Page 1: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 1

ddilipkumar
Text Box
BOBASIO/7-PT04
Page 2: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 2

Introduction

Page 3: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 3

Framework for Regional ATM Contingency Plan

Level 1: (domestic or internal State)- For domestic Plans having little or NO effect on external air

navigation service providers;

Level 2: (Inter State)-For coordinated contingency plans involving two or moreStates;

Level 3: (Regional)-For sub-Regional or Regional contingency plans, detailingcontingency arrangements affecting airspace users or servicesprovided outside the contingency airspace

Page 4: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 4

State’s Readiness of ATM Contingency Plan

Each State’s overall contingency readiness was categorized asRobust, Marginal or Incomplete for both Level 1 and Level 2plans according to the following scale:

- Robust (80-100% implementation)

- Marginal (40-79%)

- Incomplete (0-39%)

Page 5: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 5

States and Regional Contingency Readiness

Robust stage

Myanmar

Data by RACP/TF/3

Page 6: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS

6

ObjectiveObjective

Plan contains arrangements to ensure continuedsafety of air navigation in the event of partial ortotal disruption of air traffic services in Yangon FIR

Not address arrangements for ARR and DEPtraffic at Myanmar airports or for domestic flightoperations

Myanmar ATS Contingency Plan

Myanmar Plan submitted to ICAO-APAC in 2010

Page 7: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS

7

States and FIRs Affected ATS UnitsThailandBangkok FIR ACC (Sector 4,5,7)

IndiaKolkatta FIRChennai FIR

ACCOCC

BangladeshDhaka FIR ACC

ChinaKunming FIR ACCLao PDRVientiane FIR ACC

Affectd States & FIRs

Myanmar ATS Contingency Plan

Page 8: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 8

ContingencyRoutes

Yangon FIR (CRY)

ATS Route Direction FLAssignment

ACCs COM

CRY -1 L507BKK –LIMLA-BGO - TEBOV

Westbound(Uni-direction)

All Westbound FlightLevel Available

Kolkatta ACCBangkok ACC

HF, ADS/CPDLCVHF, ADS/CPDLC

CRY -2 A599GMA –LSO – CHILA - CTG

WestboundEast bound

300,320, 360All Eastbound Flight

Level Available

Kolkatta ACCDhaka ACC

Kunming ACC

HF, ADS/CPDLCHF, VHF, ADS/CPDLC

CRY -3 A201GMA –LSO – ANSOS

WestboundEast bound

300,320, 360All Eastbound Flight

Level Available

Kolkatta ACCDhaka ACC

Kunming ACC

HF, ADS/CPDLCHF, VHF, ADS/CPDLC

CRY -4 B465LP –AKSAG – MDY – APAGO

-CTG

WestboundEast bound

280,340, 380All Flight Level

Available

Kolkatta ACCDhaka ACC

HF, ADS/CPDLCHF, VHF, ADS/CPDLC

CRY -5 P646IBITA – PTN – BETNO - BKK

East bound(Uni-direction)

All Eastbound FlightLevel Available

Kolkatta ACCBangkok ACC

HF, ADS/CPDLCVHF, ADS/CPDLC

CRY -6 L301RINDA – DWI – TANEK - BKK

West boundEastbound

320, 360All Eastbound Flight

Level Available

Kolkatta ACCBangkok ACC

HF, ADS/CPDLCVHF, ADS/CPDLC

CRY -7 M770MEPEL – SADUS – LALIT -

IKULA

WestboundEast bound

280, 300, 340, 380All Eastbound Flight

Level Available

Kolkatta ACCBangkok ACC

HF, ADS/CPDLCVHF, ADS/CPDLC

Int’l Route Structures and Communications for TransitYANGON FIR when NO ATS available in MYANMAR Airspace

Page 9: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

CRY1

CRY2

CRY3

CRY4

CRY5

CRY6

CRY7

Contingency Routesin Yangon FIR

Page 10: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

CRY1

CRY2

CRY3

CRY4

CRY5

CRY6

CRY7

Consideredadditional

Contingency Routein Yangon FIR

Route: P762PPB – LULDA – LALAT – DWIFL270 (East bound)FL280 (West bound)

Page 11: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 11

Meeting is invited -

- Note this information

- discussion

Page 12: DCA ANS BOBASIO/7-PT04 - Air Navigation Services PT04 AT… · DCA ANS. 3. Framework for Regional ATM Contingency Plan. Level 1: (domestic or internal State) - For domestic Plans

DCA ANS 12

Thanks for kindattention