Dense Bituminous Macadam

Page 2: Dense Bituminous macadam

Presentation Outline:• Introduction• Why DBM?• Design Criteria• Materials• Construction• References

Page 3: Dense Bituminous macadam

Introduction:

• Dense Bituminous Macadam (DBM) is a binder course used for roads with more number of heavy commercial vehicles and a close-graded premix material having a voids content of 5-10 per cent.

Page 4: Dense Bituminous macadam

Why DBM?

• This material has increased in popularity due to durable surface which performs almost well as in all situations.

• Suitable for all pavement layers and for all traffic conditions.

• DBM provides a good quality smooth surface and improved skid resistance.

Page 5: Dense Bituminous macadam

DESIGN CRITERIA(IRC:94-1996):

• Due to high cost of DBM it should be properly designed according to standard design method so as to satisfy certain criteria needed to assure adequate stability and durability.

SR No. Designation Requirement

(I) Number of Compaction blows on each end of Marshall specimen

75

(II) Marshall Stability in Kg.(Minimum) 340

(III) Marshall flow in mm 2-4

(IV) VMA 5-10

(V) VFB 55-75

(VI) Bitumen content percent by weight of total mix 4.5-6.0

Page 6: Dense Bituminous macadam

MATERIALS:

• In order to satisfy Design criteria, DBM mix shall consists of Coarse Aggregate, Fine Aggregate and filler in suitable proportions with required binder content.

• Proper Blend of aggregates should be done to so that final gradation will satisfy either two limits according to thickness in following table.

Page 7: Dense Bituminous macadam

CONTI..

Sieve Size(mm)

Grading Number1(For Layer thickness

≤50mm)2(For Layer thickness

≥50mm)

(Percentage Passing)

37.5 - 10026.5 100 85-10019 85-100 71-95

13.2 63-82 58-829.5 52-74 52-72

4.75 39-54 35-502.36 28-43 28-430.60 15-27 15-270.3 7-21 7-21

0.15 5-15 5-150.075 2-8 2-8

Page 8: Dense Bituminous macadam

Coarse Aggregate (retained on 2.36mm sieve):

• Preferably it should be hydrophobic and of low porosity.

• If hydrophilic aggregates are to be used the bitumen shall be treated with antistripping agents.

• In case of more porous aggregates extra bitumen for absorption by aggregates shall be provided to satisfy design criteria.

Page 9: Dense Bituminous macadam

CONTI..

Test Maximum percent

Aggregate impact value 35

Los Angeles Abrasion Value 40

Flakiness Index 35

Stripping Value 25

Soundness: I)Loss with sodium sulphate-5 cycles II)Loss with Magnesium sulphate-5 cycles

12

18

Water Absorption 2

Page 10: Dense Bituminous macadam

Fine Aggregate (passing on 2.36mm and retained on 75µm):

• Crushed Screenings, natural sand or mixture of both.• Shall be clean, hard, durable dry and free from organic

substances.

Filler (passing 75 µm):• Stone dust, cement, hydrated lime, fly ash or other non-plastic

mineral matter.

• Normally Filler requirement is met by the material passing through 75 µm sieve in fine aggregate, if fine aggregate is deficient then extra filler is added. Extra filler should be as following:

Page 11: Dense Bituminous macadam

CONTI..

Sieve % passing600 µm 100150 µm At least 9075 µm >70

BITUMEN:• The bitumen shall be viscosity grade paving bitumen

complying with the Indian Standard specification IS:73.

Page 12: Dense Bituminous macadam

JOB MIX FORMULA:

• While the laboratory mix design gives the different proportions of the mineral aggregate combinations in terms of individual sieve sizes, for actual operational purposes in the field, blending of two or more sizes of aggregate in terms of weight or volume would be necessary.

• This blending ratio can be on a weight basis by giving percent weight of the CA, FA and filler needed to give the aggregate gradation.

• It can also be proportioned on a volumetric basis based on the unit weight or bulk density of the aggregate supplied.

Page 13: Dense Bituminous macadam

CONTI..

• The mineral aggregate content with Optimum Binder Content as determined in the laboratory constitutes the job-mix formula.

• Mix design shall be carried out, based on a correct and truly representative sample of the materials that will actually be used in the specific construction project.

Page 14: Dense Bituminous macadam

CONSTRUCTION:

– PREPARATION OF BASE:• The base on which dense bituminous macadam is to be laid

shall be prepared to the specified dimensions.

• The surface shall be thoroughly swept and free from dust and other materials.

• If the base is irregular and wavy then proper corrective course of adequate thickness is provided to rectify the profile.

Page 15: Dense Bituminous macadam

CONTI..

• After that Tack coat(asphalt applied before a road is laid to form an adhesive bond) is provided as per type of surface as follows:

Rate Surface

6 to 7.5 Kg per 10 square meter Dry

5 to 5.5 Kg per 10 square meter Normal bituminous surface

7.5 to 10 Kg per 10 square meter Non-bituminous surface

Page 16: Dense Bituminous macadam

CONTI..

- PREPARATION OF MIX:• Preparation of mix is carried out in Hot Mix Plant of adequate

capacity.• Plant may be either batch type or a continuous type.

Page 17: Dense Bituminous macadam

CONTI..

-SPREADING OF THE MIX:• The Mix shall be transported by tipper truck and spreading

done by mechanical paver.• It should be spread in such a manner that after compacting

required thickness binder course is uniformly laid.

Page 18: Dense Bituminous macadam

CONTI..

-COMPACTION:• The Mix after spreading shall be compacted by rolling by a set

of rollers at a speed not more than 5km/hour.• Typical roller position used in compaction is: 1) Initial or break down rolling » By 8 to 12 tonnes, three

wheel steel roller

Page 19: Dense Bituminous macadam

CONTI..

2) Intermediate rolling » By 15 to 30 tonnes, smooth wheel pneumatic roller

3) Finished rolling » By 8 to 10 tonnes, tandem roller

Page 20: Dense Bituminous macadam

CONTI..

• Wheel of rollers should be kept moist to prevent the mix from adhering to them. Rolling shall commence from longitudinally from edge and proceed towards centre. Rolling shall be continued till desired density is achieved.

Page 21: Dense Bituminous macadam

CONTI..

-OPENING TO TRAFFIC:• Traffic can be allowed after completion of the final rolling

when the mix has cooled down to the surrounding temperature.

Page 22: Dense Bituminous macadam

REFERENCES:

• IRC 94-1986 : Specification for Dense Bituminous Macadam

• MORTH(5th Revision):SPECIFICATIONS FOR ROAD AND BRIDGE WORK

• pavementinteractive.org• pavingexpert.com