1
Demo & Grading Pilings Form & Pour Pile Caps/Grade Beams Form & Pour 1st Flr/Columns/Walls Form & Pour 2nd Flr/Columns/Walls Form & Pour 3rd Flr/Columns/Walls Form & Pour Roof (Dry In) Bldg Specialties & Finishes Receive & Set Equipment Process Piping Process Electrical Instrumentation Checkout & Turnover Line 1 Line 2 Line 3 Planned vs Actual Critical Path 1994 1997 Demo & Grading Pilings Form & Pour Pile Caps/Grade Beams Form & Pour 1st Flr Form & Pour 2nd Flr Form & Pour 3rd Flr Form & Pour Roof (Dry In) 1995 Planned Duration Actual Duration Piling Delay Causes Acceleration Delay Acceleration 1/3/96 “Dry In ON TIME
-
Upload
freya-patrick -
Category
Documents
-
view
9 -
download
0
description
1995. Demo & Grading. Demo & Grading. Pilings. Pilings. Form & Pour Pile Caps/Grade Beams. Form & Pour Pile Caps/Grade Beams. Form & Pour 1st Flr/Columns/Walls. Form & Pour 1st Flr. Form & Pour 2nd Flr/Columns/Walls. Form & Pour 2nd Flr. Form & Pour 3rd Flr/Columns/Walls. - PowerPoint PPT Presentation
Transcript of Demo & Grading
Demo & Grading
Pilings
Form & Pour Pile Caps/Grade Beams
Form & Pour 1st Flr/Columns/Walls
Form & Pour 2nd Flr/Columns/Walls
Form & Pour 3rd Flr/Columns/Walls
Form & Pour Roof (Dry In)
Bldg Specialties & Finishes
Receive & Set Equipment
Process Piping
Process Electrical
Instrumentation
Checkout & Turnover Line 1
Line 2
Line 3
Planned vs Actual Critical Path1994 1995 1996 1997
Demo & Grading
Pilings
Form & Pour Pile Caps/Grade Beams
Form & Pour 1st Flr
Form & Pour 2nd Flr
Form & Pour 3rd Flr
Form & Pour Roof (Dry In)
1995
Planned Duration
Actual Duration
Piling Delay Causes
Acceleration
DelayAcceleration 1/3/96 “Dry In”
ON TIME