DECLARATION - Konkan Railwaykonkanrailway.com/uploads/vacancy/1551181279DYCEE... · 2019. 3....

4
q;1q;ur ~ q;JqfuTif ~ {a:rm:r fF(q;1{ Cffl 5QSf)CR) KONKAN RAILWAY CORPORATION LIMITED (Gov!. of India undertaking) No. CO-13032/11/2018-PERS[25500] VACANCY NOTICE NO.RE/06/2019 Dated 26/02/2019 The Corporation invites applications from Central Govt. Employees from Railways and other Govt. Departments and Central PS Us for appointment on Re-employment basis against the posts in USBRL Project Division at J&K. Sr Category Pay scale No. of Upper Eligibility Holding COA Holding No at then time of posts age Pay Band + lOA Pay superannuation limit Grade Pay in Scales in Parent Cadre Central PSUs 1 Deputy SG in 7 trl CPC 03 64 Working SG in 7th Officers Chief Pay Matrix years experience of CPC Pay worked in Electrical Level-13. 10 years in Matrix Level- E-5 & 6 Engineer (as per 6 th CPC constructionl 13. OR JAG [Dy.CEE PB-4 RS.37400- maintenance in Pay Matrix @ 6700 with GP of OHE & PSI. Level-12. USBRL Rs.87001-) or J&K] JAG, in 7 trl CPC Pay Matrix Level-12. (as per 6 th CPC PB-3, RS.15600- 39100 with GP Rs.76001-) NOTE:- Candidates should ensure that they see the instructions, eligibility and other details of the notification on www.konkanrailway.com under the link Departments->Human Resources- >Recruitment->Notification. Applications in prescribed format as given on the above link and completed in all respects along with enclosures and clearly mentioning the above Notification No. and Post applied for should reach the office of Senior Recruitment Officer at Belapur Bhavan, Plot No.6, Sec-ll, CBD Belapur, Navi Mumbai - 400614 by 17:30 hrs on or before 2510312019. @r1../!) 6 ! s., Date:- 26/02/2019 Chief Personnel Officer Belapur. Konkan Railway Corporation Ltd

Transcript of DECLARATION - Konkan Railwaykonkanrailway.com/uploads/vacancy/1551181279DYCEE... · 2019. 3....

Page 1: DECLARATION - Konkan Railwaykonkanrailway.com/uploads/vacancy/1551181279DYCEE... · 2019. 3. 18. · maintenance of OHE & PSI. 9 Detail job description IRSEE officers having eight

q;1q;ur ~ q;JqfuTif ~

{a:rm:r fF(q;1{ Cffl 5QSf)CR)

KONKAN RAILWAY CORPORATION LIMITED(Gov!. of India undertaking)

No.CO-13032/11/2018-PERS[25500]

VACANCY NOTICE NO.RE/06/2019

Dated 26/02/2019

The Corporation invites applications from Central Govt. Employees from Railways andother Govt. Departments and Central PSUs for appointment on Re-employment basisagainst the posts in USBRL Project Division at J&K.

Sr Category Pay scale No. of Upper Eligibility Holding COA HoldingNo at then time of posts age Pay Band + lOA Pay

superannuation limit Grade Pay in Scales inParent Cadre Central

PSUs

1 Deputy SG in 7trlCPC 03 64 Working SG in 7th OfficersChief Pay Matrix years experience of CPC Pay worked inElectrical Level-13. 10 years in Matrix Level- E-5 & 6Engineer (as per 6thCPC constructionl 13. OR JAG[Dy.CEE PB-4 RS.37400- maintenance in Pay Matrix@ 6700 with GP of OHE & PSI. Level-12.USBRL Rs.87001-) orJ&K] JAG, in 7trlCPC

Pay MatrixLevel-12.(as per 6thCPCPB-3, RS.15600-39100 with GPRs.76001-)

NOTE:-Candidates should ensure that they see the instructions, eligibility and other details of thenotification on www.konkanrailway.com under the link Departments->Human Resources->Recruitment->Notification. Applications in prescribed format as given on the above linkand completed in all respects along with enclosures and clearly mentioning the aboveNotification No. and Post applied for should reach the office of Senior Recruitment Officerat Belapur Bhavan, Plot No.6, Sec-ll, CBD Belapur, Navi Mumbai - 400614 by 17:30 hrs

on or before 2510312019. @r1../!) 6!s. ,Date:- 26/02/2019 Chief Personnel OfficerBelapur. Konkan Railway Corporation Ltd

Page 2: DECLARATION - Konkan Railwaykonkanrailway.com/uploads/vacancy/1551181279DYCEE... · 2019. 3. 18. · maintenance of OHE & PSI. 9 Detail job description IRSEE officers having eight

FORMAT OF APPLICATION

Paste a recentpass port sizephotograph

with signatureacross

NameFather's NameDate of birthAge as onDesignation on retirement in Parent RailwayScale/Grade PayPeriod of service (service certificate to beenclosed)QualificationAddress for communication

Telephone No

DECLARATION

I here by declare that the information's furnished above are true to the best of myknowledge and I will be liable for punitive action if any of these is/ are found incorrect!false. I also declare that I have gone through the terms and conditions stipulated innotification and I shall abide by them.

Date:Place:

Signature of Applicant(Full Name)

Page 3: DECLARATION - Konkan Railwaykonkanrailway.com/uploads/vacancy/1551181279DYCEE... · 2019. 3. 18. · maintenance of OHE & PSI. 9 Detail job description IRSEE officers having eight

INSTRUCTION SHEET FOR THE POST OF DYCEE/USBRLlRE-EMPLOYMENT1 Organization Konkan Railway Corporation Limited

2 Title & No. of Posts Deputy Chief Electrical Engineer, 03 posts

3 Location USBRLJ&K.

4 Service Electrical Dept. Executives or of PS Us

5 Term of appointment Re-employment basis.

6 Age 64 Years as on 01-01-2019

7 Scale of Pay Parent Pay Plus Deputation Allowance. TADKAllowance and other applicable Allowances/incentives ofUSBRL Project.

8 Eligibility Criteria Working experience of 10 years in construction/maintenance of OHE & PSI.

9 Detail job description IRSEE officers having eight years of Electrical Officersfrom Open Line or experience in group -A in IRSEE andDeputation having five years of should preferably haveexperience in experience preferably in RailwayElectrification, and Electrical Electrification, andElectrical general general service etc.

Officer shall be responsible for all electrical worksrelated to USBRL project including preparing estimates,tender documents, design and drawings, specifications,execution and monitoring of progress of field worksincluding power supply arrangements.

The officer is required to co-ordinate and liaise with allconnected agencies as well as other relatedorganizations including CORE/ALD, RDSO, CRS andpower development department (PDD) J&K etc. forco-ordination and interfacing of works.

10 Photo Copies Attested photo copies of certificates of qualifications.

11 Other Documents 02 Self Attested Passport size Photographs andBio-data. DARNigilance clearance.

12 Web Address www.konkanrailway.com

13 Closing Date 30 days from date of issue.

Important Note:Application complete in all respect along with all enclosures as mentioned above should besent by registered/ speed post or delivered in person on working days so as to reach theabove mentioned office before closing date of 23103/2019 by 17:30 hrs. Applications receivedafter this date/time will not be entertained. Konkan Railway will not be responsible for anypostal delay. Candidates are warned that submission of false information will render themliable for immediate dismissal, if selected without any notice or disciplinary action. KonkanRailway holds all the right to alter the number of vacancy and other procedure or cancel therecruitment against this notification as it may deem fit without citing any reason. Nocorrespondence will be entertained from or on behalf of ineligible candidates.

Page 4: DECLARATION - Konkan Railwaykonkanrailway.com/uploads/vacancy/1551181279DYCEE... · 2019. 3. 18. · maintenance of OHE & PSI. 9 Detail job description IRSEE officers having eight

Annexure - B

PROJECT INCENTIVES TO THE EXECUTIVES WORKING AT USBRLlJ&K

RatesSI Incentive detailsNo

@ Jammu,Udhampur Katra.

1 Incentive Increments 9% of the Basic + DA [as per 7th

CPC Basic]

2 Additional Allowance [SG/JAG] RS.6500/- (per month)

3 Disturbed Area Allowance RS.l000/- (per month)

4 Consolidated TA 15 days [as per 7th CPC Basic]

RS.458/- [Payment per head per

5 Messing Allowance day- availing official mess facility]Rs.417/- [Payment per head perday-not availing official mess facility]

6 Telephone Allowance RS.750/- (per month)

7 Medical Allowance Rs.l000/- Optional/ Actual

8 Winter Clothing Allowance Once in a year RS.20,000/-

All the IR officers and KR Executives in JAG Grade and above working in USBRL9 Project shall be eligible for RS.5000/- as TADK allowance if they have not

engaged TADK.

10 Housing *

i Leased Accommodation:- 75% of 'X' class rates for 'Y' class city and 60% of 'X'class rates for 'z' class cities. OR

ii HRA :- Will be admissible where the family resides but has to submit thedeclaration.

1] Four full sets for self only, ifemployee is staying alone at project

Air travel facility area.2] Existing one set for family Plusone set for self, if an employee isstaying with family at project area .

.. .* Out of two facilities, mentioned at Item number 10 only one IS admissible at onepoint of time.NOTE:- Above incentives are as per T" CPC recommendations.