Davis-Besse Nuclear Power Station Reactor Vessel Incore Nozzles
Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor...
Transcript of Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor...
![Page 1: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/1.jpg)
Davis-BesseAnnual Assessment
M ti
1
Meeting
Reactor Oversight Process – 2011
Nuclear Regulatory Commission - Region III
Oak Harbor, OH
August 15, 2012
![Page 2: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/2.jpg)
Purpose of Today’s Meeting
• A public forum for discussion of the licensee’s performance in 2011
• NRC will address the performance
2
issues identified in the annual assessment letter
• Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance
![Page 3: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/3.jpg)
Agenda
• Introduction
• Review of Reactor Oversight Process
• National Summary of Plant Performance
Di i f Pl P f R l
3
• Discussion of Plant Performance Results
• Licensee Response and Remarks
• NRC Closing Remarks
• Break
• NRC available to address public questions
![Page 4: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/4.jpg)
Region III Organization
Chuck CastoRegional Administrator
Cynthia PedersenDeputy Regional Administrator
Steve WestDirector Division of Reactor Projects
Steve ReynoldsDirector Division of Reactor Safety
4
Gary ShearDeputy Director
Ken O’BrienDeputy Director
Jamnes CameronBranch Chief
Regional Specialists
Davis-BesseResident InspectorsDan Kimble, SRIAdam Wilson, RI
Project EngineerJack Rutkowski
Reactor EngineersTom Briley
Phil SmagaczJakob Steffes
![Page 5: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/5.jpg)
Our Mission
• To license and regulate the nation’s civilian use of byproduct, source, and special nuclear materials to
5
nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
![Page 6: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/6.jpg)
Some Nuclear Facts
• 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
• Nuclear materials are used in medicine for diagnosis
6
in medicine for diagnosis and cancer treatment.
• Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
![Page 7: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/7.jpg)
The NRC Regulates
• Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
• Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
7
• Nuclear waste – transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
• Nuclear security – physical security of nuclear facilities and materials from sabotage or attacks
![Page 8: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/8.jpg)
What We Don’t Do
• Regulate nuclear weapons, military reactors, or space vehicle reactors
8
• Own or operate nuclear power plants
• Regulate some radioactive sources, such as X-rays and naturally occurring radon
![Page 9: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/9.jpg)
How We Regulate
• Establish rules and regulations• Issue licenses• Provide oversight through inspection,
f t d l ti f
9
enforcement, and evaluation of operational experience
• Conduct research to provide support for regulatory decisions
• Respond to events and emergencies
![Page 10: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/10.jpg)
Assurance of Plant Safety
• Require “defense-in-depth”
• Require long-term maintenance of equipment
10
• Require continual training of operators
• Verify compliance with regulations
![Page 11: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/11.jpg)
What We Do – Nuclear Waste
• The NRC regulates:– Storage of spent
reactor fuel in fuel pools or dry storage casks and
11
casks, and
– Any national spent fuel storage site.
![Page 12: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/12.jpg)
What We Do – Nuclear Security
• NRC Requires:– Well-armed and well-
trained security forces,
– Surveillance and perimeter patrols,
12
perimeter patrols,
– State-of-the-art site access equipment and controls,
– Physical barriers and detection zones, and
– Intrusion detection systems and alarm stations.
![Page 13: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/13.jpg)
NRC Performance Goals
• Safety: Ensure adequate protection of public health and safety and the environment.
13
• Security: Ensure adequate protection in the secure use and management of radioactive materials.
![Page 14: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/14.jpg)
Reactor Oversight Process
SafetyCornerstones
Baseline Inspection Results
Performance IndicatorResults
StrategicPerformance Areas
SafetyCornerstones
Baseline Inspection Results
Performance IndicatorResults
StrategicPerformance Areas
14
Significance Threshold
Action Matrix
Significance Threshold
Regulatory Response
Significance Threshold
Action Matrix
Significance Threshold
Regulatory Response
![Page 15: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/15.jpg)
Examples of Baseline Inspections
• Equipment Alignment ~80 hrs/yr
• Triennial Fire Protection ~250 hrs every 3 yrs
• Operator Response ~125 hrs/yr
E P d 80 h /
15
• Emergency Preparedness ~80 hrs/yr
• Rad Release Controls ~110 hrs every 2 yrs
• Worker Radiation Protection ~95 hrs/yr
• Corrective Action Program ~250 hrs every 2 yrs
• Corrective Action Case Reviews ~60 hrs/yr
![Page 16: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/16.jpg)
Significance Threshold
Performance IndicatorsGreen: Only Baseline InspectionWhite: Increases NRC oversightYellow: Increases NRC oversightRed: Increases NRC oversight
16
Red: Increases NRC oversight
Inspection FindingsGreen: Very low safety issueWhite: Low to moderate safety issueYellow: Substantial safety issueRed: High safety issue
![Page 17: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/17.jpg)
Action Matrix Concept
LicenseeResponse
RegulatoryResponse
DegradedCornerstone
Multiple/Rep.DegradedCornerstone
UnacceptablePerformance
17
Increasing Safety Significance
Increasing NRC Inspection Efforts
Increasing NRC/Licensee Management Involvement
Increasing Regulatory Actions
![Page 18: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/18.jpg)
National Summary of Plant Performance
Status as of 12/31/2011
Licensee Response 88
Regulatory Response 11
Degraded Cornerstone 3
18
Degraded Cornerstone 3
Multiple/Repetitive Deg. Cornerstone 1
Unacceptable 0
IMC 0350 Oversight 1
Total 104
![Page 19: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/19.jpg)
National Summary
• Performance Indicator Results for 2011*– Green 6585– White 9– Yellow 0
Red 0
19
– Red 0*PIs are counted per plant per quarter
• Total Inspection Findings in 2011#– Green 846– White 13– Yellow 2– Red 0# Finding data current as of 2/24/2012 and does not include
security findings
![Page 20: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/20.jpg)
Davis-Besse Assessment Results
January 1 - December 31, 2011• Davis-Besse was in the Licensee
Response Column of the NRC’s ROP Action Matrix for 2011
20
Action Matrix for 2011.
![Page 21: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/21.jpg)
Davis-Besse Inspection Activities
January 1 – December 31, 2011• 2 resident inspectors on site – residents
make four quarterly inspection reports per year and walk through the plant every day
21
• 5,392 hours of inspection and related activities, including over 600 hours of inspection for the reactor pressure vessel head replacement
![Page 22: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/22.jpg)
Davis-Besse Inspection Activities
January 1 - December 31, 2011
• Mid-cycle outage for the replacement of the reactor pressure vessel head
22
of the reactor pressure vessel head from Oct 1 to Dec 2
• Shield building inspections upon discovery of cracking within the structure
• Ongoing license renewal inspections
![Page 23: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/23.jpg)
Davis-BesseAnnual Assessment Summary
January 1 - December 31, 2011• FENOC operated Davis-Besse in a
manner that preserved public health and safety
23
y• All cornerstone objectives were met
![Page 24: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/24.jpg)
January 1 - December 31, 2011• One substantive cross-cutting issue in
human performance
NRC l b li i ti t
Davis-BesseAnnual Assessment Summary
24
• NRC plans baseline inspections at Davis-Besse for 2012
![Page 25: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/25.jpg)
Licensee Response and Remarks
Brian Boles
25
Brian BolesDirector, Site Operations, Davis-Besse
FirstEnergy Nuclear Operating Company
![Page 26: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/26.jpg)
Open to the Public
• The NRC places a high priority on keeping the public and stakeholders informed of its activities.
26
• At www.nrc.gov, you can:– Find public meeting dates and transcripts;– Read NRC testimony, speeches, press releases,
and policy decisions; and – Access the agency’s Electronic Reading Room
to find NRC publications and documents.
![Page 27: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/27.jpg)
Contacting the NRC
• Report an emergency– (301) 816-5100 (call collect)
• Report a safety concern
27
– (800) 695-7403
• General information or questions– www.nrc.gov
– Select “What We Do” for Public Affairs
![Page 28: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/28.jpg)
NRC Representatives
• Dan Kimble, Senior Resident Inspector– (419) 244-4494
• Adam Wilson, Resident Inspector– (419) 244-4494
• Jamnes Cameron, Branch Chief– (630) 829-9833
28
( )• Viktoria Mitlyng, Public Affairs Officer
– (630) 829-9662
![Page 29: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/29.jpg)
NRC Social Media Channels
• Blog: http://public-blog.nrc-gateway.gov/
• Flickr: http://www.flickr.com/photos/nrcgov/
• Twitter: https://twitter.com/#!/nrcgov
• YouTube: http://www.youtube.com/user/NRCgov
• RSS: http://www.nrc.gov/public-involve/listserver.html#rss
29
![Page 30: Davis-Besse Annual Assessment Mti Meeting · Davis-Besse Annual Assessment Mti 1 Meeting Reactor Oversight Process – 2011 Nuclear Regulatory Commission - Region III Oak Harbor,](https://reader035.fdocuments.us/reader035/viewer/2022070923/5fbb1ab7eedd7453f61b72b6/html5/thumbnails/30.jpg)
Reference Sources
• Reactor Oversight Process– http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in
dex.html
30
• Public Electronic Reading Room– http://www.nrc.gov/reading-rm.html
• Public Document Room– 1-800-397-4209 (Toll Free)