Page 1: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 1

Page 2: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 2

Presentation Overview

• Problem

• Solution

• Product Description

• Prototype

• Demonstration

• Budget

• Conclusion

Page 3: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 3

We often

wake up late.

Page 4: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 4

Lost your chance at a slice of 4.8 million dollars lately?

Retief Goosen lost his chance to play in the Nissan

Open due to oversleeping on February 17th, 2005.Source: http://www.sportinglife.com/story_get.dor?STORY_NAME=golf/05/02/17/

manual_080839.html

Page 5: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 5

What causes us to wake up late?

•Forgetting to set the alarm clock

Page 6: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 6

What causes us to wake up late?

•Forgetting to set the alarm clock

•Setting the alarm incorrectly

AMPM

Page 9: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 9

Solution

A system that identifies alarm events entered into a scheduler and sends the

alarm events to an alarm clock.

Page 10: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 10

How are we solving the problem?

• User does not have to remember the earliest event for the next day

• User does not have to manually adjust the setting of their alarm

Page 11: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 11

I-Clock System: Production Design

`Internet

PC w/ Outlook Firewall

Message Server

Datacenter

Home

Router

Router I-Clock

Page 12: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 12

Process Flow – Work

`

Internet

Client Batch Program send appointments to

the datacenter

Clock Batch Program reads appointments from the datacenter

I-Clock

1

4

3

2

Page 13: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 13

Product Description:Functional Hardware

• User’s schedule computer with Internet connection

• Message Servers• Home Internet connection• Router• Wired or wireless home network• I-Clock

Page 14: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 14

• Microsoft Outlook – Extending Outlook

– Enter and store alarm events here

Product Description:Functional Software

Page 15: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 15

• Microsoft Outlook– Extending Outlook

– Enter and store alarm events here

• Application software with batch program– Gathers alarm events from Outlook

– Alarm events sent to remote message server

Product Description:Functional Software

Page 16: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 16

• Microsoft Outlook– Extending Outlook

– Enter and store alarm events here

• Application software with batch program– Gathers alarm events from Outlook

– Alarm events sent to remote message server

• Message server software– Alarm events received and stored in message queues

Product Description:Functional Software

Page 17: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 17

• Microsoft Outlook– Extending Outlook

– Enter and store alarm events here

• Application software with batch program– Gathers alarm events from Outlook

– Alarm events sent to remote message server

• Message server software– Alarm events received and stored in message queues

• I-Clock software– Retrieves alarm events from the message server

– Sounds the I-Clock alarm upon next alarm event

Product Description:Functional Software

Page 18: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 18

• Demonstrate the major functional components.

• Prove that the I-Clock is feasible through the lab prototype.

Prototype’s Objectives

Page 19: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 19

Prototype’s Goals

• Proof of our concept through simulation

• Demonstration of a system that always wakes us up on time by:

1. Capturing alarm events

2. Sending alarm events to the remote message server

3. Retrieving alarm events from the remote message server

4. Sounding of I-Clock’s alarm caused by earliest alarm event

Page 20: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 20

PC w/ Outlook

Message Server

Datacenter

Home

RouterI-Clock

Work

User

Prototype

`Internet

Work

PC w/ OutlookUser Firewall

Message Server

Datacenter

Home

Router

Router

Actual

__________________________________________________________________

I-Clock

Page 21: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 21

How are the functional parts met with the prototype?

• Laptop 2 = User Schedule PC– Microsoft Outlook, Application software

• PC = Server with message queues

– Message queue software

• Laptop 1 with Monitor = I-Clock– I-Clock software

• Router = Internet & wireless home network

Page 22: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 22

I-Clock AM/FM radio antenna Main display screen Snooze button

Secure Digital (SD) memory card slot CAT-5 Ethernet cable port

Personal Computer Memory Card International Association (PCMCIA) expansion slot

Auxiliary display screen Button pad Lithium-ion battery slot

Page 23: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 23

Microsoft Outlook

• Popular scheduling software with 100 million licensed worldwide users

• Used to enter events

Source: http://www.ivoice.com/media/Jan242002100035.htm

Page 24: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 24

User’s Schedule

Page 25: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 25

Entering an Event

Page 26: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 26

Entering an Alarm Event

Page 27: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 27

Entering an Alarm Event

Page 28: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 28

Message Server

Page 29: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 29

Prototype Scenarios

1. Show default alarm

2. Transfer alarm event to the I-Clock

3. Delete an alarm event

4. Change an alarm event

5. Add non-alarm event

6. Add event to preempt the current alarm event

Page 30: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 30

Prototype Proof

• Add event

• Edit event

• Delete event

• Alarm will sound at correct time

• Only alarm events used

• Event preempting

• Alarm will sound on default time

Page 31: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 31

• Change the system time to before the default alarm time.

– Results: • Default alarm will sound

Prototype Scenario #1Show Default Alarm

Page 32: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 32

• Add a scheduled alarm event for the following day.

– Results: • Alarm event will be displayed on the I-Clock screen

Prototype Scenario #2Transfer Alarm Event to the I-Clock

Page 33: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 33

• Delete the alarm event from #2.

– Results: • Alarm event will be cleared from the I-Clock screen

• Default alarm time will be shown

Prototype Scenario #3Delete an Alarm Event

Page 34: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 34

• Add an alarm event into the future• Change the alarm time to close to current

time– Results:

• Alarm event will change• Alarm will sound• Event will be cleared• Default alarm time will be shown

Prototype Scenario #4Change an Alarm Event

Page 35: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 35

• Add an alarm event into the future without the checkbox checked

– Results: • Alarm event will not be added

Prototype Scenario #5Add Non-alarm Event

Page 36: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 36

Prototype Scenario #6 Add Event to Preempt the Current

Alarm Event• Add event into the future• Add another earlier event close to current

time– Results:

• Earlier alarm event will preempt to first event• Alarm will sound• Earlier event will be cleared• Next alarm event will be shown

Page 37: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 37

Prototype Proof

• Add event

• Edit event

• Delete event

• Alarm will sound at correct time

• Only alarm events used

• Event preempting

• Alarm will sound on default time

Page 38: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 38

Budget Expenditures

Fixed Costs

Hardware Costs $61,000

Prototype Costs $10,000

Initial Equipment $100,000

Inventory 100,000

Phase 2 Personnel $623,229 Total Fixed Costs $894,229

Recurring Costs

Overhead $92,000 Personnel $489,602 Total Recurring Costs $581,602

•Fixed costs for Phase 2

(Initial Equip & Inventory for the

warehouse)

•Recurring Costs for Out Years

(Overhead = Data Center, warehouse, utilities)

Page 39: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 39

I-Clock Components

Page 40: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 40

Component Quantity Costs

Total Quantity Costs

6W (10W Max.) Speakers 2 $1.41 $2.81Snooze Button Switches 2 $0.15 $0.30LH7A404 Card Engine (Main Board) 1 $55.00 $55.00AM/FM Tuner Chip 1 $1.77 $1.7710W Stereo Amp 1 $2.18 $2.1820x4 LCD + Keypad 1 $36.00 $36.005.7” Color 320x240 LCD 1 $54.52 $54.52Power Supply 1 $5.12 $5.12Plastic Case 2 $8.00 $16.00AA Batt. Holder 1 $0.16 $0.16Total $173.86

Components Costs

* Prices adjusted for expected volume discounts based on actual volume discounts received.

Page 41: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 41

Marginal Profit

Marginal RevenueRevenue/ Clock $250Total $250

Marginal CostsCost/ Clock $173.86Datacenter Cost/ Clock $0.81

$0.00Total $174.67

Marginal Profit $75.33

Cost $174.67 69.87%Profit $75.33 30.13%

Marginal Cost vs Profit

Cost

Profit

Page 42: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 42

Projected Sales by Year

0100002000030000400005000060000700008000090000

Number of Clocks Sold Annually

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Year

Sales by Year

Sales by Year

Year 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Clocks Sold 10,000 22,500 50,625 72,900 88,209 79,609 64,483 46,589 37,737 30,567 Revenue 2,500,000$ 5,625,000$ 12,656,250$ 18,225,000$ 22,052,250$ 19,902,156$ 16,120,746$ 11,647,239$ 9,434,264$ 7,641,754$

Total Clocks Sold 503,219

Page 43: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 43

Break Even Analysis

Break Even Analysis

$0

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

$14,000,000

$16,000,000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Years

Do

llar

s

Costs

Revenue

* Break Even occurs in 2010

Page 44: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 44* Break Even occurs in 2010

Year # of Clocks

Current Year Costs

Current Year Gross Profit

Total Cumulative Costs

Total Cumulative Revenue Profit (Loss)

2008 10000 $581,602 $750,000 $1,475,831 $750,000 -$725,831

2009 15625 $581,602 $1,171,875 $2,057,433 $1,921,875 -$135,558

2010 24414 $581,602 $1,831,055 $2,639,035 $3,752,930 $1,113,895

2011 29541 $581,602 $2,215,576 $3,220,637 $5,968,506 $2,747,869

2012 32569 $581,602 $2,442,673 $3,802,239 $8,411,179 $4,608,940

2013 26381 $581,602 $1,978,565 $4,383,841 $10,389,743 $6,005,902

2014 19060 $581,602 $1,429,513 $4,965,443 $11,819,257 $6,853,814

2015 13771 $581,602 $1,032,823 $5,547,045 $12,852,080 $7,305,035

2016 11154 $581,602 $836,587 $6,128,647 $13,688,667 $7,560,020

2017 9035 $581,602 $677,635 $6,710,249 $14,366,302 $7,656,053

Break Even Analysis

Page 45: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 45

Outside Funding Plan

• National Science FoundationDirectorate for Engineering

Division of Design, Manufacture and Industrial Innovation

Phase I: Solicitation funding award: $100k

Phase II: SBIR funding limited to $750k or 2 years, whichever is reached 1st

– Topic: Electronics (EL) and Security Technologies (ST).

– Funds cannot be used for marketing and production operations

– Company must match research and development costs

• CIT Corporate Giving Program Commercial Finance Group

• Additional funds needed above $100k - No deadline

Page 46: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 46

Conclusion

• Results from our test scenarios proves our concept works

• A system can be developed that identifies alarm events entered into a scheduler and sends the alarm events to an alarm clock

• Approval for Phase 2 continuance requested– Matching company funds for research and

development– SBIR II will be submitted

Page 47: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 47

Appendix

Section

A: Components

B: Major Functional Diagrams

C: Risks

D: Detailed Costs

E: Miscellaneous

F: Sources

Page 48: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 48

Appendix A: I-Clock ComponentsSharp LH7A404 Card EngineProcessor - Sharp LH7A404 32 bit ARM922TDMI RISC

microprocessor - Running up to 200 MHz (0 to 70 Degrees C) with 100 MHz

bus speed SDRAM Memory - 32, 64, or 128 MBytes on board Flash Memory - Up to 32 MBytes on board Display - Programmable color LCD controller - Built in driver supports up to 1024 x 768 x 16 bit color - Supports STN, Color STN, Dual STN, HR-TFT, AD-TFT,

TFT Touch Screen - Four or Five wire integrated touch interface Network - Support 10/100 BASE-T Ethernet controller

(application/debug) - SMSC LAN 91C111 (MAC & PHY) Audio - Audio Codec AC97 (Wolfson WM9708) Memory Card Expansion - CompactFlash Type 1 card (memory storage only) - Smart

Card Interface (ISO7816) - Dual PCMCIA interface - MMC/SD

USB - 2 X USB host and 1 device interface (USB 1.1) Serial Ports - 3 X 16C550 like, standard UARTs IrDA - SIR supports up to 115.2 Kbps PS2 - PS2 Keyboard & Mouse GPIO - Programmable depending on peripheral requirements SSP - Supports either Motorola SPITM, National

Semiconductor MICROWIRETM, TI SSI Software - WindowsTM CE and Linux BSPs available -

LogicLoaderTM (bootloader/monitor) Mechanical - Compact Size: 2.37" (60.2 mm) long x 2.67" (67.8 mm)

wide x 0.17" (4.4 mm) high - 144 pin SODIMM Connector for connection to custom

peripheral board - Two high density 80-pin expansion connectors for

peripheral access

Page 49: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 49

` Internet

`

Work

Home

GTT DatacenterPotential User’s PC w/ ScheduleUser

PDA

I-Clock

Firewall

Router

InformationServers

Router

Wireless Network (Optional)

Potential User’s PC w/ ScheduleUser

PDA

Appendix B: MFCD

Page 50: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 50

` Internet

Work

Home

GTT DatacenterPotential User’s PC w/ ScheduleUser

PDA

I-Clock

Firewall

Router

InformationServers

Router

Wireless Network (Optional)

Appendix B: MFCD – Work

Page 51: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 51

`

Client Batch Program send appointments to the virtual datacenter

program

Clock Batch Program reads appointments from the datacenter

I-Clock

1

43

2

Appendix B: Process Flow - Home

Page 52: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 52

`

Home

I-Clock

Wireless Network (Optional)

Potential User’s PC w/ Scheduler

And Virtual DatacenterUser

PDA

Appendix B: MFCD – Home

Page 53: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 53

`

I-Clock

In The Box

Client Software User Manual

Not In The Box

PC w/ Schedule

Wireless Router

Wired RouterOr Hub

OR

Internet

Appendix B: What We Provide & What The Customer Needs

Page 54: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 54

• Dependence on Microsoft Outlook•Format may change

• Interoperability of Components •May be more difficult to integrate than expected

• Dependence on one manufacturer•Motherboard

Appendix C: Risks

Page 55: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 55

Project Manager Core $75,616 $36.35 2080 $75,616

Marketing Director Core $73,500 $35.34 2080 $73,500

Product Director Core $121,086 $58.21 2080 $121,086

Operations Manager Operations $74,840 $35.98 2080 $74,840

$0.00

Client Developer IT $83,557 $40.17 856 $34,387

Server Developer IT $60,213 $28.95 700 $20,264

Q Developer IT $83,446 $40.12 2340 $93,877

Clock Hardware Engineer IT $65,739 $31.61 556 $17,573

Computer Hardware Engineer (VB) IT $52,557 $25.27 264 $6,671 Computer Hardware Engineer (NOVA) IT $77,780 $37.39 608 $22,736

Tech Writer IT $56,926 $27.37 400 $10,947

Procurement Manager Front Office $102,037 $49.06 348 $17,072

HR Manager Front Office $75,280 $36.19 248 $8,976

Web Developer IT $63,114 $30.34 800 $24,275

Web Designer IT $55,668 $26.76 800 $21,411 Total $623,229

Appendix D: Detailed Personnel

Page 56: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 56

Component Quantity Cost Total Cost

6W (10W Max.) Speakers 2 $2.99 $5.98 Snooze Button Switches 2 $0.32 $0.64 LH7A404 Card Engine (Main Board) 1 $451.00 $451.00 AM/FM Tuner Chip 1 $3.76 $3.76 10W Stereo Amp 1 $4.63 $4.63 20x4 LCD + Keypad 1 $76.00 $76.00 5.7” Color 320x240 LCD 1 $116.00 $116.00 Power Supply 1 $10.90 $10.90 Plastic Case 2 $3,750.00 $7,500.00 AA Batt. Holder 1 $0.34 $0.34 Total $8,169.25

Appendix D: Detailed Prototype Costs

Page 57: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 57

Queue Server (DEV & TEST) DELL PowerEdge SC1425 20 1549 $30,980 Switch Cisco Catalyst 2950G-24 Switch 2 1778 $3,556 Router Cisco 2610XM T1 Router 1 1478 $1,478 Workstation (DEV & TEST) DELL Precision 370 21 $699 $14,679 Microsoft Office 2003 Pro 19 $499 $9,481 Cables 25' CAT6 Network Cables 21 $25 $525 Prototype Netgear 802.11b Wireless CF Card 1 $65 $65 Prototype Prototype Product Cost 1 0 $0 Total $60,764

Appendix D: Hardware Detailed Costs

Page 58: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 58

How much would you pay for an alarm clock that provided all the above features? 4% answered they would pay over $250 for I-Clock

Expected Customer Base - 400,000 consumers*

Price Point - $250

___________________________________________

Expected Revenue - $100 million *Formula Used:

100 million Outlook Users * 4% said they were Outlook users & would pay over $250 * 10% (expected sales at least 1 in 10)

Sources: In a recent preliminary survey of 111 randomly selected users conducted by Greenteam Technologies, 4% said they would pay over $250 for the I-Clock. http://greenteamtech.com/main.aspx

Source: http://www.ivoice.com/media/Jan242002100035.htm (Outlook at 100 Million)

Appendix D: Expected Revenue

Page 59: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 59

182.9 Million Americans Need an Alarm Clock

Days per week needing an Alarm Clock

62%

38%

1 to 7

0 or Don't know

Source: http://www.sleepfoundation.org/publications/2001poll.cfm#3

Based on current population of 295,000,000

Source: http://www.internetworldstats.com/am/us.htm

Appendix E

Page 60: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 60

Unsuccessful attempts at wakingHow many times have you been late to

work due to alarm clock setting incorrectly (yearly average)?

• 43% of those surveyed stated: One or more times

Source: In a recent preliminary survey of 111 randomly selected users conducted by Greenteam Technologies, Appendix

How many times have you been late to work due to alarm not waking you up, but it went off (yearly average)?

• 44% of those surveyed stated: One or more times

42%

23%

10%4%

10%2% 2%

6%

0%

10%

20%

30%

40%

50%

1 2 3 4 5 6 9 Over10

27% 29%

10%

6%

8%

2% 2%

16%

0%

5%

10%

15%

20%

25%

30%

1 2 3 4 5 9 10 Over10

Appendix E

Page 61: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 61

• http://www.bestbuy.com/site/olspage.jsp?skuId=6970931&type=product&productCategoryId=pcmcat13900050018&id=1099387489297

• http://www.census.gov/population/socdemo/foreign/ppl-176/tab01-1.xls• http://www.cit.org/goal3-05.asp• http://www.clickz.com/stats/sectors/hardware/article.php/5921_902081• http://www.internetworldstats.com• http://www.internetworldstats.com/america.htm#us• http://www.ivoice.com/media/Jan242002100035.htm• http://www.marketing.pcworld.com/site/advertising.html• http://www.marketproshows.com/faq.asp• http://www.msnbc.msn.com/id/6986861/• http://www.nbc4.com/advertise/1131462/detail.html• http://www.nielsen-netratings.com/pr/pr_030618_us.pdf• http://www.ntia.doc.gov/reports/anol/NationOnlineBroadband04.htm• http://www.pmpa.org/resource/public/work_sched.htm• http://www.sleepfoundation.org/publications/2001poll.cfm#3• http://www.sportinglife.com/story_get.dor?STORY_NAME=golf/05/02/17/manual_080839.html• http://tennessean.com/business/archives/04/08/57011547.shtml?Element_ID=57011547• http://www.techplan.virginia.gov/• http://www.wired.com/news/technology/0,1282,48756,00.html• Our Website: http://www.greenteamtech.com/

Appendix F: Sources

Page 62: December 15, 20051. 2 Presentation Overview Problem Solution Product Description Prototype Demonstration Budget Conclusion.

December 15, 2005 62

• 6W (10W Max.) Speakers - http://www.digikey.com/scripts/DkSearch/dksus.dll?PName?Name=GF1004M-ND

• Snooze Button Switches - http://www.digikey.com/scripts/DkSearch/dksus.dll?PName?Name=SW416-ND

• LH7A404 Card Engine - http://www.logicpd.com/eps/som/sharp/LH7A404/

• AM/FM Tuner Chip - https://www.em.avnet.com/pns/home/0,5533,CID%3D0%26CCD%3DUSA%26SID%3D0%26DID%3DDF2%26LID%3D0%26BID%3DDF2%26CTP%3DPNS,00.html?ref=https://emwcs.avnet.com/webapp/wcs/stores/RedirectWCSLogon?langId=-1&storeId=500201&catalogId=500201&reLogon=https://www.em.avnet.com/auth/framelogin/&URL=RemoteAdvancedSearchView%3FlangId%3D%2D1%26storeId%3D500201%26catalogId%3D500201%26manufacturerPartNum%3DTEA5757HLBE

• 10W Stereo Amp - http://www.digikey.com/scripts/DkSearch/dksus.dll?PName?Name=296-2464-5-ND

• 20x4 LCD + Keypad - http://www.crystalfontz.com/cgi-bin/pricing.pl?product=635

• 5.7” Color 320x240 LCD - http://www.mouser.com/index.cfm?handler=displayproduct&lstdispproductid=404582&e_categoryid=221&e_pcodeid=68700

• Power Supply - http://www.digikey.com/scripts/DkSearch/dksus.dll?PName?Name=T371-P5P-ND

• AA Batt. Holder - http://www.digikey.com/scripts/DkSearch/dksus.dll?PName?Name=2474K-ND

Appendix F: Technical Sources