DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic...

59
DECONTAMINATION

Transcript of DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic...

Page 1: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECONTAMINATION

Page 2: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

REGULATION OSHA 1910.120(q)

Employer shall develop plans

• Operations level = basic implementation

• Technician = understand and implement

• Specialist = determine and implement

• IC = understand importance

Page 3: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DEFINITION

The process of removing or neutralizing

contaminants that have accumulated on

personnel, property, and equipment

Page 4: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECONTAMINATION PLAN

• Development

• Part of scene safety plan

• Person responsible

Page 5: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECONTAMINATION PLANREASONS

• Number and layout of decon stations

• Equipment needs

• Appropriate decon methods

• Preventing contamination of clean areas

• Contaminant contact minimized

• Disposal of clothing and equipment

Page 6: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

TRAIN ALL PERSONNEL ON THE PLAN

DECONTAMINATION PLANFLEXIBILITY

REVISE THE PLAN WHENEVER:

• Level of PPE changes

• Ambient or other conditions change

• Hazards are reassessed

Page 7: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

SAFE WORK PRACTICES

DO NOT (if possible):

CONTAMINATION PREVENTION

• Walk, sit, or stand, get splashed by, or come in contact with airborne or liquid materials

• Use contaminated equipment and instruments

Page 8: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DO:

• Use disposable garments and equipment when possible

• Cover equipment and tools when possible

• Use proper donning and doffing procedures

• Use remote sampling and handling equipment

• Encase the source of contamination with plastic sheeting or overpacks

CONTAMINATION PREVENTION

Page 9: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

PPE INSPECTION• Ensure there are no cuts or punctures

• Close all flaps, zippers, buttons, and ties

• Tape openings of gloves, boots, and jackets

• Dress prior to entering work zone

CONTAMINATION PREVENTION

Page 10: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

CONTAMINATION LOCATION

• Surface only or permeated into PPE

• Sometimes easy to detect and remove on the surface

• Permeated material may be difficult or impossible to detect and remove

• Without removal, permeation continues until breakthrough occurs

Page 11: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

FIVE MAJOR FACTORS OF PERMEATION

• Contact time

• Chemical concentration

• Temperature

– Ambient

– Chemical

• Size of chemical molecules and pore space of PPE material

• Physical state (solid, liquid, or gas)

Page 12: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

THREE DECON METHODS

1. Physical removal– Dislodging / displacing– Washing / rinsing– Wiping / brushing– Evaporation– High pressure (air or water)– Disposal– Vacuum (dry decon)

Page 13: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

THREE DECON METHODS

2. Chemical removal

– Done only if recommended by a chemist, industrial hygienist, or qualified professional

3. Inactivation (rendering inert)

– Chemical detoxification

– Disinfection

– Sterilization

Page 14: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

EPA RECOMMENDS ONLY SOAP AND WATER FOR ALL WET DECON

CLEANING SOLUTIONS

Before using any other solution, contact

the chemical manufacturer and check

chemical compatibility and suit material

compatibility

Page 15: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

EXAMPLES OF CLEANING CHEMICALS

Page 16: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

• Visual observation

– Natural light

– Discoloration or stains

– Material degradation and breakdown

• Ultraviolet light

– Some hydrocarbons become visible

• Colorimetric tube

– Individual chemical testing

TESTING DECON EFFECTIVENESS

Page 17: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

• Wipe sampling

– Natural light

– Dry or wet cloth swab; send to lab

– Sample inner and outer surfaces

• Cleaning solution analysis

– Sample final rinse

– pH of final rinse

• Permeation testing

– Send sample pieces of suit to lab

TESTING DECON EFFECTIVENESS

Page 18: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

HEALTH AND SAFETY HAZARDS

• Compatibility of decon solution with PPE and hazardous substances

• Possible health hazard to workers

• Effective decon methods

• Decon line established before anyone enters the Hot Zone

Page 19: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON DESIGN

• Located in the Contamination Reduction Zone (CRZ) between the Hot and Cold Zones

• The level and type of decon are dependent on the material(s) found

• Should include emergency contingencies

Page 20: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Redress

CRC

Support Staff

Tank

change

Cle

an

Sid

e

Dir

ty S

ide

Auxiliary access

control path

Equipment Decontamination

Em

erge

ncy

Dec

on

Cold Line

Cold Zone

Hot Zone

Hot Line

Enter Path

Exit Path

Warm Zone

CRZ

Wind

Wash and

Rinse

CONTAMINATION REDUCTION ZONE

Page 21: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Recommended heavy equipment DECON

CONTAMINATION REDUCTION ZONE

Page 22: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON PROCEDURES

• Place chemically impervious ground cover in decon area

• Follow a series of specific tasks

• Perform work at several separate stations to prevent cross contamination

• Perform work in order of decreasing contamination (dirty to clean)

Page 23: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON PROCEDURES

• Set up in a straight line when possible

• Size depends on:

– Number of work stations

– Scene layout and topography

– Usually 75' x 15' is adequate

Page 24: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Overall DECON

Page 25: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Entering the DECON corridor

Page 26: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Personnel DECON

Page 27: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Emergency Shower

Page 28: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Suit and boot washSuit and boot rinseSafety boot removalFES removalCBA backpack removalInner glove washInner glove rinseFace piece removalInner glove removalInner clothing removal

7 81011121314151617

9

Tank change

5

1

Outer glove removal

Boot cover removal

Tape removal

Boot cover and glove wash

Segregated equipment drop4 3 2

COLD LINE

BC and G rinse HOT LINE6

19

18Field wash

Redress

Decon LayoutLevel A Protection

Contamination Reduction or Warm Zone

Support or Cold Zone

Exclusion/ Hot Zone

Contamination Reduction Corridor

19-STEP DECON LINE

Page 29: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Equipment Drop B drop all equipment except the information that goes to the Command

Center

Page 30: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Gross wash and rinse done by the Entry Team personnel with assistance from DECON personnel

Page 31: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON personnel conduct the second wash and rinse

Page 32: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Final rinse

Page 33: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Decision: Change-out tank or remove suit?

Page 34: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Tank change-out done by the “rinser”

Page 35: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Removal of the chemical suit

Page 36: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

SCBA Removal

Page 37: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Field wash and rinse, or shower,or DECON trailer

Page 38: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON shower with privacy curtain

Page 39: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Shower B PVC pipe and a 200-gal. catch basin

Page 40: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Shower and final rinse

Page 41: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Shower for cooling personnel

Page 42: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON trailer

Page 43: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Stools for members of the Entry Team remaining in their suits B medical monitoring and debriefing

Page 44: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Medical monitoring and debriefingfor out-of-suit personnel

Page 45: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Air-inflatable tent used for medical monitoring and

debriefing

Page 46: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON line diagrammed ontoa clear polyethylene sheet

Page 47: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Wind direction

Decon solutionWater

Equipment drop

Exclusion zone

Plastic sheet

Can (10 gallon) Can

(32 gallon)

Decon outer garments Remove

boot covers and outer gloves

Tank changeover

point

Contamination Reduction Zone

Remove SCBA

201

201

Ho

t L

ine

Sup

port

Zon

e

Remove boots/gloves

and outer garments

(For disposal and offsite decontamination)

F.S.O.P. No. 7 MINIMUM A AND B DECON

Page 48: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Segregated equipment drop1

COLD LINE

HOT LINE

Decon LayoutLevel A and B Protection

Contamination Reduction or Warm Zone

Support or Cold Zone

Exclusion or Hot Zone

3

Tank change

Contamination Reduction Corridor

EPA's 7-STEP DECON LINE

2

4

5

6

7

Outer boot, glove, FES wash and rinse

Outer boot and glove removal

Boot, glove, and FES removal

SCBA removal

Field wash

Page 49: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

7-step Decontamination Line

Page 50: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Station # 1 - Gross Wash and RinseAA. VacuumBB. Extra pads

A. Equipment dropB. Bucket with brushC. Plastic pool

D. Bucket for trashE. Wash solutionF. StoolG. Shower (if used)H. Drums for spent solution

Station # 2 - Second Wash and RinseB. Bucket with brushC. Plastic poolE. Wash solutionH. Drums for spent solutionI. Garden hose with spray wand

J. Stabilizing device

Station # 3 - Final Rinse C. Plastic poolG. Shower (if used)H. Drums for spent solution I. Garden hose with spray wand

J. Stabilizing device

Station # 4 - Tank Change / CartridgeF. StoolsK. CylindersL. Supply of outer glovesM. Outer boot covers

Station # 5 - Equipment RemovalD. Trash canF. StoolsH. Drums for trashN. Trash bagsO. Table

P. Bucket of soap and waterQ. Bucket of water

Station # 6 - Field Wash or ShowerD. Trash canG. Shower ( if used )O. Table

P. Bucket of soap and waterQ. Bucket of water R. Supply of inner suits

Station # 7 - Medical Monitoring / DebriefingF. StoolsO. Table

S. Blood pressure cuff and thermometer

K

II

EN

TR

Y

EN

TR

Y

EX

IT

EX

IT

CLEAN SIDE

N N

Sta

. 7

H

S

O

D

BE

C

D J

G GO

QP R

A

CLEAN SIDE

DIRTY SIDE

HO

T Z

ON

E

WA

RM

ZO

NE

CO

LD Z

ON

E

Area

Emergency

Decon

BBA

A

BE

C

H H

C

J

H H H H

L

M

F

O

P

Q

D

G

F

F

F

F F

F F

F

RE

TU

RN

TO

HO

T Z

ON

E

Sta

. #

2

Sta

. #

1

Sta

. #

4

Sta

. #

3

Sta

. #

5

Sta

. #

6

DECON COMPLETE LAYOUT

Page 51: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

PERSONAL PROTECTION

• Decon workers can set up the decontamination reduction corridor in level D protection

• Once the warm zone has been activated, the minimum level of protection is one level less or the same as the entry team's

• The first position in decon may require a greater level than the rest

Page 52: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DISPOSAL METHODS• All equipment used must be

disposed of or decontaminated properly

• All spent solutions must be collected and disposed of properly

Clothing and solid materials must be placed in plastic bags pending further testing, decon, and/or disposal according to local, state, or federal standards

Page 53: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

DECON workers must clean up their area, restock, then DECON themselves

Page 54: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Basic emergency

DECONset-ups

Page 55: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

EMERGENCY DECONTAMINATION

• The primary concern is for response personnel, then the public

– Prevent loss of life

– Prevent severe injury

• Plan for medical emergencies

– Decon victim(s)

– Protect medical personnel

Page 56: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

• Decision to decon victim is based on:

• Type and severity of contamination or injury

• Immediate life-saving and first aid needs

• Aggravation of the injury or delay of life-saving treatment

EMERGENCY DECONTAMINATION

Page 57: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

• Alert medical personnel of potential contamination; protect medic unit

• Send chemical information with the victim

• Send response personnel familiar with the incident with victim if possible

EMERGENCY DECONTAMINATION

Page 58: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Dispose of contaminated PPE

Page 59: DECONTAMINATION. REGULATION OSHA 1910.120(q) Employer shall develop plans Operations level = basic implementation Technician = understand and implement.

Wash, rinse, and/or cut off PPE or clothing