DENTIST SURGERY
BRIEF
“Patients are also customers, the project provides a balance between the need to project the clinical and the increas-ingly important cosmetic service provided by dentists”
REQUIREMENTS
- 2 Treatment rooms (approx 20m2 and min 3500 long) Each with a chair , dental unit, a mobile stool, a sink, a separate wash hand basin, space for a computer and a sterilizer (300x300x300) X-ray machine and lighting.- Recovery area, used mainly post treatment, a place to relax before facing the world.- Consultation area, 2 customers, 1 consultant , where options for procedures and treatments/payment plans etc are discussed.
- Decontamination area where dental equipment can be sterilised.- Reception with duel height counter, record storage and comfortable waiting for 6 people.- Retail display area equivalent to 1000mm single side of gondola unit.- WC for patients, suitable for wheelchair users.- Staff changing area with 5 lockers, soiled laundry container and WC.
- Staff room with small table and 3 chairs and a kitchenette - could also be used to prepare refreshments for patients. Staff will need privacy to talk, listen to the radio etc.- Lift for wheelchair access to all area - remember that the staff may need wheelchair access too.- Lab-work and laundry are dealt with off site by third parties.
GROUND FLOOR: 1:100
2
3
4 5
6
7
8
9
10
1
1. Waiting area2. Reception3. Consultation area4. Storage5. Disabled W. C.6. Decontamination area7. Staff room8. Lift9. Ventilation lobby/Staff changing10 Staff W. C.
DUKE ST.
HIGH S
T.
FIRST FLOOR: 1:100
1. Treatment room 12. Treatment room 23. Recovery area4. Streriliser 5. X-ray machine
1
2
3
4
5
1. RECEPTION AREA AND TREATMENT ROOM 1.
1.
VIEW POINT PLAN
MATERIALS AND FURNISHINGS
1. ‘TECU Gold Copper cladding/ KME0.6mm panels attached using cleat system.2. GKD ’Mandarin’/ Bronze metal fabric/ hung from handrail and fixed to treads.3. ‘Arabescato’ Marble tiling/ Alistair Mackintosh.4. Eames Softpad Group Executive chair/ Royal Hide leather (Black Coffee VR50) Herman Miller.4. Duel height reception desk/Bespoke.
RECEPTION DESK
Visual showing basic timber construction, MDF and veneer finish.Offcuts from treatment rooms to be used as cladding for the duel height frontage
2
3
4
1
3. WAITING AREA AND TREATMENT ROOM 2.
2. FIRST FLOOR CORRIDOR/TREATMENT ROOMS.
3.
2.
5
6
FURNISHINGS
5. Side Table/ Eileen Gray. 6. Eames Compact Sofa/ Royal Hide Leather (Black Coffee VR50) Herman Miller.
The treatment rooms are clad in copper, the panels mimic the red sandstone blocks of the surrounding tenements but also creates an aesthetic to meet the aspirations of the beauty-orientated customer.
In contrast the first floor corridor to the treatment rooms is a white space implying a clean and hygienic environment.
A
B
10 mm tempered glassbalustrade/ fixed to C sectionand sill.
5 mm cast iron flat section/annodised and brazed tocolumn.
L section fixing plate/attached with M4 bolts.
Hardwood handrail.
Existing column/painted white.
Cased heading curtain panels/white.
Curtain railing hardware.
120 x 180 mm welded finplate/ M12 hex boltsattached to I beam.
38 mm hex bolt/3 mm neoprene washer/attached to C section.
Visible 65 mm sectionof C section/ untreated.
15 mm stop bead.
200 x 27.9C section.
10 mm DRS Biocote Resin/ 10-A-01.
12 mm plywood/screwed to joists.
A: WINDOW DETAIL: 1:5
B: FLOOR DETAIL: 1:5
180 x 50 mm joist.
200 x 35.7I beam.
232
12 mm plasterboard/skimmed/ painted white.
100 mm square section column.
100 mm square section/ welded to column
127 mm hex bolt/ 3 mm neoprenewasher.
Door to staff changing and W. C.
75 x 47 CLS/ screwed to sill.
8 mm DRS Biocote Resin floor/20-E-50.
15 x 15 mm PVC Scotiacorner piece.
Pavement.
1028
969
SECTION AA : 1:20
12 mm Plasterboard
NORTH ELEVATION
SECTION BB: 1:100
The north elevation reveals the internal structure, much of which is glazed, allowing natural light into the ground floor staff facilities.
B
B
Square Column100 x 100
Joist180 x 50
Aluminium Stud work/100 mm Thickness
Existing O 125 load- bearing column
CONSTRUCTION
Structure Plan: 1:200
Primary construction Plan: 1:100
O 100 Column
Secondary construction Plan: 1:100
I Beamw-200 x 35.7
C Sectionc-200 x 27.9
L Section200 x 200
A
A
SIDE ELEVATION: 1:50
TREAD DETAIL: 1:10
WALL DETAIL: 1:5
250
250
170
30
M10 sq
uare
bolts
attac
hing
tread
to st
eel s
tringe
r.
250
x 148
stee
l strin
ger.
2400
x 12
00 P
laster
board
cut to
fit st
air/ s
kimmed
,
paint
ed w
hite.
1200
x 25
0 x 2
0 HW
tread
/
Oak ‘E
nglish
Brow
n’
STAIRS
20 x
6 mm H
W of
fcut/
grain
aligne
d to
miss m
atch
grain
of HW
tread
.
20 x
15 m
m coun
tersin
k.
M10 x
40 m
m/
bolte
d to
unde
rside
of str
inger.
12 m
m Plas
terbo
ard
conc
ealing
wall
plates
.
30 x
25 m
m Stud
work
.
M14 C
oach
bolt
s into
exist
ing w
all
250
20 m
m shad
ow ga
p
betw
een t
read
and
plaste
rboard
.
M10 sq
uare
bolts
attac
hing
tread
to st
eel s
tringe
r.
2400
x 12
00 P
laster
board
cut to
fit st
air/ s
kimmed
,
paint
ed w
hite.
1200
x 25
0 x 2
0 HW
tread
/
1200
x 25
0 x 2
0 HW
tread
/
Oak ‘E
nglish
Brow
n’
Oak ‘E
nglish
Brow
n’
M10 sq
uare
bolts
attac
hing
tread
to st
eel s
tringe
r.
AA: METAL WEAVE: 1:2
40 mm Steel handrail
Circular fillet weld.
5 mm Theaded steel rod.
25 x 5 mm Steel angle bar/ annodised black.
Socket counter sunk screw/ 18 x 5mm
20mm Oak tread/ English Brown.
20 x 5 mm Steel flat bar/ annodised black.
Socket counter sunk screw/ 23 x 5mm
20 x 5 mm Steel flat bar/ annodised black.
5 mm Aluminium binding rod.