De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der...
Transcript of De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der...
![Page 1: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/1.jpg)
De impact van Internet of Things en Edge Computing
Legrand Data Center Solutions, Niek van der Pas
![Page 2: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/2.jpg)
LEGRAND – THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE
2017 RESULTS• Turnover: €5,5 bn (+10%)• Present in over 180 countries• >37.000 employees• Benelux:Veghel, Boxtel, Schiedam,
Weert, Diegem, Wijgmaal
• Sharing knowledge• White Papers• Active participation in standards
committees
![Page 3: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/3.jpg)
Agenda
![Page 4: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/4.jpg)
Source: Futuriom
Source: Longman Dictionary
The Edge
![Page 5: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/5.jpg)
Wat stuurt de Edge
Source: IOT Analytics
![Page 7: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/7.jpg)
Zelfrijdende auto’s Tijdspad
1939 Vision GM 1966
2018 Level 2 Driver assistance
2021-25 Level 4 No driver
2025 Level 5 Full Autonomous
Source: Norman Bel Geddes, Futurama at the 1939 New York World's Fair14:27-15:08
![Page 8: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/8.jpg)
Zelfrijdende auto’s Voorwaarden
Mobileye layers: • harvesting agents (any camera-equipped vehicle),10KB/km• map aggregating server (cloud)• map-consuming agents (autonomous vehicle)• Data sharing i.e . Mobileye REM™
Waymo: Level 4• Perception• Behavior Prediction• Planner
Source: Waymo
![Page 10: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/10.jpg)
Het Edge Landschap
• Het netwerk– Telco aanbieders
• Vast: ADSL, Coax, Glas
• Mobile: 3G, 4G
– Lokale netwerken• Glas
• Fixed wireless
Bron: Westo
Bron: Engie
Bron: Alticom
![Page 11: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/11.jpg)
CORD Central Office Re-architected as a Data Center
• 4G 80% binnen• Wij zijn 93% binnen
• 5G 2020
Source: Nokia
![Page 12: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/12.jpg)
CORD Central Office Re-architected as a Data Center
• IMT 5G 2020
uto ated dri in
art it
art o e
e
T
ission riti al
appli ations te le edi ine
Voi e
ndustr auto ation
ps data ra te
ideo
or and pla in t e loud
eMBB
MMTC URLLC
Source: Huawei, Indoor 5G network WP
Capability Description 5G target Usage scenario
Peak data rateMaximum achievable
data rate20 Gbit/s eMBB
enhanced Mobile Broad
BandUser experienced
data rate
Achievable data rate
across coverage area1 Gbit/s eMBB
Latency
Radio network
contribution to packet
travel time
1 ms URLLCUltra-Reliable Low-Latency
Communications
Connection densityTotal number of devices
per unit area106/km2 MMTC
Massive Machine Type
Communications
Mobility
Maximum speed for
handoff and QoS
requirements
500 km/heMBB/U
RLLC
enhanced Mobile
BroadBand / Ultra-Reliable
Low-Latency
Communications
![Page 13: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/13.jpg)
CORD Central Office Re-architected as a Data Center
Source: Open Network Foundation
![Page 14: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/14.jpg)
CORD Central Office Re-architected as a Data Center
Source: Open Network Foundation
![Page 15: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/15.jpg)
CORD Central Office Re-architected as a Data Center
Source: Open Compute Project
![Page 16: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/16.jpg)
KPN presentatie Open Compute Congres Amsterdam
Source: KPN OCP presentatie Amsterdam 01-10-2018
![Page 18: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/18.jpg)
Legrand IOT
![Page 19: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/19.jpg)
The Edge
Source: Nokia
Source: Verizon
![Page 20: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/20.jpg)
Wanneer
![Page 21: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/21.jpg)
Om 12:30 Stand 16
- 12.30 en 13.30 – Vragenuur op de stand:
- Mark Acton zal op stand 16 een vragenuurtje houden over
de EN 50600. Niek en Mark zullen dit na afloop van hun
presentatie ook nog benadrukken.
- De bezoekers die een visitekaartje overhandigen
ont an en na afloop per ail de nieuwe itepaper ‘ n
energy-efficient data centre using EN 50600’.
![Page 22: De impact van Internet of Things en Edge Computing · Legrand Data Center Solutions, Niek van der Pas. LEGRAND –THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURE](https://reader035.fdocuments.us/reader035/viewer/2022062604/5fb561d51066924fcd55ad4a/html5/thumbnails/22.jpg)
Contactgegevens
• Bedrijfsnaam: Legrand Data Center Solutions
• Adres: Eisenhowerweg 12
• Telefoonnummer: 0413311100
• E-mailadres: [email protected]
• Standnummer: 16