DCS - general Unscheduled power cut Wed. morning (08.02.2012, human error) DCS (and HLT) off, due to UPS on bypass In the middle of DB migration, had to start again. OK on Thursday. 48V consolidation tests on Fri. 17.02.2012 Switch off all DCS (timing to be defined) Detector equipment (including gas and cooling) shall be in a state to support power interruptions Restart DCS in the afternoon: only new DCS cluster, except agreed exceptions. Some ‘restart issues’ might persist over the weekend (not all experts are available on Friday) 14/2/12 TC meeting - A.Augustinus 1

Transcript of DCS - general Unscheduled power cut Wed. morning (08.02.2012, human error) –DCS (and HLT) off, due...

Page 1: DCS - general Unscheduled power cut Wed. morning (08.02.2012, human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.

DCS - general

• Unscheduled power cut Wed. morning (08.02.2012, human error) – DCS (and HLT) off, due to UPS on bypass– In the middle of DB migration, had to start again. OK on Thursday.

• 48V consolidation tests on Fri. 17.02.2012– Switch off all DCS (timing to be defined)– Detector equipment (including gas and cooling) shall be in a state to

support power interruptions– Restart DCS in the afternoon: only new DCS cluster, except agreed

exceptions.– Some ‘restart issues’ might persist over the weekend (not all experts are

available on Friday)

14/2/12 TC meeting - A.Augustinus 1

Page 2: DCS - general Unscheduled power cut Wed. morning (08.02.2012, human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.

DCS – migration status

• Phase II (all SW upgrades completed on old HW)– All done except for: AD0, PHS, SPD, SDD, MCH-GMS, LHC I/F

• All systems have been allocated new hardware• Migration to new hardware

– See table ( Done - Ongoing - Not started )

• Remarks– SPD will start ‘after drilling’– SDD will start 15.02– Gas will be done this week

14/2/12 TC meeting - A.Augustinus 2

   ACO 

  AD0

  EMC

  FMD

  HMP

  MCH

  MTR

  PHS

  PMD

  SPD

  SDD

  SSD

  TOF

  TPC

  TRD   T0   V0

  ZDC

  Gas

  MCH-GMS   TRI

  LHC I/F

Phase II                                            

Allocated                                            

Migrated                                            

Page 3: DCS - general Unscheduled power cut Wed. morning (08.02.2012, human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.

DCS - plans

• DCS on-call started– Only for operation issues, not for support on migration

• Next week mornings: Integration sessions, – Integrating detector DCSes in central DCS, checking compatibility issues– Central operation tests

14/2/12 TC meeting - A.Augustinus 3