Ddim

49
Photo by VinothChandar - Creative Commons Attribution License http://www.flickr.com/photos/44345361@N06 Created with Haiku Dec

description

Sustainability of Data Informed Decision Making in Schools

Transcript of Ddim

Page 1: Ddim

Photo by VinothChandar - Creative Commons Attribution License http://www.flickr.com/photos/44345361@N06 Created with Haiku Deck

Page 2: Ddim
Page 3: Ddim

Objectives

• Learn from Peers in Previous Cohort Regarding Implementation and Sustainability

• Complete the Renewal Matrix for the time being.

• Strategize for Implementation and Sustainability.

Page 4: Ddim

Deliverables

• Sign off on the Renewal Matrix / Take a Picture

• Complete the Sustainability Work Sheets

• Fill out the Plan for the Incentive Funds

• Complete all Misc Paperwork.

Page 5: Ddim

INTRODUCTIONNCLB and RTTT legislative fiats have placed tremendous pressure on school staff to improved student achievement.

Page 6: Ddim
Page 7: Ddim
Page 8: Ddim

• A body of research shows principals have a significant influence on improving student achievement (Hallinger & Leithwood, 1996; The Wallace Foundation, 2013).

Page 9: Ddim
Page 10: Ddim

• Developing leadership capacity to improve school conditions is difficult work - few educators have the background and experience to do this important work

(Fullan, 2001, 2005; Wayman, Midgley & Stringfield, 2006).

Page 11: Ddim

An increasing number of studies suggest excellent schools have excellent principals

(Hallinger & Leithwood, 1996; Leithwood, 2003).

Page 12: Ddim

• Principals must not only focus on student achievement, they must also support the intellectual and emotional work of teachers

(Hargraves, Moore, & Manning, 2001).

Page 13: Ddim

WMU LEARNING-CENTERED LEADERSHIP GRANT

In 2010, the USDE awarded a five-year grant to WMU’s Educational Leadership, Research and Technology (ELRT) Department

Page 14: Ddim

WMU LEARNING-CENTERED LEADERSHIP

GRANT• The grant purpose

was to develop and implement a Learning-Centered Leadership Development Program for practicing and aspiring principals.

Page 15: Ddim

WMU LEARNING-CENTERED LEADERSHIP GRANT: Cohort A –

2012/13

In the first round of the grant project, 25 school teams comprised of a practicing and an aspiring principal, plus two teacher leaders, participated in a series of workshops on the seven dimensions of leadership that are empirically related to improving student achievement.

Page 16: Ddim

Next, the school teams engaged other stakeholders in examining the schools’ unique context, identifying renewal priorities, and developing renewal activities within the framework of the seven dimensions.

The teams, then, set about implementing the renewal work in their schools

Page 17: Ddim

WMU RESEARCH ON SUSTAINABILITY

Now, with the combination of Cohort A and Cohort B, we have approximately 50 school buildings from 15 school districts that are involved WMU’s Learning-Centered Leadership Program

Page 18: Ddim

As we began to work with Cohort B, the WMU Project Team collected data from Cohort A to determine the extent to which the first round of schools have been able to sustain their renewal activities over time

Page 19: Ddim

• We also collected data to determine what factors enhanced implementation and sustainability of the renewal activities and what factors created barriers

Page 20: Ddim

The Research DesignWe surveyed 22 of the 25 schools that were

involved in Cohort A from October 2010 to March 2013. Cohort A principals were surveyed in November 2013 –eight months after they had completed the Program

Of the 22 principal contacted, 16 (or 72.7%) completed and returned the questionnaire

In addition to the survey, we conducted a case study with one participating school. The purpose of the case study was to contextualize the findings from the survey

Page 21: Ddim

THE STUDY FINDINGS

First, we looked at responses regarding the implementation and sustainability of renewal activities that involve Data Informed Decision Making (DDIM)

Page 22: Ddim

FINDINGS OF STUDY – IMPLEMENTATION OF DIDM

ACTIVITIES

Page 23: Ddim

FINDINGS OF STUDY – IMPLEMENTATION OF DIDM

ACTIVITIESDIDM ACTIVITIES RENEWAL ACTIVITIES EVOLVE

Data Discussions Modify the Use of Data Walls

PLCs Included more time for PLCs

Data Teams Changed Data Leadership Team to Instructional Leadership Team

Data Notebooks Use data Differently – Created “Power Hours”

Data, Assessment Focus Teams and Data Walls

Incorporate Renewal Activities into the School Improvement Process

Page 24: Ddim

FINDINGS: Sustaining means “continuing as is”

Respondent Excerpts

#1 "... informed decision making based on DIBEL's data....“

#2 "Data discussions with all staff.“

#6 “Data informed decisions are made utilizing the systematic strategies developed through WMU.”

#8 “We incorporated all our renewal activities into our school quality plan along with the methods for measurement.”

Page 25: Ddim

FINDINGS: Sustaining means “continuing as is”

Respondent Excerpts

#10 “All teachers participate in Professional Learning Community (PLC) meetings. These meetings are scheduled to allow grade level and multi-grade level teachers to meet and plan instruction using data. These meetings are held once per week.”

#11 “Our school continues to use the Data Team process for units of instruction.”

#12 “Decisions are made based on student need. We use data notebooks w/intervention notes. All staff are using.”

#15 “Data, Assessment Focus Team, and Data Walls will start back-up for 2nd Semester . These strategies are embedded in our SIP, and is a consistent component of staff meetings.”

Page 26: Ddim

FINDINGS: Sustaining means “evolving given the changing

context”Respondent Excerpts

#5 “We have decided to not push Data Walls as much as we have in the past. We do look at data monthly at Grade Level Meetings and have a clear overall picture which we use to drive our instruction for that month. We no longer feel the need to post the data in our classrooms.”

#9 “We are currently structuring our grade level PLC's to include more time allotted to at least an hour. Providing this extra time really allows our team to analyze the data and develop a plan of action.”

Page 27: Ddim

FINDINGS: Sustaining means “evolving given the changing

context”

Respondent Excerpts

#10 “Last year our school had a data leadership team which met to discuss the various data that was used to plan for school improvement in reading, math and behavior. This year our leadership developed the idea of using an Instructional Leadership Team to help guide the best practices and teaching learning that would drive increased student achievement by using data. The ILT meets once per month and then filters the information to the PLC's. Administration monitors the progress and the ILT is in constant position to adjust best practices as needed to address any concerns as cited by the school data.”

Page 28: Ddim

FINDINGS: Sustaining means “evolving given the changing

context”

Respondent Excerpts

#11 “We are beginning to use our data in different ways now. Teachers and teams are creating "power hours" or "team time" to better meet the needs of our students based on what our data tell us.”

#13 “... we are now using data in different ways, including a new initiative called Power Hour. We also are deeply committed to Professional Learning Communities (or Critical Friends Groups) which is a big part of school improvement and professional growth.”

Page 29: Ddim

FINDINGS: Sustaining means “incorporating into the overall school

improvement process”

Respondent #13: “EVERYTHING is based on data”

respondents #8: “We incorporated all our renewal activities into our school quality plan”

Page 30: Ddim

FINDINGS OF STUDY

Page 31: Ddim

FINDINGS: Changes attributed to the Grant Project by the respondents

61% mentioned that “we now decide school improvement goals based on student and school data” and they attributed the change to the grant project.

64.3% indicated “we now decide school improvement strategies based on student and school data.”

Page 32: Ddim
Page 33: Ddim
Page 34: Ddim

Additional Changes attributed to the Grant Project by the respondents

60% indicated that they now engage stakeholders more in school decisions

60 % indicated that their SIP process now builds upon previous efforts, rather than starting from scratch

Page 35: Ddim

53.3% indicated that their school improvement process is more focused on improving student achievement

53.3 % indicated that they now have a process in place to ensure that SIP work is continuous

Page 36: Ddim

Additional Changes attributed to the Grant Project by the respondents

46.7 indicated that their school improvement strategies are more coordinated and aligned with one another

40 % indicated that more of the impetus for change comes from teachers as well as external forces

40% indicated that they now monitor the progress of their school improvement initiatives more and adjust as needed

Page 37: Ddim

FINDINGS: Facilitators and Barriers for Sustaining Renewal

Activities–“Staff participation, collaboration and commitment”–“leadership effort to put a structure in place”–“coordinated and aligned (SIP) strategies”

Page 38: Ddim

FINDINGS: Facilitators and Barriers for Sustaining Renewal

Activities

BarriersLeadership and staff turnoverTime availability to follow throughDistrict level factors, e.g. finances, support, and focus

“Re-allocating” or “micro-managing”Staff commitment – “not all on board”

Page 39: Ddim

SUSTAINABILITY – LESSONS LEARNED FROM THE LITERATURE AND WMU

RESEARCH

Big Idea 1: Sustainability is a by-product of high fidelity

implementation

Page 40: Ddim

SUSTAINABILITY – LESSONS LEARNED FROM THE LITERATURE AND WMU

RESEARCH

Big Idea 2: High Fidelity Implementation requires ongoing

monitoring and adjusting

Page 41: Ddim

SUSTAINABILITY – LESSONS LEARNED FROM THE LITERATURE AND WMU

RESEARCH

Ten Things That Support Sustainability

(From our findings and other Studies)

Page 42: Ddim

ELEMENTS TO SUSTAINABILITY

1. Clear and Compelling Vision2. Systems Alignment3. Development and Use of

Capacity4. Sustained and Committed

Leadership5. Clear Definitions of High

Fidelity Implementation

Page 43: Ddim

ELEMENTS TO SUSTAINABILITY

1. Clear Indicators of Success

2. Progress Monitoring3. Aligning Resources4. Communication and

Transparency5. Culture of Safety and

Innovation

Page 44: Ddim

TALK TOGETHER: Which of these have worked for you?

How?1. Clear and Compelling Vision

2. Systems Alignment

3. Development and Use of Capacity

4. Sustained and Committed Leadership

5. Clear Definitions of High Fidelity Implementation

Page 45: Ddim

TALK TOGETHER: Which of these have worked for you?

How?6. Clear Indicators of Success

7. Progress Monitoring

8. Aligning Resources

9. Communication and Transparency

10. Culture of Safety and Innovation

Page 46: Ddim

SHARE: 1-2 points from your conversation

• What insight about getting to full, high fidelity implementation can you share?

• What insight about sustaining an important school improvement initiative can you share?

Page 47: Ddim

NEXT: Two Cohort A Schools will share their story of

implementing and sustaining renewal activities

While you listen to our guests from Cohort A:Listen for examples of the Ten Elements of Sustainability in their stories. While you may not hear all Ten Elements in each of their stories, you will hear some interesting examples of many elements. Make notes about what you hear.

Page 48: Ddim

THANKS: To our guests from Cohort A

We appreciate hearing your

stories of renewal

Page 49: Ddim

THIS AFTERNOON

After Lunch:School Teams will have the time to

Review your renewal activitiesand

Have conversation about how you will achieve full implementation and

sustainability