Dentist

9
DENTIST SURGERY BRIEF “Patients are also customers, the project provides a balance between the need to project the clinical and the increas- ingly important cosmetic service provided by dentists” REQUIREMENTS - 2 Treatment rooms (approx 20m2 and min 3500 long) Each with a chair , dental unit, a mobile stool, a sink, a separate wash hand basin, space for a computer and a sterilizer (300x300x300) X-ray machine and lighting. - Recovery area, used mainly post treatment, a place to relax before facing the world. - Consultation area, 2 customers, 1 consultant , where options for procedures and treatments/payment plans etc are discussed. - Decontamination area where dental equipment can be sterilised. - Reception with duel height counter, record storage and comfortable waiting for 6 people. - Retail display area equivalent to 1000mm single side of gondola unit. - WC for patients, suitable for wheelchair users. - Staff changing area with 5 lockers, soiled laundry container and WC. - Staff room with small table and 3 chairs and a kitchenette - could also be used to prepare refreshments for patients. Staff will need privacy to talk, listen to the radio etc. - Lift for wheelchair access to all area - remember that the staff may need wheelchair access too. - Lab-work and laundry are dealt with off site by third parties.

description

dentist project

Transcript of Dentist

DENTIST SURGERY

BRIEF

“Patients are also customers, the project provides a balance between the need to project the clinical and the increas-ingly important cosmetic service provided by dentists”

REQUIREMENTS

- 2 Treatment rooms (approx 20m2 and min 3500 long) Each with a chair , dental unit, a mobile stool, a sink, a separate wash hand basin, space for a computer and a sterilizer (300x300x300) X-ray machine and lighting.- Recovery area, used mainly post treatment, a place to relax before facing the world.- Consultation area, 2 customers, 1 consultant , where options for procedures and treatments/payment plans etc are discussed.

- Decontamination area where dental equipment can be sterilised.- Reception with duel height counter, record storage and comfortable waiting for 6 people.- Retail display area equivalent to 1000mm single side of gondola unit.- WC for patients, suitable for wheelchair users.- Staff changing area with 5 lockers, soiled laundry container and WC.

- Staff room with small table and 3 chairs and a kitchenette - could also be used to prepare refreshments for patients. Staff will need privacy to talk, listen to the radio etc.- Lift for wheelchair access to all area - remember that the staff may need wheelchair access too.- Lab-work and laundry are dealt with off site by third parties.

GROUND FLOOR: 1:100

2

3

4 5

6

7

8

9

10

1

1. Waiting area2. Reception3. Consultation area4. Storage5. Disabled W. C.6. Decontamination area7. Staff room8. Lift9. Ventilation lobby/Staff changing10 Staff W. C.

DUKE ST.

HIGH S

T.

FIRST FLOOR: 1:100

1. Treatment room 12. Treatment room 23. Recovery area4. Streriliser 5. X-ray machine

1

2

3

4

5

1. RECEPTION AREA AND TREATMENT ROOM 1.

1.

VIEW POINT PLAN

MATERIALS AND FURNISHINGS

1. ‘TECU Gold Copper cladding/ KME0.6mm panels attached using cleat system.2. GKD ’Mandarin’/ Bronze metal fabric/ hung from handrail and fixed to treads.3. ‘Arabescato’ Marble tiling/ Alistair Mackintosh.4. Eames Softpad Group Executive chair/ Royal Hide leather (Black Coffee VR50) Herman Miller.4. Duel height reception desk/Bespoke.

RECEPTION DESK

Visual showing basic timber construction, MDF and veneer finish.Offcuts from treatment rooms to be used as cladding for the duel height frontage

2

3

4

1

3. WAITING AREA AND TREATMENT ROOM 2.

2. FIRST FLOOR CORRIDOR/TREATMENT ROOMS.

3.

2.

5

6

FURNISHINGS

5. Side Table/ Eileen Gray. 6. Eames Compact Sofa/ Royal Hide Leather (Black Coffee VR50) Herman Miller.

The treatment rooms are clad in copper, the panels mimic the red sandstone blocks of the surrounding tenements but also creates an aesthetic to meet the aspirations of the beauty-orientated customer.

In contrast the first floor corridor to the treatment rooms is a white space implying a clean and hygienic environment.

 

 

A

B

10 mm tempered glassbalustrade/ fixed to C sectionand sill.

5 mm cast iron flat section/annodised and brazed tocolumn.

L section fixing plate/attached with M4 bolts.

Hardwood handrail.

Existing column/painted white.

Cased heading curtain panels/white.

Curtain railing hardware.

120 x 180 mm welded finplate/ M12 hex boltsattached to I beam.

38 mm hex bolt/3 mm neoprene washer/attached to C section.

Visible 65 mm sectionof C section/ untreated.

15 mm stop bead.

200 x 27.9C section.

10 mm DRS Biocote Resin/ 10-A-01.

12 mm plywood/screwed to joists.

A: WINDOW DETAIL: 1:5

B: FLOOR DETAIL: 1:5

180 x 50 mm joist.

200 x 35.7I beam.

232

12 mm plasterboard/skimmed/ painted white.

100 mm square section column.

100 mm square section/ welded to column

127 mm hex bolt/ 3 mm neoprenewasher.

Door to staff changing and W. C.

75 x 47 CLS/ screwed to sill.

8 mm DRS Biocote Resin floor/20-E-50.

15 x 15 mm PVC Scotiacorner piece.

Pavement.

1028

969

SECTION AA : 1:20

12 mm Plasterboard

NORTH ELEVATION

SECTION BB: 1:100

The north elevation reveals the internal structure, much of which is glazed, allowing natural light into the ground floor staff facilities.

B

B

Square Column100 x 100

Joist180 x 50

Aluminium Stud work/100 mm Thickness

Existing O 125 load- bearing column

CONSTRUCTION

Structure Plan: 1:200

Primary construction Plan: 1:100

O 100 Column

Secondary construction Plan: 1:100

I Beamw-200 x 35.7

C Sectionc-200 x 27.9

L Section200 x 200

A

A

SIDE ELEVATION: 1:50

TREAD DETAIL: 1:10

WALL DETAIL: 1:5

250

250

170

30

M10 sq

uare

bolts

attac

hing

tread

to st

eel s

tringe

r.

250

x 148

stee

l strin

ger.

2400

x 12

00 P

laster

board

cut to

fit st

air/ s

kimmed

,

paint

ed w

hite.

1200

x 25

0 x 2

0 HW

tread

/

Oak ‘E

nglish

Brow

n’

STAIRS

20 x

6 mm H

W of

fcut/

grain

aligne

d to

miss m

atch

grain

of HW

tread

.

20 x

15 m

m coun

tersin

k.

M10 x

40 m

m/

bolte

d to

unde

rside

of str

inger.

12 m

m Plas

terbo

ard

conc

ealing

wall

plates

.

30 x

25 m

m Stud

work

.

M14 C

oach

bolt

s into

exist

ing w

all

250

20 m

m shad

ow ga

p

betw

een t

read

and

plaste

rboard

.

M10 sq

uare

bolts

attac

hing

tread

to st

eel s

tringe

r.

2400

x 12

00 P

laster

board

cut to

fit st

air/ s

kimmed

,

paint

ed w

hite.

1200

x 25

0 x 2

0 HW

tread

/

1200

x 25

0 x 2

0 HW

tread

/

Oak ‘E

nglish

Brow

n’

Oak ‘E

nglish

Brow

n’

M10 sq

uare

bolts

attac

hing

tread

to st

eel s

tringe

r.

AA: METAL WEAVE: 1:2

40 mm Steel handrail

Circular fillet weld.

5 mm Theaded steel rod.

25 x 5 mm Steel angle bar/ annodised black.

Socket counter sunk screw/ 18 x 5mm

20mm Oak tread/ English Brown.

20 x 5 mm Steel flat bar/ annodised black.

Socket counter sunk screw/ 23 x 5mm

20 x 5 mm Steel flat bar/ annodised black.

5 mm Aluminium binding rod.