Delta Project Status

2
PLC PANEL Instrument Quantity 1 PLC Based Control System along with 1 No. SCADA Software, Control panel and accessories 1 17.08.13 2 1 17.08.13 TOTAL 2 Field Instruments Instrument Quantity 1 RTD+Temperature Indicating Transmitter 1 17.08.13 2 Pressure Transmitter 1 17.08.13 3 Control Valve for H2 line (Line size – 25mm) 1 4 Control Valve for steam supply line (Line size – 50mm) 1 5 On-off valve for Cooling water supply 1 6 On-off valve for return line 1 7 On-off valve for Steam trap 1 8 On-off valve for N2 gas line 1 9 On-off valve for Vacuum line 1 10 On-off valve for H2 Line 1 11 Mass Flow meter for H2 line 1 10.09.13 TOTAL 11 Erection Hardware Instrument Quantity Units 1 1 PAIR X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 250 Mtrs 10.09.13 2 8 CORE X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 300 Mtrs 10.09.13 3 4 CORE X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 250 Mtrs 10.09.13 4 6 MM2 EARTHING COPPER CABLE FOR INSTRUMENTS 60 Mtrs 5 150 MM WIDTH 50 MM COLLER ( PERFORATED ) 50 Mtrs 10.09.13 6 50 MM WIDTH 50 MM COLLER ( PERFORATED ) 50 Mtrs 10.09.13 7 TRAY FITTING ACCESSORIES ( COUPLAR PLATES,NUT & BOLTS ETC 1 Lot 10.09.13 8 1/2" NPT DC FLP CABLE GLAND FOR GAS GR.IIC 20 Nos 10.09.13 9 1/2" ET DC NON FLP CABLE GLAND WITH CHECK NUT FOR PANEL 20 Nos 10.09.13 10 1/2" NPT MS PLUG WITH CHECK NUT 25 Nos 10.09.13 11 PRE-PRINTED FERRULES ON WHITE PVC 1 Nos 12 SS 304 TUBING - 1.25" THK ., 1/4" OD PVC COATED 140 Mtrs 10.09.13 13 1/4" NPTM X 1/4" OD CONNECTOR 15 Nos 10.09.13 14 1/4" OD X 1/4" OD UNION 20 Nos 10.09.13 15 1/4" OD EQUAL TEE 4 Nos 10.09.13 16 1/4" NPT PLUG 20 Nos 10.09.13 17 1 Nos 10.09.13 Sr No Dispatch date from Prolific Control room readiness Tray entry upto panel Panel Condition Earthing upto panel 1 No. 2 KVA Online UPS with isolation transformer for 30mins battery backup & 1 No. Commercial Personal Computer PC is not yet dispatched Sr No Dispatch date from Prolific Process connection avai Instrument testing done Instrument installatio n accessories readiness Instrument installatio n status Wiring & termination s 17.08.13, 10.09.13 17.08.13, 10.09.13 Sr No Dispatch date from Prolific Readiness of Layout Installatio n as per layout AIR HEADER - 8 POINTS with 1/4" SS 3104 Needle Valve Fabricated with 2" SS 304 Sch 40 Pipe , 1" Ball Valve At Inlet & Outlet ( Drain ) having Dual AFR in parallary arranged as per specification

description

hi

Transcript of Delta Project Status

Page 1: Delta Project Status

PLC PANEL

Instrument Quantity

1 PLC Based Control System along with 1 No. SCADA Software, Control panel and accessories 1 17.08.13

2 1 17.08.13

TOTAL 2

Field Instruments

Instrument Quantity

1 RTD+Temperature Indicating Transmitter 1 17.08.13

2 Pressure Transmitter 1 17.08.13

3 Control Valve for H2 line (Line size – 25mm) 1

4 Control Valve for steam supply line (Line size – 50mm) 15 On-off valve for Cooling water supply 16 On-off valve for return line 1

7 On-off valve for Steam trap 1

8 On-off valve for N2 gas line 1

9 On-off valve for Vacuum line 1

10 On-off valve for H2 Line 1

11 Mass Flow meter for H2 line 1 10.09.13

TOTAL 11

Erection Hardware

Instrument Quantity Units

1 1 PAIR X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 250 Mtrs 10.09.13

2 8 CORE X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 300 Mtrs 10.09.13

3 4 CORE X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 250 Mtrs 10.09.13

4 6 MM2 EARTHING COPPER CABLE FOR INSTRUMENTS 60 Mtrs

5 150 MM WIDTH 50 MM COLLER ( PERFORATED ) 50 Mtrs 10.09.13

6 50 MM WIDTH 50 MM COLLER ( PERFORATED ) 50 Mtrs 10.09.13

7 TRAY FITTING ACCESSORIES ( COUPLAR PLATES,NUT & BOLTS ETC 1 Lot 10.09.13

8 1/2" NPT DC FLP CABLE GLAND FOR GAS GR.IIC 20 Nos 10.09.13

9 1/2" ET DC NON FLP CABLE GLAND WITH CHECK NUT FOR PANEL 20 Nos 10.09.13

10 1/2" NPT MS PLUG WITH CHECK NUT 25 Nos 10.09.13

11 PRE-PRINTED FERRULES ON WHITE PVC 1 Nos

12 SS 304 TUBING - 1.25" THK ., 1/4" OD PVC COATED 140 Mtrs 10.09.13

13 1/4" NPTM X 1/4" OD CONNECTOR 15 Nos 10.09.13

14 1/4" OD X 1/4" OD UNION 20 Nos 10.09.13

15 1/4" OD EQUAL TEE 4 Nos 10.09.13

16 1/4" NPT PLUG 20 Nos 10.09.13

17 1 Nos 10.09.13

Sr No

Dispatch date from Prolific

Control room readiness

Tray entry upto panel

Panel Condition

Earthing upto panel

1 No. 2 KVA Online UPS with isolation transformer for 30mins battery backup & 1 No. Commercial Personal ComputerPC is not yet dispatched

Sr No

Dispatch date from Prolific

Process connection avai

Instrument testing done

Instrument installation accessories readiness

Instrument installation status

Wiring & terminations

Cold loop check

simulation check

power on check

17.08.13, 10.09.13

17.08.13, 10.09.13

Sr No

Dispatch date from Prolific

Readiness of Layout

Installation as per layout

AIR HEADER - 8 POINTS with 1/4" SS 3104 Needle ValveFabricated with 2" SS 304 Sch 40 Pipe , 1" Ball Valve At Inlet & Outlet ( Drain ) having Dual AFR in parallary arranged as per specification

D4
PC is not yet dispatched
E27
Not yet dispatched
E34
Not yet dispatched