Demand Response Registration User Guide
Version 4.9
October 28, 2020
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
2 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Table of Contents
1 INTRODUCTION ................................................................................................................................................................................................................... 5
1.1 Purpose ................................................................................................................................................................................................................................ 5 1.2 Content and Organization .................................................................................................................................................................................................... 6 1.3 Application Access ............................................................................................................................................................................................................ 12 1.4 DRRS Automated Email Notification ............................................................................................................................................................................... 15 1.5 DRRS User Roles .............................................................................................................................................................................................................. 16
2 DRRS FUNCTIONALITY OVERVIEW............................................................................................................................................................................ 17
2.1 Locations ........................................................................................................................................................................................................................... 17 2.2 Registrations ...................................................................................................................................................................................................................... 18 2.3 Application Layout ............................................................................................................................................................................................................ 19
2.3.1.1 Role-based tab views ................................................................................................................................................................................. 19
2.3.1.2 Column Headers.......................................................................................................................................................................................... 22
2.3.1.3 Sorting and Filtering Locations and Registrations ............................................................................................................................ 24
2.4 Actions .............................................................................................................................................................................................................................. 25 2.4.1.1 DRP Actions ................................................................................................................................................................................................. 25
2.4.1.2 UDC and LSE Actions ................................................................................................................................................................................ 36
2.5 Location and Registration Status Lifecycle ....................................................................................................................................................................... 37 2.5.1.1 Location Status Lifecycle Process Flow............................................................................................................................................... 41
2.5.1.2 Registration Status Lifecycle Process Flow ........................................................................................................................................ 42
3 CREATING AND REGISTERING LOCATIONS AND RESOURCE: .......................................................................................................................... 43
3.1 Create a Location ............................................................................................................................................................................................................... 44 3.1.1 Edit ........................................................................................................................................................................................................................... 48
3.1.2 Copy ......................................................................................................................................................................................................................... 58
3.1.3 Delete ....................................................................................................................................................................................................................... 60
3.1.4 Duplication Check .................................................................................................................................................................................................... 61
3.1.5 Defend ...................................................................................................................................................................................................................... 62
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
3 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1.6 Withdraw .................................................................................................................................................................................................................. 68
3.1.7 End Date ................................................................................................................................................................................................................... 70
3.2 Location Review ................................................................................................................................................................................................................ 72 3.2.1 LSE Review .............................................................................................................................................................................................................. 72
3.2.2 UDC Review ............................................................................................................................................................................................................ 75
3.2.3 Invalid Review Disputed Location ........................................................................................................................................................................... 79
3.2.4 LSE/UDC Review notification ................................................................................................................................................................................. 82
3.2.5 Application Programming Interface (API) Location Management .......................................................................................................................... 83
3.3 Creating a Registration ...................................................................................................................................................................................................... 84
4 REGISTRATION MANAGEMENT ................................................................................................................................................................................... 98
4.1 DRRS User Interface (UI) Registration Management ....................................................................................................................................................... 98 4.1.1 Edit ........................................................................................................................................................................................................................... 99
4.1.2 Copy ....................................................................................................................................................................................................................... 101
4.1.3 Terminate ............................................................................................................................................................................................................... 102
4.1.4 Delete ..................................................................................................................................................................................................................... 104
4.2 Application Programming Interface (API) Registration and Resource Management ...................................................................................................... 106
5 HELPFUL LINKS .............................................................................................................................................................................................................. 107
6 REVISION HISTORY ........................................................................................................................................................................................................ 111
APPENDIX A – THREE (3) POSSIBLE CASES OF DEFEND PROCESS ............................................................................................................................. 116
APPENDIX B – EDITABLE FIELD(S) BY LOCATIONS STATUS ........................................................................................................................................ 120
APPENDIX C - CUSTOMER MARKET RESULTS INTERFACE (CMRI) .......................................................................................................................... 124
Viewing Total Expected Energy (TEE) ....................................................................................................................................................................................... 124
APPENDIX D – TIPS FOR CREATING REGISTRATIONS BY BASELINE METHOD TABLE ...................................................................................... 126
APPENDIX E- DRRS LOCATION DEVICE TYPE BUSINESS RULES AND BASELINE METHOD REFERENCE MATRIX ................................... 128
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
4 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
APPENDIX F– EXAMPLE OF CREATING A REGISTRATION USING CONTROL GROUP BASELINE METHOD................................................. 133
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
5 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
1 Introduction
1.1 Purpose
The Demand Response Registration System (DRRS) is the application developed to enable wholesale market participation by end-use customers, referred to as locations, under the PDR and RDRR participation models. The DRRS application facilitates the registration process which identifies the end-use customers providing load curtailment in response to a CAISO PDR/RDRR dispatch instruction. The system also performs a series of process controls including data validation, duplication check and review process by LSEs and UDCs, to ensure the uniquely identified end-use customer is being registered appropriately and not participating in overlapping registrations or retail programs. The DRRS application provides a robust User Interface (UI) and Application Program Interface (API) to facilitate a streamlined registration process for all DRRS user roles. This includes an API for uploading bulk location data to accommodate the input of volumes of locations participating, in aggregate, as PDR/RDRRs. Additional DRRS APIs are provided for the creation, modification, review and termination of locations and their registrations. Business process will not be covered in this User Guide, please refer to Business Practice Manual (BPM) for Demand Response.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
6 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
1.2 Content and Organization
The purpose of the guide is to instruct users how to use the features of the Demand Response Registration System (DRRS) User Interface. This guide describes the DRRS application layout, as well as the steps for creating Locations and Registration. Other applications that may be applicable, and utilized by Scheduling Coordinator who participates in Demand Response will not be discussed in this User Guide, please refer to its respective manuals/documentations. All Technical documentations are located on the CAISO website at: http://www.caiso.com/participate/Pages/ApplicationAccess/Default.aspx
Market Results Interface – Settlements (MRI-S) application access is required to submit performance and load values to MRI-S by the Scheduling Coordinator (SC).
Master File User Interface – This application is used to submit RDT updates, and maybe be used to generate reports such as:
o Generator RDT Report o Use Limit Plan (ULPDT) Report o Resources with Approved Changes
The Customer Interface for Resource Adequacy (CIRA) application is used to manage ISO’s resource adequacy needs by the Scheduling Coordinator. This application allows the SC to submit their Net Qualifying Capacity (NQC), annual and monthly Supply and Resource Adequacy (RA) Plans. This application also provides the capability for a SC and a LSE to provide generic and flexible RA capacity information to the ISO using their Supply and RA Plans.
Customer Market Results Interface (CMRI) – This Application may be used to generate the following reports. Appendix D provide screenshots of viewing binding schedules and awards for Demand Response.
o Total Expected Energy (TEE)
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
7 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
o Real-time Unit Commitment (RTUC) o Fifteen Minute Market (FMM).
Scheduling Infrastructure and Business Rules (SIBR) – SIBR provides a SC interface to submit Bids and Inter-SC Trades (IST). For Demand Response, SIBR will utilize the bid dispatchable options registered in the Master File.
Automated Dispatch System (ADS) - ADS user interface displays commitment instructions, energy instructions, and ancillary services awards from the real-time market application. The energy instructions displays 5 minute dispatch operating target (DOT) for Demand Response.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
8 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Definitions The following defined terms and acronyms are used throughout this document:
Terms Definition
AARF Application Access Request Form – method used to provision access to users of the DRS
Address information The physical address of the location.
ADS Automated Dispatch System
AIM
Access Identity Management (AIM) application. The application provides registered UAAs with the ability
to view application-level access for all of their organization’s users as well as any users from other
organizations who have access to their resources (endorsed users).
AIMS Access and Identity Management System – application used to provision access to users of the DRRS
API Application User Interface. Allows users to upload bulk location data to accommodate the input of the
volume of locations participating in the Demand Response Program.
BTM
Behind-the-meter (BTM) refers to a connected device that is ‘behind’ the user’s utility service
meter from the perspective of the utility. Therefore, the BTM connected device is considered a
retail consumer of electricity.
Custom Resource ID A unique resource ID requested by the DRP, modeled with their specified nodal locations and associated
generation distribution factors (GDF).
Customer The name of the customer that user assigned during the registration process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
9 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Device Type The physical device that is installed at the service account location. This can either be Energy Storage,
Electric Vehicle Supply Equipment or both.
DLA Resource The DLAP in which the Locations of the Registration resides.
DLAP Default Load Adjustment Point
DRP Demand Response Provider
DRP SC Demand Response Provider Scheduling Coordinator who are responsible for submitting bids into the market
and meter data to the MRI-S.
DRRS Demand Response Registration System. Allows users to create large volumes of locations and aggregate
locations for participation in the ISO’s demand response program.
DRRS UI Demand Response Registration System User Interface
End Date End date of registration. The end date when the Registration will become inactive.
Endorsed User Individual(s) outside of the company that is requesting for application access.
ES
Energy Storage. The ES is used for identifying location that has a behind-the-meter generator or
energy storage device. Energy storage technologies capable of charging energy from an external
source and discharging this energy at a later time, after some amount of the initial energy is lost.
EVSE Electric Vehicle Supply Equipment
Load Reduction The total Load Reduction capacity per location.
Location name Identifies the location/site for the user.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
10 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Locations Physical location of the demand response entity. This includes the customer data such as the service
account number, physical service location, and curtailable load amounts.
LSE Load Serving Entity
New Custom PDR CAISO will develop a new resource ID for this registration (custom).
PDR Proxy Demand Resource
PDR-LSR Proxy Demand Resource – Load Shift Resource. An enhancement of the PDR participation model that
facilitates participation of both curtailment and consumption of load.
Pnode Pricing Node - A single network Node or subset of network Nodes where a physical injection or withdrawal
is modeled and for which a Locational Marginal Price is calculated and used for financial settlements.
POC Point of Contact now referred to as UAA.
Pre-Defined Resource ID A pre-established resource ID pre-modeled in each SubLAP based on CAISO specifications and available in
the MasterFile for DRP to request assignment to a registration.
RDRR Reliability Demand Response Resource
RegID The registration ID number assigned to the registration by the Demand Response System; this ID is
assigned by the DRRS in sequential order.
Registration
Comprised of a single location or an aggregation of many locations. Submitted by the DRP to the LSE and
UDC for review and CAISO for approval. Meter data is also submitted at the registration level for the
baseline calculation prior to the market participation.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
11 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Resource ID
A unique ID used for participation in the ISO wholesale markets (scheduling/bidding and settlements).
Assigned by the CAISO during the registration process in the Demand Response Registration System.
Resource specific information for the ID resides in the ISO Master File.
SAN Service Account Number. Unique number assigned to a location by the UDC. Dashes or any other special
characters are not allowed for the location SAN.
Start Date Start date of the registration (cannot overlap with existing registration for the same location).
SubLAP One of the 23 SubLAP locations of CAISO. The SubLAP in which all the locations within the registration
reside.
UAA User Access Administrator formerly known as the POC.
UDC Utility Distribution Company. The UDC in which the Locations in the Registration reside and is part of the
approval process.
UDC Account # This is the account number a DRP receives from a UDC for billing.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
12 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
1.3 Application Access
This user guide will address the Demand Response Registration System (DRRS) application. DRRS access is required for a DRP to submit locations, registration, and resource management processes in order to establish a PDR/RDRR resource ID for market participation. DRRS access is required for LSEs and UDCs to manage the review process of locations submitted by the DRP. Access to DRRS can be obtained through the organization’s User Access Administrator (UAA) via the Access Identity Management (AIM) application. The UAA is the designated User Access Administrator for the organization that is managing their user’s application access. More information on how to become a UAA can be found at http://www.caiso.com/participate/Pages/UserAccessAdministratorGuide/Default.aspx The AIM User Interface (UI) is an application that provides registered UAA with the ability to view application-level access for all of their organization’s users as well as any users from other organizations who have access to their resources (Endorsed users). More information can be found at http://www.caiso.com/Documents/AccessandIdentityManagement_AIM_UserGuide.pdf The AARF (Application Access Request Form) is no longer used by the UAAs to submit application access. All access request shall be performed through the AIM UI application. To request DRRS application access, the following shall occur:
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
13 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
In AIM, for existing using user within the organization, the UAA shall: o Go to the Access Request tab o Click on the pencil icon o Click on the New Row button o Type in a brief description o Click Update o Go to the Select Users tab o Select the user from the Available Users column and click Add to move them over to the Selected Users
column on the right side o Go to the Select Application and Roles tab o Select the appropriate roles from the Available Applications/Roles column.
For the DRP role, select EXTERNAL DRP For the LSE role, select EXTERNAL LSE For the UDC role, select EXTERNAL UDC
o Be sure to update the applicable Action, Application, Role, Environment, and Entity o Click Update to save the roles. o Next, click the green Preview button, which will open a submission window o Click Submit to finalize the request.
In the order to provision user for the “EXTERNAL LSE” or EXTERNAL UDC” role for DRRS in AIM, the UAA must have the following contract types in the AIM profile.
o DR LSE (Demand Response Load Serving Entity) o DR UDC (Demand Response Utility Distribution Company)
If the UAA does not have this contract type, they will need to submit a new UAA Agreement form to add these contract type into their UAA profile.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
14 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Below is a screenshot of the contract type from the UAA Agreement form. Please check the Demand response box and list the LSE and or UDC ID in the corresponding field.
Submit a request for both the production and market simulation/map stage environments is recommended.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
15 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
1.4 DRRS Automated Email Notification
The DRP shall send contact information to [email protected]. A common email distribution list is required. The Contact(s) will receive automated email notifications from DRRS of Location and/or Registration status change and when the defense process has been initiated for an existing location, in an active or inactive status, that need the incumbent DRP’s attention.
First Name Last Name Common Email
Address (this is a
group email
distribution list will
be used for DRRS
email notifications)
USER_IDs
(from AIM)
Email Address Org. Name DRP ID
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
16 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
1.5 DRRS User Roles
There are three types of user roles for this application.
User Role Entity
Read
Access
Only
Read
Write
Access
Brief Description of the entity (DRP, LSE,
UDC, ISO)
APP_DRRS_DRP_EXT DRP X
DRP can create, modify and end-date
locations and create, modify and terminate
registrations.
APP_DRRS_UDC_EXT UDC X
UDC can review and submit comment(s) on
location info and view registrations
containing those locations
APP_DRRS_LSE_EXT LSE X
LSE can review and submit comment(s) on
location info and view registrations
containing those locations.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
17 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2 DRRS Functionality Overview
In DRRS, there are two functionality tabs: (1) Locations, (2) Registrations 1. Location tab – Allows the DRP to Create, Copy, Delete, Defend, Withdraw, Edit, End Date and Register locations.
The UDC and LSE can review locations and registrations in which associated locations are assigned.
2. Registration tab – Allows the DRP to Create, Edit, Copy, Terminate, and Delete registrations. The UDC and LSE can view registrations and location(s) associated to the registration.
2.1 Locations
Require effective dates (Start Date and End Date) which provides flexibility in creating and processing registrations. (see example in figure 1 below)
Start Date and End Dates cannot be prior dates.
Can be created individually via UI or in bulk using web service API.
Cannot be added or removed from a Confirmed registration.
Once submitted, can be end-dated or edited, but not deleted.
Provides DRP control in their use in creating registrations
The green line allows for locations to move in and out of registrations without additional UDC or LSE review. The
red arrows for locations indicate that locations requires re-review by the UDC and LSE.
Figure 1
Location effective date
Effective date change (allowed with no review)
Extending end date (requires re-review)
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
18 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.2 Registrations
Effective dates are validated against location effective dates.
Multiple registrations can be created within location effective dates (see example in figure 2 below)
Can be created using web service API or UI.
Can be created when reviewed locations are available. o Includes location validations that may result in processing errors (i.e. location being used in another
registration during effective dates)
May be affected by edits made to location attributes.
Once confirmed, can be terminated but not deleted.
Effective dates determine associated Resource effective dates.
One Registration to one Resource relationship (1:1) maintained
Figure 2
R1 (allowed)
R2 (allowed)
R3 (not allowed)
R4 (not allowed)
Location effective data
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
19 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.3 Application Layout
2.3.1.1 Role-based tab views
In DRRS, there are three (3) different role-based tab views. The views that are accessible to the users will be determined by the
number of roles provisioned on the digital CMA certificate.
1. DRP View – This tab will be visible to users that log in with the DRP role. Users can have multiple views if the users have multiple roles.
2. UDC View – This tab will be visible to users that log in with the UDC role. 3. LSE View – This tab will be visible to users that log in with the LSE role.
To access the Location or Registration functionality, users can place their cursor over the applicable tab(s) (DRP VIEW, UDC VIEW or LSE VIEW). The Locations and Registration screens are accessible under the corresponding views.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
20 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRP VIEW, UDC VIEW or LSE VIEW selection shows all the locations/ assigned to that entities ID or filtered view showing a subset of that entities locations. Example: LSE VIEW Locations
LTEST
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
21 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Additionally, DRP VIEW, UDC VIEW or LSE VIEW will show all registrations comprised of locations assigned to that entities ID or filtered view showing a subset of locations Example: LSE VIEW Registrations
LTEST
541021 Test DTEST UTEST LTEST SLAP_TEST
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
22 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.3.1.2 Column Headers
In the Locations tab, users can choose what columns they would like visible at any time. These options include: Loc Id, Loc Name, SAN, DRP ID, UDC ID, LSE ID, SUBLAP, PNODE, Start Date, End Date, Status, Updated By and Updated Date.
In the Registrations tab, users can choose what columns they would like visible at any time. These options include: Reg Id, Reg Name, DRP ID, UDC ID, LSE ID, SUBLAP, DLAP, DRP SC, Resource Id, Resource Type, Program, Baseline Method, Start Date, End Date, Status, Updated By and Updated Date.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
23 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Note: The system will display blank under the LSE and DLAP columns for registration with a start date of 11/13/2019 and forward. Search Parameters Locations: Allows users to search using any of the available following criteria: (1) LOC ID, (2) LOC Name (3) SAN, (4) DRP (5) UDC, (6) LSE, (7) SUBLAP.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
24 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Registrations: Allows users to search using the following criteria: (1) Reg ID, (2) Reg Name (3) DRP ID (4) UDC ID, (5) LSE ID, (6) SUBLAP.
2.3.1.3 Sorting and Filtering Locations and Registrations Sorting from ascending to descending by clicking on any of the column headers.
Multiple column headers can be sorted either ascending or descending.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
25 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Users can also use the inline filtering option . . The inline filter works as a toggle. Click the icon to filter data based on the content of a particular column. Press Enter after inputting the filter criteria. Please note that wildcard symbols can be used in this column, but are not necessary.
2.4 Actions
In DRRS, the action buttons are role-based. Actions provided are determined by the role provisioned for the user. 2.4.1.1 DRP Actions
Locations: Create, Copy, Delete, Defend, Withdraw, Edit, End Date, Register
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
26 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Registrations: Create. Edit, Copy, Terminate, Delete
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
27 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Under the DRP action, the Create button is used when a location is being created for the first time. When DRP selects the Create button, the “Create New Location” view will appear as shown in the figure below. All required fields will be designated with an asterisk.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
28 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRP Copy provides the user the ability to copy a previously created location. The user must first select the location to be copied then the Copy button. The copied location information will be presented and all fields will be editable. This action is provided for cases where the user is creating multiple locations with the same key fields, reducing the effort in having to create each independently.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
29 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
30 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRP DELETE action is usable when a location has been previously created. DELETE is only actionable for certain location statuses.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
31 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRP Defend is actionable by a DRP that has been notified by another DRP, referred to as the prospective DRP, that the defense process has been initiated for an existing location, in an active or inactive status, of theirs. To defend a location, the DRP for the existing location, referred to as the incumbent DRP, must first select the location then the Defend button.
The incumbent DRP will then have an opportunity to respond to the comments submitted by the prospective DRP. In the defend locations screen, the incumbent DRP has the ability to either accept or reject the Defend request. DRP Withdraw action is usable when a location has been previously created and submitted for review but not completed the review process. To withdraw a location, the user must first select the location then the Withdraw button. The DRP will be required to provide contact information prior to submitting the location to the defend process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
32 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
33 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRP Edit action is usable when a location has been previously created. To edit a location, the user must first select the location then the Edit button. The location information will be presented to the user with available fields that are editable. Editable fields will be dependent on the locations status.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
34 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
35 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRP End Date action is actionable only under certain location statuses. NOTE: ending a location may impact the effective
dates of a registration. To End Date a location, the user must first select the location then the End Date button. The DRP
will be required to confirm that they want to End Date the location prior to it being processed. Using the End Date action
does not allow the DRP to select an end date but the end date will correspond with the date that the action was taken.
The DRP must use the Edit action to End Date a location for a different date.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
36 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.4.1.2 UDC and LSE Actions
Locations: Review
Registrations: View Location
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
37 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.5 Location and Registration Status Lifecycle
DRRS Status
Location Registration
1. New
2. Processing
3. Pending
4. Inactive
5. Active
6. Withdrawn
7. End-Dated
8. Duplicate
9. Disputed
1. New
2. Pending
3. Confirmed
4. Terminated
DRRS Statuses Description
Location
New Location will be set to this status when it is created and saved
but not yet submitted for review.
Processing Location will be set to this status while being validated when it
is submitted for review.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
38 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Pending
Location will be set to this status when it is submitted for review
and validation has successfully completed. This status indicated
that the review process has been initiated for the location.
Inactive
Location will be set to this status when it has successfully
completed the review process but is not part of a registration that
is in a ‘pending” or “confirmed” status.
Active Location will be set to this status when it is part of a registration
that is in a “pending” or “confirmed” status.
Withdrawn Location will be set to this status when it is Withdrawn while in
the pending, duplicate or disputed statuses.
Duplicate
Location will be set to this status when, during the submittal
validation, the location SAN for the same UDC is found to be
used by another DRP.
Disputed
Location will be set to this status when it has NOT successfully
completed the LSE/UDC review process. Review process has
resulted in invalidation findings.
End Dated
Location will be set to this status when the effective end date of
the location is prior to the current date. End dated locations are
logically equivalent to deleted records.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
39 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Registration
New Registration will be set to this status when it has been created
but NOT yet submitted.
Pending Registration will be set to this status when it has been submitted
and validation is in progress.
Confirmed Registration will be set to this status when it has been submitted
and validation has successfully completed.
Terminated
Registration will be set to this status when the effective end date
of the registration is prior to the current date. End dated
registrations are logically equivalent to deleted records.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
40 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Registration
Status Registration
Status Description
Fields that can be edited
New Created but NOT
yet submitted. All fields
Pending
Submitted and
validation is in
progress
Edit option not available,
can only Terminate
Confirmed
Submitted and
validation has
successfully
completed
Name, Start Date, End Date
and Resource (if applicable)
Terminated
Effective end date
of the registration
is prior to the
current date. End
dated registrations
are logically
equivalent to
deleted records.
Cannot be Edited, will
receive an error message if
attempted through UI or
rejected if submitted with
API
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
41 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.5.1.1 Location Status Lifecycle Process Flow1
1 Draft as of 8/1/2016, updates in process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
42 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2.5.1.2 Registration Status Lifecycle Process Flow2
2 Draft as of 9/24/2018, updates in process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
43 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3 Creating and Registering Locations and Resource:
For the DRP/SC, the DRRS facilitates three registration process components: manage locations, manage registrations, and manage resources. After the DRP receives approvals for Baseline methodologies, the process begins with creating the location(s) information into the DRRS, the LSE/UDC reviews and approves the location(s), DRP/SC creates registrations from one or many reviewed locations, registration is in “Confirmed” status, and the DRP/SC submits Generator Resource Data Template (GRDT) to be added to Master File.
For the UDC and the LSE, the DRRS facilitates a review process as part of the DRP’s management of locations. Once the DRP submits a location for review, the DRRS will perform data validation including a duplication check for that location. If the data is valid then the UDC and LSE is notified that there is a location ready for review. The UDC and LSE have ten (10) business days to complete their review and either submit with or without findings. If the ten (10) business day elapses without a UDC or LSE acting on the review notification, the DRRS will auto approve the location.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
44 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1 Create a Location
The registration process builds from location to registration to resource management. The DRRS provides Location management which includes the creation of locations by the DRP, a duplication check by the DRRS and an LSE and UDC review of the location to validate its use by the DRP for the established effective dates. The DRRS provides a robust UI and API’s for the DRP(s), LSE(s) and UDC(s) use in performing their location management tasks. System generated email notifications are also generated as alerts to activities occurring that may require their attention.
DRRS User Interface (UI) Location Management
To Create a new location, DRP(s) will click on the Create button under their Locations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
45 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Next, enter the location information. The required fields are indicated by the asterisk (*) signs. Fill out all required fields and any optional fields as needed.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
46 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Name DRP chosen name of the designated location. SAN Service Account Number unique identifier of the location often assigned by the UDC. Start Date The Start Date cannot be a prior date or overlap with an existing Active location with same SAN and UDC assignment. End Date The End Date cannot be a prior date or overlap with an existing Active location with same SAN and UDC assignment. DRP Designated Demand Response Provider. UDC Designated Utility Distribution Company LSE Designated Load Serving Entity
SubLAP The SubLAP in which all the locations within the registration reside SubLAP are determined by the Start/End Dates. PNODE The Pnode at which the location load is modeled at. Required field if planning to use the location in a Registration
selecting a Custom Resource ID. Address, City State, Zip, Type The address of the location and type of location (e.g. commercial, residential) for DRP identification purposes Device Type
Specifies which device type is installed at the service account location. This field is optional. Please refer to Appendix E for Business Rules in DRRS by Baseline Method.
Valid inputs are:
Null/blank = Indicates the service account does not have any behind-the-meter device type installed (ie. ES, EVSE).
Energy Storage (ES) = Indicates that the location has a behind-the-meter generator or energy storage device installed.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
47 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Electric Vehicle Supply Equipment (EVSE) = Indicates that the service account has behind-the-meter EVSE installed.
ES and EVSE combination = Indicates that both ES and EVSE are installed at that location. To select ES and EVSE, use the mouse and click the left mouse button to select ES, hold down the mouse, move the cursor to EVSE and release the mouse.
Options within Create New Location include:
Cancel - cancels the creation of a location.
Save - creates a new location and location ID for it.
Submit - creates a new location and location ID for it and submits it to the UDC/LSE review process. Submits a
previously Saved and Edited location to the UDC/LSE review process Once the new location information has been saved or submitted, a new Location ID (LOC ID) will be generated. When saved, the locations Status will be displayed as New.
When submitted, the locations Status will be displayed as pending.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
48 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1.1 Edit New Location
To Edit a New location, DRP(s) must first select a location with a Status of New then click on the Edit button under their
Locations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
49 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
In the Edit location view, any changes can be made to the location without it having to be end dated. In this example, the LSEID and start date is changed and the location is updated by selecting the Update option.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
50 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
A message indicates that the Update was successful.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
51 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
The Update is reflected for that Location without a Loc ID change. This type of modification is not available once a location has been submitted for review.
Refer to Appendix B for Editable fields by Location status.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
52 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Pending Location A Pending Location has successfully completed the submittal validation and is in the LSE and UDC review. A location in the Pending status cannot be edited and if an attempt is made to Edit a Pending location an error message will be received. The Pending locations only allows for end dating of the location. The DRP must select the End Date and confirm that the selected location is to be End Dated.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
53 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Inactive Location An Inactive Location has successfully completed the LSE and UDC review process, but is not part of a registration that is in Pending or Confirmed status. Editing to Inactive locations is limited to the location name, start date, end date and address fields. All other fields (fields in gray) will be unavailable for modification and update.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
54 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Active Location An Active Location is part of a registration that is in Pending or Confirmed status. Editing of Active locations is limited to the location name and address fields. All other fields (in gray) will be unavailable for modification and update.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
55 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
If editing the Location end date that is currently in an “Active” status, the corresponding Registration, and the rest of the Location(s) that are also part of that Registration may be affected. The Location end date can only be contracted until the end date of the registration. System will allow user to edit Location within the Registration start and end date if the Registration start date is in the future. If the Location that are being ended is part of a Registration that contains more than one (1) Locations, the rest of the Locations will no longer be linked to that Registration once the Registration expired, and the Locations’ status will be changed from “Active” to “Inactive”. Example 1.
User end-date a location with an “Active” status.
Location End-Date is in the future and within the Registration period. REG ID#249719, Resource ID = RESA.
1. On 10/28/2019: USER1 created REG ID#249719, Resource ID = RESA for 11/15/2019 through 11/30/2021. REG ID#249719 contains more than 1 locations.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
56 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2. On 10/29/2019: USER1 “Edit” the Location ID #249716 End date from 12/31/2029 to 11/28/2019; which caused the Registration End date to change.
The system update the Registration End Date from 11/30/2021 to 11/28/2019 status is still in “Confirmed”.
3. On 11/29/2019, after the Registration expired. Registration status will change from “Confirmed” to “Terminated”, Location ID #249716 status will change from “Active” to “End Dated”, and Location ID #249718 status will change from “Active” to “Inactive”.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
57 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Example 2.
User end-dating a location with an “Active” status.
Location End-Date is in the future and earlier than the Registration period.
1. REG ID#249719 Resource ID = RESA registration is for 11/15/2019 through 11/30/2021. 2. The user end the LOCATION_ID = 123 to 11/14/2019, since the location end date is earlier than the corresponding
Registration; this will cause the Registration effective (in the future) to be deleted.
LOCATION_ID SAN
SUBLAP START_DATE END_DATE
UPDATED_BY
UPDT_DT_TM
Notes-
123 SAN1
SLAP_PGSI 11/17/2017 12/30/2029
8/23/2019 10:29 AM
Original record.
123 SAN1
SLAP_PGSI 11/17/2017 11/14/2019
User1
11/14/2019 11:19 AM
User “User1” made a location record to the end-date from 12/30/2029 to 11/14/2019; which caused the Registration effective (in the future) 11/15/2019 to be deleted.
REGISTRATION_ID SUBLAP RESOURCE_ID START_DATE END_DATE UPDT_DT_TM Notes-
249719 SLAP_PGSI RESA 11/15/2019 12/31/2019 11/14/2019
11:19 AM
System deleted this Registration per Location end-date update above
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
58 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
For Location that is under a defense process, user must not alter the registration record outside of the defense process. If so, undesirable results will occur such as overlapping registration records. Please see sections 3.1.5, and Appendix A for more information on how to handle the different cases. End Dated Location No changes are permitted for an End-Dated Location. Submissions to Edit an End-Date Location will be rejected. End-dated locations are logically equivalent to deleted records
3.1.2 Copy The Copy feature allows the DRP to create a new location by copying an existing location and making changes to the copied field information. Locations in any status may be copied. To Copy a location, the location is first selected then the
Copy button chosen under the Locations View.
The Copy option takes the user to the Create New Locations window and provides the same Options:
Cancel - Cancels the creation of a new location.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
59 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Save - Creates a new location with changes and location ID for it.
Submit - Creates a new location with changes and location ID for it and submits it to the LSE and UDC review process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
60 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1.3 Delete
The Delete feature allows the DRP to delete a new location. Locations can only be deleted when they are in the New
status. To Delete a location, the new location is first selected then the Delete button chosen under the Locations View.
Once Delete is selected, the Location to be deleted will be identified and a confirmation to delete is required by selecting
the Continue button.
A deleted Location and its created Location ID will no longer exist in the Locations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
61 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1.4 Duplication Check When a location is submitted for review, a duplication check is performed against other locations in the system. If the DRPID is the same as the submitting DRP, the system will reject the location and provide an error message. If the DRPID is different, the location will be created with a Duplicate status. Note: Location cannot be submitted and cannot enter the defend process until the duplicate location is in the active or inactive status.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
62 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1.5 Defend The Defend feature allows the DRP to defend a location that has been found to be a duplicate of another location in the inactive or active status having the same SAN, UDC and overlapping effective dates with another DRP (Incumbent). The location will be identified as a duplicate once it is submitted for approval. The system may also send a courtesy notification to the Incumbent DRP that their location needs to be defended for use by request of another DRP. Example of email notification sent to the Incumbent DRP to defend location ownership.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
63 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Prospective DRP action: The prospective DRP must include a contact name, number and comment if they chose to enter the defend process by
selecting the Continue button. Locations submitted into the defense process will set to a duplicate status.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
64 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Incumbent DRP action: The incumbent DRP must accept or reject the prospective’s location claim request via the Defend process on the UI.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
65 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
To view the location record under defense, the incumbent DRP can log into the Locations screen. The Location(s) that is under defense will show a status of Defense Active = ‘Y’, and the Defense Start, and Defense End. See the figure below.
The status of Defense Active = ‘Y’, and the Defense Start, and Defense End will disappear after the incumbent DRP respond to the prospective DRP.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
66 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
While the defend process in is in progress, the incumbent DRP must accept/reject through the defend process. Do not alter the registration and location outside of the defend process; doing so will result in overlapping record. To defend, incumbent DRP must select the Location, click Defend, provide comment on their defense of the location, contact name, and phone number.
If “Valid Location” is checked, the incumbent DRP is indicating that the location is valid and will not release that location based on comments received from prospective DRP.
If the “Valid Location” is not checked, the incumbent DRP is stating that the request received is accepted and action will be taken by them to release the location to the prospective DRP.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
67 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
68 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
If the incumbent DRP takes no action within 10 business days, the system will automatically end date the location and its corresponding registration after the 10 business days. In addition, the system will automatically adjust the end date out by 5 business days for the location that is in defense process and its corresponding registration. Note that the status for the location that are under the defend process will remain “Active” until the registration expired, and the rest of the locations will be in “Inactive” status. A list of the possible Cases of the Defend Process is in Appendix A in this document. If the incumbent DRP defends the location during the defense period, the prospective DRP must contact them to resolve the duplicate use conflict outside of the ISO registration process.
3.1.6 Withdraw
The Withdraw feature allows the DRP to withdraw a location from the validation and UDC or LSE review processes. Locations can only be withdrawn when they are in “Pending”, “Duplicate” or “Disputed” statuses. To Withdraw a location,
the location is first selected then the Withdraw button chosen under the Locations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
69 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Once Withdraw is selected, the Location to be withdrawn will be identified and a confirmation to withdraw is required by
selecting the Continue button.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
70 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.1.7 End Date
The End Date feature allows the DRP to end date a location. Locations can only be end dated when they are in the
“Inactive”, “Active”, “Duplicate”, or “Disputed” statuses. To End Date a location, the location is first selected then the End
Date button chosen under the Locations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
71 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Once End Date is selected, the Location to be end dated will be identified and a confirmation to end date is required by
selecting the Continue button.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
72 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.2 Location Review
3.2.1 LSE Review After logging into the DRRS, the LSE is provided a view option for Locations and Registrations. Selecting the Location view will provide a list of locations that they have been assigned as the LSE. The Location view includes all the locational information provided by the DRP to create the location. 3 In addition the following is provided in this view:
Location ID A unique ID assigned by the DRRS for all new locations when they are saved or submitted. Status The Current status of the location. Review Start The date on which the location was submitted for review. This date begins the ten business
day (10) review period for the LSE to review and respond before the DRRS auto approves the location.
Review End The date on which the review period end or date on which the review was completed. LSE Review A “Y” indicates that a valid location review has been completed. Reviewer Name The name of the reviewer provided as part of validation Reviewer Contact Phone number of the reviewer provided as part of validation.
Locations requiring review will be in the Pending status.
3 See Location Management > Create section for all location information provided by the DRP.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
73 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Locations reviewed without findings will be in the Active or Inactive status. Locations reviewed with findings from either the LSE or UDC will be in the Disputed status
The LSE selects the Locations (one or multiple) to be reviewed and chooses the Review button to enter the review
confirmation process screen. Note: The system only accepts 25 Locations/rows at a time when approving.
When selecting more than one location, all locations listed are reviewed by the LSE together. Response by the LSE will affect all locations listed, selection of individual locations is not available in the “locations to be reviewed” view.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
74 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
The location(s) is confirmed as being valid by selecting the Valid Location box. The location confirmation is disputed by leaving the box un-selected indicating that the location(s) have not passed the review.
The LSE must include a Reviewer Name and Phone # and, if the location is not valid, a Review Comment when choosing
to Continue. Comment should include the reason as to why the LSE has determined this to be an invalid location.
Examples include, but are not limited to the following:
Incorrect location information (e.g. incorrect SubLAP)
Wrong LSE or UDC designation
No commercial agreement
Regulatory non-conformance
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
75 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Location identified as participating in another program
Location device type
Note: The Comments box is limited to 255 characters.
The LSE may end their validation of the location(s) by choosing to Cancel .
3.2.2 UDC Review After logging into the DRRS, the UDC is provided a view option for Locations and Registrations. Selecting the Location view will provide a list of locations that they have been assigned as the UDC. The Location view includes all the locational information provided by the DRP to create the location. 4 In addition the following is provided in this view:
Location ID A unique ID assigned by the DRRS for all new locations when they are saved or submitted. Status The Current status of the location. Review Start The date on which the location was submitted for review. This date begins the ten business
day (10) review period for the UDC to review and respond before the DRRS auto approves the location.
Review End The date on which the review period end or date on which the review was completed.
4 See Location Management > Create section for all location information provided by the DRP.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
76 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
LSE Review A “Y” indicates that a valid location review has been completed. Reviewer Name The name of the reviewer provided as part of validation. Reviewer Contact Phone number of the reviewer provided as part of validation.
Locations requiring review will be in the Pending status. Locations reviewed without findings will be in the Active or Inactive status. Locations reviewed with findings from either the LSE or UDC will be in the Disputed status
The UDC selects the Locations (one or multiple) to be reviewed and chooses the Review button to enter the review
confirmation process screen. Note: The system only accepts 25 Locations/rows at a time when approving.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
77 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
When selecting more than one location, all locations listed are reviewed by the UDC together. Response by the UDC will affect all locations listed, selection of individual locations is not available in the “locations to be reviewed” view.
The location(s) is confirmed as being valid by selecting the Valid Location box. The location confirmation is disputed by leaving the box un-selected indicating that the location(s) have not passed the review.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
78 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
The UDC must include a Reviewer Name and Phone # and, if the location is not valid, a Review Comment when choosing
to Continue. Comment should include the reason as to why the UDC has determined this to be an invalid location.
Examples include, but are not limited to the following:
Incorrect location information (e.g. incorrect SubLAP)
Wrong LSE or UDC designation
No commercial agreement
Regulatory non-conformance
Location identified as participating in another program
Location device type
Note: The Comments box is limited to 255 characters.
The UDC may end their validation of the location(s) by choosing to Cancel
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
79 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.2.3 Invalid Review Disputed Location A Disputed Location was unsuccessful in obtaining a valid review by one of the reviewing entities (LSE/UDC). The DRP must now determine from provided comments why they were unable to pass validation of the location submitted for review. When a location has not passed the LSE/UDC review it will be set to the status of Disputed and the reviewer contact information and comments can be viewed by the DRP in their Locations view when the location is highlighted.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
80 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
To correct errors identified, the DRP must create a new location. The disputed Location is not editable but may be copied and updated with the corrected information. When saved or submitted, a new location with new Location ID will be created. The new location created must then be submitted for review and will be in Pending status until the review is complete.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
81 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
If the DRP believe the location is valid with information provided and does not agree with the LSE or UDC findings, they must work with the entity that provided the comments to resolve the reason it was not found to be a valid location. The process for resolving the disputed location issues is managed outside of the ISO. The DRP is provided information through the review process needed to make direct contact with LSE or UDC to initiate resolution.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
82 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.2.4 LSE/UDC Review notification Example of email notification to the LSE and UDC when a location has been submitted for review.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
83 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.2.5 Application Programming Interface (API) Location Management The DRRS provides APIs for the performance of all location management processing. Market Participants can perform the following using the DRRS web services:
Retrieve DRRS Locations
Save request for creating draft/new DRRS Locations
Delete request for deleting the draft/new DRRS Locations
Submit request for creating/end-dating DRRS Locations
Review request for reviewing DRRS Locations (for LSE/UDC/LSE&UDC review)
Modify request for modifying DRRS Locations
Initiate Defend request for defending for a DRRS Location
Review Defend request for reviewing the DRRS Location that is under defend process (for DRP review)
Retrieve status for the creation or modification requests
Retrieve locations attributes that is currently displayed on the UI.
Retrieve locations that are currently involved in a defense process. This is equivalent to the existing function on the UI to retrieve locations with “Defense Active” = ‘Y’
Technical ISO Interface Specifications with more detailed information are available on the ISO Developer website at https://developer.caiso.com.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
84 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
3.3 Creating a Registration
After the LSE and UDC have reviewed and approved the Location(s), the DRP can then create a registration. The Register feature allows the DRP to register a location or multiple locations. Locations can only be registered when they are in the inactive, and active statuses. Registration can be in multiple LSEs, but must be within the same SubLAP. There are 2 approaches to register a location or multiple locations.
Approach 1: o Under the DRP View > Locations
o Select the required locations Locations belonging to the same or various LSEs are permitted, but with the same DRP, UDC, and SUBLAP for the registration. The “Device Type” will determine corresponding baseline methodologies available for registrations inclusive of these devices, please refer to Appendix E-DRRS Location Type – Baseline Method Reference Matrix.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
85 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
o Click on the Register button
o On the Registration screen, input the data and save/submit. The following is a description of the fields requested for input to create a Registration:
Name DRP chosen name of the Registration. May contain alphanumeric and special characters, up to a max of 255
Start Date5 The Start Date cannot be a prior date. Only Locations with start dates before and end dates after will be generated as Available Locations for selection
5 The system validates effective dates input for the Registration against Location effective dates to determine available Locations that can be registered.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
86 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
End Date The End Date cannot be a prior date or overlap with an existing Active location with same SAN and UDC assignment
DRP6 Demand Response Provider ID
UDC Utility Distribution Company ID
Baseline Method The Baseline Method that will be used to determine the performance of the Resource. This requires approval by the CAISO. Only the approved Performance Evaluation Method (baseline) will be available from the drop down. Please see Business Practice Manual (BPM) for Demand Response for instruction on how to submit a Performance Evaluation Methodology request section 5, and Appendix E – DRRS Location Device Type Business Rules and Baseline Method Reference Matrix
SubLAP The SubLAP in which all the locations within the registration reside
DRP SCID The ID of the acting Scheduling Coordinator for the Registrations market Resource.
Program Proxy DR or Reliability DR
Resource Type Predefined or Custom. o Available Locations will be filtered based on the Resource Type selection. When selecting Custom, only
Locations with PNODE information can be selected for the Registration.
o Custom Resource ID o If the DRP believes that the pre-defined Resource ID is not sufficient for its needs, the DRP selects or
requests a custom Resource ID be assigned when the Registration is created. The information
6 The system uses DRP, UDC, LSE and SubLAP information provided to ensure Locations presented as available have the same designations.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
87 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
provided in the DRRS during the Registrations creation, including PNodes and their applicable Distribution Factors, is to develop the Custom Resource ID.
o For an example (applicable for a PDR or RDRR): A DRP requests a custom Resource ID for 4 end use Loads that have the same LSE and are located in the same Sub-LAP. Based on historic Load of these 4 end use customers, 80% of the Load is connected to Bus 1 and 20% of the Load is connected to Bus 2.
Here is how it will look:
Customer LSE Sub-
LAP Location Registration GDF Custom DR Resource ID
1 A PGF1 Bus 1 Reg 01 0.8 PRMNTE_6_PDRC01
2 A PGF1 Bus 1 Reg 01 PRMNTE_6_PDRC01
3 A PGF1 Bus 2 Reg 01 0.2 PRMNTE_6_PDRC01
4 A PGF1 Bus 2 Reg 01 PRMNTE_6_PDRC01
o Requesting a Custom Resource ID with Dynamic GDF
If approved by the CAISO, a DRP may submit GDFs as part of its Bid for a given PDR or RDRR. In order to be eligible to submit GDFs as part of a Bid, the DRP must request and receive approval from the CAISO to dynamically Bid GDFs. To request a custom GDF, please contact the PDR coordinator at [email protected] with the following information: Location of bus, and total MW. The custom GDF can be deployed based on the Master File deployment.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
88 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Resource (Resource ID)
o When Resource Type = Pre Defined or Custom o The drop-down list will show available resources that can be selected based on Registration
information provided including Resource IDs previously assigned to the DRP and unassigned Pre Defined resource IDs for the identified SubLAP. The resource ID naming convention has the letter “C” after the letter “PDR” and Pre defined has the letter “P” after the letter “PDR” for Proxy Demand Resource.
This field is not required (not used) upon the “Save” action or when the registration is in “New” status. A
“New” registration status record exists without a resource ID.
This field is optional upon the “Submit” action or when the status is in “Confirmed”. If a resource ID is provided, the system will: Validate against the baseline method. All PDR-LSR baseline methods must have the naming convention with a
substring, ‘CUR’ (curtailment ID).
Validate the resource ID against the Resource Type. Resource Type = ‘Pre Defined’ must have a ‘P’ after the string, ‘PDR’, and Resource Type = ‘Custom’ must have a ‘C’ after the string ‘PDR’. A resource ID cannot be modify after the registration is submitted. You must end-date the registration and create a new one. If the resource ID is not provided upon the “Submit” action, system will accept the record. After the registration is submitted upon the “Submit” action with no resource ID, the user can add the resource ID by using the ‘edit’ on the UI. A “Confirmed” registration status record can exist with or without a resource ID.
Please see Appendix D for business rules and tips.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
89 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Note: If no available resource appear in the drop-down list, submit a request to [email protected] with the following information:
Is the request for PDR-LSR?
What Resource Type (i.e. Pre-Defined or Custom)?
What Program Type (i.e. Proxy DR or Reliability DR)? For PDR-LSR, this is Proxy DR.
How many Resource IDs do you need? What effective date are you requesting? Effective date cannot be back dated.
Show/Refresh Available Location
o The selected locations will appear in the Selected Locations grid.
Distribution Factors for Custom Resource
If the Resource Type selected is Custom, the system generated list of available Locations, to select from, will only include locations that have been assigned a PNode. When creating this Registration, the DRP must assign distribution factors for PNodes identified. PNodes will be populated in the Distribution Factor window based on the Locations selected to be registered. The Edit button in this window provides the DRP with the opportunity to assign a Distribution Factor to each of the PNodes. The Distribution Factor must indicate the percent of load reduction that will be occur at each PNode represented as a two decimal precision level. Distribution Factors across all PNodes provided must total 1.00. The SC shall provide the Pnode and Distribution Factors used to create the custom Resource ID and the Registration in the DRRS to [email protected] when submitting the GRDT form.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
90 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Creating Registration using the Control Group baseline method, please see Appendix F.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
91 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Approach 2:
o Under the DRP View, select Registrations then click on the Create button.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
92 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
o Input registration data.
The following is a description of the fields requested to for input to create a Registration:
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
93 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Name DRP chosen name of the Registration. May contain alphanumeric and special characters, up to a max of 255
Start Date7 The Start Date cannot be a prior date. Only Locations with start dates before and end dates after will be generated as Available Locations for selection
End Date The End Date cannot be a prior date or overlap with an existing Active location with same SAN and UDC assignment
DRP8 Demand Response Provider ID
UDC Utility Distribution Company ID
Baseline Method The Baseline Method that will be used to determine the performance of the Resource. This require approval by CAISO. Only the approved Performance Evaluation or Baseline Method will be available from the drop down.
SubLAP The SubLAP in which all the locations within the registration reside
DRP SCID The ID of the acting scheduling coordinator for the Registrations market Resource.
Program Proxy DR or Reliability DR
Resource Type Predefined or Custom.
7 The system validates effective dates input for the Registration against Location effective dates to determine available Locations that can be registered.
8 The system uses DRP, UDC, LSE and SubLAP information provided to ensure Locations presented as available have the same designations.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
94 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
o Available Locations will be filtered based on the Resource Type selection. When selecting Custom, only Locations with PNODE information can be selected for the Registration.
o Custom Resource ID o If the DRP believes that the pre-defined Resource ID is not sufficient for its needs, the DRP selects or
requests a custom Resource ID be assigned when the Registration is created. The information provided in the DRRS during the Registrations creation, including PNodes and their applicable Distribution Factors, is to develop the Custom Resource ID. This information is automatically provided from the DRRS to the applicable business unit that will then match this Registration information with the submitted Generator Resource Data Template.
o For an example (applicable for a PDR or RDRR): A DRP requests a custom Resource ID for 4 end
use Loads that have the same LSE and are located in the same Sub-LAP. Based on historic Load of these 4 end use customers, 80% of the Load is connected to Bus 1 and 20% of the Load is connected to Bus 2.
Here is how it will look:
Customer LSE Sub-
LAP
Location Registration GDF Custom DR Resource ID
1 A PGF1 Bus 1 Reg 01 0.8 PRMNTE_6_PDRC01
2 A PGF1 Bus 1 Reg 01 PRMNTE_6_PDRC01
3 A PGF1 Bus 2 Reg 01 0.2 PRMNTE_6_PDRC01
4 A PGF1 Bus 2 Reg 01 PRMNTE_6_PDRC01
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
95 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
o Requesting a Custom Resource ID with Dynamic GDF
If approved by the CAISO, a DRP may submit GDFs as part of its Bid for a given PDR or RDRR. In order to be eligible to submit GDFs as part of a Bid, the DRP must request and receive approval from the CAISO to dynamically Bid GDFs. To request a custom GDF, please contact the PDR coordinator at [email protected] with the following information: Location of bus, and total MW. The custom GDF can be deployed based on the Master File deployment.
Resource
o When Resource Type = Pre Defined or Custom o The drop-down list will show available resources that can be selected based on Registration
information provided including Resource IDs previously assigned to the DRP and unassigned Pre Defined resource IDs or Custom Resource IDs for the identified SubLAP.
The resource ID naming convention has the letter “C” after the letter “PDR” and Pre defined has the letter “P” after the letter “PDR” for Proxy Demand Resource.
This field is not required (not used) upon the “Save” action or when the registration is in “New” status. A
“New” registration status record exists without a resource ID.
This field is optional upon the “Submit” action or when the status is in “Confirmed”. If a resource ID is provided, the system will: Validate against the baseline method. All PDR-LSR baseline methods must have the naming convention with a
substring, ‘CUR’ (curtailment ID).
Validate the resource ID against the Resource Type. Resource Type = ‘Pre Defined’ must have a ‘P’ after the string, ‘PDR’, and Resource Type = ‘Custom’ must have a ‘C’ after the string ‘PDR’.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
96 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
A resource ID cannot be modify after the registration is submitted. You must end-date the registration and create a new one. If the resource ID is not provided upon the “Submit” action, system will accept the record. After the registration is submitted upon the “Submit” action with no resource ID, the user can add the resource ID by using the ‘edit’ on the UI. A “Confirmed” registration status record can exist with or without a resource ID.
Please see Appendix D for business rules and tips.
Note: If no available resource appear in the drop-down list, submit a request to [email protected] with the following information:
Is the request for PDR-LSR?
What Resource Type (i.e. Pre-Defined or Custom)?
What Program Type (i.e. Proxy DR or Reliability DR)? For PDR-LSR, this is Proxy DR.
How many Resource IDs do you need?
What effective date are you requesting?
Show/Refresh Available Location
The system will generate a list of available Locations to select from based on the information provided when creating a Registration. The Locations list is based on DRP, UDC, SubLAP, effective dates, and Baseline method and its associated Location device type (please refer to the Appendices D and E).
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
97 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
o To select more than 25 location, in the Available Locations, change the number of Rows from 25 to 200. This will allow you to move more than 25 rows to the available locations.
o Move available locations to Selected Locations.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
98 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Distribution Factors for Custom Resource
See Approach 1 above.
4 Registration Management
The registration process builds from Performance/Baseline Methodology to location to registration to resource management. Registration management includes the development of registration(s) by the DRP that identify the locations participating, in aggregate, as a PDR or RDRR for an effective period of time. Location information established, including its effective dates, control availability for their use by the DRP in creating registrations. The DRRS provides a robust UI and API’s for the DRP(s) use in performing their Registration development and management tasks. System generated email notifications are also generated as alerts to activities occurring that may require their attention.
4.1 DRRS User Interface (UI) Registration Management
The DRP may use either the Location view or Registration view to register one or multiple locations. The Registration view provides the DRP a list of all the Registrations created and saved or submitted with their Status. When highlighted, the view will list all Locations included in that Registration. When using the UI, DRRS limits to 200 locations per registration unless this is loaded using the API.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
99 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
4.1.1 Edit To Edit a registration from the registration view, the DRP must first select the Registration to be edited then click on the
Edit button under their Registrations View.
Note: If modifying the End Date, utilize the “Terminate” function instead; the system will determine the proper end-date of the registration based on 5 business days. The 5 business day window is to align with the Master File submission process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
100 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Once the Registration is edited, the options to proceed include:
Cancel - Cancels Edit of the Registration.
Update - Updates the Registration maintaining its Registration ID.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
101 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
4.1.2 Copy The Copy feature allows the DRP to create a new registration by copying an existing registration and making changes to the copied field information. Registrations in any status may be copied. To Copy a registration, the registration is first
selected then the Copy button chosen under the Registrations View.
Note: If using this functionality for extending out a registration on a registration that is approaching end-date, verify the information including the Resource ID is the same and locations are not used in another registration prior to submitting.
The Copy option takes the user to the Registration window and provides the same Options as Create registration:
Cancel - cancels the creation of a new registration.
Save - creates a new registration with changes and registration ID for it.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
102 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
4.1.3 Terminate The Terminate feature allows the DRP to end-date a Registration. Registrations can only be end-dated when they are in the Confirmed status. The system will determine the proper end date of the registration based on the 5 business days
from the current date. To Terminate, the Registration is first selected then the Terminate button chosen under the
Registration View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
103 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Once Terminate is selected, the Registration to be end-dated will be identified and a confirmation to terminate is required
by selecting the Continue button.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
104 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
A Registration is in a Terminate status when its effective end date is prior to the current date. Terminated Registrations are logically equivalent to deleted records. A Terminated Registration can be Copied but not Edited.
4.1.4 Delete The Delete feature allows the DRP to delete a new Registration that are in draft (NEW) status. To Delete a Registration,
the new Registration is first selected then the Delete button chosen under the Registrations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
105 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Once Delete is selected, the Registration to be deleted will be identified and a confirmation to delete is required by
selecting the Continue button.
A deleted Registration and its created Registration ID will no longer exist in the Registrations View.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
106 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
4.2 Application Programming Interface (API) Registration and Resource Management
The DRRS provides APIs for the performance of all Registration management processing. Market Participants can retrieve or submit the following Registration data via the DRRS web services:
Retrieve status for the creation or modification requests
Retrieve DRRS Registrations
Retrieve Locations
Save request for creating new DRRS Registrations
Delete request for deleting the /new DRRS Registrations
Submit request for creating/terminating (end-date) DRRS Registrations
Modify request for modifying (edit) DRRS Registrations
Technical ISO Interface Specifications with more detailed information are available on the ISO Developer website at https://developer.caiso.com. Login permission is required, and users can sign up on the website provided.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
107 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
5 Helpful Links
Document Link
Application Access Request Form
reference Guide http://www.caiso.com/Documents/ApplicationAccessRequestFormReferenceGuide.pdf
Access and Identity Management (AIM)
User Guide http://www.caiso.com/Documents/AccessandIdentityManagement_AIM_UserGuide.pdf
Energy Storage and Distributed Energy Resources 3B External Training Presentation
http://www.caiso.com/Documents/EnergyStorage_DistributedEnergyResources_Phase3B.pdf
Demand Response and Proxy Demand
Resources FAQ http://www.caiso.com/Documents/DemandResponseandProxyDemandResponseFAQversion5.xls
Demand Response Provider Agreement
Information Request Sheet
http://www.caiso.com/Documents/DemandResponseProviderAgreementInformationRequestSheet.doc
Direct Telemetry BPM http://bpmcm.caiso.com/Pages/BPMDetails.aspx?BPM=Direct Telemetry
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
108 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External User Application Access
request Form http://www.caiso.com/Documents/UserApplicationAccessRequestForm.xls
ISO Connected Entity Service Guide http://www.caiso.com/Documents/ISOConnectedEntityServiceGuide.pdf
List of certified SC’s http://www.caiso.com/Documents/List-SchedulingCoordinators_CRRHoldersandConvergenceBiddingEntities.pdf
List of Demand Response Participants http://www.caiso.com/Documents/ListofDemandResponseParticipants.pdf
Load and Demand Response Page http://www.caiso.com/participate/Pages/Load/Default.aspx
Load Serving Entity Request (LSE ID)
Form http://www.caiso.com/Documents/LoadServingEntityIDRequestForm.doc
Meter Service Agreement ISO Metered
Entities Information Request Sheet
http://www.caiso.com/Documents/MeterServiceAgreement_ISOMeteredEntitiesInformationRequestSheet.doc
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
109 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Meter Service Agreement Scheduling
Coordinators Information Request Sheet
http://www.caiso.com/Documents/MeterServiceAgreement_SchedulingCoordinatorsInformationRequestSheet.doc
Metering BPM http://bpmcm.caiso.com/Pages/BPMDetails.aspx?BPM=Metering
New Resource Implementation Checklist http://www.caiso.com/Documents/NewResourceImplementationChecklist.xlsxhttp://www.caiso.com/Document
s/NewResourceImplementationChecklist.xls
Requirements for becoming and
Scheduling Coordinator http://www.caiso.com/participate/Pages/SchedulingCoordinator/Default.aspx
Reliability Demand Response Resource
TrainingRequirements for becoming and
Scheduling Coordinator
http://www.caiso.com/Documents/ReliabilityDemandResponseResourceOverview.pdf
Energy Storage Distributed Energy
Resources customer partnership group
meeting artifacts including presentation
http://www.caiso.com/Documents/Presentation-EnergyStorage-DistributedEnergyResourcesPhases2-3-ImplementationCustomerPartnershipGroup-May6-2019.pdf
Energy Storage Distributed Energy
Resources – Phase 3 -Business
Requirements
http://www.caiso.com/Documents/BusinessRequirementsSpecificationClean-EnergyStorageandDistributedEnergyResourcesPhase3.pdf
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
110 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRRS Enhancement -Demand Response
Location Registration Enhancement –
Technical Specifications
http://www.caiso.com/informed/Pages/ReleasePlanning/Default.aspxhttp://www.caiso.com/Documents/Deman
dResponseLocationRegistrationEnhancement-TechnicalSpecificationsv4REDLINED.pdf
DRRS Enhancement -Summary of Use
Case for Demand Response Solutions
Registrations
http://www.caiso.com/Documents/SummaryofUseCaseforDemandResponseSolutions-Registrations.pdf
DRRS Enhancement -Location and
Registration Life Cycle http://www.caiso.com/Documents/LocationandRegistrationLifecycle.pdf
DRRS Enhancement -Summary of Use
Case for Demand Response Solutions
Locations
http://www.caiso.com/Documents/SummaryofUseCaseforDemandResponseSolutions-Locations.pdf
Example – Day Match Workbook http://www.caiso.com/Documents/Example-DayMatchWorkbook.xlsx
Example – Day Randomization
Validation http://www.caiso.com/Documents/Example-RandomizationValidationTemplate.xlsx
Example – Weather Match Workbook http://www.caiso.com/Documents/Example-WeatherMatchWorkbook.xlsx
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
111 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
GRDT and IRDT Definitions http://www.caiso.com/Documents/GRDTandIRDTDefinitions.xls
Generator Resource Data Template
(GRDT)
http://www.caiso.com/Documents/GeneratorResourceDataTemplate_ForNewDemandResponse.xlsx
Full Network Model Pricing Node http://www.caiso.com/Documents/FullNetworkModel_PricingNodeMapping_Based_FullNetworkModel_ReleaseDB2019Q2.xls
6 Revision History
Date Version Updated By Description
03/24/15 3.7 Monica Added info on BUS Pnode
03/25/15 3.7 Monica
Added the following info to the LSE and UDC Commenting
on a Registration sections
Note: The Comments box is limited to 255 characters. If
the LSE review generates comments larger than 255
characters.
When a comment is provided by the LSE indicating that there is a “review with findings” within the registration information, the CAISO will deny the registration. The DRP is required to resolve any issues related to the
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
112 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
"findings" with the appropriate party. During that time, additional detail may be exchanged by parties to resolve all issues determined in the review process. CAISO’s responsibility is to look for general comments as to why there is an issue with the registration and therefore does not require listing of multiple SANs that may be in conflict with availability to participate. The 255 character limitation should be sufficient to provide the CAISO with enough information to deny the registration and request issue resolution be made between the parties outside of the registration process. If the CAISO determines that there is error in the registration detail that needs to be corrected by the DRP, the registration will be denied as a means to alert the DRP of corrective actions that are being requested by the CAISO.
06/04/15 3.8 Monica M. Updated the sections pertaining to requesting for a
DRP/LSE/UDC ID and OMS.
06/05/15 3.9 Monica M. Added clarifying language for terminating
location(s)/ALOC(s).
11/05/15 3.9 Monica M.
Incorporated the Jill’s Demand Response Resource
Participation Guide into the current Demand Response User
Guide document and removed the original document off the
external site.
04/12/16 3.10 Monica M.
Added clarifying language for Reliability Demand Response
Services Term.
Summer term runs from June through September – Winter
term runs from October through May
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
113 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
4/19/16 3.11 Monica M.
Updated link on page 129 regarding the XML test materials.
http://www.caiso.com/Pages/documentsbygroup.aspx?Group
ID=6A0B3CBD-4EE0-4BCD-B44F-CBB9E711D31F
10/01/16 4.0 Jill Powers
Updated User Guide to include information related to the
Enabling Demand Response Phase II for the PDR/RDRR
Registration functionality transfer from DRS to DRRS.
Updates to include new baseline and statistical sampling
methodologies approved as part of Energy Storage and
Distributed Energy Resource Initiative.
12/06/16 4.1 Monica M.
Updated the section on “Generation Resource Data Template
Submission and Processing”. Going forward, all GRDTs
shall be submitted to [email protected] and no longer to
12/13/16 4.2 Monica M. Updated the Market Participation chart under Customer
Baseline Methodology.
5/5/2017 4.3 Tim B.
Completed unfinished sentence on last bullet of page 170
and changed page 84 to remove RDRR from statement
regarding necessity of telemetry.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
114 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
10/26/2018 4.4 Pia S.
Updated User Guide to include information related to the
Energy Storage and Distributed Energy Phase II for the
PDR/RDRR process and application.
10/31/2018 4.5 Pia S.
Updated sections: Purpose, Performance
Evaluation/Baseline Methodology, “Generator Data
Submission and Processing” for Custom Resource ID, and
Telemetry.
8/16/2019 4.6 Pia S.
Updated: Removed sections related to business process to
BPM for Demand Response, ESDER3a, DRRS Automated
Email Notification, Application Access, helpful links
Added: Appendix C, and Notes in Appendix A.
8/22/19 4.6a Pia S. Removed notes in section 3.3
11/7/19 4.7 Pia
Updated sections:
- Title of the User Guide from Demand Response to Demand
Response Registration User Guide.
- 1.3 Application Access
- 1.4 DRRS Automated Email Notification
- 2.1 Locations
- 2.3.1.2 Column Headers
- 3.1.1 Edit
- 3.1.5 Defend
- Appendix A – Three (3) Cases of Defend Process.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
115 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
7/22/20 4.8 Pia
Updated for ESDER 3B initiative – sections 3, 4.2,
Appendix B, Helpful Links, Definitions, and UI screenshots
due to WebSD changes.
Added for ESDER 3B initiative – Appendices D through F.
10/27/2020 4.9 Pia
Updated Appendix E, Definitions for “ES”, section 3.3
Creating Registration for Resource ID validation rules, and
resource ID request.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
116 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Appendix A – Three (3) Possible Cases of Defend Process
All three (3) possible cases of defend process below starts with:
1) Prospective DRP submit Location for approval through the UI.
2) The Prospective DRP receives a message, “A Location with given SAN and UDC combination already exists, do you want to continue and initiate the Defend Process?” Prospective DRP complete all the required fields… name, phone number, and comments. The Location for the SAN will be in "Duplicate" status after initiating the defense process.
3) The Incumbent DRP Locations screen will show a status of Defense Active = Y, and the Defense Start, and Defense End.
4) The Incumbent DRP may receive an email notification that “their location(s) has triggered the location defense process”.
1. If Incumbent DRP accepts the Prospective DRP claim to the customer.
See steps 1-4 above. 5) The Incumbent DRP accepts the prospective DRP claim by releasing the Location for the SAN. 1. On the Locations screen, select the Location under the defense process, click “Defend”. A “Selected Locations” screen will appear. Do not check the “Valid Location” box. Enter your name, Phone number, and Comment, and click “Continue”
6) The system will automatically update the “End Date” of the incumbent’s DRP location and change the status of the Prospective DRP’s
Location from “Duplicate” to “Pending” for LSE and UDC approval.
7) The Prospective DRP’s Location status changes to “Inactive” after approved by the LSE and UDC.
8) The Prospective DRP creates Registration for the Location.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
117 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
2. Incumbent DRP rejects the Prospective DRP claim to the customer.
See steps 1-4 above.
5) The Prospective DRP’s Location for the SAN will remain in the "Duplicate" status as the Incumbent DRP still owns the Location in an "Active" or "Inactive" status.
6) The Incumbent DRP rejects the Prospective’s claim through the UI.
a. On the Locations screen, select the location in defense process and click “Defend”.
b. Check the “Valid Location” box, Review Name, Phone number, and Comments.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
118 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
119 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
7) After the Incumbent DRP rejects the Prospective DRP claim, the Defense Active flag, Defense Start, and End Date will be blank.
8) The Prospective DRP will see the comments on the Locations screen > Location Defend Details – Incumbent.
9) If the Prospective DRP agrees with the Incumbent, the Prospective DRP can end date or delete the Location.
If the Prospective DRP disagrees during the defense process, they must contact the Incumbent DRP to resolve the duplicate use conflict outside of the ISO registration process.
3. Incumbent DRP takes no action within the 10 business day window.
See steps 1-4 above. 5) If the Incumbent DRP takes no action, the system will automatically end-date the Incumbent DRP’s Locations, and its corresponding Registration after the 10 business days. The Incumbent DRP loses the Location, and the Prospective DRPs Location status will change from “Duplicate” to “Pending”. In addition, the system will update the end date to 5 business days out for the location in the defend process and its corresponding registration.
* The email notification from DRRS will be sent out the following day, and to only to those that are currently registered in
the database. See DRRS Automated Email Notification section 1.4. Note: As a result of the Defend process, the Location’s Review Start Date may have a start date after the Location’s Start Date, depending on when the LSE/UDC review process is triggered.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
120 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Appendix B – Editable field(s) by Locations Status
Locations Status
New
Fields Validation Rules Editable (Yes/No)
Name Yes
Start Date Yes
End Date Yes
Address (1 and/or 2) Yes
City Yes
State Yes
Zip Yes
LOC ID Yes
SAN No
DRP Yes
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
121 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
UDC Yes
SUBLAP Yes
PNODE Yes
Device Type Yes
Pending
Cannot be edited. The Pending Location(s) only allows for end dating.
Duplicate
Cannot be edited. The Duplicate Location(s) only allows for end dating.
Inactive
Fields Validation Rules Editable (Yes/No)
Name Yes
Start Date IF Update > Existing/Recorded THEN Yes ELSE No
End Date IF Update < Existing/Recorded THEN Yes ELSE No
Address Yes
City Yes
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
122 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
State Yes
Zip Yes
LOC ID No
SAN No
DRP No
UDC No
SUBLAP No
PNODE No
Device Type No
Active
Fields Validation Rules Editable (Yes/No)
Name Yes
Start Date No
End Date IF Update < Existing/Recorded THEN Yes ELSE No
Address Yes
City Yes
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
123 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
State Yes
Zip Yes
LOC ID No
SAN No
DRP No
UDC No
SUBLAP No
PNODE No
Device Type No
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
124 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Appendix C - Customer Market Results Interface (CMRI)
Viewing Total Expected Energy (TEE)
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
125 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
126 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Appendix D – Tips for Creating Registrations by Baseline Method table
Program Resource
Type Baseline Method Notes
Proxy DR Predefined or Custom
All Baseline Methods
For all PDR-LSR Baseline Methods: PDR-LSR PDR-LSR+Day Matching 5/10 PDR-LSR+Day Matching 10/10 PDR-LSR+Weather Matching PDR-LSR+Day Matching Combined
DRRS store only the Curtailment Resource ID. The Resource ID contain a substring, ‘CUR’. Examples of the naming convention is in the table below:
Curtailment ID
Pre-defined Resource
ABCD_x_PDRPCURxxx
Custom Resource
ABCD_x_PDRCCURxxx
For Master File, the GRDT must include 2 resource IDs, Curtailment and Consumption resource IDs. An example of the a pre-defined PDR-LSR resource ID for Master File submittal: ABCD_1_PDRPCUR001 ABCD_1_PDRPCON001
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
127 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
The business rules for location’s device type applies to all Baseline Methods, please refer to BPM for DR, Appendix E – DRRS Location Device Type Business Rules and Baseline Met.
Control Group must have at least 150 control group locations and 1 treatment group location.
Reliability DR
Predefined or Custom
1. MGO+Day Matching 5/10
2. MGO+Day Matching 10/10
3. MGO+Day Matching
Combined
4. MGO+Weather Matching
5. Meter Generation Output
6. Matching Combined
7. Day Matching Combined
8. Day Matching 10/10
9. Day Matching 5/10
(Residential Only)
10. Weather Matching
11. Control Group
The business rules for location’s device type applies to all Baseline Methods, please refer to BPM for DR, Appendix E –DRRS Location Device Type Business Rules and Baseline Met.
Control Group must have at least 150 control group locations and 1 treatment group location.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
128 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Appendix E- DRRS Location Device Type Business Rules and Baseline Method Reference Matrix
Business Rules for Location Device Type: A summary of the baseline method criteria in relation to its associated location business rule:
Baseline Method
Need at least one location with a device type equal to
Energy Storage (ES)
Electric Vehicle Supply Equipment (EVSE)
1. PDR-LSR
2. PDR-LSR+Day Matching 5/10
3. PDR-LSR+Day Matching 10/10
4. PDR-LSR+Weather Matching
5. PDR-LSR+Day Matching Combined
6. MGO+Day Matching 5/10
7. MGO+Day Matching 10/10
8. MGO+Day Matching Combined
9. MGO+Weather Matching
10. Meter Generation Output
Yes
1. EVSE res
2. EVSE res+Day Matching 5/10
3. EVSE res+Day Matching 10/10
4. EVSE res+Day Matching Combined
5. EVSE res+Weather Matching
6. EVSE non-res
7. EVSE non-res+Day Matching 10/10
8. EVSE non-res+Weather Matching
9. EVSE non-res+Day Matching Combined
Yes
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
129 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Baseline Method
Need at least one location with a device type equal to
Energy Storage (ES)
Electric Vehicle Supply Equipment (EVSE)
1. Day Matching Combined
2. Day Matching 10/10
3. Day Matching 5/10 (Residential Only)
4. Weather Matching
5. Control Group
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
130 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
DRRS Location Device Type Baseline Method Reference Matrix:
Location Device Type Baseline Methods for Registration
Energy Storage (ES) PDR-LSR*
PDR-LSR+Day Matching 5/10*
PDR-LSR+Day Matching 10/10*
PDR-LSR+Weather Matching*
PDR-LSR+Day Matching Combined*
MGO+Day Matching 5/10*
MGO+Day Matching 10/10*
MGO+Day Matching Combined*
MGO+Weather Matching*
Weather Matching
Meter Generation Output
Day Matching Combined
Day Matching 10/10
Day Matching 5/10 (Residential Only)
Control Group
Electric Vehicle Supply
Equipment (EVSE)
EVSE res*
EVSE res+Day Matching 5/10*
EVSE res+Day Matching 10/10*
EVSE res+Day Matching Combined*
EVSE res+Weather Matching*
EVSE non-res*
EVSE non-res+Day Matching 10/10*
EVSE non-res+Weather Matching*
EVSE non-res+Day Matching Combined*
Weather Matching
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
131 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Day Matching Combined
Day Matching 10/10
Day Matching 5/10 (Residential Only)
Control Group
Neither ES Nor EVSE Day Matching Combined
Day Matching 10/10
Day Matching 5/10 (Residential Only)
Weather Matching
Control Group
Both ES and EVSE PDR-LSR*
PDR-LSR+Day Matching 5/10*
PDR-LSR+Day Matching 10/10*
PDR-LSR+Weather Matching*
PDR-LSR+Day Matching Combined*
MGO+Day Matching 5/10*
MGO+Day Matching 10/10*
MGO+Day Matching Combined*
MGO+Weather Matching*
Weather Matching
EVSE res*
EVSE res+Day Matching 5/10*
EVSE res+Day Matching 10/10*
EVSE res+Day Matching Combined*
EVSE res+Weather Matching*
EVSE non-res*
EVSE non-res+Day Matching 10/10*
EVSE non-res+Weather Matching*
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
132 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
EVSE non-res+Day Matching Combined*
Meter Generation Output
Day Matching Combined
Day Matching 10/10
Day Matching 5/10 (Residential Only)
Control Group
Note: Baseline methods in asterisk (*) are new with ESDER 3B and those not in asterisk (*) are existing methods.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
133 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Appendix F– Example of Creating a Registration using Control Group Baseline Method
A minimum of 150 Control Group Locations and at least 1 Treatment Group must be selected. See the BPM for Demand Response for more details on the requirements for Baselines.
Note: DRRS limits 200 locations per registration unless this is loaded using the API.
External Use
Version No. 4.9
Effective
Date 10/28/2020
DEMAND RESPONSE REGISTRATION USER GUIDE Draft
134 Copyright © 2018 CALIFORNIA INDEPENDENT SYSTEM OPERATOR. All rights reserved.
Information in this document is subject to change.
Once the Registration information is complete, Locations have been selected and Distribution Factors updated (for custom
resource id), the options to proceed include:
o Cancel - cancels the creation of the Registration
o Save - creates a new Registration and Registration ID for it.
o Submit - creates a new Registration and Registration ID for it and submits for registration.
Once the new Registration information has been created and saved or submitted, a new Registration ID (Reg ID) will be
generated.
When saved, the locations Status will be displayed as New.
When submitted, the locations Status will be displayed as Confirmed.