DBT Project in NREGS-AP DEPARTMENT OF RURAL DEVELOPMENT GOVERNMENT OF ANDHRA PRADESH 1

Transcript of DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of...

Page 1: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

DBT Project in NREGS-AP

DEPARTMENT OF RURAL DEVELOPMENT

GOVERNMENT OF ANDHRA PRADESH

1

Page 2: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

MGNREGS..The game changer

• Biggest wage Employment programme

• 100 Days guaranteed wage Employment under MGNREG Act 2005 enacted by Parliament

• Rights based and demand driven scheme

• More than 84.75 Lakh Job Card holders

• More than Rs. 28203 Cr funds spent over last 10 years in villages

Page 3: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

•PMJDY (Bank A/c)+ Mobile number

•Aadhaar(UID)

Page 4: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

DBT-Objectives

• Elimination of the role of Middlemen & Leakages, Duplicates.

• Avoid Delays in Payment

• Need to reach payment to

»Right person

»Right time

»Right place

4

Page 5: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

AADHAAR ENABLED PAYMENT SYSTEM IN MGNREGS DISBURSEMENTS

5

Page 6: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

A.P. Model of DBT

AePS Pilots launched for MNREGA Wage Payments andPensions

In January, 2013 with ICICI Bank in East Godavari (IPolavaram Mandal) & with Axis Bank in Anantapur(Dharmavaram Mandal)

In March, 2013 with India Post in Chittoor District

6

Page 7: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

A.P. Model of DBT

• GPs with good connectivity are served online and wages are paid through AadhaarAuthentication(AEPS).

• GPs with low connectivity (640 gps) are identified and wages are paid with Local Biometric authentication in offline mode.

• PoTD (Point of transaction devices) machines are enabled with GPRS connectivity.

• AP Online provides Hardware and Software support to DoP.

7

Page 8: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

Electronic Fund Management System (eFMS)

8/90

Page 9: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

AUA - DoP

APOnline

BO

Mandal HQ

GoAPData Center

NodalBank

SO

HO

Aadhaar authenticated payments- Process flow

ASABSNL

CIDRUIDAI

TSP (APOnline) server

Day 1-6

Day 7-10

Day 10

Day 11

Day 11

Day 11

Day 11

Day 12-15

Day 11

9

Page 10: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

Real Time MIS - DBT

Page 11: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

BC

Mandal HQ

GoAPData Center

SponsorBank

APB based Aadhaar authenticated payments

ASABank

CIDRUIDAI

Day 1-6

Day 7-10

Day 10

Day 11

Day 11

Day 11

Day 11

Day 11 11

NPCI

Credit the wageamount into the wageseeker individual bankA/c

Page 12: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

STRENGHS OF THE SYSTEM

• Electronic flow of Cash (e-FMS) and transaction data.

• End to end transaction based MIS

• Real time sharing of Disbursement data with NREGS server

12

Page 13: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

ACHEIVEMENTS• Aadhaar seeded for 98% active wage seekers• Aadhaar enabled Micro ATMs deployed in all the

Gram Panchayats• At the end of Dec 2016 an amount Rs.5,808 crs

disbursed covering 7.96 cr transactions throughAEPS.

• Rs.2,530 crore is paid through Aadhaarauthentication in the current Financial Year throughDoP.

• Nearly Rs.300 crs was saved due to elimination ofleakages, deaths & duplicates.

13

Page 14: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

Way Forward

• JAM- TRINITY

14

Page 15: DBT Project in NREGS-APAPHRDI/2017/1_jan... · DBT-Objectives •Elimination of the role of Middlemen & Leakages, Duplicates. •Avoid Delays in Payment •Need to reach payment to

THANK YOU . . .