYPICAL SECTIONAL ELEVATION
SCALE 1:100
DETAIL OF PILE CAP
SCALE 1:50DETAIL OF CONNECTION @ DRIVEN PILES
SCALE 1:50
DETAIL OF CONNECTION @ ANCHOR BEAM
SCALE 1:50BAR CUTTING DETAIL
SCALE NTS
0.60
2.00 0.55
0.85
0.80
0.40
0.20
0.20
0.60
1.50
1.10
0.75
1.10
0.25
0.25 0.50
0.35
0.55
1.90
0.55
0.55
1.90
0.55
0.75
0.70
0.45
1.10
0.70
1.10
WHEEL GUARD DETAIL
SCALE NTS
10
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
SPECIFICATIONS OF STEEL MEMBERS
SCALE :
N.T.S
CONNECTION OF INTERMEDIATE BEAM
SCALE :
NTS
Table 1—Materials for headed and threaded anchors*
Material
Tensilestrength,
Gradeor type Diameter, in.
Welded studsAWS D.1.1:2006ASTM A 29-05/
A108-03
ASTM F 1554-04(HD, T)†
ASTM A 193-06a(T)
ASTM A 307-04(Gr. A: HD)(Gr. C: T)
ASTM A 36-05(T)
ASTM A 449-04b(HD, T)
B 1010B 1020
3655105
B7
A
C
1/4 to 1
1/4 to 4≤2‡
1/4 to 3≤2-1/2
Over 2-1/4 - 4Over 4 to 7
1/4 to 4
1/4 to 4
— To 8
1/4 to 11 Over 1 to 1-1/2
Over 1-1/4 to 3
65
5875125125115100
51
3655
9575
0.2% 20
0.2% 230.2% 21
105 0.2% 15
2 in.
2 in.2 in.2 in.
105 0.2% 16 4D0.2% 16 4D0.2% 18 4D
60 — — 18
58
58
12010590
36 — 23
36 — 23
928158
2 in.
2 in.
2 in.
0.2% 14 4D0.2% 14 4D0.2% 14
50
403045505050
Ductile
minimum,ksi
Yield strength,minimum
Elongation,minimum Reduction of
area,ksi Method % Length minimum,%
ACI 349ductilitycriterion Comments
Structural Welding Code—Steel, Section 7,covers welded headed or welded bent studs.AWS D1.1 requires studs to be made from colddrawn bar stock conforming to requirements ofASTM A 108.
Ductile ASTM F 1554, “Standard Specification forAnchor Bolts, Steel, 36, 55, and 105-ksi YieldStrength,” is the preferred material specificationfor anchors.
Ductile‡DuctileDuctile ASTM A 193, “Standard Specification for Alloy-
Steel and Stainless Steel Bolting Materials forHigh-Temperature Service”: Grade B7 is an alloysteel for use in high-temperature service.
DuctileDuctile
— Ductile
— Ductile
— Ductile
4D
353535
ASTM A 307, “Standard Specification forCarbon Steel Bolts and Studs, 60,000 psiTensile Strength”: ACI 349 specifies thatelements meeting ASTM A 307 shall beconsidered ductile. Note that Grade C conformsto tensile properties for ASTM A 36.ASTM A 36, “Standard Specification forCarbon Structural Steel”: Because ACI 318considers ASTM A 307 to be ductile, A 36 willalso qualify because it is the basis for ASTM A307 Grade C.
Ductile ASTM A 449, “Standard Specification forQuenched and Tempered Steel Bolts andStuds”: this specification is for general high-strength applications.
DuctileDuctile
*The materials listed are commonly used for concrete fasteners (anchors). Although other material may be used (for example, ASTM A 193 for high-temperature applications,ASTM A 320 for low-temperature applications), those listed are preferred for normal use. Structural steel bolting materials such as ASTM A 325 and A 490 are not typically availablein the lengths needed for concrete fastening applications.†Anchor type availability is denoted as follows: HD = headed bolt; and T = threaded bolt.‡Diameters larger than 2 in. (up to 4 in.) are available, but the reduction of area will vary for Grade 55.
Table 2—Threaded fastener dimensions*
Diameter† do, in.0.2500.3750.5000.6250.7500.8751.0001.1251.2501.3751.5001.7502.000
Threads per in., nth20161311109877665
4.5
Effective area Nominal steel strength NsaGross,‡ AD, in.2
0.0490.1100.1960.3070.4420.6010.7850.9941.2271.4851.7672.4053.142
Tensile,§ Ase, in.20.0320.0780.1420.2260.3340.4620.6060.7630.9691.161.411.902.50
Stud,|| kips3.27.2
12.819.928.739.151.164.679.896.5114.9156.3204.2
*Table taken from AISC Manual of Concrete Construction.†Concrete breakout strength limited to anchor diameter no greater than 2 in. and length no greater than 25 in. (D.4.2.2).‡Use gross area AD for studs.§Use tensile stress area Ase for threaded anchors (Note: Ase is the same as tensile stress area in AISC). Ase = 0.7854 × (do – (0.9743/nth))2.||Nsa = AD × futa; futa = 65 ksi; see Table 1 for other materials.#Nsa = AD × futa; futa = 58 ksi; see Table 1 for other materials.Note: futa = 65 ksi for A108, and futa = 58 ksi for F 1554 Gr. 36.
Threaded,# kips1.84.58.213.119.426.835.144.356.267.381.5110.2144.9
Table 4(c)—Anchor head and nut (heavy hex) dimensions*
Anchor areas
Nominal anchordiameter do, in.
0.2500.3750.5000.6250.7500.8751.0001.1251.2501.3751.5001.7502.000
Gross, area of bolt,AD, in.20.0490.1100.1960.3070.4420.6010.7850.9941.2271.4851.7672.4053.142
Tensile area,Ase,† in.20.0320.0780.1420.2260.3340.4620.6060.7630.9691.161.411.902.50
*Dimensions taken from AISC Steel Design Manual.†See Table 2 for definition of Ase.‡AH = F2 or AH = 1.5F2tan 30°.§Abrg = AH – AD.
Width F, in. Width C, in. Height H, in.——
0.8751.0631.2501.4381.6251.8132.0002.1882.3752.7503.125
——
1.0001.2501.4381.6881.8752.0632.3132.5002.7503.5003.625
——
0.3750.4380.5000.5630.6880.7500.8750.9381.0001.1881.375
Gross area of head AH,‡based on width F, in.2
——
0.660.981.351.792.292.853.464.144.886.558.46
Net bearing area Abrg ,§in.2——
0.470.670.911.191.501.852.242.663.124.145.32
Table 5—Hardened washer dimensions
SAE dimensions*
Anchor areas
Nominal anchordiameter do, in.
0.2500.3750.5000.6250.7500.8751.0001.1251.2501.3751.5001.7502.000
Gross, area ofbolt, AD , in.2
0.0490.1100.1960.3070.4420.6010.7850.9941.2271.4851.7672.4053.142
U.S. Standard dimensions†
Anchor areas
Nominal anchordiameter do, in.
0.2500.3750.5000.6250.7500.8751.0001.1251.2501.3751.5001.7502.000
Gross, area ofbolt, AD, in.2
0.0490.1100.1960.3070.4420.6010.7850.9941.2271.4851.7672.4053.142
Tensile area, Ase,‡in.2
0.0320.0780.1420.2260.3340.4620.6060.7630.9691.1601.4051.8992.50
OD, in.0.7501.0001.3751.7502.0002.2502.5002.7503.0003.2503.5004.2504.500
ID, in.0.3130.4380.3750.6560.8130.9381.0631.2501.3751.5001.6251.8752.125
Washer dimensions
Thickness t, in.0.064/0.0800.079/0.0930.122/0.1460.136/0.1600.136/0.1600.136/0.1600.136/0.1920.126/0.1920.126/0.1920.126/0.1920.153/0.2130.153/0.2130.153/0.213
Gross area of headAH ,§ in.2
0.440.791.482.413.143.984.915.947.078.309.62
14.1915.90
Net bearing areaAbr ||, in.2
g0.390.671.292.102.703.374.124.955.846.817.85
11.7812.76
Tensile area, Ase,‡in.2
0.0320.0780.1420.2260.3340.4620.6060.7630.9691.161.411.902.50
OD, in.0.5630.8131.1671.3131.4691.7502.002.2502.5002.7503.0003.3753.750
ID, in.0.2810.4060.5310.6560.8130.9381.0631.2501.3751.5001.6251.8752.125
Washer dimensions
Thickness t, in.0.051/0.0800.051/0.0800.074/0.1210.074/0.1210.108/0.1600.108/0.1600.108/0.1600.136/0.177
(0.305/0.375 extra thick)0.136/0.1920.136/0.2130.153/0.2130.153/0.2130.153/0.213
Gross area of headAH ,§ in.2
0.250.521.071.351.692.413.143.984.915.947.078.95
11.04
Net bearing areaAbr ||, in.2
g0.200.410.871.051.251.802.362.983.684.455.306.547.90
*Hardened washers to SAE dimensions.†Material ASTM F 436.‡Refer to Table 2 for definition of Ase .§AH = π(OD)2/4.||Abrg = AH – AD.
SPECIFICATION OF ANCHOR BOLT/WASHER
DETAIL OF END PLATE CONNECTION
SCALE :
NTS
11
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
STANDARD PORTLAND CEMENT CONCRETE PAVEMENT
SCALE NTS
DEFORMED TIE BARS16 mmØ X 600 @ 750
WEAKEND PLANE JOINT
TYPICAL BAR LAYOUT FOR 230mm THICK PAVEMENT 25mmØ X 600 @ 300 O.C.PLAIN DOWEL BARS
LANE SHOWING TRANSVERSE CONSTRUCTIONJOINT AT LOCATION OF WEAKENED PLANE JOINT
TRANSVERSE CONSTRUCTION JOINT
LANE SHOWING TRANSVERSE CONSTRUCTION JOINTAT MIDDLE THIRD OF NORMAL JOINT INTERVAL
MINIMUM
SECT
ION
- I
WID
TH A
S SH
OWN
ON P
LANS
N O T E :
TRANSVERSECONSTRUCTION ( CONTACT ) JOINTSHALL BE PROVIDED AT THE END OF ANY RUN WHERELAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY( 30 ) MINUTES OF LONGER.
TRANSVERSE CONSTRUCTION JOINTS WHICHOCCUR AT LOCATION WEAKENED PLANE JOINT SHOULDBE BUTT JOINTS WITH DOWELS. IF JOINT OCCURS IN THEMIDDLE THIRD OF THE WEAKENED JOINT INTERVAL( 1500 - 3000mm ) IT SHOULD BE KEYED JOINTS WITH TIE BARS.
BEGI
NNIN
G OF
F L A
R I N
G
1000
MINI
MUM
EDGE OF EXISTINGCONCRETE PAVEMENT
12mmØ X 500DOWEL BARSBAR SUPPORT
EXISTING CONCRETE PAVEMENT
N O T E :
DEFORMED TIE BAR16mmØ X 600 @ 750 (230mm)
SAWED GROOVE WITHPOURED JOINT FILLER
SAWED GROOVE WITH KEYWAYSFILL WITH POURED JOINT FILLER
FIRST SLAB
SAWED GROOVE WITH POURED JOINT FILLER(@4.5m INTERVAL OR AS DIRECTEDBY THE ENGINEER)
DEFORMED TIE BAR16mmØ X 600 @ 750 (230mm)
PLAIN DOWEL BAR 28mmØ X 600 @ 300ONE HALF OF THE LENGTH SHALL BEPAINTED WITH APPROVED RE LEADAND THEN GREASED.
SAWED GROOVE WITHPOURED JOINT FILLER
FIRST SLAB
FORMED GROOVE WITH KEYWAYSFILL WITH POURED JOINT FILLER
FIRST SLAB
DEFORMED TIE BAR16mmØ X 600 @ 600 (230mm)
SAWED JOINT(2 - LANE PAVING)
CONTACT JOINT(HALF LANE PAVING)
SEE DETAIL "C"
ROOFING NAIL@ 750mm O.C.
WOODEN SIDE FORM WOODEN / METAL SIDE FORM METAL SIDE FORM
FORMED GROOVE WITH KEYWAYSFILL WITH POURED JOINT FILLER
NEWPAVEMENT
EXISTINGPAVEMENT
CONST. JOINT TO BEMOPPED W / ASPHALT
EXISTING PAVEMENT NEW PAVEMENT
GROUT
12mmØ X 50cm DOWELBAR @ 500mm O.C.
OUTLINE OF CHIPPED OFFEXISTING CONCRETE PAVEMENT
WHERE :
Te - THICKNESS OF EXISTING PAVEMENTTn - THICKNESS NEW PAVEMENT
DEFORMED TIE BAR16mmØ X 600 @ 750 (230mm)
LONGITUDINAL JOINT
T a b250 150 600230 375 750
TRANSVERSE CONTACT JOINTOF WEAKENED PLANE JOINT
FIXED SLIDING
20mm PREMOLDEDEXPANSION FILLER
PLAIN DOWEL BAR28mmØ X 600 @ 300
30-50 PENETRATION ASPHALT SEAL OR COLDAPPLIED LIQUID RUBBER BASE SEALING COMPOUND
GENERAL NOTES:
TYPICAL PLAN OF A TWO LANE PAVEMENT
DETAIL "A"
DETAIL "B"
DETAIL "C"
DETAIL "D"
SECTION
DETAIL SECTION JOINT IN GRID PAVEMENT
SECTION - II
SEE DETAIL "D"
SEE DETAIL "A" SEE DETAIL "B"
SECTION - I
SECTION SECTION
PLAN
DETAIL OF BAR SPACING ALONG CURVES
DETAIL OF EXPANSION JOINT (DOWELED) AT
CERTAIN INTERSECTIONS AND STRUCTURES
12
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
COMMISSION ON AUDIT
(PROVINCE AND CITY)
Project:Location:
Cost:Fund Source:
Implementing Agency:Development Partner:Contractor/Supplier:Brief Description of Project:
Project Details:
Project Date Project Status
Duration Started Target Date ofCompletion
Percentage ofCompletion
As of(Date)
Cost Incurredto Date
DateCompleted
Remarks
For Particulars or complaints about this project, please contact the Regional Office or Cluster which has audit jurisdiction on this project.
COA Regional Office No./Cluster:Address:Contact No: or Text COA Citizen's Desk at 0915-539-1957
HELVETICA 3''
HELVETICA 1''
HELVETICA 1''
DISPLAY AREA( TARPAULIN ON 2400 X 2400 X 5 MARINE PLYWOOD )
50 x 50 HORIZONTALCOCO LUMBER
GROUND LEVEL
50 x 50WOODEN STAKE
FRONT ELEVATIONTYPICAL FRAME ELEVATION
SPECIFICATION :
1. The new billboard design layout and dimension shall beinstalled on a standard billboard measuring 1220 mm x 2440 mm (4ft. x 8ft.) using12 mm (1/2 inch) thick marine plywood or tarpaulin posted on 5 mm (3/16 inch)marine plywood.
2. For each building project, the billboard shall be installed in front of the project site.3. For each road/ bridge /flood control project, two billboards shall be installed, i.e., one
at the beginning and one at the end of the project.4. For road projects with length of 10 kilometers or more, billboard(s) shall also be
installed at every 5-kilometer interval.5. Name(s) and/or picture(s) of any personages should not appear in the billboard.6. No political billboard shall be allowed to be installed 100 meters before and 100
meters after all DPWH projects and in between the project limits or within the roadright-of-way.
7. DPWH contractors shall not be allowed to place names of politicians on theirequipment or carry political billboard on their equipment.
COA PROJECT BILLBOARD
DPWH PROJECT BILLBOARD
DISPLAY AREA( TARPAULIN ON 1200 X 2400 X 12 MARINE PLYWOOD )
GROUND LEVEL
FRONT ELEVATIONTYPICAL FRAME ELEVATION
DISPLAY AREA
DISPLAY AREA
GROUND LEVEL
50 x 50 HORIZONTALCOCO LUMBER
50 x 50WOODEN STAKE
50 x 75 VERTICALCOCO LUMBER
STANDARD PROJECT BILLBOARD
(DPWH and COA)
COA LOGO
WHITE BACKGROUNDBLACK TEXT
CONSTRUCTION OF (Name of Project and Location)
CONTRACTOR :DATE STARTED :CONTRACTOR COMPLETION DATE :CONTRACT COST :CONSTRUCTION CONSULTANT:IMPLEMENTING OFFICE :SOURCES OF FUND :
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSText 2920 or call (02) 165-02 for any concern on this projectwww.dpwh.gov.ph.
13
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY
D-1 W-1
1 2 3
A
B
C
BRIEFING
AREA
ROOF LINE
1 32
W-1
D-1W-1
W-1
W-1
D-1 W-1
SINGLE PANEL WOODEN WINDOW(AWNING TYPE)
½" THICK MARINE PLYWOOD
PLAIN G.I. SHEET GUTTER
CORRUGATED G.I. ROOFING SHEET G.A. #26
SINGLE PANEL WOODEN WINDOW(AWNING TYPE)
½" THICK MARINE PLYWOOD
PLAIN G.I. SHEET GUTTER
SINGLE PANEL WOODEN DOOR
ASSORTED GOOD COCO LUMBER
FRONT ELEVATION RIGHT SIDE ELEVATION
FLOOR PLAN SCHEDULE OF DOORS AND WINDOWS
CORRUGATED G.I. ROOFING SHEET G.A. #26
PROJECT
ENGINEER'S
DESK
14
14
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BARRISTER J. REYES FERNANDO C. GARCIA MARLO B. CORREAMARK PETER C. RECTOPAOLO F. GARCIA
CONSTRUCTION OF RIVERWALL AND ROAD
DIKE ALONG BATASAN RIVER (PHASE XVI),
BRGY. DAMPALIT, MALABON CITY