O1Ensure smooth and fair implementation of Policy
O2Planning monitoring & Grievance redressal
O3Revision of ZDPs & sector delineation
O4Acquisition of any land required for effectuating policy in any sector
O1Preparation of layout/ site plans as per guidelines
O2Timely payment of External Development Charges
O3Obtain Approvals –layout plans & site plans
O4Time bound development & maintenance
O5Bear cost of Acquisition for development of infrastructure
LAND POOLING POLICY
5 ZONES | 95 VILLAGES
ZONE - L
ZONE - NZONE – P-II
D E L H I
ZONE - J
Affordable Housing
Shopping Center
Efficient Transportation
Parks & Playgrounds
Hospitals
Employment Opportunities
Educational facilities
Efficient Waste Management
WHERE IS THE POLICY APPLICABLE ?
FRAGMENTED LAND HOLDINGS
HOW MY PARTICIPATION WILL IMPROVE THE LOCALITY ?
Landowners with any size ofland may come for pooling
Planned development will increase value of land.
60 % of land to DE/Consortium
Special Provision for EWS Housing
Online Single Window System
for timely and transparent
implementation
Developer Entity (minimum land-2Ha.)
✓ Individual✓ Group of individuals✓ Developers
40 % of land to DDA/SPA for development
WHAT ARE THE ADVANTAGES OF LAND POOLING POLICY?
LAND POOLING POLICY
WHAT IS LAND POOLING?
ZONE – K-1
Sports Complex & Stadiums
Exhibition Centres
Smart Sewerage System
Blue-Green Infrastructure
Grievance Redressal Committee to resolve any dispute
SEPARATE DEVELOPER ENTITY
1Pooling of land will be done on the basis of sectors asdelineated in the Zonal Development Plans
BASIS OF POOLING
2MINIMUM AREA REQUIREMENTMinimum 70% contiguous land of the developable areawithin the sector, free of encumbrances, is required to bepooled to make the sector eligible for development
3LAND HOLDING BREAK-UP
Of the pooled land, Land owner/ Consortium will retain60% and hold remaining 40% to be surrendered as andwhen required to DDA/ service agencies respectively
4 60% land shall be utilized by the Consortium/ Land ownerfor development of residential, commercial, public andsemi-public facilities as per the Policy
DEVELOPMENT BY CONSORTIUM
5IMPLEMENTATION PLAN
6
Consortium will mutually decide a formula among landowners for redistribution of developed land/ built space aspart of “Implementation Plan” & convey the same to DDA.
EXTERNAL DEVELOPMENT CHARGES
WHAT ARE THE GUIDING PRINCIPLES OF THE POLICY?
7
External Development Charges (EDC) shall be applicableon the entire area of pooled land to cover the actual costof providing city-level infrastructure.
Landowners/ group of landowners with min 2 ha pooledland can choose to work as separate Developer Entities(DEs).
SEPARATE DEVELOPER ENTITY
Integration of Smart City
Concepts leadingto higher returns
Delhi Development Authority
Land Pooling Cell
3rd Floor, Vikas Minar
I.P.Estate, New Delhi 110002
Delhi
Development
Authority
Delhi Development Authority
Land Pooling Cell
3rd Floor, Vikas Minar
I.P.Estate, New Delhi 110002
Phone No. 011-23378518
LAND
POOLING
POLICY OF
DELHI - 2018
DISCLAIMER: The graphics used in this pamphlet are only for non-profit educational purpose and may not be covered / may be exempted for any copyright infringement. The information in pamphlet is based on Land Pooling Policy/ Regulations notified by Central Government/DDA
Development Agreement
with consortium
Delhi Development Authority
Land Pooling Cell
3rd Floor, Vikas Minar
I.P.Estate, New Delhi 110002
WEB PORTAL
Online registration
Online Registration
Verificationby GNCTD
1 2
Notified Via
Application form
Registration Fee
Land Map Ownership Certificate
LAND POOLING PROCEDURE
LAND POOLING POLICY
Notice to form
Consortium
3 4
NewspaperDDA Website (website URL: www.dda.org.in)
Online Application By Consortium
Application form
Implementation Plan
Contract Agreement
Processing Fee
DDA will prepare SectorPlan showing land areabreak up (60% & 40% )
5
67
GreivanceRedressal
9Layout plan prepared
by Consortium
FinalEntitlement Certificate
810
Provisional
Development License
11
PDL
Application by Consortium/DE
for Final Development License (FDL)
Within 12 months
12Scrutiny of documents
13
FDL
14
Layout Plan Approval(Individual use –
Premise/Plot)
16
Consortium/ DE will registered under
1718
Completion Certificate
Layout Plan
PDL Infrastructure Report
UndertakingProcessing
FeeBank
guarantee
PDL
Completion Certificate & Occupancy Certificate
Payment of balanceEDC within 90 daysof FDL issuance(lumpsum) or in 8six monthlyinstalments in spanof 48 months
15
DFS
Along with undertakingfor handing over ofencumbrance free landto DDA/Service ProvingAgency forinfrastructure andpayment of EDC as perschedule.
As listedclause 8(II)of theregulations
As listed clause9 (I & II) of theregulations
RERA
Application for completion certificate
by DE/Consortium
Consortium/DE tohandover 40%encumbrance freeland to DDA/SPA fordevelopment ofservices and city levelinfrastructure
Execution of Project
For further details on the Policy/ Regulations and to register through the web portal for expression of willingness for participation under Land
Pooling Scheme, the link is as under:https://online.dda.org.in/landpooling/AppForm/default.aspx
Land owners of any size falling in planning zones J, K-I, L, N & P-II, are required to register themselves on the portal for participation under the
Policy.