Dave glanzer fieldbus foundation english

28
2012 General Assembly End User Conference Sao Paulo, Brazil © 1994 – 2012 Fieldbus Foundation Technology Update Dave Glanzer Director of Technology Development Fieldbus Foundation

description

Danve Glanzer Technology Roadmap Presentation from Fieldbus Foundation General Assembly

Transcript of Dave glanzer fieldbus foundation english

Page 1: Dave glanzer fieldbus foundation english

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Technology Update

Dave Glanzer

Director of Technology Development

Fieldbus Foundation

Page 2: Dave glanzer fieldbus foundation english

2

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Topics

FOUNDATION™ for Remote Operations Management

Field Device Registration

Host System Registration

Segment Design Tool

Field Device Integration (FDI)

Page 3: Dave glanzer fieldbus foundation english

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Technical Specification Development Program

Page 4: Dave glanzer fieldbus foundation english

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

FOUNDATION for ROM Application Example

ConventionalI/O

Wireless Sensors(e.g. WirelessHART®, ISA100.11a)

H1

Control Room

Shared Wireless Backhaul Network WIFI, WIMAX,

SATELLITECELLULAR, ETC.

Remote Process

HART®

HSE

Video

Video

HSE

Page 5: Dave glanzer fieldbus foundation english

5

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Analog InputAnalog Output Bias & GainControl SelectorDiscrete Input Discrete OutputManual LoaderPD ControlPID ControlRatio Control

Analog AlarmArithmeticDeadtimeDevice Control8 Channel Analog Input8 Channel Analog Output8 Channel Discrete Input8 Channel Discrete Output Flexible Function BlockInput SelectorIntegratorLead/LagSetpoint Ramp GeneratorSignal CharacterizerOutput SplitterTimerTotalizer

16 Channel Analog Input16 Channel Analog Output64 Channel Discrete Input64 Channel Discrete Output

Wired HART ® Connectivity

Wireless Connectivity Wireless HSE Backhaul Wireless Field Devices

WirelessHART®

ISA100.11a

FOUNDATION for ROM Development

Basic Control Advanced Control

Safety Instrumented

Functions

Page 6: Dave glanzer fieldbus foundation english

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Specification Development Teams

ConventionalI/O HART®

H1

HSE Remote I/O Team

Wireless Backhaul Team

Wireless Sensor Interface Team

Page 7: Dave glanzer fieldbus foundation english

7

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Wireless Backhaul Security Example

Secure Tunnel

PV PV

#8%%0@!!(%0

Security

Security

ISA100.15 Architecture Model

Wireless Backhaul

Control RoomRemote Process

HSE HSE

Page 8: Dave glanzer fieldbus foundation english

8

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

I/O

WirelessHART

H1

Operator Station Wireless Backhaul

Remote Process

ISA100.11a

HART

HSE

HSEHSE

WirelessHART

ISA100.11a

SMAR

APAT

HSE

Security

Security

S

S

S

HSEI/O

I/O

FOUNDATION for ROM Media EventDecember 1 at Lee College

Wi-Fi

HSE

HSE

Page 9: Dave glanzer fieldbus foundation english

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

2008 Draft Preliminary Specifications – Conventional I/O, HART, WirelessHART Oct

2009 Wireless Backhaul Networking Team Kickoff Jan Validation Team Kickoff Meeting Feb First Laboratory Prototypes – Conventional I/O Aug

2010 First Laboratory Prototypes – HART Mar First Laboratory Prototypes – Wireless Backhaul Aug First Laboratory Prototypes - WirelessHART Nov ISA100.11a Development Team Kickoff Oct Preliminary Specifications – Conventional I/O Dec

2011Final Specifications – Conventional I/O AprPreliminary Specifications – Wired and WirelessHART SepWireless Backhaul Architecture Model Approval by ISA100.15 OctFOUNDATION for ROM Media Event at Lee College Dec

2012FOUNDATION for ROM Demo Working Group Kickoff FebFinal Specifications - Wired and WirelessHART MarISA100.11a Draft Preliminary Specification AprFOUNDATION for ROM Media Event at Jemima - Japan Oct

Specification Development Timeline

Page 10: Dave glanzer fieldbus foundation english

10

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Field Device Registration

Page 11: Dave glanzer fieldbus foundation english

11

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Device

FunctionBlock

TransducerBlock

Device Description(DD)

RegisteredDevice

Interoperability Tester

Field Device Test

Registered DD

CommunicationStack

Page 12: Dave glanzer fieldbus foundation english

12

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Registered Device Trend

Page 13: Dave glanzer fieldbus foundation english

13

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Field Diagnostics Feature – NAMUR NE-107

Page 14: Dave glanzer fieldbus foundation english

14

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Field Diagnostics Adoption Rate

Page 15: Dave glanzer fieldbus foundation english

15

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Unique Registered Devices by Type

Page 16: Dave glanzer fieldbus foundation english

16

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Host Registration

Page 17: Dave glanzer fieldbus foundation english

17

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Host Registration

Operations

Maintenance

Engineering

Note: Illustrations are examples only. Supplier defines host.

Class 61 – Integrated Host

Class 63/64 – Bench Host

Class 62 – Visitor Host

Page 18: Dave glanzer fieldbus foundation english

18

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Registered Hosts

2008 2009 2010 2011 20121H 2H 1H 2H 1H 2H 1H 2H 1H 2H

Host InteroperabilitySupport Test

(HIST)

Valid through Dec 2008

Profile A9 – 61a Integrated Hosts

12Registered

Hosts

12Registered

Hosts

Profile B3 – 61b Integrated Hosts

Page 19: Dave glanzer fieldbus foundation english

19

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

DesignMATE™

Segment Design Tool

Page 20: Dave glanzer fieldbus foundation english

20

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Complete software tool for planning, validation, and documentation of H1 segments

Automatically audits segment layouts against physical layer specifications

DesignMATE™

Page 21: Dave glanzer fieldbus foundation english

21

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

DesignMATE™ Key Features

Intuitive drag and drop interface for segment design and verification

Analyzes and checks physical layer parameters Voltage Load conditions at power supply, coupler and device terminals

Complete instrument database from Registered Foundation Fieldbus Devices (updated periodically)

Custom instrument libraries

Generates documentation

Designed segments can be exported or printed

Creates error log of deviations from the physical layer specification

Page 22: Dave glanzer fieldbus foundation english

22

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Available for Free Download

www.fieldbus.org >> End User Resources >> Technical References

Page 23: Dave glanzer fieldbus foundation english

23

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Field Device Integration

Page 24: Dave glanzer fieldbus foundation english

24

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Common Tools

Project

EDDLPhase 1Project

EDDLPhase 2 Project

FDI Project

FDI CooperationLLC

’03 ’04 ’05 ’06 ’07 ’08 ’09 ’10 ’11 ’12 ‘13

History of Cooperation Projects

Page 25: Dave glanzer fieldbus foundation english

25

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Charts Images

Enhanced User Interface

Graphs

Enhanced Data Storage

EDDL Phase 1 Features

Page 26: Dave glanzer fieldbus foundation english

26

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

EDDL Phase 2 Features Client Applications

OPC UA Servers

Complex Devices

Web ServicesOPC UA Clients

Trend/HistorianAsset Management

Blue line is a reference retrievedvia FILE and ARRAY

EDDL Cooperation Project

Blue line is a reference retrievedvia FILE and ARRAY

EDDL Cooperation Project

Blue line is a reference retrievedvia FILE and ARRAY

EDDL Cooperation Project

OperatorHMI

Remote I/O

Access to Multiple BlocksOff-Line Configuration

Modular Devices

OP

C U

A P

roto

col

OPC UA Protocol

EDD

Data Acquisition

HSE, ProfiNet ProtocolHSE, ProfiNet Protocol

Enhanced Procedural Supportfor

Complex Devices

Page 27: Dave glanzer fieldbus foundation english

27

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

DeviceDefinition

DeviceDefinition

User Interface Description

User Interface Description

User Interface Plug-in

User Interface Plug-in

Business Logic

Business Logic

UsingIEC 61804-3 EDDL

UsingIEC 61804-3 EDDL

Based onIEC 62453 FDT

Based onIEC 62453 FDT

Device Package

UsingIEC 62541 OPC UA

UsingIEC 62541 OPC UA

FDI Device Package Standard

AttachmentsAttachments

e.gDatasheets,

Manuals,Certificates

Page 28: Dave glanzer fieldbus foundation english

2012 General AssemblyEnd User Conference

Sao Paulo, Brazil

© 1994 – 2012 Fieldbus Foundation

Thank you