Demand Response Task Force
February 2008 Update
Bridge Solution
Short Term Only:• Use as “bridge” to long term solution
Standardize Energy Impacts:• Utilize “deemed” impacts
Standardize Payments:• Participating CRs get a credit for that day
based on “deemed” impacts
Bridge Solution (cont.) Limited Program Participation:
• 10000 ESIIDs per participating CR
• Total Market Load limit of 100 MW
Limited Number of Events:• CRs limited to calling 1 DR Day per month
• Only 1 DR Day per week
Registration & Verification:• Participating CRs file attestations with ERCOT
Programs & Deemed Impacts
Program #
Program DescriptionDeemed Load Reduction
1 Residential, Single Family, AC, 33% Cycling* 1.0 kW
2Residential, Single Family, Pool Pump, 100% Cycling
0.33 kW
3 Residential, Multifamily, AC, 33% Cycling 0.65 kW
4Residential, Single Family, Electric Water Heater, 100% Cycling
0.35 kW
Process Overview
Step 1: CR calls ERCOT Client Relations to initiate DR Day• Must call by 4:00 PM the day before
Step 2: ERCOT notices the market via ERCOT. com and email• A new distribution list will be created
Step 3: CRs conduct DR events on DR day
Process Overview
Step 4: CRs provide ERCOT with lists of participating ESI IDS via MarkeTrak• Includes DUNS, ESI IDs, Program ID and
Intervals load was curtailed
Step 5: ERCOT validates list of ESI IDs to verify Rep of Record• Communicates discrepancies via MarkeTrak
Process Overview
Step 6: ERCOT calculates preliminary Deem Load Reduction• Provides spreadsheets to participating CRs
Step 7: ERCOT performs calculations during Final settlements process
Next Steps for Demand Response
Short Term Solution• COPGMRR filed as urgent and up for vote
this month
• PRR will be filed as urgent after COPS and RMS review
Interim Solution• PUCT Staff has asked that the Advanced
Metering Implementation Team be allowed to address