THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-ES14.059BMA as follows: PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including Asbestos Abatement Summary of Work Sections apply to work of this Section. B. In the event that additions, clarifications, and/or changes occur, section identified as ADDENDUM will be used. C. Documents included in this addendum one are as follows: 1. Pre-bid attendance sign-in sheet 2. A&P Arch Demo Plans 3. A&P Mech Demo Plans 4. DPS South Floor Plan Set 5. Revised bid form 1.11 MISCELLANEOUS PROVISIONS A. The following coordination is to be scheduled by the Owner: 1. N/A. B. The following additional requirements will be observed by the Contractor: 1. As identified during the pre-bid meeting, approximately 120 linear feet of lead drain-tray disposal will be part of the base bid; the work will be completed during the science lab phase of the project. 2. Plaster quantity clarification: The ETS scope of work identifies multiple areas of plaster removal. In the Asbestos Containing Materials Abatement Matrix, the plaster statements read as follows: 30 SF of plaster in 5 areas. This statement corresponds to approximately 150 SF of plaster and/or glazed block/tile demolition, e.g. 5 areas with 30 SF per area for an approximate total of 150 SF. 3. Extensive project coordination will be required to complete this project. The GAC will be held to the schedule per work area. Plan to attend several construction coordination meetings prior to and during the course of the project to ensure the schedule is maintained as needed. 4. The GAC will plan to provide sufficient HEPA attached negative air support to the GC during the crawlspace work to allow for sufficient air circulation in the space during the GC’s re- piping and soldering work. 5. Trace (OSHA) plaster will be disposed of as ACM waste, proper manifests will be required as part of the project closeout documentation. 6. The GC will disconnect water, gas, and electric services to the science lab tops that are scheduled for demolition prior to the GAC starting demolition work. Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-ES14.059BMA ADDENDUM NUMBER ONE February 18, 2014

Transcript of Denver Public Schools Purchasing Department Denver...

Page 1: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

THIS ADDENDUM MUST BE ACKNOWLEDGED.

THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-ES14.059BMA as follows: PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including Asbestos Abatement Summary of Work Sections apply to work of this Section.

B. In the event that additions, clarifications, and/or changes occur, section identified as ADDENDUM will be used. C. Documents included in this addendum one are as follows:

1. Pre-bid attendance sign-in sheet 2. A&P Arch Demo Plans 3. A&P Mech Demo Plans 4. DPS South Floor Plan Set 5. Revised bid form

1.11 MISCELLANEOUS PROVISIONS

A. The following coordination is to be scheduled by the Owner:

1. N/A. B. The following additional requirements will be observed by the Contractor:

1. As identified during the pre-bid meeting, approximately 120 linear feet of lead drain-tray

disposal will be part of the base bid; the work will be completed during the science lab phase of the project.

2. Plaster quantity clarification: The ETS scope of work identifies multiple areas of plaster removal. In the Asbestos Containing Materials Abatement Matrix, the plaster statements read as follows: 30 SF of plaster in 5 areas. This statement corresponds to approximately 150 SF of plaster and/or glazed block/tile demolition, e.g. 5 areas with 30 SF per area for an approximate total of 150 SF.

3. Extensive project coordination will be required to complete this project. The GAC will be held

to the schedule per work area. Plan to attend several construction coordination meetings prior to and during the course of the project to ensure the schedule is maintained as needed.

4. The GAC will plan to provide sufficient HEPA attached negative air support to the GC during

the crawlspace work to allow for sufficient air circulation in the space during the GC’s re-piping and soldering work.

5. Trace (OSHA) plaster will be disposed of as ACM waste, proper manifests will be required as part of the project closeout documentation.

6. The GC will disconnect water, gas, and electric services to the science lab tops that are scheduled for demolition prior to the GAC starting demolition work.

Denver Public Schools Purchasing Department

1617 S. Acoma St. Denver, Colorado 80223

INVITATION TO BID 14-MC-ES14.059BMA

ADDENDUM NUMBER ONE February 18, 2014

Page 2: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

7. Some fixtures are scheduled for salvage as part of this project. Prior to the GAC starting

demolition work, the GC will have the salvaged fixtures removed from the work area. Fixtures that remain in the work area may be disposed of to facilitate the abatement scope of work.

8. Dumpster: Dumpster staging will be allowed on the site. Coordination of fire lanes, facility

staff and other contractors, etc., will be required in the positioning of the dumpster. Site protection will be required; damages caused by dumpster placement will be repaired by the GAC at no cost to DPS.

9. Contractor parking: GAC can utilize the DPS parking spaces and on street parking.

10. Power & Water: GAC can utilize facility power and water, if additional power is needed the GAC must provide a licensed electrician to tie into an existing building power panel. If wall sockets are utilized for power the GAC must use ground fault circuit interrupters. Disruptions or damages caused to the power system caused by the GAC’s actions will be repaired by the GAC.

If your proposal has been submitted and you wish to amend it, please modify your proposal on company letterhead. The amended proposal must be received prior to or included at the time and date set for the proposal opening. Each modification submitted to the District's Purchasing Office located at 1617 S. Acoma St. Denver, CO 80223. It must have Vendor’s name and return address and the applicable RFP number and title of the RFP clearly marked on the face of the envelope. If more than one modification is submitted, the modification bearing the latest date of receipt by the District's Strategic Sourcing Office will be considered the valid modification. *****This addendum must be acknowledged, whether or not you amend your proposal.*****

This Addendum must be included in your submittal or proposal, providing you do not need to amend your proposal.

PRINT OR TYPE YOUR INFORMATION

Name of Company: ____________________________________________ Fax: _____________

Address: ________________________ City/State: ________________ Zip: ______________

Contact Person: ___________________ Title: _____________________ Phone: ___________

Authorized Representative’s Signature: ____________________________ Phone: ___________

Printed Name: ____________________ Title: _____________________ Date: _____________

Approved by: ______________ Date: _____________

Reviewed by: ______________ Date: _____________

14-MC-ES14.059BMA Addendum # 1

Page 3: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

BID FORM

BASE BID TO: SCHOOL DISTRICT NO 1 IN THE

CITY AND COUNTY OF DENVER AND STATE OF COLORADO

PROJECT: South Abatement for Renovation

LOCATION: South H.S. 1700 E. Louisiana Ave. Denver, CO 80210

14-MC-ES14.059BMA

School Bid Amount

South H.S. Base Bid $______________________________

Add/Alternate #1: Boiler Abatement & Demolition if found to be asbestos containing. Abate and remove three boilers as identified in the pre-bid meeting. To be completed in two weeks. $______________________________

Add/Alternate #2: Crawlspace Abatement. Abate approximately 6,800ft² of contaminated soil in 3 areas with a minimum of 3” soil removal across area. Remove approximately 500 linear feet of pipe with asbestos insulation and fittings in the spaces. Work schedule: 7/27/14 – 8/22/14 $______________________________

Add/Alternate #3: Crawlspace Abatement. Replace Add/Alternate #2 if work is shifted to Summer 2015 - Abate approximately 6,800ft² of contaminated soil in 3 areas with a minim of 3” soil removal. Remove approximately 500 linear feet of pipe with asbestos insulation and fittings. Work schedule: June 2015 $______________________________

Name of Company: ____________________________________________ Contact Person: ___________________ Title: _____________________ Date:_____________

Authorized Representative’s Signature: ________________________________

Page 4: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UPDN

UP

DN

UP

CUSTODIAL

STORAGE

037

MECHANICAL

BOILER

036

CUSTODIAL

STORAGE

036F

MECHANICAL

GAS

METER

036E

MECHANICAL

036D

ELECTRICAL

EQUIPMENT

036CA

ELECTRICAL

ELEC.

PANEL

036C

CUSTODIAL

STORAGE

036B

STAIR

F

MECHANICAL

036A

ELEVATOR

2

13

14

10

CORRIDOR

6

STORAGE

037A

MECHANICAL

038

/A

1A

D-1

10.B

/A1 AD-110.C

/A

1A

D-1

10.C

11

2B

15

2B

2B

2J

1F

15

3H

3H

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:55:3

4 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-110.A

BASEMENT DEMOLITIONPLAN - AREA A

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1BASEMENT DEMOLITION PLAN - AREA A

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 5: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UP

MECHANICAL

FAN

ROOM

7

STAFF

STORAGE

039A

STAFF

STORAGE

039AA

MECHANICAL

FAN

ROOM

041

CUSTODIAL

STORAGE

8

ALUMNI

STORAGE

043A

CUSTODIAL

STORAGE

042

/A1 AD-110.C

/A

1A

D-1

10.A

/A1 AD-110.D

AR

EA

E -

NIC

MUSEUM

043B

STAFF

OFFICE

043C

2B

2B

1F

2G

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:55:3

9 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-110.B

BASEMENT DEMOLITIONPLAN - AREA B

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1BASEMENT DEMOLITION PLAN - AREA B

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 6: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DN

DNUP

UP

1A

2B

1F1301 - 1306

MUSIC

BAND

142

MUSIC

142C

MUSIC

STORAGE

142D

NURSE

CLINIC

143

MUSIC

142B

NURSE

CLINIC

144A

TOILET

UNISEX

144AA

NURSE

COT

ROOM

144B

NURSE

OFFICE

144

STAFF

TOILET -

UNISEX

151B

STORAGE

151D

STORAGE

151E

STAFF

STORAGE

151F

SCHOOL

ADMIN

OFFICE

113B

SCHOOL

ADMIN

OFFICE

113C

SCHOOL

ADMIN

OFFICE

113D

SCHOOL

ADMIN

OFFICE

113E

SCHOOL

ADMIN

OFFICE

113F

SCHOOL

ADMIN

OFFICE

113G

SCHOOL

ADMIN

OFFICE

115A

SCHOOL

ADMIN

OFFICE

115B

FACILITY

TOILET -

GIRLS

135A

JANITORS

CLOSET

135B

FACILITY

TOILET -

BOYS

135C

STAIR

F-1STAFF

STORAGE

141A

COMPUTER

LAB

141

SHOP

STORAGE

141B

MUSIC

OFFICE

142A

1A

1A

1A

1A1A

3J

1A

1C

1A

1A

1A

1A

1A

1A

1A

3H 4A

3H

3H

3H1A

1A

1A

3H

3G

3H1A

5K

5K

3J

3H

/A

1A

D-1

11.B

/A1 AD-111.C

/A

1A

D-1

11.C

1A

2A

CORRIDOR

100

3A

5D 5E

5G 5L

3J

7A

5L5H

1DXXX-XXX

5B7A5L

5L 7A

3H

1DXXX-XXX

3H

4' - 10 1/2"

4A7D 10

3H

4' - 9" 4"

1D

1D

1C

5F5A

5B5C

1A

1D5D

5E

5G

2A

2A

1A

3H

3H

5D 5G 2A1D

1A2A

1C

1A

1D

1D3A

5A 5F

5B

5E

12

5L

1E

5H 7E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:55:4

4 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-111.A

FIRST FLOOR DEMOLITIONPLAN - AREA A

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FIRST FLOOR DEMOLITION PLAN - AREA A

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 7: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DN

UPDN

DN

DN

DN

UP

UP

UP

UP

UP

UP

UP

DN

NURSE

COT

ROOM

144B

NURSE

OFFICE

144

STAFF

TOILET -

UNISEX

151B

STAFF

OFFICE

151A

TOILET

151C

STORAGE

151D

STORAGE

151E

STAFF

STORAGE

151F

STAFF

STORAGE

151

ROTC

STORAGE

152

CLASSROOM

154

HALLWAY

150CUSTODIAL

OFFICE

150C

STAIR

H-1

FACILITY

TOILET -

GIRLS

150D

STAFF

OFFICE

150E

MECHANICAL

159B

STAFF

STORAGE

159AHALLWAY

159

RIFLE

RANGE

159C

HALLWAY

157

STAIR

J-1

STAFF

STORAGE

158FACILITY

TOILET

157B

STAIR

P-1

COMPUTER

LAB

155COMPUTER

OFFICE

155A

COMPUTER

OFFICE

155B

DATA

IDF/MDF

155BA

COMPUTER

OFFICE

156A

COMPUTER

OFFICE

156B COMPUTER

LAB

156

STORAGE

150B

HALLWAY

150A

CUSTODIAL

STORAGE

O/S1

WEIGHT

ROOM

STORAGE

167A

1A 1A 1A 1A

1A

1A

1A

2A

3H

2F

2A3H

3F

1A

4A

3H

3H1A

1A

1A

6A

GOB: REMOVE EXISTING 2'-0" x 8'-0" CATCH BASIN-CUT AND REMOVE SOG AS REQ FOR ACCESS.-RE: PLUMBING

3J

3J

3J

3J

REMOVE 1 PANEL OF ACOUSTIC MATERIAL

3'-8" 3'-4"

1C3B

/A1 AD-111.C/A1 AD-111.D

2C

1A

2A

2A

2H

2G

5B

7A

3A

3J

2F

3F

7A 7C7B7A 7C7B

3H

3J 1E5H 7E

2H

1L

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:55:5

1 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-111.B

FIRST FLOOR DEMOLITIONPLAN - AREA B

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FIRST FLOOR DEMOLITION PLAN - AREA B

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 8: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UP

SCHOOL

ADMIN

OFFICE

128A

SCHOOL

ADMIN

OFFICE

128

SCHOOL

ADMIN

OFFICE

129

SCHOOL

ADMIN

OFFICE

101

SCHOOL

ADMIN

STORAGE

101A

SCHOOL

ADMIN

OFFICE

101B

SCHOOL

ADMIN

OFFICE

102

STAFF

TOILET -

UNISEX

102A

DATA

IDF/MDF

103

SCHOOL

ADMIN

OFFICE

102B

SCHOOL

ADMIN

CONFERENCE

105

SCHOOL

ADMIN

OFFICE

106

SCHOOL

ADMIN

OFFICE

106A

CORRIDOR

107

COMPUTER

LAB

108

COMPUTER

LAB

109

SCHOOL

ADMIN

OFFICE

110

SCHOOL

ADMIN

OFFICE

111

STAFF

STORAGE

107A

CORE

112

STAIR

A-1

SCHOOL

ADMIN

OFFICE

113

SCHOOL

ADMIN

OFFICE

113A

SCHOOL

ADMIN

OFFICE

113B

SCHOOL

ADMIN

OFFICE

113C

SCHOOL

ADMIN

OFFICE

113D

SCHOOL

ADMIN

OFFICE

113E

SCHOOL

ADMIN

OFFICE

113F

SCHOOL

ADMIN

OFFICE

113G

SCHOOL

ADMIN

OFFICE

113H

CORRIDOR

113J

COMPUTER

114

SCHOOL

ADMIN

WORKROOM

115

SCHOOL

ADMIN

OFFICE

115A

SCHOOL

ADMIN

OFFICE

115B

STAIR

B-1

FACILITY

TOILET -

GIRLS

135A

JANITORS

CLOSET

135B

FACILITY

TOILET -

BOYS

135C

AUDITORIUM

121

1A

3F

1A

1A

1A

1A

1A

1A3H

3H

3H

1A

1A

3J

3J

3G

3H

/A1 AD-111.A

/A

1A

D-1

11.A

3H

5B

3H

CORRIDOR

100

CORRIDOR

100

5D5L

5L

7A 7B

TAKE CARE TO AVOID DAMAGETO HIGH WINDOW

5L 7A 7B

5L

5L

5H

5H

5N

7B

7A

5P

7A 7B

5L

5L 5D

5E 7A

1A

5E

5E

7A

5L

7B

2F

3J

5Q 5R

3J

7B

3H

4' - 9" 4"

1D

1D

1C

5F5A

5B5C

1A

1D5D

5E

5G

2A

2A

1A

3H

3H

5D 5G 2A1D

1A2A

1C

1A

1D

1D3A

5A 5F

5B

5E

AREA E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:55:5

6 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-111.C

FIRST FLOOR DEMOLITIONPLAN - AREA C

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FIRST FLOOR DEMOLITION PLAN - AREA C

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 9: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UP

UP

1A

3F 3F

1C 3B

4B

1C

3B4B

4B

3B

4C

4B

4B

4C

4B

4B

3B

3B 3B 3B

1C 3B

4B

3B

4B1C

9 9

7D

STAIR

C-1

CORE

117

CORE

118

FACILITY

TOILET -

GIRLS

100A

CORRIDOR

100

CORE

124

CORE

OFFICE

121B

DATA

IDF/MDF

121A

STAFF

OFFICE

125

CORE

126

CORE

127

SCHOOL

ADMIN

OFFICE

128A

SCHOOL

ADMIN

OFFICE

128

CORE

OFFICE

119A

GREEN

HOUSE

119AA

CORE

119

CORE

OFFICE

123A

CORE

123

CORE

122

CORE

130

CORE

120

WOMEN

100B

MEN

100D

CUSTODIAL

100C

STAIR D

STAIR

3F

1A

3B

3B

4B

3B

4B4B

4B

5A

4B4B

4B

4B

4B

4B

4B

4B

4B

4B

4B

4B4B

4B

4B

3B

3B

3B

3B

3B

3B3B3B

5C

5A

4B

4B

6A

6A

4B 5A

4B

4B

4B

4B4B4B

5F

4B

5C

3B

3B

3B

3B3B3B

3H3H

1A

1A

3H

3H

AREA E (NIC)

2E

2E

2E

2E

2E

2E

2E

2E

3J

/A1 AD-111.B

/A

1A

D-1

11.C

5B

6F

1A1A

7B

5Q

7A 7B

3J

2F

3J

3J

3H

1E 1E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:0

1 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-111.D

FIRST FLOOR DEMOLITIONPLAN - AREA D

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FIRST FLOOR DEMOLITION PLAN - AREA D

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 10: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DW

UP

UP

FACILITY

TOILET -

GIRLS

235A

FACILITY

TOILET -

BOYS

235C

CUSTODIAL

CLOSET

235B

CUSTODIAL

STORAGE

235D CUSTODIAL

TOILET -

UNISEX

235DA

CORE

241

CORE

STORAGE

241A

CORE

STORAGE

241BSPECIAL

ED

242

CORE

243

SPECIAL

ED

244

CORE

STORAGE

243A

SPECIAL

ED

STORAGE

244A

CORE

245

STAFF

OFFICE

246

DATA

IDF/MDF

247

SPECIAL

ED

248

CORRIDOR

240

CORRIDOR

235

DRESSING

RM

273

DRESSING

RM

274

1A

1A

1A

1A

1A 3H

1B

2B

1F2335-2330

5'-10"

5'-5"

1B 4A

1A

3H

3J3G

1A

/A

1A

D-1

12.B

/A1 AD-112.C

/A

1A

D-1

12.C

1A

3A

4B

1B

5S 5T 5U

5N5H

TAKE CARE NOT TO DAMAGE CABINETS

3H

4D

2A

4D5L

5L

1C

1A

1A

3H

3H1A

3H

3H

1D

1D

1C

5F5A

5B

1A

1D5D

5E

5G

2A

2A

1A

3H

3H

5D 5G 2A1D

1A2A

1C

1A

1D

1D

3A

5A 5F

5B

1E3H1A

5E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:0

6 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-112.A

SECOND FLOORDEMOLITION PLAN - AREA A

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1SECOND FLOOR DEMOLITION PLAN - AREA A

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 11: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DN

UP

SPECIAL

ED

248

HALLWAY

270

CUSTODIAL

STORAGE

271

CUSTODIAL

272

DRESSING

RM

273

DRESSING

RM

274

1A1A

1A

3F

AUXIL

GYM

228

STAIR

229

AUXIL

GYM

STORAGE

236

STAIR

237

STAIR

232

AUXIL

GYM

STORAGE

255

CORRIDOR

231

AUXIL

GYM

TOILET -

UNISEX

238

AUXIL

TOILET

UNISEX

234

AUXIL

GYM

OFFICE

233

AUXIL

GYM

230

3K

1A

3J

3J3A

AD-113.B

D3

FOR INTERMEDIATELEVEL SCOPE OF WORK

/A1 AD-112.C /A1 AD-112.D

AR

EA

E -

NIC

1A 5L

EVERY EFFORT SHOULD BE MADETO AVOID DEMOLITION OF BRICKFOR PLUMBING REINSTALLATION

3F

ACCESS PLUMBING THROUGH OPENINGFOR DRINKING FOUNTAIN. AVOIDDAMAGE TO FACE BRICK WALL

3A

3J

3K

3F

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:1

3 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-112.B

SECOND FLOORDEMOLITION PLAN - AREA B

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1SECOND FLOOR DEMOLITION PLAN - AREA B

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 12: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UP

LMC/IMC

201LMC/IMC

OFFICE

201B

STAFF

TOILET -

MENS

202A

STAIR

S-2

LMC/IMC

STORAGE

201A

STAFF

OFFICE

202

CORE

203

CORE

204

CORRIDOR

205

ART

STORAGE

206B

ART

STORAGE

206C

ART

208

ART

STORAGE

208A

ART

STORAGE

208B

ART

210

ART

STORAGE

210A

STAIR

A-2

CORE

211 CORE

212

CORE

213

CORE

214 CORE

215

ART

STORAGE

206A

STAIR

B-2

FACILITY

TOILET -

GIRLS

235A

FACILITY

TOILET -

BOYS

235C

CUSTODIAL

CLOSET

235B

CORRIDOR

200

CORRIDOR

235

1A

3F

1A

1A

1A

1A

1A

1A

1A

3H

3H

3H

3H

3H

3H

STAFF

OFFICE

219

3J

3J

3G

6 1/2" 11'-0 1/2"

18'-10" 5'-0"

4B

/A1 AD-112.A

/A

1A

D-1

12.A

4A

4A

4A

7A1B

1011

10

1C

1A

1A

3H

3H1A

3H

3H

1D

1D

1C

5F5A

5B

1A

1D5D

5E

5G

2A

2A

1A

3H

3H

5D 5G 2A1D

1A2A

1C

1A

1D

1D

3A

5A 5F

5B

5E

7F

4D

4A

1E

AREA E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:1

8 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-112.C

SECOND FLOORDEMOLITION PLAN - AREA C

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1SECOND FLOOR DEMOLITION PLAN - AREA C

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 13: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UPUP3B

4B

4B

4B 4B 4B 4B

3B 3B 3B 3B

3B 3B

1C

1C

4B

3B

3B

1C

4B

3B

4B

3B 3B 3B

3B

3B

3B

4B

4B

3B

3B

4B

4B

4B

4B

4B

3B

3B

3B

3B

3B

3F

STAIR

C-2

CORE

218FACILITY

TOILET -

GIRLS

200A

CORE

219

CORE

225CORE

OFFICE

225A

CORE

STORAGE

225BA

CORE

STORAGE

225B

CORE

226

STAFF

OFFICE

227

CORE

OFFICE

220A

CORE

OFFICE

224A

CORE

224

CORE

220

CORE

221

STAFF

LOUNGE

FACULTY

223

WOMEN

200B

MEN

200D

CUSTODIAL

200C

CORE

222

STAIR D

131

1A

1A

1A

3H

4B

4B

5A

5A

6A

4B 5J

4B

6A4B

4B

5J4B12

4B

5A

5A

STAFF

OFFICE

219

4B

AREA E (NIC)

1C

6A

2E

2E

2E

2E

2E

2E

4C

4C

1C

1C

1C

1C

2C3'-8 3/4"

1'-7 3

/4"

2C

3'-8 3/4"

1'-7 3

/4"

/A1 AD-112.B

/A

1A

D-1

12.C

1B

1011

10

4A

3H

2F

3J

3J

3F 3F

3H

3H

1A

1A

1A1A

3H

1212

12

1E 1E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:2

4 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-112.D

SECOND FLOORDEMOLITION PLAN - AREA D

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1SECOND FLOOR DEMOLITION PLAN - AREA D

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 14: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UPUP

551 SF

FACILITY

TOILET -

GIRLS

335A

35 SF

CUSTODIAL

CLOSET

335B

526 SF

FACILITY

TOILET

BOYS

335C

147 SF

STAFF

TOILET -

MENS

335D

455 SF

STAIR

F-3

1870 SF

CORRIDOR

335

355 SF

MECHANICAL

PENTHOUSE

340A

299 SF

AUDITORIUM

STORAGE

335E

1A

1A

1A

1A3H

/A

1A

D-1

13.B

/A1 AD-113.C

/A

1A

D-1

13.C

1E

1D

SEE SHEET A-131 FOR ROOF SCOPE

1F

1D

1C

1A

1A

1A

3H

3H1A

3H

3H

1D

1D

5F5A

5B

1A

1D5D

5E

5G

2A

2A

1A

3H

3H

5D 5G 2A1D

1A2A

1C

1A

1D

1D3A

5A 5F

5B

1E

5A

5E

1A

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:2

8 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-113.A

THIRD FLOOR DEMOLITIONPLAN - AREA A

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1THIRD FLOOR DEMOLITION PLAN - AREA A

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 15: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

1274 SF

CUSTODIAL

STORAGE

340

331 SF

MECHANICAL

PENTHOUSE

341

407 SF

STAIR

G-3

355 SF

MECHANICAL

PENTHOUSE

340A

816 SF

CUSTODIAL

STORAGE

342

299 SF

AUDITORIUM

STORAGE

335E

303 SF

AUDITORIUM

STORAGE

335EA

1A 1A 1A

AD-113.B

D3FOR INTERMEDIATELEVEL SCOPE OF WORK

/A

1A

D-1

13.A

/A1 AD-113.C/A1 AD-113.D

1E

1D 1D 1D

SEE SHEET A-131 FOR ROOF SCOPE

SEE SHEET A-131 FOR ROOF SCOPE

1F

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

1A

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:3

3 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-113.B

THIRD FLOOR DEMOLITIONPLAN - AREA B

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1THIRD FLOOR DEMOLITION PLAN - AREA B

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

1/4" = 1'-0"D3CUSTODIAL STORAGE STAIR LANDING - DEMO

Page 16: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

610 SF

CORE

307

604 SF

CORE

308

604 SF

CORE

306

438 SF

STAIR

A-3

604 SF

CORE

309604 SF

CORE

310

604 SF

CORE

311300 SF

STAIR

B-3

551 SF

FACILITY

TOILET -

GIRLS

335A

35 SF

CUSTODIAL

CLOSET

335B

526 SF

FACILITY

TOILET

BOYS

335C

1870 SF

CORRIDOR

335

2214 SF

LMC/IMC

MAIN

301

110 SF

LMC/IMC

OFFICE

LIBRARIAN

301A

141 SF

STAIR

S-3

359 SF

STAFF

WORKROOM

FACULTY

302604 SF

CORE

303

726 SF

CORE

304

1405 SF

MUSIC

305

243 SF

CORE

STORAGE

304A

6942 SF

CORRIDOR

300

324 SF

STAFF

WORKROOM

FACULTY

313

130 SF

STAFF

STORAGE

312A

48 SF

TOILET

302A

10'-9 3/4" 2'-3"

18'-8" 3'-4"

3A

1A1A

1A

1A

1A

3H

3G

/A1 AD-113.A

/A

1A

D-1

13.A

/A

1A

D-1

13.D

SE

E S

HE

ET

A-1

31 F

OR

RO

OF

SC

OP

E

4D

1A

4A 5L 7A

3J

4B

1B

1011

10

1D

1C

1A

1A

1A

3H

3H1A

3H

3H

1D

1D

5F5A

5B

1A

1D5D

5E

5G

2A

2A

1A

3H

3H

5D 5G 2A1D

1A2A

1C

1A

1D

1D3A

5A 5F

5B

5A

5E

1A

1E

1E

AREA E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:3

8 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-113.C

THIRD FLOOR DEMOLITIONPLAN - AREA C

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1THIRD FLOOR DEMOLITION PLAN - AREA C

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 17: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UP

324 SF

STAFF

WORKROOM

FACULTY

313

301 SF

STAIR

C-3

596 SF

CORE

314

646 SF

CORE

315

79 SF

CORE

STORAGE

315A

604 SF

CORE

324638 SF

CORE

325

675 SF

CORE

316B

677 SF

CORE

317

686 SF

CORE

318

677 SF

CORE

320

684 SF

CORE

319

293 SF

STAIR D

132

761 SF

CORE

322

682 SF

CORE

321

CORE

323

1A

2'-3"

1A

2C3'-8 3/4"

1'-7 3

/4"

/A1 AD-113.B

/A

1A

D-1

13.C

1D3386-3388

1A

3F

754 SF

CORE

316A

4B

1B

1011

10

7B

7B7A

7A

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:4

1 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-113.D

THIRD FLOOR DEMOLITIONPLAN - AREA D

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1THIRD FLOOR DEMOLITION PLAN - AREA D

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 18: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

W

59 SF

CAFETERIA

STORAGE

412D

1964 SF

KITCHEN

MAIN

412 183 SF

KITCHEN

STORAGE

412C

25 SF

KITCHEN

TOILET

UNISEX

412BA

24 SF

CUSTODIAL

CLOSET

412B

74 SF

KITCHEN

OFFICE

MANAGER

412A

574 SF

KITCHEN

STORAGE

411

139 SF

CORRIDOR

410

98 SF

MECH

410A

78 SF

STAIR

T-4

53 SF

REF

412E

/A

1A

D-1

14.A

/A1 AD-114.C /A1 AD-114.D

SEE SHEET A-131 FOR ROOF SCOPE

3J

2F

2A 3H

3J

3H3H

3H

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:4

5 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-114.B

FOURTH FLOORDEMOLITION PLAN - AREA B

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FOURTH FLOOR DEMOLITION PLAN - AREA B

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 19: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UPUP

UPUPUP

662 SF

CORRIDOR

400

301 SF

STAIR

B-4

272 SF

FACILITY

TOILET -

BOYS

400A

8278 SF

CAFETERIA

401

695 SF

CORE

402

88 SF

HALLWAY

409

411 SF

CORE

405

272 SF

BALCONY

405A

3F 3F

1A1A

3J

DEMO SHOWN IN THISAREA IS FOR RAMPRECONFIGURATION, ALT #3

CORE

404

/A1 AD-114.A

/A1 AD-114.B

CORE

403

SEE SHEET A-131 FOR ROOF SCOPE

2F 2A3H

1E

1E

1E

1A

6A

1A 1A2A

AREA E

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:4

9 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-114.C

FOURTH FLOORDEMOLITION PLAN - AREA C

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FOURTH FLOOR DEMOLITION PLAN - AREA C

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

SEE SHEET G-110 FOR GENERAL NOTES

Page 20: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

670 SF

CORRIDOR

407

222 SF

FACILITY

TOILET -

GIRLS

407A

301 SF

STAIR

C-4

3F

1A

DEMO SHOWN IN THISAREA IS FOR RAMPRECONFIGURATION, ALT #4

/A1 AD-114.B

/A

1A

D-1

14.C

SEE SHEET A-131 FOR ROOF SCOPE

1E2F

2A

3H

1E 3J

6A

1A1A2A

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:5

3 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-114.D

FOURTH FLOORDEMOLITION PLAN - AREA D

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

2 40 168

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

1/8" = 1'-0"A1FOURTH FLOOR DEMOLITION PLAN - AREA D

SEE SHEET G-110 FOR GENERAL NOTES

Page 21: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

UPUPUPUP

UP

2352 SF

BAND

ROOM

559

246 SF

FAN

ROOM

#11

89 SF

PASSAGE

#12

3J

ELEC

560

STORAGE

559B

5D 5L 7A

3F

AREA A(NE)

AREA C(NW)

AREA D(SW)

AREA B(SE)

AREA E(NIC)

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:56:5

9 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

As indicated

AD-115.A

FIFTH FLOOR AND CLOCKTOWER DEMOLITION PLAN

SOUTH HIGH SCHOOL - DPS

TM

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"A1FIFTH FLOOR DEMOLITION PLAN - AREA A

SHEET NOTES - BEST - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A REMOVE PORTION OF WALL AS REQ. TO ACCESS (E) PIPING IN THIS AREA, FROM SIDEINDICATED.

1C REMOVE EXISTING WALL

1D REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

1E AVOID DAMAGE TO WALL FINISH, FROM SIDE INDICATED.

1F CORE DRILL WALL AS REQ. FOR NEW PLUMBIGN, RE: PLUMBING

1L CORE DRILL WALL AS REQ/ FOR NEW PIPING, RE: PLUMBING

2 FLOORS

2A REMOVE FLOOR AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2B DEMO SLAB AS REQ. TO ACCESS FLOOR DRAIN PIPING TO SUMP PUMP, RE: PLUMBING

2C DEMO FLOOR SLAB, AREA SHOWN HATCHED. VIF JOIST LOCATIONS AND DUCT SIZING.INFORM ARCHITECT OF ANY CONFLICTS.

2E REMOVE ALL FLOORING MATERIALS AND WALL BASE

2F CORE HOLE AT SLAB. VIF HOLE LOCATION TO AVOID CONC. JOIST

2G REMOVE TURF AND SOIL AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED.STORE SOIL FOR REPLACEMENT

2H REMOVE SOG AS REQUIRED TO ACCESS PIPING AS REQ. AREA SHOWN HATCHED

2J REMOVE AREAS OF DAMGED CHECKER PLATE

3 PLUMBING

3A DEMO FIXTURE

3B REMOVE EXISTING SINK

3F DEMO EXISTING DRINKING FOUNTAIN

3G REMOVE DRINKING AND SALVAGE FOR RE-INSTALLATION

3H REMOVE FIXTURES (AND TOILET PARTITIONS) AS REQUIRED TO ACCESS PIPING, SALVAGEFOR REINSTALLATION

3J ABANDON PIPING IN PLACE

3K DEMO EXISTING CUSPIDOR

4 CASEWORK

4A MODIFY CASEWORK AS REQ. FOR PLUMBING DEMO

4B REMOVE EXISTING CASEWORK

4C REMOVE UPPER EXISTING CASEWORK ONLY, BASE CABINETS TO REMAIN

4D REMOVE CASEWORK AND SALVAGE FOR REINSTALLATION, AS REQ.

5 ACCESSORIES

5A REMOVE EXISTING TACKBOARD

5B REMOVE EXISITNG TACKBOARD, SALVAGE FOR REINSTALLATION

5C REMOVE EXISTING BLACKBOARD

5D REMOVE EXISTING BLACKBOARD, SALVAGE FOR REINSTALLATION

5E REMOVE EXISTING ACOUSTIC PANEL, SALVAGE FOR REINSTALLATION

5F REMOVE EXISTING WHITEBOARD

5G REMOVE EXISTING MTL CANOPY AS REQ. TO ACCESS (E) PIPING IN THIS AREA

5H REMOVE PAPER TOWEL DISPENSER, SALVAGE FOR REINSTALLATION

5J REMOVE EXISTING FIRE EXTINGUISHER AND CABINET

5K REMOVE AND SALVAGE MIRROR AND MARBLE TRIM FOR REINSTALLATION

5L REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

5N REMOVE SOAP DISPENSER, SALVAGE FOR REINSTALLATION

5P REMOVE WOOD CHAIR RAIL AS REQ., SALVAGE FOR REINSTALLATION

5Q REMOVE TACK STRIP

5R REMOVE PICTURE RAIL, SALVAGE FOR REINSTALLATION

5S REMOVE FIRST AID KIT, SALVAGE FOR REINSTALLATION

5T REMOVE FIRE EXSTINGUISHER, SALVAGE FOR REINSTALLATION

5U REMOVE FIRE BLANKET, SALVAGE FOR REINSTALLATION

6 DOORS

6A REMOVE EXISTING DOOR AND FRAME

6F REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

7 MEP

7A MODIFY POWER CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7B MODIFY DATA CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7C MODIFY FIRE ALARM CONDUIT/MOLD AS REQ. FOR WALL DEMO, RE: ELEC.

7D REMOVE WIRE MOLD AND OUTLETS FROM CASEWORK

7E REMOVE CLOCK, SALVAGE FOR REINSTALLATION

7F REMOVE SPEAKER, SALVAGE FOR REINSTALLATION

10 REMOVE (E) BREACHING AT CHIMNEY

11 REMOVE WINDOW FRAME AND GLAZING. PREP FRAME FOR NEW LOUVER, RE: MECH

12 REMOVE EXHAUST HOOD AND ASSOCIATED DUCTING

13 REMOVE INCINERATOR; ALTERNATE #1

14 REMOVE STEEL CATWALK AND ASSOCIATED STRUCTURE

15 WORK REGARDING SUMP PIT, RE: PLUMBING

SHEET NOTES - GOB - DEMOLITION PLANS

# Sheet Note

1 WALLS

1A DEMO WALL

1B REMOVE PORTION OF WALL AS REQUIRED FOR NEW OPENING

1C DEMO PORTION OF WALL FOR NEW DOOR OPENING

1D REMOVE WALL FINISH, SALVAGE TILE FOR PATCH AND REPAIR IN OTHER AREAS.

1E REMOVE GATE AND ASSOCIATED MATERIALS

1F REMOVE LOCKERS AND SALVAGE FOR REINSTALLATION

2 FLOORS

2A REMOVE FLOOR FINISH, AREA SHOWN HATCHED

2B REMOVE TERRAZZO BASE AT LOCKERS

2C DEMO STAIR AS REQ. TO FLUSH WITH WALL

3 PLUMBING

3A REMOVE AND SLAVAGE FIXTURE FOR REINSTALLATION

3B REMOVE DOOR, EXISTING FRAME TO REMAIN. PREP FRAME FOR REVERSE SWING.

4 CASEWORK

4A DEMO CASEWORK

4B MODIFY CASEWORK AS SHOWN

5 ACCESSORIES

5A REMOVE MIRROR AND MARBLE FRAME. SLAVAGE MARBLE FRAME FOR REINSTALLATION

5B REMOVE PAPER TOWEL DISPENSOR. RETURN TO OWNER.

5C DEMO HAND DRYER

5D REMOVE TOILET PAPER DISPENSOR. RETURN TO OWNER.

5E REMOVE GRAB BARS. RETURN TO OWNER.

5F REMOVE SOAP DISPENSOR. RETURN TO OWNER.

5G DEMO TOILET PARTIONS IN THEIR ENTIRETY. RETURN MARBLE SLABS TO OWNER.

6 DOORS

6A DEMO DOOR AND FRAME. PREPARE OPENING TO RECEIVE INFILL

7 MEP

7D MODIFY MTL CANOPY AS SHOWN

9 REMOVE SIGNAGE, SALVAGE FOR REINSTALLATION

10 MODIFY POWER/DATA CONDUIT AS REQ. FOR WALL DEMO

11 REMOVE WOOD BASE AS REQ., SALVAGE FOR REINSTALLATION

12 REMOVE EXISTING DOOR HARDWARE

2 40 168

4 80 3216 4 80 3216 4 80 32162 40 168

1/8" = 1'-0"C1D LEVEL 06

1/8" = 1'-0"C2D LEVEL 07

1/8" = 1'-0"C3D LEVEL 08

1/8" = 1'-0"C4D LEVEL 09

SEE SHEET G-110 FOR GENERAL NOTES

Page 22: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

1

1

1

1

1

1

1

1

1

1

MUSIC

BAND

142

MUSIC

142C

MUSIC

STORAGE

142D

NURSE

CLINIC

143MUSIC

142B

NURSE

CLINIC

144A

NURSE

COT

ROOM

144B

NURSE

OFFICE

144

STAFF

STORAGE

151

HALLWAY

150

CUSTODIAL

OFFICE

150CSTAIR

H-1

STAIR

P-1

STAIR

C-1

CORE

117

CORE

118

FACILITY

TOILET -

GIRLS

100A

CORRIDOR

100

CORE

124

CORE

OFFICE

121B

DATA

IDF/MDF

121A

STAFF

OFFICE

125

CORE

126

SCHOOL

ADMIN

OFFICE

128A

SCHOOL

ADMIN

OFFICE

128

SCHOOL

ADMIN

OFFICE

129

SCHOOL

ADMIN

OFFICE

101SCHOOL

ADMIN

OFFICE

101B

SCHOOL

ADMIN

OFFICE

102

STAFF

TOILET -

UNISEX

102ADATA

IDF/MDF

103

SCHOOL

ADMIN

OFFICE

102B

SCHOOL

ADMIN

CONFERENCE

105

SCHOOL

ADMIN

OFFICE

106

SCHOOL

ADMIN

OFFICE

106A

CORRIDOR

107

COMPUTER

LAB

108

COMPUTER

LAB

109

SCHOOL

ADMIN

OFFICE

110

SCHOOL

ADMIN

OFFICE

111

STAFF

STORAGE

107ACORE

112

STAIR

A-1

SCHOOL

ADMIN

OFFICE

113

SCHOOL

ADMIN

OFFICE

113A

SCHOOL

ADMIN

OFFICE

113B

SCHOOL

ADMIN

OFFICE

113C

SCHOOL

ADMIN

OFFICE

113D

SCHOOL

ADMIN

OFFICE

113E

SCHOOL

ADMIN

OFFICE

113F

SCHOOL

ADMIN

OFFICE

113G

SCHOOL

ADMIN

OFFICE

113H

CORRIDOR

113J

COMPUTER

114

SCHOOL

ADMIN

WORKROOM

115

SCHOOL

ADMIN

OFFICE

115A

SCHOOL

ADMIN

OFFICE

115BSTAIR

B-1

FACILITY

TOILET -

GIRLS

135A

FACILITY

TOILET -

BOYS

135C

STAIR

F-1STAFF

STORAGE

141ACOMPUTER

LAB

141

AUDITORIUM

121

CORE

OFFICE

119A

GREEN

HOUSE

119AA

CORE

119

CORE

OFFICE

123ACORE

123

CORE

122

CORE

130

CORE

120

WOMEN

100B

MEN

100D

CUSTODIAL

100C

STAIR D

STAIR

HALLWAY

150A

?

?

STAFF

OFFICE

151A

TOILET

151C

STORAGE

151D

STORAGE

151E

STAFF

STORAGE

151F

ROTC

STORAGE

152

CLASSROOM

154

FACILITY

TOILET -

GIRLS

150D

STAFF

OFFICE

150E

MECHANICAL

159B

STAFF

STORAGE

159A

HALLWAY

159

RIFLE

RANGE

159C

HALLWAY

157

STAFF

STORAGE

158FACILITY

TOILET

157B

COMPUTER

LAB

155COMPUTER

OFFICE

155A

COMPUTER

OFFICE

155B

COMPUTER

OFFICE

156A

COMPUTER

OFFICE

156B

COMPUTER

LAB

156

STORAGE

150B

NIC

3

3 3

3

3

3

AD-121.T

1

1

1

REMOVE ANDSALAVAGEACCOUSTICPANELS FORRE-INSTALLATION

5

5

5

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:57:0

7 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

1/16" = 1'-0"

AD-121

FIRST FLOOR DEMOLITIONRCP

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

4 80 3216

SHEET NOTES - BEST - DEMOLITION RCP

# Sheet Note

1 REMOVE PORTION OF CEIILING AS REQ. FOR RE-ROUTING OF PIPES IN EXISTING CEILING

2 REMOVE 1'x1' ACOUSTIC CEILING TILE AND ADHESIVE, IN AREA SHOWN HATCHED

3 DEMO CEILING AND ASSOCIATED STRUCTURE

4 DEMO PORTION OF CEILING FOR NEW SHAFT ENCLOSURE

5 REMOVE UNISTRUT AND ASSOCIATED CEILING MOUNTED ELEC. SYSTEM.

SHEET NOTES - GOB - DEMOLITION RCPS

# Sheet Note

1/16" = 1'-0"A1D RCP LEVEL 01

SEE SHEET G-110 FOR GENERAL NOTES

Page 23: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

2

2

2

2

2

2

222

(E) AIR RETURN GRILLES TO REMAIN, TYP.

(E) CHANDELER TO REMAIN,PROTECT IN PLACE. REMOVECANOPY AS REQ. FOR FULL REMOVALOF ACOUSTIC TILE, TYP.

CAN LIGHT TO REMAIN, TYP. DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:57:0

9 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

1/8" = 1'-0"

AD-121.T

AUDITORIUM DEMOLITIONRCP

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

1/8" = 1'-0"1D RCP - Auditorium Ceiling

SHEET NOTES - BEST - DEMOLITION RCP

# Sheet Note

1 REMOVE PORTION OF CEIILING AS REQ. FOR RE-ROUTING OF PIPES IN EXISTING CEILING

2 REMOVE 1'x1' ACOUSTIC CEILING TILE AND ADHESIVE, IN AREA SHOWN HATCHED

3 DEMO CEILING AND ASSOCIATED STRUCTURE

4 DEMO PORTION OF CEILING FOR NEW SHAFT ENCLOSURE

5 REMOVE UNISTRUT AND ASSOCIATED CEILING MOUNTED ELEC. SYSTEM.

SEE SHEET G-110 FOR GENERAL NOTES

Page 24: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

LMC/IMC

201

LMC/IMC

OFFICE

201B

STAFF

TOILET -

MENS

202ASTAIR

S-2

LMC/IMC

STORAGE

201A

STAFF

OFFICE

202

CORE

203

CORE

204

CORRIDOR

205

ART

STORAGE

206B

ART

STORAGE

206C

ART

208

ART

STORAGE

208A

ART

STORAGE

208B

ART

210

ART

STORAGE

210A

STAIR

A-2

CORE

211CORE

212

CORE

213

CORE

214CORE

215

ART

STORAGE

206A

STAIR

B-2

FACILITY

TOILET -

GIRLS

235A

FACILITY

TOILET -

BOYS

235C

CUSTODIAL

CLOSET

235B

CUSTODIAL

STORAGE

235D

CUSTODIAL

TOILET -

UNISEX

235DA

CORE

241

CORE

STORAGE

241A

CORE

STORAGE

241B

SPECIAL

ED

242

CORE

243

SPECIAL

ED

244

CORE

STORAGE

243A

SPECIAL

ED

STORAGE

244A

CORE

245

STAFF

OFFICE

246

DATA

IDF/MDF

247

SPECIAL

ED

248

CORRIDOR

200

CORRIDOR

235

STAIR

C-2

CORE

218

FACILITY

TOILET -

GIRLS

200A

CORE

219

CORE

225

CORE

OFFICE

225A

CORE

STORAGE

225BA

CORE

STORAGE

225B

CORE

226

STAFF

OFFICE

227

CORE

OFFICE

220A

CORE

OFFICE

224A

CORE

224

CORE

220

CORE

221

STAFF

LOUNGE

FACULTY

223

WOMEN

200B

MEN

200D

CUSTODIAL

200C

CORE

222

STAIR D

131

HALLWAY

270

CUSTODIAL

STORAGE

271

CUSTODIAL

272

DRESSING

RM

273

DRESSING

RM

274

1

1

1

1

1

NIC

STAFF

OFFICE

219

AUXIL

GYM

228

STAIR

229

AUXIL

GYM

230

CORRIDOR

231

STAIR

232

AUXIL

GYM

OFFICE

233AUXIL

TOILET

UNISEX

234 AUXIL

GYM

STORAGE

236

STAIR

237

STAIR

251

AUXIL

GYM

STORAGE

255

3

3 3

3

3

3

1

1

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:57:1

6 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

1/16" = 1'-0"

AD-122

SECOND FLOORDEMOLITION RCP

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

4 80 3216

SHEET NOTES - GOB - DEMOLITION RCPS

# Sheet Note

SHEET NOTES - BEST - DEMOLITION RCP

# Sheet Note

1 REMOVE PORTION OF CEIILING AS REQ. FOR RE-ROUTING OF PIPES IN EXISTING CEILING

2 REMOVE 1'x1' ACOUSTIC CEILING TILE AND ADHESIVE, IN AREA SHOWN HATCHED

3 DEMO CEILING AND ASSOCIATED STRUCTURE

4 DEMO PORTION OF CEILING FOR NEW SHAFT ENCLOSURE

5 REMOVE UNISTRUT AND ASSOCIATED CEILING MOUNTED ELEC. SYSTEM.

1/16" = 1'-0"A1D RCP LEVEL 02

SEE SHEET G-110 FOR GENERAL NOTES

Page 25: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

11CORE

307

CORE

308

CORE

306

STAIR

A-3

CORE

309

CORE

310CORE

311

STAIR

B-3

FACILITY

TOILET -

GIRLS

335A

FACILITY

TOILET

BOYS

335C

STAFF

TOILET -

MENS

335D

STAIR

F-3

CORRIDOR

335

CUSTODIAL

STORAGE

340

MECHANICAL

PENTHOUSE

341

STAIR

G-3

MECHANICAL

PENTHOUSE

340A

CUSTODIAL

STORAGE

342

LMC/IMC

MAIN

301LMC/IMC

OFFICE

LIBRARIAN

301A

STAIR

S-3STAFF

WORKROOM

FACULTY

302

CORE

303CORE

304

MUSIC

305

CORE

STORAGE

304A

CORRIDOR

300

STAFF

WORKROOM

FACULTY

313

STAIR

C-3

CORE

314 CORE

315

CORE

STORAGE

315A

CORE

323

CORE

324

CORE

325

CORE

316B

CORE

317

CORE

318

CORE

320

CORE

319

STAIR D

132

CORE

322

CORE

321

AUDITORIUM

STORAGE

335E

AUDITORIUM

STORAGE

335EA

STAFF

STORAGE

312A

TOILET

302A

4

4

NIC

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:57:2

2 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

1/16" = 1'-0"

AD-123

THIRD FLOOR DEMOLITIONRCP

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

4 80 3216

SHEET NOTES - GOB - DEMOLITION RCPS

# Sheet Note

SHEET NOTES - BEST - DEMOLITION RCP

# Sheet Note

1 REMOVE PORTION OF CEIILING AS REQ. FOR RE-ROUTING OF PIPES IN EXISTING CEILING

2 REMOVE 1'x1' ACOUSTIC CEILING TILE AND ADHESIVE, IN AREA SHOWN HATCHED

3 DEMO CEILING AND ASSOCIATED STRUCTURE

4 DEMO PORTION OF CEILING FOR NEW SHAFT ENCLOSURE

5 REMOVE UNISTRUT AND ASSOCIATED CEILING MOUNTED ELEC. SYSTEM.

1/16" = 1'-0"A1D RCP LEVEL 03

SEE SHEET G-110 FOR GENERAL NOTES

Page 26: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

AUDITORIUM

STORAGE

335EA

CORE

404

CORRIDOR

407

FACILITY

TOILET -

GIRLS

407A

CORE

402

CORRIDOR

400

STAIR

B-4

FACILITY

TOILET -

BOYS

400A

STAIR

C-4

CAFETERIA

401

CAFETERIA

STORAGE

412D

KITCHEN

MAIN

412

KITCHEN

STORAGE

412C

KITCHEN

TOILET

UNISEX

412BA

CUSTODIAL

CLOSET

412B

KITCHEN

OFFICE

MANAGER

412AKITCHEN

STORAGE

411

MECH

410A

STAIR

T-4

REF

412E

BALCONY

405A

JANITOR

407B

1

DEMO SHOWN IN THIS AREA IS FOR ADD ALT #3

DEMO SHOWN IN THIS AREA IS FOR ADD ALT #4

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. 456 SITE NO. 71

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENTAW

RN

1/1

3/2

014 1

:57:2

6 P

M

c:\

Revit L

ocal F

iles\D

PS

SR

_C

entr

al_

TM

ichie

li.rv

t

1/16" = 1'-0"

AD-124

FOURTH FLOORDEMOLITION RCP

SOUTH HIGH SCHOOL - DPS

Author

01/13/2014

1700 E. LOUISIANA AVEDENVER, CO 80210

01/13/2014 100% DESIGN DEVELOPMENT

11365.000

4 80 3216

SHEET NOTES - GOB - DEMOLITION RCPS

# Sheet Note

SHEET NOTES - BEST - DEMOLITION RCP

# Sheet Note

1 REMOVE PORTION OF CEIILING AS REQ. FOR RE-ROUTING OF PIPES IN EXISTING CEILING

2 REMOVE 1'x1' ACOUSTIC CEILING TILE AND ADHESIVE, IN AREA SHOWN HATCHED

3 DEMO CEILING AND ASSOCIATED STRUCTURE

4 DEMO PORTION OF CEILING FOR NEW SHAFT ENCLOSURE

5 REMOVE UNISTRUT AND ASSOCIATED CEILING MOUNTED ELEC. SYSTEM.

1/16" = 1'-0"A1D RCP LEVEL 04

SEE SHEET G-110 FOR GENERAL NOTES

Page 27: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

First Floor HVAC DemolitionPlan - Area DCNS

MEGTDR

Page 28: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DW

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

Second Floor HVAC DemolitionPlan - Area ACNS

MEGTDR

Page 29: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

Third Floor HVAC DemolitionPlan - Area ACNS

MEGTDR

Page 30: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

K J H G F E D C B A

7

6

5

4

3

2

1

5.9

3.1

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

Fourth Floor HVAC DemolitionPlan - Area DCNS

MEGTDR

Page 31: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

HVAC Enlarged Plan - FirstFloor PlanJCF

MEBEMM

Page 32: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

HVAC Enlarged Plan - SecondFloor PlanJCF

MEBEMM

Page 33: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing

DRAWN BY:

DATE:

DENVER PUBLIC SCHOOLS

DESIGNED BY:

CHECKED BY:

1 2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

P 303.607.0977www.slaterpaull.com

DEPARTMENT OF FACILITY MANAGEMENTSCHOOL DISTRICT NO. 1 DENVER, CO

SCALE:

1331 Nineteenth StreetDenver, CO. 80202

SHEET:

OF:

SCHOOL NO. SITE NO.

PROJECT NO:

NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D.

DENVER PUBLIC SCHOOLSDEPARTMENT OF

FACILITY MANAGEMENT

DATE:

APPROVED CONTRACT DOCUMENT

10

/7

/2

01

3 9

:4

1:3

0 A

M

c:\R

evit L

oca

l F

ile

s\D

PS

SR

_C

en

tra

l_

TM

ich

ie

li.rvt

SOUTH HIGH SCHOOL - DPS

1/13/14

1700 E. LOUISIANA AVE

DENVER, CO 80210

1/13/14100% DESIGN DEVELOPMENT

11365.000

HVAC Enlarged Demo Plan -Boiler RoomJCF

MEBEMM

Page 34: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 35: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 36: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 37: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 38: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 39: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 40: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 41: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 42: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 43: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 44: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 45: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing
Page 46: Denver Public Schools Purchasing Department Denver ...purchasingts.dpsk12.org/bids/openbids/14-MC-ES14.059BMA Addendum 1.pdfGAC must provide a licensed electrician to tie into an existing