INTRODUCTION OF INFRASTRUCTURE PROJECT
2014.05.20-23
THE PROJECT OF INFRASTRUCTURE
“ The infrastructure project” of the Ministry of Construction Urban
development was established the frame work of implementing policy by the
resolution 118 of 2013 the Mongolian Government housing policies and home
district's policy is to limit the amount of this policy.
Infrastructure projects are to construct to supply consumption, infrastructure engineering lines & network, and construction of facilities in the newly proposed districts with 42,000 apartments to be built in Ulaanbaatar, to serve 26700 seats school children, 7100 seats kindergarten, to serve 4350 residents per a day hospitals, 2,000 job vacancies public services centers, shopping centers, hotels, sports, swimming pool, cultural centers and office.
PURPOSE OF PROJECT
Implementing project the general planning of districts
“Yarmag ” residential district
“Bayan gol am” residential district
residential district “VII-р sub district ”
“Buyant-Ukhaa”residential district
Around “Public broadcasting center ”
“Ireedui complex ” district
Center of Ulaanbaatar
“Solongo” district
- Completed jobs - 6
- Ongoing work - 8
- Implementat ion of the new jobs - 12
26 construction works are ongoing the frame of "Infrastructure " project on the 7 districts of Ulaanbaatar.
Attributable to:
IMPLEMENTING JOBS
“BUYANT UKHAA ”RESIDENTIAL DISTRICT
This residential district is located near the Chingiss -Khaan
international airport or 12km from the center of capital city Ulaanbaatar
where has been planned to construct around 15,000 residential houses,
apartment buildings , schools , kindergartens, hospitals , and sports
complex with a modern architectural solution “Buyant- Ukhaa”
residential area which is planned to be established . The complex
system engineering infrastructure is to build the frame work of
infrastructure project “Buyant- Ukhaa” residential area.
1 . The construction work of Buyant-Ukhaa residential areas where have been
doing the drinking water sources , 20 pieces wells , V = 2800kh2 m3 of 2 pcs
reservoir and pump station , construction of power supply.
"BUYANT -UKHAA" DISTRICT ENGINEER INFRASTRUCTURE
2 . f400 mm 2863 m double line is continued from fresh water resource,
from the pump station to the ring line is continued 546m and a totally
3884 pipes , 120 m access channel construction work on the Buyant-
Ukhaa residential area.
3 . F 315 mm 10031, 2 m, F 110 mm diameter of fresh water 70 m ring line, and
80 m channel access of the construction work of Byant-Ukhaa residential area.
4 . F 200 mm 2242 m double line with waste water pressure , f 200 mm 2820
lines , f160 mm 1042 m line , 2 pieces stations and 40 m access channel
construction on the Buyant- Ukhaa residential area.
5 . From Shine Yarmag sub-station 10 kV 2 complex structures is to delivering
dispense facilities are 9.89 km , architecting and designing the 9.9 MW power
cable work and construction on the Buyant-Ukhaa residential area.
6. 2 complex division of 10 kVis distribution network of approximately 9.9
MW capacity to meet demand for the power supply, 2 * 400 Kwa capacity TP
25 kits , 33.0 km long 10 kV cable lines achecture has designed and
construction on the Buyant-Ukhaa residential area
6 . 10 pieces archectures design of heating & water delivering center,
construction on the 10th parts of Buyant- Ukhaa residential district
7 . The design and archectures of the 13v magistrali 400 double line of
heating and 100 m line 7th pump station is to pair to extend into f400 mm and
to become the corridor system construction on the Buyant- Ukhaa residential
district
8 . Design and 20,000 m3 of wastewater treatment plant construction Buyant- Ukhaa
residential area.
Water, hearing 10 pieces center
Delivering station 25 pieces
20 pecies deep well
9 600 м wast woter line
10 031 м fresh water line
2х2800 м3 volume water pool
ENGINEERING INFRASTRUCTURE OF “BUYANT
UKHAA” RESIDENTIAL DISTRICT
GENERAL PLANNING OF THE BUYANT-UKHAA
RESIDENTS DISTRICT
PLANNING PROJECTS OF IMPLEMENTING IN THE FUTURE
Д/д Project in action , construction , capacity , location Standard price of
construction /billion tugrig г/
VII, XIV, residential districts engineering lines
1 6 pieces of water and heat transferring center’s design and construction12 Part of 7th District 1.558
2 6 pieces of Archecture and design of near the Public broadcasting district 1.558
Engineering lines of Berlin Eco Residential district
3 Berlin eco Town , outside heat , clean water f32 3000 - 300 -mm m main line drawings and construction 2.767
4 Berlin –eco town , 2 pieces , water , heat transferring center design and construction 0.52
5 Berlin 2000 , in addition to eco - town sewer m main line drawings and construction 0.399
" Rainbow " residential area of engineering line works
6 " Rainbow " area outside water pipes expand and sewage main line drawings and construction 0.529
Yarmag housing areas of engineering networks
7 Yarmag apartments 15.0 km of water main line design and construction 4.831
8 Yarmag apartments 14.5 km sewage main line drawings and construction 2.711
9
Yarmag districts electrical supply for the 10 kV distribution network, estimated to provide 14.3 MW of capacity
utilization close to 10 kV with AE - 3 complex , 2 * 400kVA mighty TP 36 kits , 37.6 km long 10 kV cable picture
project and construction
8.807
10near Yarmag bridge district substation 10 kV 1 NT 12 km into the complex 15 MW power cable for use by the design and construction
1.035
“Ireedui” complex areas of engineering networks
11 Future complex area’s water f150 - 350 11 - mm main line 4377 m , swimming pool design and construction 2.333
Totally 27.048
PROJECT RESULTS
Currently, " Infrastructure " project has been fulfilled successfully 95.6
billion worth, total 5 distribution facilities of the electricity supplies, 59
closed buildings substation with a capacity of 250 - 630kV with equipment,
112.2 km long cable line construction, 20 heat transferring centeral
buildings , 20 wells of clean water supplyment , 2 water tank pools with a
capacity of 2,800 m3 , 18.2 km long line pipe F110 - 315 -mm diameter are
constructed , and 2 waste water pump station , 14.1 km long pipeline F150 -
600 -mm diameter assembled were successfully completed in Ulaanbaatar.
ACHIEVEMENTS OF PROJECT
1. Nowadays there are some solve problems have been appeared which
are depended on the lines and equipment of plants very fewer. So using
the importing the most equipment is from the Republic of China and
Russia to construction works of infrastructure. Beside them, to waste
the time, lost money for importing very much that is appeared the
negative results for the country’s economics. In order to decide those
solve problems to involve the foreign investment and to establish lines
and equipment’s plants such as engineering infrastructure lines and
equipment etc. which are most important role to execute the
infrastructure.
PROPOSAL OF INVESTMENT
2. In recently, there has been using the solar energy power intensively,
especially geotherma, sun, wind, water solar power energy which are
using on the worldwide renewable energy . In order to decide the
infrastructure issues which are most virtual need to requirement in
Mongolia increasingly. In this regard, we are ready to joint work with the
business activities of foreign investors in this field to express their
willingness to cooperate with you.
We have confidence with you to cooperate the filed of infrastructure
which is to implement the policy of Mongolian government that is
increase housing supply, to support the manufacturing of construction
materials, based on the development of modern technology.
Thank you very much