PLC PANEL
Instrument Quantity
1 PLC Based Control System along with 1 No. SCADA Software, Control panel and accessories 1 17.08.13
2 1 17.08.13
TOTAL 2
Field Instruments
Instrument Quantity
1 RTD+Temperature Indicating Transmitter 1 17.08.13
2 Pressure Transmitter 1 17.08.13
3 Control Valve for H2 line (Line size – 25mm) 1
4 Control Valve for steam supply line (Line size – 50mm) 15 On-off valve for Cooling water supply 16 On-off valve for return line 1
7 On-off valve for Steam trap 1
8 On-off valve for N2 gas line 1
9 On-off valve for Vacuum line 1
10 On-off valve for H2 Line 1
11 Mass Flow meter for H2 line 1 10.09.13
TOTAL 11
Erection Hardware
Instrument Quantity Units
1 1 PAIR X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 250 Mtrs 10.09.13
2 8 CORE X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 300 Mtrs 10.09.13
3 4 CORE X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED 250 Mtrs 10.09.13
4 6 MM2 EARTHING COPPER CABLE FOR INSTRUMENTS 60 Mtrs
5 150 MM WIDTH 50 MM COLLER ( PERFORATED ) 50 Mtrs 10.09.13
6 50 MM WIDTH 50 MM COLLER ( PERFORATED ) 50 Mtrs 10.09.13
7 TRAY FITTING ACCESSORIES ( COUPLAR PLATES,NUT & BOLTS ETC 1 Lot 10.09.13
8 1/2" NPT DC FLP CABLE GLAND FOR GAS GR.IIC 20 Nos 10.09.13
9 1/2" ET DC NON FLP CABLE GLAND WITH CHECK NUT FOR PANEL 20 Nos 10.09.13
10 1/2" NPT MS PLUG WITH CHECK NUT 25 Nos 10.09.13
11 PRE-PRINTED FERRULES ON WHITE PVC 1 Nos
12 SS 304 TUBING - 1.25" THK ., 1/4" OD PVC COATED 140 Mtrs 10.09.13
13 1/4" NPTM X 1/4" OD CONNECTOR 15 Nos 10.09.13
14 1/4" OD X 1/4" OD UNION 20 Nos 10.09.13
15 1/4" OD EQUAL TEE 4 Nos 10.09.13
16 1/4" NPT PLUG 20 Nos 10.09.13
17 1 Nos 10.09.13
Sr No
Dispatch date from Prolific
Control room readiness
Tray entry upto panel
Panel Condition
Earthing upto panel
1 No. 2 KVA Online UPS with isolation transformer for 30mins battery backup & 1 No. Commercial Personal ComputerPC is not yet dispatched
Sr No
Dispatch date from Prolific
Process connection avai
Instrument testing done
Instrument installation accessories readiness
Instrument installation status
Wiring & terminations
Cold loop check
simulation check
power on check
17.08.13, 10.09.13
17.08.13, 10.09.13
Sr No
Dispatch date from Prolific
Readiness of Layout
Installation as per layout
AIR HEADER - 8 POINTS with 1/4" SS 3104 Needle ValveFabricated with 2" SS 304 Sch 40 Pipe , 1" Ball Valve At Inlet & Outlet ( Drain ) having Dual AFR in parallary arranged as per specification