Deliverable 10.2
First report on dissemination activities
Document version : Final
Submission Date : 30/03/2018
Dissemination Level
Contribution to
:
:
Public
WP10
Document Owner : IPB
File Name : GO0D MAN Deliverable 10.2
Revision : 0.4
Project Acronym : GO0D MAN
Project Title : Agent oriented zero defect multi-stage manufacturing
Grant Agreement n. : 723764
Call : H2020-IND-CE-2016-17
Project Duration : 36 months, from 01/10/2016 to 30/09/2019
Website : go0dman-project.eu
Page 2 of 30 Deliverable 10.2 First report on dissemination activities
Revision History
REVISION DATE INVOLVED PARTNERS DESCRIPTION
0.1 10/05/2017 IPB Definition of the deliverable structure, document generation and creation of ToC
0.2 09/03/2018 LOC Communication activities
0.3 18/03/2018 IPB Contribution for the dissemination activities and formatting of the sections
0.4 29/03/2018 IPB Final revision of the document
List of Contributors:
Cristina Cristalli (LOC), Giacomo Angione (LOC), Isabella terzoni (LOC), Paulo Leitão (IPB), José
Barbosa (IPB)
Disclaimer: The information in this document is subject to change without notice.
Company or product names mentioned in this document may be trademarks or
registered trademarks of their respective companies.
All rights reserved. The document is proprietary of the GO0D MAN consortium members. No copying or
distributing, in any form or by any means, is allowed without the prior written agreement
of the owner of the property rights.
This document reflects only the authors’ view. The European Community is not liable for
any use that may be made of the information contained herein.
GO0D MAN project has received funding from the European Union’s Horizon 2020
research and innovation programme under grant agreement No 723764.
Page 3 of 30
Deliverable 10.2 First report on dissemination activities
Executive Summary
This deliverable reports the activities developed in the Task 10.1 (“Dissemination activities”) and
Task 10.2 (“Communication activities”) that belongs to the Work-Package (WP) 10 entitled
“Dissemination and Standardization”. This deliverable comprises the report of the major
achievements regarding the dissemination and communication activities during the first half of the
project and the dissemination and communication plan for the final part of the project.
In a brief manner, the plan of dissemination comprises the scientific dissemination, business
oriented communication and the general public communication activities. For the scientific
activities, some target scientific conferences and journals have been identified and addressed, being
also planned the organization of special sessions in these events and courses and seminars at
Universities. For the business communication activities, fair participations and more specific
workshops for interested industries will be organized. Actual and potential customers will be
informed with specific communication activities and spreading of the results of the project. For
general public communication activities, press publications have been prepared, social media have
been activated, website prepared and duly updated, newsletter prepared and disseminated. Special
attention has been devoted from a communication point of view to the participation to the 4ZDM
Cluster, a cluster of the projects funded by the EC on the topic of the Zero Defects Manufacturing.
Page 4 of 30 Deliverable 10.2 First report on dissemination activities
Table of Contents
1. Introduction ........................................................................................................................................ 8
1.1 Contextualization ....................................................................................................................... 8
1.2 Objective of the deliverable ....................................................................................................... 8
1.3 Structure of the deliverable ....................................................................................................... 8
2. Dissemination Activities M1-M18 .................................................................................................... 9
2.1 Academic activities ................................................................................................................... 9
Bachelor Works.................................................................................................................................. 9
Master Works................................................................................................................................... 10
PhD Works ....................................................................................................................................... 11
2.2 Scientific activities ................................................................................................................... 11
2.3 Conference events ................................................................................................................... 12
2.4 Exhibitions and fairs ................................................................................................................ 14
2.5 Inter-project activities .............................................................................................................. 15
2.6 Lectures and courses .............................................................................................................. 16
2.7 Overall evaluation .................................................................................................................... 16
3. Communication Activities M1-M18................................................................................................ 17
3.1 Corporate communication and design and website ............................................................. 17
3.2 The website .............................................................................................................................. 18
3.3 Electronic newsletter ............................................................................................................... 19
3.4 Brochure and Information material ........................................................................................ 21
3.5 Press ......................................................................................................................................... 22
3.6 Social Media ............................................................................................................................. 22
3.7 Measurement of the results of the communication activities ............................................. 24
4. Dissemination plan for the interval M18-M36 ............................................................................... 26
5. Communication plan for the interval M18-M36 ............................................................................ 29
6. Conclusions ..................................................................................................................................... 30
Page 5 of 30
Deliverable 10.2 First report on dissemination activities
List of Figures
Figure 1 – Award “Premio Innovazione 4.0” ......................................................................................... 15
Figure 2 – Project Logo .......................................................................................................................... 17
Figure 3 – Project Visual Identity ........................................................................................................... 17
Figure 4 – GO0D MAN website home page .......................................................................................... 18
Figure 5 – Statistical on website visits of the first 18 months ............................................................ 18
Figure 6 – Worldwide distribution of the website visits ....................................................................... 19
Figure 7 – Newsletter example .............................................................................................................. 20
Figure 8 - GO0D MAN brochure .............................................................................................................. 21
Figure 9 - GO0D MAN poster .................................................................................................................. 22
Figure 10 – GO0D MAN Facebook page ............................................................................................... 23
Figure 11 - Statistical on Facebook visits and likes.............................................................................. 23
Figure 12 – GO0D MAN Twitter page .................................................................................................... 24
Page 6 of 30 Deliverable 10.2 First report on dissemination activities
List of Tables
Table 1 - GO0D MAN KPI for the Dissemination activities ................................................................... 16
Table 2 – Newsletter campaign results ................................................................................................ 20
Table 3 – Twitter Statistics .................................................................................................................... 24
Table 4 - GO0D MAN KPI for the Communication activities ................................................................ 25
Table 5 - GO0D MAN KPI for the Dissemination activities ................................................................... 26
Table 6 - GO0D MAN KPI for the Communication activities ................................................................ 29
Page 7 of 30
Deliverable 10.2 First report on dissemination activities
Acronyms
GO0DMAN Agent-oriented Zero Defect Multi-stage Manufacturing
KPI Key Performance Indicators
WP Work-Package
ZDM Zero Defects Manufacturing
DoA Description of Actions
CDB Common Dissemination Booster
Page 8 of 30 Deliverable 10.2 First report on dissemination activities
1. Introduction
1.1 Contextualization
This deliverable, entitled “D10.2 First report on dissemination activities”, reports the activities
developed in the Task 10.1 (“Dissemination activities”) and Task 10.2 (“Communication activities”)
that belongs to the Work-Package (WP) 10 entitled “Dissemination and Standardization”.
The objective of the WP10 is to disseminate and communicate the impact of the GO0DMAN project
results and innovations across the scientific, technical and industrial communities and push forward
the standardization activities. An important remark is that all partners contribute for the
dissemination activities, and academy and industry must be targeted during the execution of these
activities. In particular, the objective of the Task 10.1 is to carry out publicity and dissemination
activities to the scientific, technical and industrial communities.
1.2 Objective of the deliverable
This deliverable has a two-fold objective. If by one hand, the major achievements regarding the
dissemination and communication activities during the first half of the project are reported, on the
other, the dissemination plan for the second half of the project is derived.
1.3 Structure of the deliverable
In the GO0DMAN project, we have a clear division between the dissemination activities (associated
to the Task 10.1) and the communication activities (associated to the Task 10.2), which is reflected
in this deliverable. In this way, this deliverable, is divided in two major parts and within these by other
two concerning the deliverable broader reporting scope. On a higher level, the project execution is
divided in two, which coincides with the execution report until the M18 (i.e. the current time on which
this deliverable is being reported) and the second part as a projection to the remain of the project.
The first are considered in sections 2 and 3 for dissemination and communication respectively, while
the second (i.e. after M18) are depicted in sections 4 and 5 (also for dissemination and
communication).
Finally, the deliverable is finalized with generic remarks about the overall dissemination and
communication activities.
Page 9 of 30
Deliverable 10.2 First report on dissemination activities
2. Dissemination Activities M1-M18
This chapter aims to report the dissemination activities developed during the months M1 to M18,
corresponding to the first half of the project.
2.1 Academic activities
The participation in collaborative projects, such as GO0DMAN, opens the possibility to propose real-
world problems to undergraduate or graduate students. In this situation, the future of Europe’s
working force has an early contact with real-world problems beneficing also from this factor.
Therefore, during the GO0DMAN project, several, dedicated, projects or thesis have been proposed
and are being conducted. The following tables summarizes the Bachelor, MSc and PhD works being
conducted under the GO0DMAN project in this first period.
Bachelor Works
TITLE PROGETTO E CARATTERIZZAZIONE SPERIMENTALE DI UN SISTEMA BASATO SU TRIANGOLAZIONE LASER PER MISURE DI GAP& FLUSH
AUTHOR Armili Andrea SUPERVIROR(S) Castellini Paolo YEAR 2017 DEGREE Bachelor
TITLE SVILUPPO DI PROGRAMMI E STRATEGIE PER LA MOVIMENTAZIONE DI SENSORI E PICK AND PLACE DI COMPONENTI IN UNA STAZIONE DI MISURA IN LINEA DI PRODUZIONE
AUTHOR Cascavilla Andrea SUPERVIROR(S) Castellini Paolo, Chiariotti Paolo YEAR 2017 DEGREE Bachelor
TITLE PROGETTAZIONE E REALIZZAZIONE DI UN SISTEMA A TRIANGOLAZIONE PER CONTROLLI IN AMBITO AUTOMOTIVE
AUTHOR Del Papa Marco SUPERVIROR(S) Castellini Paolo YEAR 2017 DEGREE Bachelor
TITLE CALIBRAZIONE E PROGRAMMAZIONE DI UN ROBOT ANTROPOMORFO PER LA MOVIMENTAZIONE DI SENSORI IN AMBITO INDUSTRIALE
AUTHOR Di Sabatino Christian SUPERVIROR(S) Castellini Paolo YEAR 2017 DEGREE Bachelor
TITLE ANALISI E SVILUPPO DI ALGORITMI PER IL RICONOSCIMENTO DI IMMAGINI IN CAMPO AUTOMOBILISTICO
AUTHOR Ferretti Mattia
Page 10 of 30 Deliverable 10.2 First report on dissemination activities
SUPERVIROR(S) Castellini Paolo YEAR 2017 DEGREE Bachelor
TITLE REALIZZAZIONE DI UN SISTEMA DI ACQUISIZIONE ED ELABORAZIONE DI IMMAGINI PER IL CALCOLO DI GAP&FLUSH FRA SUPERFICI ADIACENTI
AUTHOR Granata Federico SUPERVIROR(S) Castellini Paolo YEAR 2017 DEGREE Bachelor
TITLE SISTEMA DI VISIONE ARTIFICIALE PER IL CONTROLLO DIMENSIONALE DI COMPONENTI TORNITI ALL'INTERNO DI UN'ISOLA AUTOMATIZZATA
AUTHOR Melchiorre Chiara SUPERVIROR(S) Castellini Paolo, Zitti Saverio YEAR 2017 DEGREE Bachelor
TITLE MISURE NON A CONTATTO PER LA RILEVAZIONE DI FUGHE SU FORNI INDUSTRIALI
AUTHOR Mencarini Raffaele SUPERVIROR(S) Chiariotti Paolo, Castellini Paolo YEAR 2017 DEGREE Bachelor
Title SVILUPPO DI UN SISTEMA DI MISURA PER IL CONTROLLO DI DIAMETRI INTERNI MEDIANTE SENSORE CONFOCALE NEL CONTESTO DELLA PRODUZIONE " ZERO DIFETTI " DI INDUSTRIA 4.0
Author Peluzzo Michele Superviror(S) Paone Nicola, Chiariotti Paolo YEAR 2017 DEGREE Bachelor
TITLE RICERCA DI BAVE TRAMITE SISTEMI DI VISIONE SU COMPONENTI INDUSTRIALI LAVORATI MECCANICAMENTE
AUTHOR Lucarini Diego SUPERVIROR(S) Castellini Paolo YEAR 2017 DEGREE Bachelor
Master Works
TITLE PROGETTO E SVILUPPO DI SISTEMI DI VISIONE PER CONTROLLI DI QUALITÀ NELL'INDUSTRIA DELL'AUTOMOBILE
AUTHOR Zhuka Fatjon SUPERVIROR(S) Castellini Paolo, Paone Nicola YEAR 2016 DEGREE Master
Page 11 of 30
Deliverable 10.2 First report on dissemination activities
PhD Works
TITLE AT PRESENT NOT ESTABLISHED YET. THE TOPIC IS “PORTABLE SMART LASER SCANNER FOR GAP&FLUSH”
AUTHOR Elisa Minnetti SUPERVIROR(S) Paolo Castellini, Paolo Chiariotti, Nicola Paone YEAR Started in Nov. 2016, end October 2019 DEGREE PhD in Industrial Engineering
TITLE AT PRESENT NOT ESTABLISHED YET. THE TOPIC IS “SMART INSPECTION TOOLS FOR TURNED COMPONENTS”
AUTHOR Matteo Fitti SUPERVIROR(S) Nicola Paone, Paolo Chiariotti YEAR Started in Nov. 2016, end October 2019 DEGREE PhD in Industrial Engineering
In addition, the following PhD works partially use contributions of the GO0DMAN project:
TITLE AT PRESENT NOT ESTABLISHED YET. AUTHOR André Rocha SUPERVIROR(S) José Barata DEGREE PhD in Electrical and Computer Engineering ALIGNEMENT The development of GO0D MAN platform will be used as test case to validate
a methodology proposed in a PhD Thesis to design minimally invasive agent based CPPS
TITLE AT PRESENT NOT ESTABLISHED YET. AUTHOR Ricardo Peres SUPERVIROR(S) José Barata, Paulo Leitão DEGREE PhD in Electrical and Computer Engineering ALIGNEMENT The framework proposed in task 2.2 is being designed in a PhD and moreover
it is expected that at least one or two test cases could be used as validations for the proposed framework
2.2 Scientific activities
During the first half of the project two publications were produced from the project developments,
namely:
W. Utz, M. Lee (2017), “Industrial Business Process Management using ADONIS. Towards a
Modular Business Process Modelling Method for Zero-Defect-Manufacturing”, International
Conference on Industrial Engineering, Management Science and Application (ICIMSA’17), 13-
15 June 2017 (DOI: 10.1109/ICIMSA.2017.7985590).
Abstract: This paper introduces the idea of industrial business process management in the
context of the European Commission’s project GO0D MAN. It presents showcases on how
the industry domain independent, Business Process Management Toolkit ADONIS can be
Page 12 of 30 Deliverable 10.2 First report on dissemination activities
extended through composition and injection mechanisms to support the modelling of
industrial business processes for zero-defect manufacturing and can be further enhanced
with conceptual analytics techniques as a knowledge management infrastructure in the
domain of advanced manufacturing.
P. Leitão, J. Barbosa, C. Geraldes, J.P. Coelho (2017), “Multi-Agent System Architecture for
Zero Defect Multi-stage Manufacturing”, Proceedings da 7th Workshop on Service
Orientation in Holonic and Multi-agent Manufacturing (SOHOMA'17), Nantes, França, 19 - 20
October, Borangiu T., Trentesaux D., Thomas A., Cardin O. (eds) Service Orientation in Holonic
and Multi-Agent Manufacturing. Studies in Computational Intelligence, vol 762. Springer, pp.
13-16 (DOI: 10.1007/978-3-319-73751-5_2).
Abstract: Multi-stage manufacturing, typical in important industrial sectors, is inherently a
complex process. The application of the zero defect manufacturing (ZDM) philosophy,
together with recent technological advances cyber-physical systems (CPS), presents
significant challenges and opportunities for the implementation of new methodologies
towards the continuous system improvement. This paper introduces the main principles of
a multi-agent CPS aiming the application of ZDM in multi-stage production systems, which
is being developed under the EU H2020 GO0D MAN project. Particularly, the paper describes
the MAS architecture that allows the distributed data collection and the balancing of the data
analysis for monitoring and adaptation among cloud and edge layers, to enable the earlier
detection of process and product variability, and the generation of new optimized knowledge
by correlating the aggregated data.
Several scientific presentations were also conducted, mainly to present the aforementioned
scientific papers but also related presentations, particularly:
“Definir a Estratégia para a Indústria 4.0” @Leiria, Portugal, 4th May, 2017 (André Rocha)
Affidabilità e Tecnologie (A&T) @Turin, Italy, 4-5 May, 2017 (Nicola Paon)
“Factories of the Future Community Day” (organized by EFFRA) @Brussels, Belgium, 16th
May, 2017 (Nicola Paone)
4th iCatse International Conference on Industrial Engineering, Management Science and
Applications (ICATSE’17) @Seoul, Korea, 13 -15 June, 2017 (Wilfrid Utz)
Kick-Off Zero Defect Manufacturing, Sub-Platform under Manufuture @Brussels, Belgium, 5th
October, 2017 (Nicola Paone)
Workshop on Service Orientation in Holonic and Multi-Agent Manufacturing (SOHOMA’17)
@Nantes, France, 19-20 October, 2017 (Paulo Leitão)
2.3 Conference events
Regarding conference related events, two Special Sessions with topics related with the project were
proposed. One more related with the particularities of the measurements process while the other is
related to the “Zero Defect” paradigm being a common proposition of three projects from the 4ZDM
cluster.
Page 13 of 30
Deliverable 10.2 First report on dissemination activities
Title Smart measurement for on-line quality control Organizer(s) Nicola Paone Description On-line quality control is a fundamental element of Industry 4.0 manufacturing and
today quality control is often done on 100% of the production, not only at the end of the line, but also upstream, on components and sub-assemblies. On-line quality control systems are made of hardware and software components able to acquire a physical quantity, such as sensors and transducers and the relative mechatronic devices used to perform a test sequence and take measurements, the data acquisition electronics for the signal A/D conversion and the software environment for the setting of the system parameters (like sampling frequencies, acquisition time windows, gains, sensor set-up, etc.) and for the following diagnostic process. Smart quality control systems can be designed to exhibit at local level (single quality control station) real-time adaptive behaviors to keep measurement uncertainty under control even in case of variations of process or product or instrument parameters, pre-process data to derive synthetic quality indicators, implement self-diagnosis and self-calibration to maximize the confidence level of the measurement system output. This session therefore aims to collect papers describing measurement systems and quality control stations exhibiting smart behaviors, as well as papers dealing with the strategies to implement on-line quality controls (taking into account issues of uncertainty and confidence level of measured data, calibration of measurement systems, smart management of sensors, etc.) and finally algorithms for intelligent diagnostics based on measured data.
Call for Papers
Year 2018
Page 14 of 30 Deliverable 10.2 First report on dissemination activities
Webpage www.metroind40iot.org
Title Innovative Technologies and Methods for Zero Defect Manufacturing on Industrial Cyber-Physical Systems Context
Organizer(s) Jose Ramón Valdés, Christian Eitzinger, Paulo Leitao Description The quality of products is a key factor for success in manufacturing industry along
with the reduction of material waste, re-works, rejects and stocks, leading to a demand for the development of zero-defect manufacturing (ZDM) strategies at system level. Under the umbrella of the 4ZDM cluster, several European research projects, aligned with the Industry 4.0 principles, are making efforts for the integration and convergence of technologies for measurement and quality control, for data collection, storage and analysis, at single process and at factory level, aiming to guarantee high quality of products without interfering, actually improving, the production efficiency of the entire system. In this context, the objective of this special session is to provide an open discussion forum where researchers and industrial partners can share their own perspective and visions on developing methodologies, designs and roadmaps to address innovative technologies and methods for ZDM on the industrial cyber-physical systems context. This special session is organized under the scope of the 4ZDM cluster, and particularly involving the following 3 European projects: GO0DMAN (aGent Oriented Zero Defect Multi-stage mANufacturing; http://go0dman-project.eu/), STREAM-0D (Zero Defect Manufacturing Solution; http://www.stream-0d.com/) and ZAero (Zero-defect manufacturing of composite parts in the aerospace industry; http://www.zaero-project.eu/).
Call for Papers
Year 2018 Webpage https://web.fe.up.pt/~indin2018/
2.4 Exhibitions and fairs
The first half of the project corresponds to the design and the development of the system
components, missing technical results and prototypes that facilitate the demonstration of the
Page 15 of 30
Deliverable 10.2 First report on dissemination activities
project results. In this manner, the participation in fairs is not so effective and will be improved in
the second half of the project. Meanwhile, in spite of don’t having a specific GO0DMAN booth,
partners have participated in the following fairs where the GO0DMAN project was presented:
CEBIT 2017 @ Hannover, Germany, 20-24 March 2017 (BOC participation)
Hannover Messe 2017, @Hannover, Germany, 24-28 April, 2017 (Nissatech participation)
The members of the project have been also very active in disseminating the project in several
exhibitions, particularly:
NI Days, @Milano, 14th of November 2017
39ª Conference of AIM – “European Academy for Industrial Management” @Palmela,
Portugal, 23rd September, 2017
Information & Networking Day - Opportunità di finanziamento in H2020: Information and
Communication Technologies (ICT) in H2020, @Ancona, Italy, 19-20 September, 2017.
Your Future Festival - LE STRATEGIE PER LA RICERCA EUROPEA, @Ancona, Italy, 9th May,
2017
Affidabilità e Tecnologie (A&T) Fair @Torino, Italy, 4th May, 2017 (hosts a completion
between Industry 4.0 projects, http://www.affidabilita.eu/aet/default.aspx). In this fair, the
project team were awarded the 3rd position in the Prize for Innovation.
Figure 1 – Award “Premio Innovazione 4.0”
2.5 Inter-project activities
Some inter-project and/or project related activities were addressed by the consortium members,
namely those related with the project scope or promoted by the European Commission. In such way,
the following activities are reported:
4ZDM cluster meeting @Brussels, 24th November 2016 (FOCUS - CSA about clustering,
exploitation & road mapping and 4ZDM Cluster)
Common Dissemination Booster (CDB) services (exploitation of dissemination results for a
ZDM project group, which also includes the Z-fact0r, ForZDM, STREAM-0D and ZAero
Page 16 of 30 Deliverable 10.2 First report on dissemination activities
projects funded by the European Commission under the H2020-FOF-03-2016 funding
programme)
2.6 Lectures and courses
In the normal teaching activities, the academic partners largely use the accumulated knowledge
during the project, while two lectures were organized outside the academic world, namely:
"Industrial Agents and future trends in distributed control", 2nd February 2018 (in Loccioni)
“Industry4.0 in Electrolux Professional”, 13th March 2018 (ITST J. F. Kennedy)
“Knowledge Management Lecture”, University of Vienna (BOC)
2.7 Overall evaluation
Globally, the dissemination KPIs are on track, as reported in Table 1. Despite this, some of the
expected numbers were not achieved, namely with respect with lectures and courses. Although this,
one is able to extrapolate that the accumulated knowledge is without a doubt an added value in the
lectures and courses thought by the academic members within their normal university life. With
respect to the participation to meetings of other funded projects as well having people from other
projects participating to our meetings, the activity performed through the 4ZDM Cluster is already
providing the opportunity to meet the persons from the other funded projects, so we decided to
postpone these specific activities.
Table 1 - GO0D MAN KPI for the Dissemination activities
Code Indicator Expected after Y1
Effective after M18
Scientific Number of publications 2 2
Scientific Number of thesis or Ph.D. 1 1 MSc thesis
2 PhD (on-going)
Industrial Number of trade fair participation 0 0
Scientific Number of lectures and courses 3 3
Scientific/industrial Number of presentations 3 6
Events Number of conferences, exhibitions and workshops where the project is presented
3 7
Other projects Number of participation to meetings organized by other projects
1 2
Other projects Number of people from other projects participating to GO0D MAN meetings or events
1 0
Page 17 of 30
Deliverable 10.2 First report on dissemination activities
3. Communication Activities M1-M18
Task 10.2 “Communication activities” is a transversal activity which pertains to all the other tasks of
the project and is actively pursued from month 1 to month 36. Its main objective is to perform a
broad communication strategy throughout the whole project period. A continuous communication
regarding the current project status as well as general information regarding objectives, challenges,
approach and findings of the GO0D MAN project is ensured by the use of different communication
channels, addressing all relevant stakeholders and audiences. In fact, the use of online and offline
channels, such as website, social media, news on press, brochures and posters, supports and
improves the dissemination activities (Task 10.1) and the community building (Task 10.3).
Some measures for spreading information have been planned and the main results of these
activities for the first period of the GO0D MAN project are here summarized.
3.1 Corporate communication and design and website
During the GO0D MAN kick-off meeting held in Angeli di Rosora, the 10th and 11th of October 2016,
the Consortium was involved in the selection of the project logo. The LOC Identity Lab had designed
three proposals presented to partners and the one represented in Figure 2 was selected to represent
the GO0D MAN project. The visual identity has been the first step needed to design website and
templates (Figure 3). More information about the birth of the project visual identity can be found in
the Deliverable 10.1 “Project presentation”.
Figure 2 – Project Logo
Figure 3 – Project Visual Identity
As well, letterhead, deliverable, presentation and report templates have been prepared for the
partners’ use since the beginning of November 2016 and they are available on the reserved area of
Page 18 of 30 Deliverable 10.2 First report on dissemination activities
the project website. The templates report the GO0D MAN and partners’ logos, examples of solo text,
text and pictures and bullet lists. All the templates contain also the EU acknowledgement.
3.2 The website
From a communication activities point of view, great effort has been devoted to the design and
opening of the GO0DMAN website: http://go0dman-project.eu/
The website is operative and constantly updated since the beginning of month 4; it contains
information about the project, the ZDM main concepts and the consortium composition; a public
download area is available to download electronic versions of the public submitted deliverables and
other dissemination material; a screenshot of the website homepage is shown in Figure 4. The
website, powered by Wordpress, has been registered at Google Analytics in order to check and
register information about visitor accesses and monitor the website activity. More information about
the structure of the website can be found in Deliverable 10.1.
Figure 4 – GO0D MAN website home page
On the website news are reported in order to engage and inform the readers. Up to now, 32 news
have been presented.
Since January 2017, when website was published online, more than 3,000 visits to the website has
been collected, with an interesting average session duration of three minutes, indicating that people
that visits the website are interested in its content and are located all over the world (Figure 5 and
Figure 6).
Figure 5 – Statistical on website visits of the first 18 months
Page 19 of 30
Deliverable 10.2 First report on dissemination activities
Figure 6 – Worldwide distribution of the website visits
3.3 Electronic newsletter
Four electronic newsletters for all interested stakeholders have been sent up to now as a
complement to the project website. They comprise information about the current project status or
upcoming events like trainings, presentations and conferences with GO0D MAN contributions. The
layout of the electronic newsletter is reported in Figure 7.
Page 20 of 30 Deliverable 10.2 First report on dissemination activities
About 180 mails for each newsletter have been sent. Newsletters are also available on the GO0D
MAN website. In the following table the results of each campaign are summarized.
Table 2 – Newsletter campaign results
Newsletter Date Recipients Open Rate Click Rate Newsletter #1 Apr 20, 2017 179 37.7% 16.6% Newsletter #2 Jul 27, 2017 185 29.5% 7.7% Newsletter #3 Dec 20, 2017 187 29.2% 7.0% Newsletter #4 Mar. 8, 2018 187 29.1% 7.7%
Figure 7 – Newsletter example
Page 21 of 30
Deliverable 10.2 First report on dissemination activities
Open rate and click rate have slightly decreased since the first newsletter, but they are still far above
the average for industrial manufacturing mailing lists (open rate 16.6% and click rate 1.6%).
3.4 Brochure and Information material
An A4 leaflet was designed and printed by the end of month 6 and then has been updated on month
16, showing the GO0DMAN architecture (Figure 8). Paper copies have been distributed to all the
partners to be used in their dissemination activities and the electronic version can be freely
downloaded from the website. The leaflet describes the vision and the objectives of the GO0D MAN
project and shows the conceptual architecture and the characteristics of the use cases. The logos
of the partners and the contacts of the project are respectively in the first and last pages.
Figure 8 - GO0D MAN brochure
Furthermore, a poster has been designed with dimensions (width x height) 70 x 100 cm. It is composed of five parts. On the top there is the name of the project and the communication channels used (website, Facebook, Twitter). Below, the GO0D MAN vision and methodology are briefly presented. The central part shows the system architecture and the main pillars of the GO0D MAN project: Knowledge Management, Data Analytics, Multi-Agent System and Smart Inspection Tools. Afterwards, there is the description of the use cases where the results of the project are applied and at the bottom the logos of the partners of the consortium and the acknowledgement to the European Commission.
The poster in pdf or Adobe Illustrator format is available for the partner.
Page 22 of 30 Deliverable 10.2 First report on dissemination activities
Figure 9 - GO0D MAN poster
3.5 Press
At the beginning of the project a press release has been prepared in different languages and
distributed to the partners. Magazines and technical press have been contacted and the complete
list of published articles for the first 18 months is here reported:
(IT) Automazione Industriale, March 2017. Un progetto per produrre a zero difetti.
(PT) Jornal Nordeste, March 2016. Fabricar sem defeitos.
(IT) L’Impresa, December 2016. Strategie di crescita – Come cavalcare Industry 4.0 e Big Data
con le risorse giuste. Ingegnosità collettiva all’opera.
(IT) Tutto Misure, no. 4/2016. Università Politecnica delle Marche – La fabbrica del futuro e
GO0D MAN, progetto europeo del programma Horizon 2020.
(IT) Automazione Oggi, November–December 2016. Il futuro del lavoro inizia dalle Marche.
3.6 Social Media
Digital medias (with the potential of getting to all stakeholders) have the feature of not just informing
- like traditional press - but also being interactive, giving the opportunity of a peer to peer and real-
time interaction between stakeholders and target groups. The following social media channels
dedicated to scientific and industrial topics have been selected: Facebook and Twitter.
Facebook has a universal network, while Twitter has a target audience. That is why in Facebook the
most part of followers are friends, while in Twitter are usually ‘unknown’ people with the same
concentration on topics and activities. Facebook is therefore a social network to communicate
projects promoted by EU to a large public, while twitter is an information network dedicated to the
sharing of knowledge among a group of experts or such aspirants.
Page 23 of 30
Deliverable 10.2 First report on dissemination activities
Figure 10 – GO0D MAN Facebook page
Since its publication, on February, 23th, the GO0D MAN Facebook page (Figure 10) counts 221 friends
and 133 posts, with a quite good interaction with posts (as like, click or share of news - Figure 11).
Figure 11 - Statistical on Facebook visits and likes
Page 24 of 30 Deliverable 10.2 First report on dissemination activities
Figure 12 – GO0D MAN Twitter page
The GO0D MAN Twitter page, since its first tweets on February 27th, have reached a number of 110
tweets and 49 targeted followers (experts, clusters and projects about Industry4.0 and IoT), as
shown in Table 2.
Table 3 – Twitter Statistics
Month Tweets Tweet
impressions Profile visits Mentions New followers
Feb 2017 1 72 31 0 2 Mar 2017 29 9131 165 5 16 Apr 2017 19 9514 80 2 5 May 2017 19 6565 55 7 4
Jun 2017 8 2929 28 3 3 Jul 2017 4 2915 35 3 4 Aug 2017 1 1349 10 1 0 Sep 2017 12 3350 30 7 5 Oct 2017 9 4179 15 3 3 Nov 2017 3 1972 6 3 -1 Dec 2017 3 2479 4 7 1 Jan 2018 0 2800 29 9 4 Feb 2018 2 5140 15 3 2
3.7 Measurement of the results of the communication activities
In the GO0D MAN DoA some performance indicators have been selected in order to measure the
progress of communication activities performed by partners during the project. Target values for
each year of the project have been also presented, and in Table 4 the values reached during the first
year of the project are reported.
Page 25 of 30
Deliverable 10.2 First report on dissemination activities
Table 4 - GO0D MAN KPI for the Communication activities
Code Indicator Expected after Y1
Effective after 18 month
Website Number of website accesses 500 3300
Website Number of posts 8 25
Newsletter Number of newsletter subscription (and reading)
20 186 (120)
Brochure Total number of brochure distributed 50 60
Posters Number of posters installed in relevant places
10 9
Newsletters Number of newsletters sent 20 720 (4 different
newsletters)
Press Number of publication on paper press 2 5
Press Number of publication on online press 2 2
Press Number of publication on TV/radio 1 0
Social media Number of feedbacks (ask for information) collected. Number of followers and interactions
4
0 feedback Facebook 221
followers Twitter 49
followers and several like and
retweet
Video Number of tutorials and corporate video produced
0 0
Images and Pictures
Photo-Shooting and image book 0 0
The numbers in the table show that performances of the communication activities are beyond the
expectations. The missing results for the first year is one publication on TV/radio that will be
recovered during the second year and the Poster that has been prepared at Month 16, mainly
because we wanted to show on the poster information that have been reached after the first year of
the project. Now the poster has been delivered and soon will be installed in the different
offices/laboratories of the partners.
Page 26 of 30 Deliverable 10.2 First report on dissemination activities
4. Dissemination plan for the interval M18-M36
The project must continue the dissemination activities in order to greatly potentiate the spread of
the achieved results. In fact, after the M18, it is heavily expected an exponential increase on these
activities since the technical and non-technical results are more relevant after M18.
Therefore, at the end, it is expected to at least, achieve the KPI presented in the DoA as depicted in
Table 5.
Table 5 - GO0D MAN KPI for the Dissemination activities
Code Indicator Expected Progress
After Y1 After Y2 AfterY3
Scientific Number of publications 2 6 8
Scientific Number of thesis or Ph.D. 1 3 4
Industrial Number of trade fair participation 0 1 2
Scientific Number of lectures and courses 3 6 9
Scientific/industrial Number of presentations 3 6 10
Events Number of conferences, exhibitions and workshops where the project is presented
3 5 9
Other projects Number of participation to meetings organized by other projects
1 3 5
Other projects Number of people from other projects participating to GO0D MAN meetings or events
1 2 5
In order to achieve the aforementioned KPIs, some dissemination activities are already envisioned
for the short period to come.
With relation to scientific paper writing, it is expected the publication of the following papers:
Two papers for the METROIND2018 special session, one focusing the measurement system
and other the interaction between the agent and the inspection tool.
Three papers for the INDIN’2018 special session, one focusing the DC motor pre-
demonstrator, other the Knowledge Management approach, and another the description of
the GO0DMAN methodology.
Other technical and/or scientific papers describing the activities and achieved project results
addressing well recognized international events.
Elaboration of at least two articles to be submitted to a scientific international journal.
Also in a more scientific domain, it is expected to the GO0DMAN consortium to propose a tutorial in
one of the IEEE or IFAC conferences where the members are more actively involved. Tentative events
are IEEE INDIN, IEEE ICIT, IEEE IECON or IFAC IMS.
Page 27 of 30
Deliverable 10.2 First report on dissemination activities
On an event/fair perspective, several strong hypotheses are on the agenda, namely the:
ICT 2018 (European ICT research and innovation event organised by the European
Commission), @Vienna, Austria, 4-6 December 2018.
Other possibility is to attend the Hannover Messe (http://www.hannovermesse.de/home),
@Hannover, Germany, April 2019.
The GO0DMAN project is using the Common Dissemination Booster (CDB) services provided by the
European Commission (www.cdbservices.eu), which encourages projects to come together to
identify a common portfolio of results and shows them how best to disseminate to end-users, with
an eye on exploitation opportunities. GO0DMAN in included in the project group CDB03-Z-Fact0r or
“ZDM”, which also includes the Z-fact0r, ForZDM, STREAM-0D and ZAero projects funded by the
European Commission under the H2020-FOF-03-2016 funding programme. CDB will analyse and
provide the “Service 1 - Portfolio Identification Services” that identifies and suggests the
dissemination portfolio of the Project Group and recommendations for joint dissemination activities.
The preliminary results of this service point out several recommendations for joint dissemination
activities:
Recommendation #1: ZDM Paradigm and abstract concepts: difficult to capture in traditional
and new media. Complex technology that is hard to explain, also due to low awareness of
FoF and Industry 4.0 concepts.
Recommended Action: focus on benefits, and, where feasible, use real-world cases to show
how their “pains” are being transformed into “gains”.
Recommendation #2: Many different (and sometimes very specific) application areas:
making it hard to extract general benefits.
Recommended Action: use end-user testimonials as a direct way of promoting the benefits.
Dedicated images (web and social media banners with compelling tag-lines) can be part of
the promotional campaign for increased visual impact (most adults are “visual learners”).
Promote diversity as a positive – benefits that are wide-ranging across many different
sectors.
Recommendation #3: Stakeholder fragmentation: many different sub-communities, in the
verticals as well as with types of stakeholders, SME, large industry, policy makers etc.
Reaching a broad enough audience across Europe. Step-change for large part of the industry.
Societal impact may be added as another scale to consider. Resource-heavy engagement
with EU digital hubs though they are essential in reaching the market. Identifying industrial
brand ambassadors is a resource-heavy activity.
Recommended Actions: Consider co-hosting events with the different categories of
stakeholders identified with a role for each category. Think lightning talks, including end-user
presentations (based on a template for a structured approach) and interactive panels, demos
and videos. Define takeaways for each stakeholder category. Consider also more end-user
events in their respective fields. Tailor dissemination elements to their specific needs.
Recommendation #4: Language barriers. Lack of “project buy-in”: partner media
departments and general disinterest in dissemination creates a barrier to communications.
Page 28 of 30 Deliverable 10.2 First report on dissemination activities
Recommended Actions: Decide how important it is to have dissemination
material/information in languages other than English. Online and print glossaries or light
reading material can help introduce new technology terminology, thus facilitating
newcomers. Do a simple mapping of what actions they are happy to carry out and check the
effort allocated to ensure they contribute proportionately. For example, encourage partners
from different countries to provide translations of core information as a way of enticing
newcomers. Always try to involve media departments in press and marketing activities right
from the beginning. Ask partners to promote the project internally on a regular basis. Also try
to involve them in more market-facing events, e.g. trade shows and large exhibitions. They
can help in the creation of material tailored to new audiences.
Recommendation #5: Budget and effort constraints.
Recommended Action: focus on low-budget, high-impact activities like regular social media
campaigns, where visual prompts can make it easier to convey complicated/new concepts
(see above). Leverage the power of joint Project Group actions, where an action from each
project can go a long way in reaching out to end-users and other stakeholders.
Recommendation #6: Unrealistic expectations from large partner organisations and
reviewers: One example is the request to communicate the methodology to the media, which
is not a topic if interest.
Recommended Action: Make a list of general EU and national research magazines/journals
to disseminate the methodology used. Think about writing a joint article or a white paper.
Think also about introducing elements of the methodology into other types of articles, e.g.
end-user perspectives, as well as videos.
Recommendation #7: Similar solutions provide lack of clarity and decision making for
potential end-users: Having similar solutions form the individual projects provided as results
means difficulty for the end-user understanding what is right for him & her.
Recommended Action: Provide a prescriptive and easy to read list of what solutions provides
what type of result and includes, where possible, the differentiator between the other projects
to support in the outreach and this is identified in mutual collateral and marketing.
Having this in mind, GO0DMAN plans to strengthen the activities in conjunction with the 4ZDM
Cluster in order to follow and implement these recommendations to exploiting diversity and
synergies amongst the projects. For this purpose, the following activities will be considered in an
integrated manner within the 4ZDM cluster:
• Joint follow-up Roadmap report and white paper.
• Joint Scientific publications, articles and press releases.
• Combine social media outreach channels together and have dissemination
material/information in languages other than English.
• Organize talks and end-user presentations using interactive panels, demos and videos, for a
diversity of stakeholders.
Page 29 of 30
Deliverable 10.2 First report on dissemination activities
5. Communication plan for the interval M18-M36
Communication activities already started in the first half of the project (website, facebook and
twitter) will be pursued and strengthened during its second half. The number of newsletters, website
posts, social media followers, distributed brochures and installed posters will increase according to
the KPIs presented in the DOW and reported in the following table.
Table 6 - GO0D MAN KPI for the Communication activities
Code Indicator After Y1 After Y2 After Y3
Website Number of website accesses 500 1500 5000
Website Number of posts 8 20 50
Newsletter Number of newsletter subscription (and reading)
20 60 200
Brochure Total number of brochure distributed 50 150 500
Posters Number of posters installed in relevant places
10 20 30
Newsletters Number of newsletters sent 3 7 11
Press Number of publication on paper press 2 5 10
Press Number of publication on online press 2 6 10
Press Number of publication on TV/radio 1 2 5
Social media Number of feedbacks (ask for information) collected. Number of followers and interactions
4 8 50
Video Number of tutorials and corporate video produced
0 1 1
Images and Pictures
Photo-Shooting and image book 0 1 1
In particular, after the second year (M24), a project presentation video is planned to be produced.
The video will present the GO0D MAN project and its objectives. It will contain interviews to all the
partners who will explain their contribution to the project. The video will be produced in a short
version (about 3 minutes) and a long version (about 10 minutes) in order to be better used depending
on the occasion. Both videos will be uploaded on YouTube and shared using GO0D MAN website,
Facebook and Twitter.
Special focus will be devoted to the communication of the first results of the project using
specialized press and internal channels of the partners, in particular the end users. The website will
be constantly updated in order to attract the interest of a larger audience.
Communication activities in conjunction with the 4ZDM Cluster will be organized as well as with
EFFRA and the Connected Factories Cluster.
Page 30 of 30 Deliverable 10.2 First report on dissemination activities
6. Conclusions
This document has described the major achievements regarding the dissemination and
communication activities developed during the first half of the GO0DMAN project, as well as the
dissemination and communication plan for the final part of the project.
Naturally, the dissemination activities are being performed slowly in this first half of the project but
achieving all the expected indicators for the first year, and the communication activities are already
getting significant results and attraction worldwide.
For the second half of the project, it is expected an exponential increase on dissemination and
communication activities since the technical and non-technical results are more relevant after M18.
Additionally, GO0DMAN consortium plans to strengthen the activities in conjunction with the 4ZDM
Cluster in order to follow and implement the recommendations provided by CDB service 1 to
exploiting diversity and synergies amongst the projects in the ZDM field.
An important remark for the dissemination and communication materials, that will need to be
updated constantly. Especially the Web site and the presence in the social media channels, e.g.,
Facebook and Twitter, need to be feed with current and new materials, since they are the public
“face” of the project.