December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016...
Transcript of December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016...
![Page 1: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/1.jpg)
December 16, 2016
Presentation Slides
December 16, 2016
Justin J Kringstad Geological Engineer
Director
North Dakota Pipeline Authority
![Page 2: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/2.jpg)
Presentation Outline
• Understanding current and future oil production
– Activity
– Drilling economics
– Forecasts
• Williston Basin oil transportation dynamics
– Interstate oil movements
– Intrastate oil movements
• North Dakota natural gas production
– Flaring and gas capture
– Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 2
![Page 3: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/3.jpg)
North Dakota Drilling Activity
3 JJ Kringstad - North Dakota Pipeline Authority 3
![Page 4: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/4.jpg)
Initial Production (IP) Year – 2016 YTD Non-Confidential
JJ Kringstad - North Dakota Pipeline Authority 4
Bakken IP Rates
![Page 5: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/5.jpg)
Average BKN/TF Well Performance in Williams, McKenzie, Dunn, & Mountrail Counties (Minimum 1 bopd)
JJ Kringstad - North Dakota Pipeline Authority 5
Improving Well Performance
![Page 6: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/6.jpg)
Average BKN/TF Well Performance in Williams, McKenzie, Dunn, & Mountrail Counties (Minimum 1 bopd)
JJ Kringstad - North Dakota Pipeline Authority 6
Improving Well Performance
![Page 7: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/7.jpg)
A Quick Look at Bakken
Drilling Economics…
JJ Kringstad - North Dakota Pipeline Authority 7
![Page 8: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/8.jpg)
North Dakota Oil Differential
8
8 8 JJ Kringstad - North Dakota Pipeline Authority
Based on EIA Data
![Page 9: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/9.jpg)
Key Economic Assumptions
• $6-$8 Million Well Costs
• $45/BBL & $2.00/MCF Wellhead Pricing
• 1/6 Royalty
• Zero Flaring
• Assumed 10-20% IRR to drill (calculated after
production taxes and royalties)
• No Tax Incentives Included
• Production rate is 30-day average
• All Bakken/Three Forks wells drilled in 2008+
JJ Kringstad - North Dakota Pipeline Authority 9
![Page 10: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/10.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 10
Peak Month Minimum 400 BOPD
$45 Wellhead
6,616 Wells
![Page 11: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/11.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 11
Peak Month Minimum 500 BOPD
4,972 Wells
$45 Wellhead
![Page 12: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/12.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 12
Peak Month Minimum 600 BOPD
3,533 Wells
$45 Wellhead
![Page 13: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/13.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 13
Peak Month Minimum 700 BOPD
2,319 Wells
$45 Wellhead
![Page 14: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/14.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 14
Peak Month Minimum 800 BOPD
1,500 Wells
$45 Wellhead
![Page 15: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/15.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 15
Peak Month Minimum 900 BOPD
930 Wells
$45 Wellhead
![Page 16: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/16.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 16
Peak Month Minimum 1,000 BOPD
587 Wells
$45 Wellhead
![Page 17: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/17.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 17
Peak Month Minimum 1,200 BOPD
250 Wells
$45 Wellhead
![Page 18: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/18.jpg)
© OpenStreetMap contributors
JJ Kringstad - North Dakota Pipeline Authority 18
Peak Month Minimum 1,500 BOPD
70 Wells
$45 Wellhead
![Page 19: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/19.jpg)
JJ Kringstad - North Dakota Pipeline Authority 19
Summary of $45 Wellhead Oil
![Page 20: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/20.jpg)
JJ Kringstad - North Dakota Pipeline Authority 20
Breakeven Summary
![Page 21: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/21.jpg)
Forecasting Future Activity…
JJ Kringstad - North Dakota Pipeline Authority 21
![Page 22: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/22.jpg)
US Crude Oil Storage (Excl. SPR)
22 JJ Kringstad - North Dakota Pipeline Authority 22
![Page 23: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/23.jpg)
US Crude Oil Storage (Excl. SPR)
23 JJ Kringstad - North Dakota Pipeline Authority 23
![Page 24: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/24.jpg)
North Dakota Forecast Activity Assumptions
24
24 JJ Kringstad - North Dakota Pipeline Authority 24
![Page 25: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/25.jpg)
*Non-Confidential Bakken/Three Forks Production Only
Base Production Declines*
25 JJ Kringstad - North Dakota Pipeline Authority 25
![Page 26: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/26.jpg)
NDPA ND Oil Production Forecast
26 JJ Kringstad - North Dakota Pipeline Authority 26
![Page 27: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/27.jpg)
NDPA ND Oil Production Forecast
27 JJ Kringstad - North Dakota Pipeline Authority 27
![Page 28: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/28.jpg)
North Dakota Oil Production Forecast
28
28 JJ Kringstad - North Dakota Pipeline Authority 28
Production forecast is for visual demonstration purposes only and should
not be considered accurate for any near or long term planning.
![Page 29: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/29.jpg)
Presentation Outline
• Understanding current and future oil production
– Activity
– Drilling economics
– Forecasts
• Williston Basin oil transportation dynamics
– Interstate oil movements
– Intrastate oil movements
• North Dakota natural gas production
– Flaring and gas capture
– Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 29
![Page 30: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/30.jpg)
Estimated Williston Basin Oil Transportation
30
30 JJ Kringstad - North Dakota Pipeline Authority 30
October 2016
![Page 31: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/31.jpg)
Estimated Williston Basin Oil Transportation
31
31 JJ Kringstad - North Dakota Pipeline Authority 31
![Page 32: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/32.jpg)
32
Estimated ND Rail Export Volumes
JJ Kringstad - North Dakota Pipeline Authority 32
![Page 33: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/33.jpg)
Rail Destinations Market Share (Sep. 2016)
33 JJ Kringstad - North Dakota Pipeline Authority 33
Data for Rail Destination Market Share Provided by the US Energy Information Administration
![Page 34: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/34.jpg)
34
Major Rail Lines and Refineries
34
$45.11
$42.67
$41.81
$40.22
$44.21
EIA September 2016 Refiner Acquisition Cost
JJ Kringstad - North Dakota Pipeline Authority
![Page 35: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/35.jpg)
Cushing $51.56
Brent $54.81 WTI + $3.25
Crude Oil Prices – Dec 16, 2016
35 JJ Kringstad - North Dakota Pipeline Authority
Pricing Data: Bloomberg
![Page 36: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/36.jpg)
Williston Basin Truck Imports and Exports with Canada
36 JJ Kringstad - North Dakota Pipeline Authority 36
Data for truck imports/exports chart is provided by the US International Trade Commission
![Page 37: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/37.jpg)
Williston Basin Oil Production & Export Capacity, BOPD
Production forecast is for visual demonstration purposes only and should
not be considered accurate for any near or long term planning.
37 37 JJ Kringstad - North Dakota Pipeline Authority
![Page 38: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/38.jpg)
Evolution of Oil Gathering in ND
38 JJ Kringstad - North Dakota Pipeline Authority
![Page 39: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/39.jpg)
Evolution of Oil Gathering in ND Statewide Totals
39 JJ Kringstad - North Dakota Pipeline Authority
![Page 40: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/40.jpg)
Estimated Loaded Oil Truckloads Per Day
April 2015 Data 220 bbls/Truck
40 JJ Kringstad - North Dakota Pipeline Authority
![Page 41: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/41.jpg)
Presentation Outline
• Understanding current and future oil production
– Activity
– Drilling economics
– Forecasts
• Williston Basin oil transportation dynamics
– Interstate oil movements
– Intrastate oil movements
• North Dakota natural gas production
– Flaring and gas capture
– Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 41
![Page 42: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/42.jpg)
Major Gas Pipeline and
Processing Infrastructure
WBI Transmission
Whiting
42 JJ Kringstad - North Dakota Pipeline Authority
![Page 43: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/43.jpg)
Simple Terms Blue – Lack of pipelines Orange – Challenges on existing infrastructure
GREEN – % of gas captured and sold Blue – % flared from zero sales wells Orange – % flared from wells with at least one mcf sold.
Oct 2016 Data – Non-Confidential Wells Statewide
Solving the Flaring Challenge
43 JJ Kringstad - North Dakota Pipeline Authority
![Page 44: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/44.jpg)
44 JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring Challenge
![Page 45: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/45.jpg)
Capturing the 2% Faster Well Connections
45 45 JJ Kringstad - North Dakota Pipeline Authority
![Page 46: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/46.jpg)
46 JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring Challenge
![Page 47: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/47.jpg)
47 JJ Kringstad - North Dakota Pipeline Authority 47
Wellhead Gas Capture – Locations
![Page 48: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/48.jpg)
48 JJ Kringstad - North Dakota Pipeline Authority 48
Wellhead Gas Capture – Intake Volume
![Page 49: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/49.jpg)
49 JJ Kringstad - North Dakota Pipeline Authority 49
Wellhead Gas Capture – NGL Output
![Page 50: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/50.jpg)
50 JJ Kringstad - North Dakota Pipeline Authority 50
Wellhead & Plant Gas Capture
![Page 51: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/51.jpg)
51 JJ Kringstad - North Dakota Pipeline Authority 51
Wellhead & Plant Gas Capture
![Page 52: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/52.jpg)
52 52 JJ Kringstad - North Dakota Pipeline Authority
Plant Natural Gas Liquids - (Aug. 2016)
![Page 53: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/53.jpg)
NDPA ND Gas Production Forecast
53 JJ Kringstad - North Dakota Pipeline Authority 53
![Page 54: December 16, 2016 Presentation Slides - ND Pipeline Authority · 12/16/2016 · December 16, 2016 Presentation Slides December 16, 2016 Justin J Kringstad Geological Engineer Director](https://reader034.fdocuments.us/reader034/viewer/2022042300/5ecaa8b8f8ca3572ca345377/html5/thumbnails/54.jpg)
Justin J. Kringstad, Director North Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840
Phone: (701)220-6227
Fax: (701)328-2820 E-mail: [email protected]
Websites:
www.pipeline.nd.gov www.northdakotapipelines.com
54 JJ Kringstad - North Dakota Pipeline Authority
Contact Information
54