Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
-
Upload
sunrunners -
Category
Documents
-
view
220 -
download
0
Transcript of Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
1/54
EFFICIENTENTERPRISETOUR
1
MODERNIZINGCOMPUTECAPACITY TO MINIMIZEINFRASTRUCTURE
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
2/54
NEXTGENERATIONSERVERSTHANK YOU FOR YOUR TIME.
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
3/54
TECHNOLOGY SHIFTINTEL XEON 5500 SERIES New Processor Architecture
5520 (TYLERSBURG) CHIPSET ARCHITECTURE Integrated Memory Subsystem New I/O subsystem
DDR3 MEMORY
UDIMMS / RDIMMS replace FBDIMMs
PURPOSEFUL DESIGN Unprecedented Reliability
SYSTEM MANAGEMENT Lifecycle Controller
Dell Management Console
BEST POWER & THERMALS Entire server designed for efficiency
ENABLING VIRTUALIZATION Increased memory & I/O Better Management of Virtualized Environments
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
4/54
UNMATCHED BUSINESS CAPABILITIESINTEL XEON PROCESSOR 5500 SERIES Up to 3.5x the bandwidth for technical computing
Up to 2.25x the performance for enterprise computing
2x software threads and performance boost on demand
IntelligentPerformance
Flexible
Virtualization
Expand existing pools with Intel VT FlexMigration
Unique capabilities for live VM migration over network
Highest 2S virtualization scores mean more VMs per server
Automated
Energy Efficiency
Highest system level performance/watt
Lower system idle power reduces IT costs
Dynamically turns cores on/off to meet performance needs
Source: Intel internal measurements, January 2009. For notes and disclaimers, see performance and legalinformation slides at end of this presentation.
Boost performance and lower IT costs
DELL CONFIDENTIALDELL CONFIDENTIAL 4
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
5/54
SCALABLE PORTFOLIO OF SOLUTIONSAMDOPTERON PROCESSOR SERIES Up to 50% more performance than previous
generation Full suite of features provide value at every price
point
More horsepower, same thermals
Price perPerformance
Virtualization
Socket compatible; plug in upgradeable
Uses same DDR2 memory across generations
One platform with fewer images and drivers
Scalability and performance without compromise
DELL CONFIDENTIAL
Hardware-assisted virtualization technologies
Live multi-server VM migration
A focus on Efficiency for multi-threadedvirtualization environments
Stability
DELL CONFIDENTIAL 5
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
6/54
#1 Server in Customer Satisfaction:2009 Technical Business Review
Best Virtualization Server:PowerEdge R905 from InfoWorlds2009 Technology of the Year Awards
Winners of the 2009 iF GermanProduct Design Award: PowerEdgeR610 and R710
PowerEdge R610:ITPro Editors Choice AwardPC Pros 5-Star RatingTrusted Reviews Recommended
Award
DELL POWEREDGE AWARDS
DELL CONFIDENTIAL 6
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
7/54
Top VMmark Scores: Top 16-core performance with M905
Best TCO: Dell Blades over HP
Best Perf/Watt: R710 andEqualLogic storage = 21%Perf/Watt over HP
TPC-C: 2 of the top 5Price/Performance Positions
TOP BENCHMARK SCORES
For the latest benchmark results visit www.dell.com/benchmarks.
DELL CONFIDENTIAL 7
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
8/54
THE NEXT GENERATIONPOWEREDGE SERVERSSYSTEMS MANAGEMENT
Simplified Infrastructure
Management
INSPIRED DESIGN
Customer DrivenUsability & Design
POWER &THERMALSEnergy Tuned
Technologies
VIRTUALIZATION
Enhanced Virtualization
Performance
VMVMVM
VM
VMVM
VM
VMVMVM
VM VMVM
VMVM
VMVMVM
VM
VM VMVMVM
VM
8DELL CONFIDENTIAL 8
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
9/54
POWEREDGE SERVER PORTFOLIOCOVERING ENTERPRISE IT NEEDS FROM BASIC TOSPECIALIZED COMPUTING
MORE SPECIALIZATION
VIRTUALIZATION
R900
R905
R805
4-SOCKET
T300, T310,T410
PE SC1430T105, T100,
T110
R200, R300, R210, R410 MOREBASIC
M-SeriesM1000e, M600, M605, M610
M710, M805, M905 ULTRA
DENSITY
R710, R510
T610, T710
R610MORE
DENSITY
MOREEXPANDABILITY
PE 2970,PE 2970 ES
PE 1900, T605 MOREBASIC
EXPANDA
BILITY|DENSITY
9APPLICATION COMPLEXITYDELL CONFIDENTIAL 9
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
10/54DELL CONFIDENTIAL 10
11th GENERATION POWEREDGEPORTFOLIO
T610: 2S Tower
R610: 2SRack
R710: 2SRack
M610: 2S HalfHeight Blade
M710: 2S FullHeight Blade
T410: 2S TowerT710: 2STower
R410: 2SRack
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
11/54
DESIGN & VALIDATIONEVERY STAGE OF THE PRODUCT DEVELOPEMENT
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
12/54
ALL STEEL CONSTRUCTION cable mgt. arm eliminates creep
NEW METAL Hard Drive Carriers
Robust fan cage design with blind mate single pull fan module forIMPROVED MAINTENANCE
Quick release rack latching for EASY DEPLOYMENT
Multi-layer LCD screen positioned on the front of the bezel forAISLE LEVEL ACCESS to monitor and maintain
PURPOSEFUL DESIGN: RELIABILITY
Quality Steel Components Clear Multi-layer LCD
DELL CONFIDENTIALDELL CONFIDENTIAL 12
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
13/54
Image COMMONALITY Across Platforms
Clean, CONSISTENT placement of interface ports and LCD
REDUCED COMPLEXITY of internal cabling
Obvious, clear component ORGANIZATION
CONSISTENT rack installation and removal, slam latch design
PURPOSEFUL DESIGN: COMMONALITY
Clean Component Organization Consistent PSU Latch Design
DELL CONFIDENTIALDELL CONFIDENTIAL 13
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
14/54
Right sized power supplies 90%+ EFFICIENT Design
Right sized PSUs LOWERS POWER DRAW at base server level
Power Management features POWER CAPPING, powerinventory & budget
Far more EFFICIENT MODULAR fan design
DELL CONFIDENTIAL
INDUSTRYS BEST PERFORMANCEPER WATT
Modular Cooling Fan Design Right Sized Power Supplies
14
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
15/54
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
16/54
SIMPLIFY IT - INDUSTRY FIRSTEMBEDDED MANAGEMENTSTREAMLINEDServer configuration, zeromedia deployment andupdate with tools embeddedon Dell Platforms
SIMPLIFIEDSingle-button, singlecommand update
FASTERserver deployment fromdays to hours
INTUITIVEUser interface
16
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
17/54
SIMPLIFY IT - INTEGRATED, OPENSYSTEMS MANAGEMENTDell Management Console
SIMPLIFIEDSingle console managementvs. multiple complex andproprietary consoles
REDUCED COSTCut management costs inhalf
OPEN
Architecture designed tocompliment and integrate
FULLY HETEROGENEOUSHardware support
17
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
18/54
INDUSTRYS FIRST EMBEDDEDMANAGEMENT SYSTEM
Only vendor to deliver SIMPLIFIED embedded management
Zero Media, SIMPLIFIED Deployment
STREAMLINED server update process
Minimum FASTER server deployment
DELL CONFIDENTIAL
Confusing, Complex, ResourceIntensive, Slow and Proprietary
Dell Lifecycle ControllerEmbedded Management
18
http://welcome.hp.com/country/us/en/welcome.html -
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
19/54
VIRTUALIZATION LEADERSHIP
19
VIRTUALIZATION
OPTIMIZED PORTFOLIOPurpose-built Servers and Storage
Platforms
PERFORMANCE
LEADERSHIPTop Scores
INTEGRATED, OPEN
MANAGEMENTSimplifies Virtual
Infrastructure Management
VIRTUALIZATIONSERVICESRapid Virtualization Deployment
DELL CONFIDENTIAL 19
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
20/54
SIMPLIFYING VIRTUALIZATIONDELLS END-TO-END SOLUTION #1 in virtualization
performance benchmarks
Choice of hypervisors fromVMware, Citrix, Microsoft
Performance bottlenecks solvedwith more memory and I/O
Complete virtualizationservices portfolio including
workshops, readinessassessment, design andimplementation services
Storage solutions optimized forvirtualization environments
DELL
CON
FIDENTIA
L20
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
21/54
DELL POWEREDGE SERVERSVIRTUALIZATION OPTIMIZEDDesigned forVirtualization
Performance
Your Choice:Form factors,Hypervisors,
I/O fabrics
BestPerformance at
the LowestPower Usage
100% commitment to standards
UnmatchedPerf/Watt/$
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
22/54
VIRTUALIZATION POWERHOUSE Outstanding virtualization
performance benchmarks
Choice of embeddedhypervisors from VMware,Citrix, Microsoft
Performance bottlenecks
solved with more memoryand I/O
Complete virtualizationservices portfolio includingworkshops, readiness
assessment, design andimplementation services
Storage solutions optimizedfor virtualizationenvironments
HYPERVISOR
VM VM VM VM VM VM VM VM
VIRTUAL MACHINES
` ` `
CISCO &POWERCONNECTSWITCHES
POWEREDGESERVERS
EQUALLOGIC &DELL | EMCSTORAGE
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
23/54
ALLIANCES IN VIRTUALIZATION VMware Infrastructure 3 / ESX & ESXi
x86 Virtualization Software Market leader Enterprise-class feature set
Familiar user experience backed by Microsoft Comprehensive mgmt for physical and virtual environments Cost effective solution for Microsoft environments
Citrix XenServer Express & Enterprise Cost effective and easy to use, based on open source Xen Rich feature set
Software solutions to facilitate virtualization with Dell hardware
PowerRecons for datacenter performance optimization PowerConvert to assist in efficiently managing movement of server
workloads between physical and virtual platforms
Processing Area Network (PAN) Manager Infrastructure virtualization S/W enables customers to create and
manage a single pool of physical and virtualized servers
http://images.google.com/imgres?imgurl=http://www.xensource.com/Style%20Library/Xensource-zip-images/xs_logos/gifs/xen_server_ms.gif&imgrefurl=http://netdaily.org/citrix-xenserver.html&h=246&w=544&sz=7&hl=en&start=1&um=1&usg=__oIE5WV8XvxQqTe038DzYn2Tp_hY=&tbnid=gqayWDdb0Y3XKM:&tbnh=60&tbnw=133&prev=/images?q=xen+server&um=1&hl=en&rls=GGLJ,GGLJ:2006-37,GGLJ:en&sa=N -
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
24/54
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
25/54
BLADE LEADERSHIPTO TRUE MODULAR COMPUTING
25
The Most Manageable, Flexible, Energy-Efficient Blade System Available
PowerEdge M1000e, M600, M605, M610,
M710, M805, M905
MODULAR: FlexIO (Snap-In-Scalability)
MANAGEABLE: FlexAddress
FLEXIBLE: Enabling Choice
DELL CONFIDENTIAL 25
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
26/54
26
DELIVERING BLADES FOCUSED ONPAIN POINTS
USE LESS POWER
19% More Energy
Efficient
SIMPLER
13X Faster
Deployment
BETTER
PERFORMANCETop Benchmark Scores
MORE FLEXIBLEFlexIO &
FlexAddress
DELL CONFIDENTIAL 26
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
27/54
THE BLADE DECISION
BLADES OFFER:BETTER DENSITY Blade Servers provide the best density for serversdeployed in a rack.
LOWER POWER AND COOLING Blades use less power and run coolerthan traditional servers.
EASE OF MANAGEMENT Blade Servers are easier to deploy then
traditional servers.REDUCE TCO Ease of management, reduced cabling and reducedacquisition cost assure best return on investment.
CONSIDERATIONS IN A BLADE DECISION:
LOCAL STORAGE NEEDS Environments that require 3 or more local hard drivesare not a good blade candidate.
REQUIRE STANDARD PCI SLOTS Traditional PCI Cards do not work in a bladeenvironment.
HAVE FEWER THAN 4 SERVERS Environments with less than four servers maybe challenged with pricing over traditional servers.
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
28/54
BUILDING A BETTER BLADE
Competitive Blade Solutions LendThemselves to Issues
TCO
DEPLOYMENT
PROPRIETARY
INFLEXIBLE
Return on Investment does not payoffas well as it could
Complicated implementation
leading to wasted time
Wasteful rip-and-replace upgrades
Vendor-specific systems tools andcomplex licensing
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
29/54
THE NEXT LEVEL OF BLADES
29
M605 & M610 HALF HEIGHTM805, M905 & M710 FULL
HEIGHT
FEATURES & BENEFITS
Designed for virtualization, database and messagingworkloads
Latest Intel and AMD architectures
Future-ready, capable of supporting multiple generationsof blade servers and upcoming I/O technologies
More DIMM slots and I/O ports deliver higherconnectivity capacity and flexibility
FlexIO technology eliminates rip and replace bladeswitch upgrades
FlexAddress provides slot-assigned, persistent
WWN/MAC without additional, complicatedmanagement tools or proprietary hardware
Lower power consumption with Energy SmartTechnologies
M1000E CHASSIS
DELL CONFIDENTIAL 29
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
30/54
DELL BLADES:THE DATA CENTER SOLUTIONDENSITY Up to 16 servers in 10U of rackspace with network and storage connectivity.
ENERGY Designed to be energy efficient andgenerate less heat than traditional servers.
MANAGEMENT Complete management fromdeployment to remote control.
I/O Offering a multitude of I/O options includingFibre Channel and InfiniBand.
NETWORKING Designed with ease of networkmanagement.
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
31/54
M1000E BLADE CHASSIS - REAR
3
4
2
1
1 MANAGEMENT
2 FLEXIO
3 COOLING
4 POWER
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
32/54
FLEXIO OPTIONSDell M-series provides complete, snap-in FlexI/Oscalability down to the switch interconnects. FlexIOtechnology is the foundation of the M1000e I/Osubsystem.
CISCO NETWORKING
DELL POWERCONNECT
FIBRE CHANNEL
INFINIBAND
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
33/54
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
34/54
I/O MODULES FORVIRTUALIZATION
10 GbE switch, with 8external ports forvirtualizationperformance
Modular options:SFP+, CX4,10G Base-T (1Q09)
Managementsimplification,performance, andscalability combine tominimize TCO
The worlds first end-to-
end 8Gb Fibre Channelsolution for bladesprovides morebandwidth to meet yourvirtualization needs
M5424 FC8 M3130PowerConnectM8024 10GbE
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
35/54
FLEXADDRESS
CMC assigns WWN/MAC values to blade slots in placeof factory-assigned blade WWN/MAC
Allows for blades to be swapped without affecting SANZoning, iSCSI zoning, or any MAC-dependent functions
SD card is provisioned with a UNIQUE pool of 208MACs and 64 WWNs
SD card is inserted into the CMC at Dell Factory orAPOS SD card is now tied to that specific chassis
User-configurable to enable iSCSI MAC, Ethernet MAC,and/or WWN Persistence
COST EFFECTIVE & INTELLIGENTNETWORK ADDRESSING
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
36/54
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
37/54
SIMPLIFIED CABLING
STACKED ETHERNET SWITCHING Internal switches have optional 10GbEuplinks and/or stacking connectors
Manage/configure multiple switches asone with stacking
Consolidate uplinks from multiple
chassis into 2-4 x 10GbE ports
STACKED CMCs CMC has a 2nd Ethernet port for
connection to other CMCs in the rack CMC connects to the management
network to manage all blade servers Saves port consumption on external
switches
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
38/54
DELL CONFIDENTIAL 38
Dell offers up to 43%
Lower Acquisition
Cost
and41% Lower TCO overequivalent blade servers
from HP.*
* Source: Principled Technologies, Inc., Total cost of ownership (TCO) of Dell PowerEdge M710 and HP ProLiant BL685c G5 blade solutions a March 2009 reportcommissioned by Dell. TCO includes hardware, support, management software, IO virtualization, power, cooling, network ports, and data center space.
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
39/54
39
More servers impacts power, cooling, management,
and data center space cost
32 full-height Dellblades in one rackof four full 8-blade
enclosures
40 full-height HPblades in Two rackswith five full 8-blade
enclosures
Dell HP
POWER
COOLING
MANAGEMENTCOST
DATA CENTERSPACE COST
OperatingExpenses
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
40/54
40
Dell RISC Migration Solutions
SIMPLIFY I.T.
MINIMIZE RISC.
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
41/54
41
RISC Migration Why Migrate andWhy Now?
Forrester predicts WW IT
spending decline ~3% in 2009*
IT must reduce TCO andenhance productivity andcompetitiveness
*eWeek.com, Forrester Research Sees IT Spending Declining in 2009, by Scott Ferguson, 2009-01-13http://www.eweek.com/c/a/IT-Infrastructure/Forrester-Research-Sees-IT-Spending-Declining-in-2009/
Global Economies and IT Spending Under Pressure
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
42/54
42
RISC Versus Industry Standards
Choice,Flexibility& Value
Industry Standard Choice(IntelXeon Processor Based Solutions)
Multiple OEMs
Multiple Operating Systems
Open Ecosystem &Solutions
Services
Traditional Proprietary Stack(SPARC, POWER, etc.)
Hardware
OS
Solutions
Services
Closed
CPU
CentricSolutions
Industry standard servers typically offer betterprice/performance, investment protection, and costs
savings than RISC-based servers
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
43/54
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
44/54
Sun to Dell OracleMigration
5X improvement in
overall performance
Payback in 6 months
202% ROI over 5 years
Success Stories:
Actual results and ROI calculated after 3+ years (2004-2007)
Source: Dells Oracle-based Order Entry Solution. Published by Mainstay Partners, 2007.http://www.dell.com/downloads/global/solutions/oracle_roi.pdf
Large FinancialInstitution Dell Svcs.
72% of proprietary UNIXservers could be migratedwithin 24 months
$32Min infrastructure
savings over 3 years,including migration costs
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
45/54
98.7
7881.6
85.5
0
20
40
60
80
100
120
Intel Xeon
X5355 2.66GHz
2P /8C**
Sun V490 w/
UltraSP ARC *
IV+ 2.1GH z
4P /8C**
Fujitsu* M 4000
w/ SP ARC 64*
VI 2.15GHz
4P /8C**
Su n
UltraSP ARC T2
1.4GH z 1P /8C **
Sco
re
SPECint_rate2006* (Solaris)
BEST PUBLISHED PERFORMANCE COMPARISON (DP)INTEL XEON PROCESSOR 5000 SEQUENCE VS. SPARC* PROCESSOR
All products, dates, and figures are subject to change without any notice. Copyright 2009, Intel Corporation. All rights reserved. Performance tests and ratings are measuredusing specific computer systems and/or components and reflect the approximate performance of Intel products as measured by those tests. Any difference in system hardwareor software design or configuration may affect actual performance. Buyers should consult other sources of information to evaluate the performance of systems or components
they are considering purchasing. For more information on performance tests and on the performance of Intel products, visithttp://www.intel.com/performance/resources/limits.htm or call (U.S.) 1-800-628-8686 or 1-916-356-3104.
SPECint_rate_base2006* (Solaris)
On Solaris operating system, Intel Xeon processor based systems providebetter performance than UltraSPARCT2*/SPARC64* processor based systems.
80.3
71.768.6
76.4
0
10
20
30
40
50
60
70
80
90
100
Intel Xeon
X5355
2.66GHz
2P/8C**
Sun V490 w/
Ul t raSPARC*
IV+ 2.1GH z
4P/8C**
Fujitsu M 4000
w/ SPAR C64*
VI 2.15GHz
4 P / 8 C* *
Su n
UltraSPARC
T2 1.4GH z
1P /8C**
Score
Higher isbetter
Higher isbetter
P: Processor, C: Core, S: Socket. Source: www.spec.org as of Apr 15, 2009For notes and disclaimers, see legal information slide at end of this presentation.
Dell Confidential Internal Use Only
ENERGY EFFICIENCY
http://www.spec.org/http://www.spec.org/ -
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
46/54
INTEL XEON PROCESSOR VS. SUN ULTRASPARC* T2
SPECjbb2005* vs. SunUltraSPARC* T2 (BOPs) Energy Efficiency
(BOPs/Watt)
Up to 77% More Efficient vs. UltraSPARC* T2on Java
PowerConsumption
(Watts)
1.31x
192k
532k
1S Sun
Ultra-SPARCT2*
Higher is better
Intel
Xeon
X7460
Intel
Xeon
X5460
Intel
Xeon
X7460
1.4 GHz
1S/8C/64T
2S Sun
Ultra-SPARCT2+*
4S Sun
Ultra-SPARCT2+*
373k
693k
303k
1.31x
464W
816W
1S Sun
Ultra-SPARCT2*
Lower is better
Intel
Xeon
X7460
Intel
Xeon
X5460
Intel
Xeon
X7460
2S Sun
Ultra-SPARCT2+*
4S Sun
Ultra-SPARCT2+*
770W
1525W
413W
1.31x
414
652
1S Sun
Ultra-SPARCT2*
Intel
Xeon
X7460
Intel
Xeon
X5460
Intel
Xeon
X7460
2S Sun
Ultra-SPARCT2+*
4S Sun
Ultra-SPARCT2+*
485
454
734
Higher is better
1.4 GHz
2S/16C/
128T
1.4 GHz
4S/32C/
256T
3.16 GHz
2S/8C/8T
2.66 GHz
4S/24C/24T
77%Gain!
Dell Confidential Internal Use Only
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
47/54
LOWER TCOTCO Comparison
Average
Solution A:
Alternative RISCServer
Solution B: Intel
Server Solution
Difference
(A-B)
Difference
(A- B) %
Server HW Costs $87,269 $21,151 $66,118 75.8%
Server SW Costs $452,133 $302,745 $149,388 33.0%
System ManagementLabor
$211,782 $70,505 $141,277 66.7%
Power and FacilitiesCosts
$16,810 $3,215 $13,595 80.9%
Migration/ProjectChange Costs
$3,521 $9,147 -$5,626 -159.8%
Total $771,516 $406,763 $364,752 47.3%
Example from Alinean1 ROI Analysis Calculator developed for Intel for migration fromSPARC solution to Red Hat on Intel2
Theoretical example only. Actual savings will vary.1See www.alinean.com for examples of calculators.2 Inputs: A theoretical customer in the Financial Services industry with revenues of $1Bn per year, expected growth of 15%, and 2,000 users.Current solution hypothesized as 10 Sun SPARC V880 servers running Solaris, Oracle EE, Apache and HP OpenView. Theoretical customer had 5 systemsadministrators, 2.5 Systems operators, 99.5% availability with 30 hours scheduled downtime.Solution A hypothesized customer remained on SPARC, upgrading to 2 Sunfire M5000 servers.Solution B hypothesized customer migrating to 2 HP BL680c servers with Intel Xeon 7340 processors, Red Hat Enterprise Linux f rom Solaris, JBoss from Apacheand IBM Tivoli from HP Openivew. Oracle EE remained as the database.
Dell Confidential Internal Use Only
https://roianalyst.alinean.com/DellServerSavingsCalculator/
http://www.alinean.com/https://roianalyst.alinean.com/DellServerSavingsCalculator/https://roianalyst.alinean.com/DellServerSavingsCalculator/http://www.alinean.com/ -
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
48/54
SAMPLE ROI SAVINGS
Impact to baseline:
Includes ramp up costs priorto migration start
Reductions happen as UNIXhardware decommissioned
48
Comparisons
Initial Spend
Linux Migration
UNIX environment upgradeand consolidation
-1600000
-1400000
-1200000
-1000000
-800000
-600000
-400000
-200000
0
200000
400000
SpendImpactinDollars
36 Month Expense Change
0
1
2
3
4
5
6
US
DinMillions
36 Month Comparison
Dell Confidential Internal Use Only
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
49/54
REDUCE COST: SW EXAMPLEWhat is the License for Oracle Enterprise Edition with no Site License optionson a 4 socket Intel Xeon 7400 System Vs a 4 socket UltraSPARCT2+ system?
Step 1: Understand the license core factor Intel Xeon Series 74XX & Series 55XX = 0.5 per core
SUN UltraSPARC T2+ = 0.75 per core
SUN / Fujitsu SPARC64VII = 0.75 per core
Step 2: Multiple cores by license core factor
4 Xeon 7400 = 0.5 per core X 24 cores = 12 4 UltraSPARCT2+ = 0.75 per core X 32 cores = 24
Step 3: Oracle EE Licenses of $47,500 X Step 2
Xeon 7400 12 X $47,500 = $570,000
UltraSPARCT2+ 24 X $47,500 = $1,140,000
Step 4: Oracle EE yearly (after year 1) support fees $10,450 X Step 2 Xeon 7400 12 X $10,450 = $125,400
UltraSPARCT2+ 24 X $10,450 = $250,800
Source: http://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdf
2X
2X
Dell Confidential Internal Use Only
http://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdfhttp://www.oracle.com/corporate/contracts/library/processor-core-factor-table.pdf -
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
50/54
DELL CONFIDENTIAL 50
\etc
!PROJECTPORTAL
DeliversVisibility and
Accountability
TechnicalConstraints
Business Attributes
PerformanceCharacteristics
WorkloadRationalization
The Collaborative Processaccelerates progress
GETTING THERE ISNT JUST ABOUTTECHNOLOGY
Dell Confidential Internal Use Only
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
51/54
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
52/54
ANOTHER EXAMPLE, REDUCINGMESSAGING INFRASTRUCTURE &COMPLEXITY
52
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
53/54
2:1 CONSOLIDATION
DELL CONFIDENTIAL
MICROSOFT EXCHANGE AND 11G
Exchange 03 on a 2850 Exchange 07 on an
R710
Max # of heavymailboxes ~2000-3000 ~5000-6000
Usable RAM 4GB 32GB
Architecture 32-bit 64-bit
OLTP DATABASE CONSOLIDATION1 PE R710 is greater than 10 PE 2650s
-
8/7/2019 Dell - Track 1 Modernizing Compute Capacity to Minimize Infrastructure
54/54
THANK YOU
Intermission