Activities of the Environmental Education Workshop (in the Demonstration and Training
Center)
February 18- March 2
Activities Included:
• A meeting between the Alberto Melgar Rada Program and Mano a Mano International
• In this meeting, modules on specific technical skill formation were solidified
• There will be teachings on conserving natural resources and alternative energy sources
Modules 1 and 2: Ecology and Solid Waste Management
• Module 1 began on February 20• 23 individuals participated• Module 2 began with a construction of a dry
bathroom • The 23 participants assisted in the construction • Participants will continue to help with projects
for the next few months (March-July 2013) to learn and develop different practical skills.
The students learning about the food chain
Our students’ first visit to the site
Students break into two groups for the activities
Group Activities
• When planning activities, we take the students into account and adapt the process to the needs of the students.
Measuring and digging holes
Group 1: The 2nd semishade
Placing and emptying the bobbins
Placing the stakes for the tension wire
The structure is ready for the tension wire
Extending the tension wire
Measuring and cutting of the mesh
With the presence and help of the students at their first and second visits, we proceeded with the following:
Students help sew the mesh
Students work together to tension and finish sewing the mesh
Defining the location and measuring for the bathroom
Group 2: The Bathroom
Students measure and mark the terrain
Clearing the terrain for the bathroom (students did not participate)
Students help transport supplies to the site.
Pedro, one of the workers, shows students how to construct adobe bricks
Pablo explains the specifications for constructing the stalls
Construction of the bathroom stalls
Students help in the construction of the stalls
Measuring and cutting the steel reinforcements for the bathroom
Construction of the perimeter wall
Other Activities
Fabrication of the adobe for the bathroom
Planting fennel bulbs, leaf lettuce, turnips radishes, parsley, beets, etc. in the second block in the open field
Our students are excited to be able to complete real, practical projects.