DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch...

7
DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE

Transcript of DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch...

Page 1: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

DCS – SDD Low Voltage Monitoring

Jiří KrálCzech Technical University in Prague, FNSPE

Vojtěch PetráčekCzech Technical University in Prague, FNSPE

Page 2: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

[email protected], ALICE Week 03 2006 2

External driver board prototype successfully tested with DCS, Carlos

and LV left and right boards

first production in couple weeks

Page 3: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

[email protected], ALICE Week 03 2006 3

Testing setup

tests of connection of DCS board (via external driver board) to one ladder of 8 SDDs are running in Torino

detectors are controlled with simple command line programs, directly from DCS board

Page 4: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

[email protected], ALICE Week 03 2006 4

DCS

no need for failsafe in programmable hardware layer

Page 5: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

[email protected], ALICE Week 03 2006 5

Comleted DCS board part

power up and down sequence for Dilbert, DCUs, GOL

reset

all temperature, voltage and current data readout from DCUs

complete command set for Dilbert and DCUs

Page 6: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

[email protected], ALICE Week 03 2006 6

To-do DCS board part

SEU error recovery

callibration

failsafe

smoothing

data exchange with DIM server

timeframe: 5 weeks

Page 7: DCS – SDD Low Voltage Monitoring Jiří Král Czech Technical University in Prague, FNSPE Vojtěch Petráček Czech Technical University in Prague, FNSPE.

[email protected], ALICE Week 03 2006 7

To-do PVSS part

first simple opperating pannel expected in 7 weeks