June 12, 1984
Docket No. 50-346
Mr. Richard P. Crouse Vice President, Nuclear Toledo Edison Company Edison Plaza - Stop 712 300 Madison Avenue Toledo, Ohio 43652
Dear Mr. Crouse:
SUBJECT: AMENDMENT NO. 69 TO FACILITY OPERATING CYCLE 4 CORE REVISED OPERATING LIMITS
Distribution: Docket File L PDR NRC PDR OELD ACRS 10 Reading CMiles LHarmon DEisenhut TBarnhart 4 EJordan JNGrace
LICENSE NO. NPF-
Wdones DBrinkman RDiggs Rlngram ADeAgazi o Gray Files 4 HDenton EBlackwood HOrnstein
The Commission has issued the enclosed Amendment No. 69 to Facility Operating License NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1. This amendment modifies the Appendix A Technical Specifications in response to your application dated February 17, 1984 (No. 1027), as revised March 29, 1984 (No. 1040).
This amendment modifies regulating rod and axial power shaping rod (APSR) position limits and axial power imbalance limits to allow APSR withdrawal at 200 ± 10 effective full power days (EFPDs). These modifications will accommodate extension of the present cycle length to approximately 280 EFPDs. The amendment also modifies Table 3.2-2 to incorporate revised quadrant power tilt limits for the symmetrical incore detector system.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's Monthly Notice.
Sincerely,
Albert De Agazio, Project Manager Operating Reactors Branch No. 4 Division of Licensing
Enclosures: 1. Amendment No. 69 to NPF-3 2. Safety Evaluation
ORB#4:D ' RIngramJw 06/4/84
SDLORB#4:DL O ADeAgazio;ef GRi n bark 06/1r/84 06/ 7 /84
OELD
06/ //84
8406230304 840612 PDR ADOCK 05000346 P PDR
-9
5)
J_
![Page 2: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/2.jpg)
Toledo Edison Company
cc w/enclosure(s):
Mr. Donald H. Hauser, Esq. The Cleveland Electric
Illuminating Company P. 0. Box 5000 Cleveland, Ohio 44101
Gerald Charnoff, Esq. Shaw, Pittman, Potts
and Trowbridge 1800 M Street, N.W. Washington, D. C. 20036
Paul M. Smart, Esq. Fuller & Henry 300 Madison Avenue P. 0. Box 2088 Toledo, Ohio 43603
Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division 7910 Woodmont Avenue, Suite 220 Bethesda, Maryland 20814
President, Board of County Commissioners of Ottawa County
Port Clinton, Ohio 43452
Attorney General Department of Attorney General 30 East Broad Street Columbus, Ohio 43215
Harold Kohn, Staff Scientist Power Siting Commission 361 East Broad Street Columbus, Ohio 43216
U.S. Nuclear Regulatory Commission Resident Inspector's Office 5503 N. State Route 2 Oak Harbor, Ohio 43449
Regional Radiation Representative EPA Reqion V 230 South Dearborn Street Chicago, Illinois 60604
Ohio Department of Health ATTN: Radiological Health
Program Director P. 0. Box 118 Columbus, Ohio 43216
James W. Harris, Director (Addressee Only) Division of Power Generation Ohio Department of Industrial Relations 2323 West 5th Avenue P. 0. Box 825 Columbus, Ohio 43216
Mr. James G. Keppler, Regional Administrator U. S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Mr. Rodert F. Peters Manager, Nuclear Licensing Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, Ohio 43652
![Page 3: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/3.jpg)
0 •UNITED STATES 00 NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555
THE TOLEDO EDISON COMPANY
AND
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
DOCKET NO. 50-346
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1
AMENDMENT TO FACILITY OPERATING LICENSE
Amendment No. 69 License No. NPF-3
1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by The Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees) dated February 17, 1984, as revised March 29, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;
B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2. Accordingly, Facility Operating License No. NPF-3 is hereby amended as indicated below and by changes to the Technical Specifications as indicated in the attachment to this license amendment:
Revise paragraph 2.C.(2) to read as follows:
14062303-4-B 40612 PDR ADoCK 05o00346 P PDR
![Page 4: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/4.jpg)
-2-
Technical Specifications
The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 69 , are hereby incorporated in the license. The Toledo Edison Company shall operate the facility in accordance with the Technical Specifications.
3. This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
George W. Rivenbark, Acting Chief Operating Reactors Branch No. 4 Division of Licensing
Attachment: Changes to the Technical
Specifications
Date of Issuance: June 12, 1984
![Page 5: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/5.jpg)
ATTACHMENT TO LICENSE AMENDMENT NO. 69
FACILITY OPERATING LICENSE NO. NPF-3
DOCKET NO. 50-346
Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages as indicated. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change. The corresponding overleaf pages are also provided to maintain document completeness.
Pages
3/4 1-26
3/4 1-28b
3/4 1-28c
3/4 1-28d
3/4 1-29b
3/4 1-29c
3/4 1-29d
3/4 1-34
3/4 1-37
3/4 1-38
3/4 1-39
3/4 1-40
3/4 1-41
3/4 1-42
3/4 1-43
3/4 2-1
3/4 2-2b
3/4 2 -2c
3/4 2-2d
3/4 2-3b
3/4 2--3c
3/4 2-3d
3/4 2-12
![Page 6: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/6.jpg)
REACTIVITY CONTROL SYSTEMS
SAFETY ROD INSERTION LIMIT
LIMITING CONDITION FOR OPERATION
3.1.3.5 All safety rods shall be fully withdrawn.
APPLICABILITY: 1* and 2*#.
ACTION:
With a maximum of one safety rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
a. Fully withdraw the rod or
b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS
4.1.3.5 Each safety rod shall be determined to be fully withdrawn:
a. Within 15 minutes prior to withdrawal of any regulating rod during an approach to reactor criticality.
b. At least once per 12 hours thereafter.
*See Special Test Exception 3.10.1 and 3.10.2. #With Keff > 1 .0.
DAVIS-BESSE, UNIT 1 3/4 1-25
![Page 7: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/7.jpg)
REACTIVITY CONTROL SYSTEMS
REGULATING ROD INSERTION LIMITS
LIMITING CONDITION FOR OPERATION
b. Reduce THERMAL POWER to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the rod group position using the above figures within 2 hours, or
c. Be in at least HOT STANDBY within 6 hours.
NOTE: If in unacceptable region, also see Section 3/4.1.1.1.
*See Special Test Exceptions 3.10.1 and 3.10.2.
DAVIS-SESSE, UNIT 1 3/4 1-26 Amendment No. M 07, 69
"•With k eff .0.
III P, All lill
3.1.3.6 The regulating rod groups shall be limited in physical insertion as shown on Figures 3.1-2a, -2b, and -2c and 3.1-3a, -3b, and -3c for the first 200 ±10 EFPD of operation. If the axial power shaping rods are completely withdrawn at 200 ±10 EFPD for extension of cycle length, then the regulating rod groups shall be limited in physical insertion as shown on Figures 3.1-2e and 3.1-3e for the remainder of the cycle. However, if the axial power shaping rods are not completely withdrawn at 200 ±10 EFPD, then the regulating rod groups shall be limited in physical insertion as shown on Figures 3.1-2d and 3.1-3d for the remainder of the cycle. A rod group overlap of 25 ±5% shall be maintained between sequential withdrawn groups 5, 6 and 7.
APPLICABILITY: MODES 1* and 2*#.
ACTION:
With the regulating rod groups inserted beyond the above insertion limits (in a region other than acceptable operation), or with any group sequence or overlap outside the specified limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
a. Restore the regulating groups to within the limits within 2 hours, or
![Page 8: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/8.jpg)
Frn
VI
Regulating Group Position Limits, 24 + 10, -0 to 150 + 10 EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
Power Level Cutoff = 100%
UNACCEPTABLE OPERATION
(246, 102)
SHUTDOWN MARGIN LIMIT
102)
(262,92)
(26 1,80)
(225,50)
bxJ
C3 CL 80
60
4
0
40)
U LJ "a
1-
20
a-
0
GR 5
0 100 200
I 0
I 75
GR 6 0 0
Rod Index (% Withdrawn)
100
I 25
I 75
300
-I 100
0 25. 100
Figure 3.1-2b.
100
4"'
1"a, 0O
ACCEPTABLE OPERATION
(
cn
rD
0 ",-q
![Page 9: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/9.jpg)
Figure 3.1-2c. Regulating Group to 200 1 10 EFPD, Besse 1, Cycle 4
Position Limits,150 i lo Four RC pumps - Davis-
rri
Q,
"-I IOOI Power L.evel Cutoff = 100%
270,102)(300,102)
(262,92)SHUTDOWN MARGIN LIMIT )
UNACCEPTABLE OPERATION
(225,
200 Rod Index (% Withdrawn)
GA 6,,17
GR 6 I 0
(255,80)
,OPERATION RESTRICTED
50)
ACCEPTABLE OPERATION
300
I I0O
I 25
7 75
GR 7i1 0
I 100
I 100
I 25
(266,102)
bL n: 0 C)
--J
Ca "Li
I
40
4, a" L.
a) 0,L
(.)
4::
co 00
80
60
40
20
0
f
CD 0i (D
:z
10
0
. L
I
GR 5
![Page 10: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/10.jpg)
Figure 3.1-2d. Regulating Group Positiol Lhaiits, 200 _ 10 Lo 240 f 10 EFPD, Four IZC Pumps -- DavisBeusse 1, Cycle 4m
(A
C..-
100 r Power Level / Cutoff = 100%
SHUTDOWN MARGIN LIMIT
UNACCEPTABLE OPERATION
(225,
200 Rod Index (% Withdrawn)
I 75
GR 60
(300, 102)
(262,92)
(255,90)
, OPERATION RESTRICTED
50)
ACCEPTABLE OPERATION
300
I 100
I 100
100
2 26
GR 7
1 76
I Ii 1
(266, i02)
r' co
La
"I
.40
s
0 a.
so
60
20
(
0(T7
1mt
GR 5
I
![Page 11: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/11.jpg)
Figure 3.1- 2 e, Regulating Group Position Limits, 200f 1 .10 to 280 1 10 EFP0, Four RC Pumps, APSR!ý Withdrawv l)dvis-Desse 1, Cycle 4'-4
C_)
POWER LEVEL CUTOFF = I10%
SIIUTDOWN MARGIN LIMIT
UNACCEPTABLE OPERA IOH
) (300,102)
OPERATION RESTRICTED(240,80)
(209,60)
80
60
40
20
200 300
Rod Index (% Withdrawn)
I 100
I 75
I 100
1 26
GR 7 1 0
(262,102)100
0
I
tI
I-.
0
ci U L ci
a.
I..ACCEPTABLE OPERAIION
C-o
0
C.
Cm 0
GR 50
5 75
GR 61 0 2t
I 100
![Page 12: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/12.jpg)
m Ln
m
wg
C=100
80
60
40
20
0
GR 5
Regulating Group Position Limits, 150 t 10 to 200 t 10 EFPD, Three IIC Pumps - Davis-Besse 1, Cycle 4
SHUTDOWN MARGIN LIMIT /
(300,77)
(262,69.5)
(255,60.5)UNACCEPTABLE OPERATION
OPERATION RESTRICTED
(225,38)
Lii
0 CL
--J
.Lii
I-r
Li
I.W
0 41
U S.
0.
a-
0 100 200 Rod Index (% Withdrawn)
I 75
GR 6
300
100
I 0 1 25 1 75
OH 71r 0
I 100
I 25
I 100
Figure 3.1-3c.
cii
-a
0�
ACCEPTABLE OPERATION
(
_: CL 54c
-r CD
0
I 0I m I
I
![Page 13: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/13.jpg)
Figure 3.1-3d.'-4 C,)
m (I, C,) m
4=
'-4 H
0
U
o
I-0
di L
a)
4�. -J
0
80
60
40
20
0J
Regulating Group Position Limits, 200 ± 10 to 240 i 10 EFPD, Three RC Pumps - Davis-Besse 1 Cycle 4
SHUTDOWN MARGIN LIMIT
(300.77)
(262,69.5)
(265,60.5)UNACCEPTABLE OPERATION
OPERATION RESTRICTED
(225,36)
ACCEPTABLE OPERATION
0 100 200 Rod Index (% Withdrawn)
I 75
300
I I00
G6 1 I- I I 0 25 75 100
64 7i I I
fb
C+
0
0
Jr',. O £
0 25 100
![Page 14: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/14.jpg)
Figure 3.1-3e. Regulating Group Position Limits, 200 1 10( to 2130 I 10 EFPD, Three RC Pumps, APSRs Withdrawn Davls-Besse 1, Cycle 4
SHUTDOWN MARGIN LIMIT
(262,77) (300,77)
UNACCEPIABLE OPEHATION OPERATION RESTRICTED
I.
m
m
C:
Hr100
80
60
qO
20 ACCEPTABLE OPERATION
0 100 200 Rod Index (% Withdrdwn)
I 15
GR 6 1 0
300
I I00
2 25 I 15
GR I
I 100
i I 100O
(209,38)
(2,o.6o.6)
c�)
0.
w,.
0
':I
U'
I.
0
I,, .4
.9a
0
GR 5
C+ c-=.
0
I 0
• • =
I
0
![Page 15: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/15.jpg)
REACTIVITY CONTROL SYST-4S
ROD PROGRAM
LIMITING CONDITION FOR OPERATION
3.1.3.7 Each control rod (safety, regulating and APSR) shall be pro
grammed to operate in the core position and rod group specified in Figure 3.1-4.
APPLICABILITY: MODES I" and Z".
ACTION:
With any control rod not programned to operate as specified above, be in HOT STANDBY within I hour.
SURVEILLANCE REQUIR-E.NTS
4.1.3.7 a. Each control rod shall be demonstrated to be programned to
operate in the specified core position and rod group by:
1. Selection and actuation from the control room and verification of movement of the proper rod as indicated by both the absolute and relative position indicators:
a) For all control rods, after the control rod drive patches are locked subsequent to test, reprogranming or maintenance within the panels.
b) For specifically affected individual rods, following maintenance, test, reconnection or modification of power or instrumentation cables from the control rod drive control system to the control rod drive.
2. Verifying that each cable that has been disconnected has been properly matched and reconnec-m to the specified control rod drive.
b. At least once each 7 days, verify that the control rod drive patch panels are locked.
"See Special test Exceptions 3.10.1 and 3.10.2.
DAVIS-SESSE, UNIT 1 Amendment ,'o.113/4 1-30
![Page 16: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/16.jpg)
iirREACTIVITY CONTROL SYSTE4MS
DAVIS-aFESS, UNIT I 3/4 1-33
XENON REACTIVITY
LMIT,!NG CONDITION FOR OPERATION
3.1.3.8 THERMAL POWER shall not be increased above the power level cutoff specified in Figure 3.1-2 unless one of the following conditions is satisfied:
a. Xenon reactivity is within 10 percent of the equilibrium value for RATED THERMAL POWER and is approaching stability, or
b. THERMAL POWER has been within a range of 87 to 92 percent of RATED THERMAL POWER for a period exceeding 2 hours in the soluble poison control mode, excluding xenon free start-ups.
APPLICABILITY: MODE 1.
ACTION:
With the requirements of the above specification not satisfied, reduce THERMAL POWER to less than or equal to the power level cutff witian 15 minutes.
SURVEiLLANCE REQUIREMNTS
4.1.3.3 Xenon reactivity shall be determined to be within 10% of the equilibrium value for RATED THERMAL POWER and to be approaching s:abili:y or it snall be determined that the THERMAL POWER has been in the range ;f 87 to 92% of RATED THERMAJ. POWER for I 2 hours, prior to increasing THERMAL POWER above the power level cutoff.
![Page 17: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/17.jpg)
REACTIVITY CONTROL SYSTEMS
AXIAL POWER SHAPING ROD INSERTION LIMITS
LIMITING CONDITION FOR OPERATION
3.1.3.9 The axial power shaping rod gro. sertion as shown on Figures 3.1-5a, -Sb, 200 ±10 EFPD of operation. If this rod g ±10 EFPD for extension of cycle length, i for remainder of the cycle and the limits However, if the rod group.is not complete group shall be limited in physical insert-5i for the remainder of the cycle.
ip shall be limited in physical in-5c, -5f, -5g and -5h for the first
•roup is completely withdrawn at 200 t shall not be reinserted in the core *of Figure 3.1-5e shall be applicable. *ly withdrawn az 200 =10 EFCD, the ion as shown on Figures 3.1-5d and
.APPLICABILITY: MODES I and 2*.
ACTION:
With the axial power shaping rod group outside the above insertion limits, either:
a. Restore the axial power shaping rod group to within the limits within 2 hours, or
b. Reduce THERMAL POWER to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the rod group position using the above figures within 2 hours, or
c. Be in at least HOT STANDBY within 6 hours.
SURVE LLANCE REQUIREMENTS
4.1.3.9 The position of the axial power shaping rod aroup shall be deter'mined to be within the insertion limits at least once-every 12 hours except when the axial power shaping rod insertion limit alarm is inoperable, then verify the group to be within the insertion limit at least once every 4 hours.
*With k - 1.0.
DAVIS-BESSE, UNIT 1 3/4 1-3" J -,) Amendment No. •, f, 4W 31, 69
![Page 18: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/18.jpg)
Figure 3.1-5c.
(8. 100
APSR Position Limits, 150 ± 10 to 200 ± 10 EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
102) (38,102)
r(8,92) (38,92) RESTRICTED REGION
80 ( (0,80) 80)
(o00. 70)
PERMISSI BLE OPERATI-NG REGION
0 10 20 30 40 50 60 70 80 90 100
APSR Position (,' Withdrawn)
DAVIS-BESSE, UNIT 1 Amendment No. M, 0, 69
t-
LQJ a
S._
V
(J r-)
3 0 0IJ
60
20
0
I
3/4 1-37
![Page 19: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/19.jpg)
Figure 3.1-5d.
02)
(8,92)
APSR Position Limits, 200 ± 10 to 240 ± 10 EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
(38, i02)
(38,92)
80 ¢: (0,-80) (48,80)
RESTRICTED REGION
PER4ISSI1BLE OPERATING REGION
(Ioo0
0 10 20 30 4 50 60 70 80 90 100
APSR Position (% Withdrawn)
DAVIS-BESSE, UNIT 1 3/4 1-38 Amendment No. A, %7, 4{, 07,69
100
LU 0
LUj
4
3..
Q.
3 0:
60
40
20
0
f .
![Page 20: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/20.jpg)
Figure 3.1-5e.
110
100
90
so 80
70
60
50
40
30
20
10
0
APSR Position Limits, 200 ± 10 to 280 ± 10 EFPD, Three or Four RC Pumps, APSRs Withdrawn Davis-Besse 1, Cycle 4
0 10 20 30 40 50. 60 70 80 90 100
APSR Position (;ý Nitnorawn)
DAVIS-BESSE, UNIT 1 Amendment No. fl, AA, 07, 69
==
m
3B 0 r6
APSR INSERTION NOT ALLOWED
IN THIS TIME INTERVAL
S I I F
3/4 1-39
![Page 21: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/21.jpg)
Figure 3.1-5f.
120
1o00
80 o- (8.77)
(8,69.5)
60 o(io, 60.5)
L•J
4
C-, a
U S_
APSR Position Limits, 0 to 24+10/-0 EFPD, Three RC Pumps - Davis-Besse 1, Cycle 4
(38.77)
(38,69.5)
'42,60.5) RESTRICTED REGION
PERMISSI BLE OPERATING REGION
(100.38)
00 10 20 30 4. 50 60 70 80 90 100
APSR Position (' Withdrawn)
Amendment Mo. t, 9, U9
L.O
20
DAVIS-BESSE, UNIT 1 3/4 1-40
![Page 22: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/22.jpg)
Figure 3.1-5g.
120 r-
APSR Position Limits, 24+10/-0 to 150±10 EFPD, Three RC Pumps - Davis-Besse 1, Cycle 4
(38.77)
RESTR I CTED 69.5) REGION
5)u-I
0U
0 10 20 30 40 50 60 70 80 90 I00
APSR Position (% Witharawn)
DAVIS-BESSE, UNIT 1 Amendment No.. ,ý, 07 69
(8.77)
ioo
4o
20
PERM4ISS IBLE OPERATING REGION
(0,60.s)
0
(100,38)
3/4 1.,41
![Page 23: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/23.jpg)
Figure 3.1-5h. APSR Position Limits, 150 ± 10 to 200 ± 10 EFPD, Three RC Pumps - Davis-Besse 1, Cycle 4
1 20
80
60
20
0
(8.77) (38.77) RESTRICTED REGION
PERMISSIBLE OPERATING REGION
____I I I t I iII
0 10 20 30 40 50 60 70 80 90 100
APSR Position (5 Withdrawn)
Amendment No. ), 9
Uj Li
=0
c__
DAVIS-BESSE, UNIT 1 3/4 1.42
![Page 24: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/24.jpg)
Figure 3.1-5i.
120
APSR Position Limits, 200 ± 10 to 240 ± 10 EFPD, Three RC Pumps - Davis-Besse 1, Cycle 4
(8,77) (38,77)
(8,69.5)
so ;r (0,60.5)
.RESTRICTED REGIONLU
W
-J
LU
0
3: a
C6
0 10 20 30 40 50 60 70 80 90 to0
APSR Position (* Withdrawn)
Amendment No. ;ý, 07, 69
i1o
80
PERMISSIBLE OPERATING REGION
,69.5)
M8,60.5)
20
20
0
DAVIS-BESSE, UNIT 1 3/4 1-43
![Page 25: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/25.jpg)
3/4.2. POWER DISTRIBUTION LIMITS
AXIAL POWER IMBALANCE
LIMITING CONDITION FOR OPERATION
3.2.1 AXIAL POWER IMBALANCE shall be maintained within the limits shown on Figures 3.2-la, -lb and -1c and 3.2-2a, -2b and -2c for the first 200 ±10
'EFPD of operation. If the axial power shaping rods are completely withdrawn at 200 1O0 EFPD for extension of cycle length, then the AXIAL POWER IMBALANCE shall be maintained within the limits shown on Figures 3.2-le and 3.2-2e for the remainder of the cycle. However, if the axial power shaping rods are not completely withdrawn at 200 ±10 EFPD, then the AXIAL POWER IMBALANCE shall be maintained within the limits shown on Figures 3.2-1d and 3.2-2d for the remainder of the cycle.
APPLICABILITY: MODE 1 above 40% of RATED THERMAL POWER.*
ACTION:
With AXIAL POWER IMBALANCE exceeding the limits specified above, either:
a. Restore the AXIAL POWER IMBALANCE to within its limits within 15 minutes, or
b. Within one hour reduce power until imbalance limits are met or to 40% of RATED THERMAL POWER or less.
SURVEILLANCE REQUIREMENTS
4.2.1. The AXIAL POWER IMBALANCE shall be determined to be within limits at least once every 12 hours when above 40Z of RATED THERMAL POWER except when the AXIAL POWER IMBALANCE alarm is inoperable, then calculate the AXIAL POWER IMBALANCE at least once per hour.
*See SPDecia Test Excation 3.10.1.
DAVIS-BESSE, UNIT IAmendment No. fl, ;J, #g, V1, 693!/4 .)-I1
![Page 26: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/26.jpg)
Figure 3.2-la.
C-
(-22,92)
(-25, 80)
RESTR I CTED REGION
Axial Power Imbalance Limits, 0 to 24+10 -0 EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
-17,102)
PERMISSI BLE OPERATI NG REGION
(20,102)
-+- 100
-4- 90
eJ
LWJ
4-
1-..
L.j
0,.
I I
-30 -20 -10 0
80
70
60
50
30
20
10
10 20
Axial Power Imbalance (11)
DAVIS-BESSE, UNIT 1Amendment No. ki, AS, 7,6l
A(25,92) (30 ,80)
30
i m
m-0-
m m
I
I I ! I
3/4 2-2
![Page 27: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/27.jpg)
Figure 3.2-lb. Axial Power Imbalance Limits, 24 + 10, -0 to EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
(-21,102)
(-26,92)
(-29,80)
RESTRICTED REGION
-30
PERMISSIBLE OPERATING REGION
-20
LJJ
0
0�
0 LjJ
4
0 .4��
w U L
3 0
-10
-.- 100
(20, 102)
- 90
-4-
(25,92)
(30.80)80
70
60
50
- Q0
30
- 20
10
,II0 I0 20 30
Axial Power Imbalance (0)
DAVIS-BESSE, UNIT 1 Amendment No. 77, A., OZ. Aý,61
150 + 10
3/4 "2-2a
Ai
m
i I
_.I
! i_
I I I I I
![Page 28: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/28.jpg)
Figure 3.2-ic.
(-26,102)
(-3/1,92)
(-38,80)
I
PERMI SSI BLE OPERATI NG REGION
-30
Axial Power Imbalance, 150 ± 10 to 200 ± 10 EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
.-4
LU
I-
0Y LU, I
4
0.
w 0L
-20
(20, 102)
- I00
(25,92)
(30,80)
RESTRI CTED REGION
30
-4- 90
-. 0_
80
70
60
50
30
20
i0
,I
0 10 20
Axial Power Imbalance (%)
DAVIS-BESSE, UNIT 1 Amendment No. ;?, ;, 0, 693/4 2-2b
W
w n
1-__
! m
==:I
r_ ---
I I I I I
0_4(
![Page 29: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/29.jpg)
Figure 3.2-1d.
(-26, i02)
(-3(1,92)
(-38,80)
PERMI SSIB LE OPERATING REGION
-30 -20
Axial Power Imbalance Limits, 200 ± 10 to 240 ± 10 EFPD, Four RC Pumps - Davis-Besse 1, Cycle 4
w
L,,J
I"J
LJ
C-.
3,. 0
a-
-10 0
(20, i02)
- 100
(25,92)
(30
90
80
70
60
50
40
30
,so)
RESTRICTED REGION
30
- 20
i0
IIo 20
Axial Power Imbalance (%)
Amendment No. 4ý, 0,L69
I
-40
3/4 2-2c
r-2I
W =m
r--n%
i R
g m
E__=
I I I
DAVIS-BESSE, UNIT 1
![Page 30: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/30.jpg)
Figure 3.2-le.
(-22, 102)
(-30,92)
0 ) : 0
PERMI SSI BLE OPERATING REGION
Axial Power Imbalance Limits, 200 ± 10 to 280 ± 10 EFPD, Four RC Pumps, APSRs Withdrawn Davis-Besse 1, Cycle 4
0
=€
C;
U0
0 M_
(23,102)4 --
-1I00
-L.. 90
- 80
-1- 70
-1-- 60
-4- 50
4- 40
4- 30
- 20
-= 10
-30 -20 -10 0 10 20
(30,92)
RESTRI CTED REGION
30
Axial Power Imbalance (7,1)
DAVIS-BESSE, UNIT 1 Amendment No. fg, fl, 59
(-35.8
-40
314 2-2d
I I II I I !
![Page 31: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/31.jpg)
Figure 3.2-2c. Axial Power Imbalance Limits, 200 ± 10 EFPD, Three RC PumDs Cycle 4
150 ± 10 to - Davis-Besse 1,
(-23. 25. 69.5',
(-28. 5, 60. 5)
-30 -20 -10 0 10
(i8.75, 69.5)
(22.5,60.5)
RESTRICTED REGION
20 30
Axial Power Imbalance (11)
DAVIS-BESSE, UNIT 1 Amendment No. 41, f7, U, 6(3/4 2-3b
![Page 32: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/32.jpg)
Figure 3.2-2d.
(-19.5,77)
(-28. 5, 60. 5)
Axial Power Imbalance Limits, 200 ± 10 to 240 ± 10 EFPD, Three RC Pumps - Davis-Besse 1, Cycle 4
100
i8.75,69.5)
(22. 5, 60. 5)
RESTRI CTED REGION
-30 -20 -10 0 10o 20 30
Axial Power Imbalance (%)
DAVIS-BESSE, UNIT 1 Amendment No. MJ, 07,693/4 2-3c
![Page 33: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/33.jpg)
Figure 3.2-2e. Axial Power Imbalance EFPD, Three RC Pumps, 1, Cycle 4
Limits, 200 ± 10 to 280 ± 10 APSRs Withdrawn - Davis-Besse
(-22.5.6
(-26.25.60.5)
I00
-30 -20 -10 0 10 20
(22.5.69.5)
RESTRI CTED
REGI ON
30
Axial Power Imbalance (C%)
DAVIS-BESSE, UNIT I Amendment No. 4t, 07, 693/4 2-3d
![Page 34: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/34.jpg)
PQWER DISTRIBUTION LIMITS
4.2.4 The QUADRANT POWER TILT shall be determined to be within the limits at least once every 7 days during ooeratlon above 15% of RATED 7HERMAL POWER exceot when the QUADRANT POWER TILT alarm is inoperable, then the QUADRANT POWER TILT shall be calculated at least once per 12 hours.
0
IILIMITING CONDITION FOR OPERATION (Continued)
ACTION: (Continued)
d. With the QUADRANT POWER TILT determined to exceed the Maximum Limit of Table 3.Z-2, reduce THERMAL POWER to 4 15- of RATED THERMAL POWER within 2 hours.
SURVEILLANCE REQU IREMENTS
3/4 2-l1
I
0AVIS-BESSE, UNIT 3
![Page 35: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/35.jpg)
Table 3.2-2 Quadrant Power Tilt Limits (Tech. Spec. Table 3.2.2)
Steady state Transient limit limit
Measurement independent QUADRANT POWER TILT
QUADRANT POWER TILT as measured by:
Symmetrical incore
detector system
Power range channels
Minimum incore detector system
4.92 11.07
3.43
1.96
1 .90
3/4 2-12 Amendment No. 77, M, 0, 69
Maximum limit
20.0
20.0
20.0
20.0
8.93
6.96
4.40
DAVIS-BESSE, UNIT 1
![Page 36: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/36.jpg)
UNITED STATES NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
SUPPORTING AMENDMENT NO.69 TO FACILITY OPERATING LICENSE NO. NPF-3
TOLEDO EDISON COMPANY
AND
CLEVELAND ELECTRIC ILLUMINATING COMPANY
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1
DOCKET NO. 50-346
1. INTRODUCTION
By letter dated February 17, 1984, as revised March 29, 1984, Toledo Edison Company (the licensee) made application to amend Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1, to allow coastdown operation at the end of Cycle 4. In support of this operation, the licensee provided Reload Report BAW-1783, Revision 1 (October 1983), and a Safety Evaluation and Significant Hazard Consideration. The original version of BAW-1783 (May 1983) was approved and is the basis for Cycle 4 operation up to this point in time.
2. EVALUATION
The amendment request which is the subject of this evaluation provides for an alternate Cycle 4 design of, 280 effective full power days (EFPDs). The original approved design life of Cycle 4 was 240 EFPDs. The additional core life is obtained by withdrawal of the axial power shaping rods (APSRs) from the core at 200 EFPDs and power coastdown. Coastdown operation was approved as part of the Davis-Besse Cycle 3 design, as well as an alternate in many B&W reactor cycle designs. In Davis-Besse Cycle 3, the APSR pull at 200 EFPDs coupled with a power coastdown resulted in a cycle length of approximately 268 EFPDs.
The fuel cladding creep collapse analysis predicts a collapse time longer than 35,000 effective full power hours (EFPHs). The expected alternate Cycle 4 residence time is 22,800 EFPHs, so that creep collapse is not predicted to occur. No other fuel effects need to be considered for the extension of Cycle 4 life.
The licensee provided a comparison of core physics parameters from Cycle 3 with those of both the (approved) base and alternate designs for Cycle 4. These values were generated using approved methods for all three designs. The thermal-hydraulic design results in the alternate Cycle 4 do not differ significantly from that in Cycle 3. The moderator and Doppler coefficients remain negative for the alternate Cycle 4. The moderator coefficient is less negative than the Final Safety Analysis Report (FSAR) value so that the FSAR value is bounding for main steam line break or any overcooling S.... 4.. T- . drop rod worth is less than the FSAR value which
8406230322 840612 PDR ADOCK 05000346 P PDR
![Page 37: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/37.jpg)
-2-
compensates for the slightly more negative Doppler coefficient at Beginning of Cycle (BOC) 4. The ejected rod worth is also smaller than the FSAR value. The boron reactivity worth is also bounded by the FSAR value for the moderator dilution accident. The FSAR accidents have been examined by B&W with respect to the alternate Cycle 4 parameters to ensure that the thermal performance during the hypothetical transients has not been degraded. Thus, the values of the alternate Cycle 4 parameters are such that the transient evaluation is bounded by the previously accepted analyses.
Technical Specification modifications were proposed in BAW-1783, Revision 1, to allow withdrawal of the APSRs and power coastdown. The Specifications affected are 3.1.3.6, 3.1.3.9, and 3.2.1. There are also changes to Figures 8-5, 8-5a, 8-5b, 8-8, 8-8a, 8-8b, 8-11, 8-11a, 8-11b, 8-12, 8-13, 8-14, 8-14a, 8-17, 8-17a, 8-17b, 8-20, 8-20a, 8-20b. These table and figure numbers are those contained in BAW-1783, Revision 1. The Technical Specification numbers are referenced on each of the abovq tables and figures.
These modifications appropriately account for changes in power peaking, control rod worths, and APSR withdrawal. Additionally, a modification to Table 8-2, Quadrant Power Tilt Limits (Technical Specification Table 3.2.2), incorporates new cycle dependent steady state and transient tilt limits for the symmetrical incore detector system with the values changing from 3.03 to 3.43 and 8.53 to 8.93 respectively. These limits should have been changed in the original Reload Report. The limits have been relaxed slightly because of the replacement of some of the incore detectors for Cycle 4. The new detectors provide an improved overall system accuracy. The safety analysis was performed with the relaxed limits.
The proposed changes to the axial power imbalance limits will maintain the peak linear heat rate during normal operation of the power plant within the bounds assumed as input to the loss of coolant accident analysis.
Our review of the licensee's submittal indicates that the fuel design, physics, thermal-hydraulic and transient information and Technical Specification changes were calculated with approved models and appropriately revised and evaluated to allow the alternate Cycle 4 design. We find all of the proposed changes appropriate and acceptable.
3. ENVIRONMENTAL CONSIDERATION
We have determined that the amendment does not authorize a change in effluent types or total amounts nor an increase in power level and will not result in any significant environmental impact. Having made this determination, we have further concluded that the amendment involves an action which is insignificant from the standpoint of environmental impact and, pursuant to 10 CFR 51.5(d)(4), that an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.
![Page 38: Davis-Besse, Unit 1, Amendment No. 69, Modifies Regulation Rod … · 2012-11-18 · 0 •united states 00 nuclear regulatory commission washington, d. c. 20555 the toledo edison](https://reader031.fdocuments.us/reader031/viewer/2022040817/5e61a82998b3d66ec50db331/html5/thumbnails/38.jpg)
-3
4. CONCLUSION
We have concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Dated:June 12, 1984
This Safety Evaluation was prepared by M. Dunenfeld