Demonstrators and Pan-European Services Laboratory WP5 session.

34
Demonstrators and Pan-European Services Laboratory WP5 session

Transcript of Demonstrators and Pan-European Services Laboratory WP5 session.

Page 1: Demonstrators and Pan-European Services Laboratory WP5 session.

Demonstrators and Pan-European Services Laboratory

WP5 session

Page 2: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 2

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 3: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 3

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 4: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 4

Overview: Goals and structure (I)

Provide demonstrators and service laboratories, covering technical and user acceptance as well as related operational and business aspects.

WP5 Leader: ??? (formerly Telenor) Main Tasks:

A1: Trial and European Lab Planning (May 04 – January 05) Leader: ??? (formerly Telenor)

A2: Integration Tests (October 04 – March 06) Leader: Telefónica I+D

A3: User Testing Sessions (January 05 – July 06) Leader: France Telecom

A4: (Field) Trial Deployment (January 05 – September 06) Leader: Belgacom

A5: (Operational) Trial Support (January 05 – September 06) Leader: Alcatel

Page 5: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 5

Overview: Goals and structure (II)

Determine another partner for the key activities of WP5.

WP leader.

A1 leader.

Page 6: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 6

Overview: List of milestones and deliverablesDeliverables (D) and milestones (M)

Type (report, software)

Due date (m/ y):

WP5D1 Trial Execution plan Report 01/ 2005

WP5M2 1st Phase Integration Completed

Software 01/ 2005

WP5M5 2nd Phase I ntegration Completed

Software 06/ 2005

WP5M8 3rd Phase Integration Completed

Software 01/ 2006

WP5M9 Integrated Trial and Test Report

Report 04/ 2006

WP5M3 1st Phase User Testing Session Results

Report 03/ 2005

WP5M6 2nd Phase User Testing Session Results

Report 10/ 2005

WP5M10 3rd Phase User Testing Session Results

Report 07/ 2006

WP5M4 1st Phase Trial Completed

Report 05/ 2005

WP5M7 2nd Phase Trial Completed

Report 12/ 2005

WP5M11 3rd Phase Trial Completed

Report 09/ 2006

WP5D12 Conclusions and Trials report

Report 09/ 2006

Page 7: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 7

Overview: Manpower allocation

WP5 Partners and role (WPL; TL) Effort allocation (PM)

Alcatel Bell (TL WP5A5) 84

Anadrome 6

Belgacom (TL WP5A4) 25

Elisa 22

France Telecom (TL WP5A3) 13

KU Leuven 12

Nokia 12

Telefonica I+D (TL WP5A2) 39

Telvent 16

Thomson R&D 18

Visonic 20

Page 8: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 8

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 9: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 9

A1: Main goals and tasks

Main objective: detailed plan describing the different lab and field trials.

Decide the test sites to be included.

Scheduled for first 8 month of the project, until the first iteration of the project begins.

Coordinate with other WP.

Task Leader: ???

Page 10: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 10

A1: Deliverables and contributors

The deliverable related to this activity is: WP5D1 Trial Execution plan (01/2005).

Contributors to this activity are: The different test site contributors:

Belgacom Elisa France Telecom Telefónica I+D...

Services and platform developers: Alcatel, Visonic, Telvent... WP1 main partner (particularly those involved in the trial support

activity).

Page 11: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 11

A1: First steps

Decide the test sites and trials to be done.

Define and plan the different trials and test sites Services to be included in each (with WP1, WP3). Size and resources to be included. Scheduling. Platform integration calendar. Testing calendar.

Coordinate with the rest of WP

Page 12: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 12

A1: Belgacom trials

Field trial focused on: community communications. virtual interactive communities.

Demonstrator showing the possibilities of service aggregation platform.

Experiments with new connected home/family services will be carried out

Third parties could be also included.

Trial planned using a VDSL pilot network and/or an ADSL access network with capacity up 3 Mb/s. Between 20-30 customers

Page 13: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 13

A1: Elisa trials

Multi-device multimedia community applications as well as home network management and equipment.

Trial planned on ADSL and/or IP-enabled Cable-TV network in combination with wireless solutions.

Elisa test bed and service trial environment. Elisa Research laboratory and trial environment. Access to other test beds (Test Bed Finland initiative). Access to public networks.

Between 10-20 customers. Coordinated with the test-bed Finland initiative.

Page 14: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 14

A1: France Telecom test site

Home demonstration area situated in Lannion premises. Install all home services and to check their interoperability

(technical and usage). Features:

Telemetry platform able to provide security (alarm management) and comfort (device control and home watching).

OSGi technology enabled on residential gateway. Multimedia gateway.

Page 15: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 15

A1: Telefónica I+D test site

Install and operate the service aggregator in its facilities.

Test lab to check the platform and services of this project, including aspects as interconnectivity and interoperation.

Demostrator facility: The digital home for user experiences Emulates a small flat composed of different ambiances. Residential gateway (OSGi compliant). Combination of fixed and wireless technologies as network

infrastructure.

Page 16: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 16

A1: Budget for equipment

Equipment (trials & test-bed) required

2004 2005 2006 Total

Belgacom 32.000,00 € 22.000,00 € 54.000,00€

France Telecom 10.000,00 € 5.000,00 €

15.000,00€

Telefónica I+D 14.000,00 € 16.000,00 € 30.000,00€

Page 17: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 17

A1: Platforms and equipment

Alcatel platforms: HIPP-controller managing the residential gateway and

networking elements. Open Media Suite application platform for hosting and managing

the multimedia application layer (???)

Visonic Residential Gateway Platform that will function as a Services Gateways platform at home.

New two-phase strategy.

Telvent equipment: Gateway operator application, several services, residential

gateways, a set of home networks and appliances. New test Site (???)

Page 18: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 18

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 19: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 19

A2: Main goals and tasks

Proof of concept of the deployment of the services and applications, providing technical feedback to WP2, WP3 and WP4.

Adapt the bouquet of services to the different needs of the different sites.

Done in simulated environments and labs, to validate the services and management platforms.

The interconnection of the different labs will be set up to build the integrated trial.

Task Leader: Telefónica I+D

Page 20: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 20

A2: Deliverables and milestones

No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report.

Milestones, regarding the end of each of the services iterations :

WP5M2 1st Phase Integration Completed: 01/2005 WP5M5 2nd Phase Integration Completed: 06/2005 WP5M8 3rd Phase Integration Completed: 01/2006 WP5M9 Integrated Trial and Test Report: 04/2006

Page 21: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 21

A2: Contributors and first steps

Contributors to this activity are: The different test site contributors:

Belgacom Elisa France Telecom Telefónica I+D...

Services and platform developers: Alcatel, Visonic, Nokia, Thompson R&D, Telvent...

First activities: Set up the testing sites for the platforms and services (proof of

concept and demos). Elaborate a testing plan for the different sites.

Page 22: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 22

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 23: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 23

A3: Main goals and tasks

Implementation of user testing sessions. Adaptation to the country. Different services and platforms to be tested.

Provide feedback to the other WPs about user reactions.

Inclusion of real users.

Major topics to be addressed: Application usability. Community aspects. Interconnection of service, platforms and trial interoperability.

Task Leader: France Telecom.

Page 24: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 24

A3: Deliverables and milestones

No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report.

Milestones, regarding the end of each of the services iterations :

WP5M3 1st Phase User Testing Session Results: 03/2005 WP5M6 2nd Phase User Testing Session Results: 10/2005 WP5M10 3rd Phase User Testing Session Results: 07/2006

Page 25: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 25

A3: Contributors and first steps

Contributors to this activity are: The different site contributors, where user sessions are planned:

Belgacom France Telecom Telefónica I+D Telvent (???)

First activities: Elaborate a method to gather the feedback from users for the

different sites. Set up the process to choose the users that will take part in the

sessions. Set up the demonstrators and enable services and platforms.

Page 26: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 26

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 27: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 27

A4: Main goals and tasks

Implementation of field trials in different European countries. Deploying the relevant applications and service bundles.

Provide feedback to the other WPs, compiling the results of the trials.

Evolve their existing pilot and trial network infrastructures for establishing a pan-European service laboratory

Performing relevant infrastructure upgrades. Providing coordination or interconnection between trials site. Connecting and/or upgrading live customer base.

Task Leader: Belgacom.

Page 28: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 28

A4: Deliverables and milestones

The deliverable, WP5D12, Conclusion of Trials report, is due on this task. (09/2006)

All other tasks in WP5 will also contribute to the document.

Milestones, regarding the end of each of the services iterations :

WP5M4 1st Phase Trial Completed: 05/2005 WP5M7 2nd Phase Trial Completed: 12/2005 WP5M11 3rd Phase Trial Completed: 09/2006

Page 29: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 29

A4: Contributors and first steps

Contributors to this activity are: The different site contributors, where field trials are planned:

Belgacom Elisa

First activities: Elaborate a method to gather the feedback from users for the

different sites. Set up the process to modify the current trials, in order to

integrate Encompas with existing infrastructure. Set up the infrastructures and enable services and platforms.

Page 30: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 30

Index

Overview

A1: Trial and European Lab Planning

A2: Integration Tests

A3: User Testing Sessions

A4: (Field) Trial Deployment

A5: (Operational) Trial Support

1

2

3

4

5

6

Page 31: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 31

A5: Main goals and tasks

Implement the required customer and technical support needed to run a successful lab and field trial operations.

Underlying infrastructure. Demonstrators. Service laboratory.

Main focuses: Customer care centre function Technical operations support Systems engineering support

Task Leader: Alcatel.

Page 32: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 32

A5: Deliverables and contributors

No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report.

Contributors to this activity are: Platform developers

Server side: Alcatel, Telefónica I+D. RG side: Telvent, Thompson R&D, Visonic

Services developers TV centered: Alcatel, Androme, K.U. Leuven Home security, monitoring: Elisa, France Telecom, Telvent AV community applications: Alcatel, Elisa, Nokia.

Page 33: Demonstrators and Pan-European Services Laboratory WP5 session.

Código 00/00 33

A5: First steps

Identify the persons who will be responsible for offering the support (regarding the different components).

Form the different supporting groups, which should be coordinated with the other tasks.

Set the support process to be ready before the beginning of the A2, A3 and A4 tasks within this WP.

Page 34: Demonstrators and Pan-European Services Laboratory WP5 session.