DATE: 10-05-2017. 6...*I-76 E & W Graffiti Removal: LANE & SHOULDER CLOSURES between City Ave. &...

31
LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA New State Rd. Roadway Construction: LANE CLOSURE between Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM & 8 PM - 5 AM. 10/5/17-10/6/17 Walsh Construction Company $212.3 million Walnut St. Prep Work: LANE RESTRICTIONS between Front St. & Broad St. 7 PM - 6 AM. 10/5/17-10/6/17 James J. Anderson $7.1 million Chestnut St. Prep Work: LANE RESTRICTIONS between 21st St. & 22nd St. 7 PM - 6 AM. 10/5/17-10/6/17 James J. Anderson $7.1 million Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between Aramingo Ave. & Delaware Ave. 7 AM - 4 PM. 10/5/17-10/6/17 James J. Anderson $869,700.00 Delaware Ave. Milling & Paving: LANE RESTRICTIONS between Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM & 7 PM - 5 AM. 10/2/17-10/6/17 Tony DePaul & Son $550,000.00 *I-95 South Exit 26 Installing Two Sign Structure: INTERMITTENT RIGHT & LEFT LANE CLOSURES on ramp. 8 PM - 5 AM. 9/26/17-9/29/17 Driscoll Construction Company, Inc./Richard E. Pierson Construction Company, Inc. $160.2 million DATE: 10-05-2017 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. 10/5/2017 Page 1 of 31

Transcript of DATE: 10-05-2017. 6...*I-76 E & W Graffiti Removal: LANE & SHOULDER CLOSURES between City Ave. &...

LOCATION RESTRICTION DATE CONTRACTOR COST

PHILADELPHIA

New State Rd. Roadway Construction: LANE CLOSURE between

Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM &

8 PM - 5 AM.

10/5/17-10/6/17 Walsh Construction

Company

$212.3 million

Walnut St. Prep Work: LANE RESTRICTIONS between Front St.

& Broad St. 7 PM - 6 AM.

10/5/17-10/6/17 James J. Anderson $7.1 million

Chestnut St. Prep Work: LANE RESTRICTIONS between 21st St.

& 22nd St. 7 PM - 6 AM.

10/5/17-10/6/17 James J. Anderson $7.1 million

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

10/5/17-10/6/17 James J. Anderson $869,700.00

Delaware Ave. Milling & Paving: LANE RESTRICTIONS between

Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM &

7 PM - 5 AM.

10/2/17-10/6/17 Tony DePaul & Son $550,000.00

*I-95 South Exit 26 Installing Two Sign Structure: INTERMITTENT RIGHT

& LEFT LANE CLOSURES on ramp. 8 PM - 5 AM.

9/26/17-9/29/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

DATE: 10-05-2017

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

ENGINEERING DISTRICT 6-0

TRAFFIC RESTRICTION BULLETIN

(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)

(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD

Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.

10/5/2017 Page 1 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 N & S Barrier Installation: INTERMITTENT RIGHT & LEFT

LANE CLOSURES between Alleghany Ave. & Bridge

St. 8 PM - 5 AM.

9/27/17-9/29/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

Market St. Removing and Installing Pavement Markings: LANE

RESTRICTIONS between Schuylkill Ave. & JFK Blvd.

Weekdays. 9 AM - 3 PM.

9/28/17-10/6/17 SEPTA

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between

Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 9

AM.

10/2/17-10/6/17 H&K Group, Inc. $7.6 million

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between

Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 9

AM.

10/2/17-10/6/17 H&K Group, Inc. $7.6 million

US 1 N & S (Roosevelt Blvd.) Soil Borings: RIGHT LANE CLOSED between Henry

Ave. & Ridge Ave. 9 AM - 3 PM.

10/1/17-10/5/17 TRC Solutions

US 1 North (Roosevelt Blvd.) Soil Borings: RIGHT LANE CLOSED between

Wissahickon Ave. & Roberts Ave. 9 AM - 3 PM.

10/1/17-10/5/17 TRC Solutions

US 1 North (Roosevelt Blvd.) Soil Borings: RIGHT LANE CLOSED between N. 16th

St. & Old York Rd. 9 AM - 3 PM.

10/1/17-10/5/17 TRC Solutions

US 1 South (Roosevelt Blvd.) Soil Borings: RIGHT LANE CLOSED between N. 7th

St. & N. 9th St. 9 AM - 3 PM.

10/1/17-10/5/17 TRC Solutions

PA 76 Test Boring: RIGHT LANE CLOSED between Green

Lane and City Ave. 9 PM- 5 AM

10/1/17-10/5/17 TRC Solutions

Aramingo Ave. Utility Adjustment: LANE RESTRICTIONS between

Wheatsheaf Lane & Church St. 7 PM - 5 AM.

10/1/17-10/6/17 Philadelphia Gas

Works

10/5/2017 Page 2 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South, Aramingo Ave to 95

South

Line Striping: INTERMITTENT RIGHT & LEFT LANE

CLOSURES at Aramingo Ave to 95 S Ramp

10/2/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

*I-95 South, Exit 26 Ramp to

Aramingo

Line Striping: INTERMITTENT RIGHT & LEFT LANE

CLOSURES at Southbound exit 26 ramp Aramingo 8

PM- 5 AM

10/2/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

*I- 95 Ramps headed west from

Besty Ross Bridge to 95 N &S

Sign Installation: INTERMITTEN RIGHT & LEFT

LANE CLOSURES ramps to 95 NB & SB 8 PM- 5 AM

10/2/17-10/4/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

$160.2 million

JFK Blvd. Bridge Rehabilitation: CLOSED & DETOURED

between 20th St & Schuylkill Ave. 24-HOUR

DETOUR. DETOUR POSTED.

10/2/17-10/6/17 Abbonizio

Contractors, Inc.

$15.8 million

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.

Robert C. Donatucci Memorial Bridge over Schuylkill

River. 9 AM - 3 PM.

10/2/17-10/6/17 Buckley & Company,

Inc.

$33.5 million

Walnut Lane Debris Removal & Concrete Repair: LANE

CLOSURES between Magdelena St. & Park Lane

Drive. Weekdays. 9 AM - 3 PM.

10/2/17-10/6/17 Buckley & Company,

Inc.

$14 million

Ridge Ave. Traffic Signal/Trench/Foundations: INTERMITTENT

LANE CLOSURES between Girard Ave & 17th St. 9

AM - 3 PM.

10/2/17-10/6/17 Armour and Sons

Electric

$1,698,438.00

*I-76 W Shielding: RAMP CLOSED at 30th St. up to Schuylkill

Ave, back to I-76 W on ramp. 11 PM - 5 AM Detour

Posted

10/3/17-10/5/17 Buckley & Company,

Inc.

$103 million

South St. off ramp to I-676 Vine St.

Expressway

Shielding: RAMP CLOSED at 30th St. off ramp up to

Schuylkill Ave. 11 PM - 5 AM

10/3/17-10/5/17 Buckley & Company,

Inc.

$103 million

10/5/2017 Page 3 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 W South St. off ramp to 676

Vine St. Expressway

Shielding: LANE CLOSURES at South St. off ramp to

676 Vine St. Expressway 9 PM - 11 PM

10/3/17-10/5/17 Buckley & Company,

Inc.

$103 million

*I-95 North Removal of Barrier, Line Stipping, Milling:

INTERMITTENT RIGHT & LEFT LANE CLOSURES

between Alleghany Ave & Bridge St. 8 PM - 5 AM

10/4/17-10/6/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

$160.2 million

*I-95 South Removal of Barrier, Line Stipping, Milling:

INTERMITTENT RIGHT & LEFT LANE CLOSURES

between Bridge St. & Alleghany Ave. 8 PM - 5 AM

10/4/17-10/6/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

$160.2 million

Aramingo Ave. Utility Adjustment: LANE RESTRICTIONS between

Wheatsheaf Lane & Church St. 9 AM - 3 PM.

10/6/17 Philadelphia Gas

Works

*US 1 South off-ramp to I-76 West Bridge Deck & Joint Repair: RAMP CLOSED &

DETOURED. 6 AM - 2 PM. DETOUR POSTED.

10/7/17 Maintenance

New State Rd. Roadway Construction: LANE CLOSURE between

Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM &

8 PM - 5 AM.

10/8/17-10/14/17 Walsh Construction

Company

$212.3 million

*I- 76 WB Shielding: RIGHT LANE CLOSURE between South

St. off Ramp & 676 Vine St. Expressway 9 PM - 5 AM

10/9/17-10/12/17 Buckley & Company,

Inc.

103.5 million

*I-76 WB Shielding: LEFT LANE CLOSURE between South St.

off Ramp & 676 Vine St. Expressway 9 PM - 5 AM

10/9/17-10/12/17 Buckley & Company,

Inc.

103.5 million

*I-76 E & W Graffiti Removal: LANE & SHOULDER CLOSURES

between City Ave. & Green Lane exits. 10:30 PM - 5

AM.

10/9/17 & 10/11/17

& 10/13/17

SEPTA

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

10/9/17-10/13/17 James J. Anderson $869,700.00

10/5/2017 Page 4 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

JFK Blvd. East Bridge Replacement: CLOSED & DETOURED

between Schuylkill Ave. & 20th St. 24-HOUR

DETOUR. DETOUR POSTED.

10/9/17-10/13/17 Abbonizio

Contractors, Inc.

$15.8 million

Ridge Ave. Traffic Signal/Trench/Foundations: INTERMITTENT

LANE CLOSURES between 19th St. & Poplar St. 9

AM - 3 PM.

10/9/17-10/13/17 Armour and Sons

Electric

$1,698,438.00

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between

Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 5

AM. Friday 7 PM - Saturday 9 AM.

10/9/17-10/14/17 H&K Group, Inc. $7.6 million

Aramingo Ave. North Bridge Inspection: LEFT LANE CLOSED between

Orthodox St. & Margret St. 9 AM - 10:30 AM.

10/11/17-10/12/17 Pickering, Corts &

Summerson

Aramingo Ave. North Bridge Inspection: RIGHT LANE CLOSED between

Orthodox St. & Margret St. 10:30 AM - 12 PM.

10/11/17-10/12/17 Pickering, Corts &

Summerson

*I-95 South Bridge Inspection: RIGHT LANE CLOSED between

Bridge St. & Betsy Ross Bridge/Aramingo Ave. 12 PM

- 2 PM.

10/11/17-10/12/17 Pickering, Corts &

Summerson

JFK Blvd. East Bridge Replacement: CLOSED & DETOURED

between Schuylkill Ave. & 20th St. 24-HOUR

DETOUR. DETOUR POSTED.

8/28/17-9/29/17 Abbonizio

Contractors, Inc.

$15.8 million

Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO

RIGHT TURN at Walnut onto Schuylkill. 24-HOUR

RESTRICTIONS.

8/28/17-12/31/17 Buckley & Company,

Inc.

$103 million

Cheltenham Ave. Utility Installation: LANE RESTRICTIONS between

Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.

8/30/17-11/2/17 PECO Energy

Holme Ave. Bridge Repair: LANE CLOSURE between Longford St.

& Arthur St. 24-HOUR RESTRICTIONS.

8/7/17-10/13/17 Road-Con, Inc. $1.3 million

I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE

LANE 24-HOUR

7/21/17-10/31/17 Buckley & Company,

Inc.

$64.8 million

10/5/2017 Page 5 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Roosevelt Blvd. Curb, Sidewalk, Bus Shelters & Pedestrian Lights:

LANE CLOSURES at Cottman Ave.; Rhawn St.;

Welsh Rd.; Grant Ave. & Red Lion Rd. 6 AM - 4:30

PM.

7/31/17-10/25/17 A.P. Construction,

Inc.

Aramingo Ave. Utility Installation: LANE CLOSURES between

Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.

7/20/17-4/1/18 A.P. Construction,

Inc.

$87 million

Palmer St. Overhead Bridge Construction: CLOSED &

DETOURED between Wildey St. & Delaware Ave. 24-

HOUR DETOUR. DETOUR POSTED.

6/15/16-5/1/18 James J. Anderson $211 million

Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between

Wildy St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/15/17-5/1/18 James J. Anderson $211 million

Richmond St. N & S Bridge Demolition: CLOSED & DETOURED between

Marlborough St. & Columbia Ave. 24-HOUR

DETOUR. DETOUR POSTED.

6/5/17-10/14/17 James J. Anderson $211 million

Columbia Ave. Bridge Demolition: CLOSED & DETOURED between

Wildey St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/5/17-10/14/17 James J. Anderson $211 million

18th St. Roadwork: CLOSED & DETOURED between Vine St.

Local E/B & Vine St. Local W/B. 24-HOUR

CLOSURE. DETOUR POSTED.

5/15/17-10/27/17 Buckley & Company,

Inc.

$64.8 million

22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

21st St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St.

(PA 611) & Rising Sun Ave. 9 AM - 3 PM.

12/2/15-11/2017 Armour and Sons

Electric

$4.7 million

Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

10/5/2017 Page 6 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Girard Ave. on-ramp to I-95 North Highway and Ramp Reconstruction: RAMP CLOSED

& DETOURED. 24-HOUR CLOSURE. DETOUR

POSTED.

12/16/15-10/20/17 James J. Anderson $211 million

Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between

Columbia Ave. & Aramingo Ave. 24-HOUR

RESTRICTIONS.

4/1/15-10/2018 James J. Anderson $211.7 million

BUCKS COUNTY

*I-95 North, Middletown Twp. Milling & Paving: INTERMITTENT LANE CLOSURES

between New Falls Rd. & Newtown-Yardley

Interchange. 7 PM - 5 AM.

9/25/17-9/29/17 James J. Anderson $29,633,134

*I-95 South, Middletown Twp. Milling & Paving: INTERMITTENT LANE CLOSURES

between New Falls Rd. & Newtown-Yardley

Interchange. 7 PM - 6 AM.

9/25/17-9/29/17 James J. Anderson $29,633,134

PA 611 South, Doylestown Twp.,

Doylestown Bor.

Line Painting: RIGHT LANE CLOSED between N.

Broad St. & W. State St. 9 AM - 3 PM.

9/25/17-10/6/17 Rohm and Haas

Chemicals, LLC

PA 611 (Easton Rd.), Warrington

Twp.

Curb Ramp Installation: LANE CLOSURES at

Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison

Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol

Rd.; Kelly Rd.; Freedoms Way/Oxford Drive;

Doylestown Plaza. 9 AM - 3 PM.

9/25/17-10/6/17 James D. Morrissey $4.3 million

US 13 N & S (Bristol Pike), Bristol

Twp.

Storm Pipe Installation: LANE RESTRICTIONS

between Haunted Lane & Cedar Ave. Weekdays. 9

AM - 3 PM.

9/25/17-10/27/17 Bencardino

Excavating, Inc.

$634,265.00

Jacksonville Rd., Warminster,

Northampton twps., Ivyland Bor.

Milling & Paving: LANE RESTRICTIONS between

County Line Rd. & Almshouse Rd. Weeknights. 7 PM

- 5 AM.

9/25/17-10/31/17 Blooming Glen

Contractors, Inc.

$4.4 million

10/5/2017 Page 7 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between

Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3

PM.

9/25/17-11/15/17 Bencardino

Excavating, Inc.

$155,000.00

Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED

between PA 152 & Constitution Ave. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/25/18 H&K Group, Inc.

Street Rd., New Hope Bor. Bridge Rehabilitation: CLOSED & DETOURED

between Atkinson Rd. & Windy Bush Rd. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/30/17 Loftus Construction,

Inc.

$6.8 million

Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Creamery Rd. & Paxson Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00

*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332

(Yardley-Newtown Rd.) & NJ state line. 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between JJ state line &

PA 332 (Yardley-Newtown Rd.). 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 32 (River Rd.), Lower Makefield

Twp.

Roadwork: LANE RESTRICTIONS between

Woodside Rd. & I-95. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Woodside Rd., Lower Makefield

Twp.

Roadwork: ALTERNATING TRAFFIC between River

Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Taylorsville Rd., Lower Makefield

Twp.

Roadwork: LANE CLOSURES between Woodside Rd.

& Highland Drive. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 152 (N. Main St.), Chalfont Bor. Utility Installation: LANE RESTRICTIONS between

Westview Ave. & Hamilton St. Weekdays. 9 AM - 3

PM.

9/20/17-10/4/17 Aqua Pennsylvania

10/5/2017 Page 8 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Brownsville Rd., Middletown Twp. Utility Installation: CLOSED & DETOURED between

Broadview Ave. & Old Lincoln Hwy. Weekdays. 9 AM

- 3 PM. DETOUR POSTED.

9/13/17-10/10/17 PECO Energy

*I-95 North, Bensalem, Bristol twps. Barrier Installation: LANE RESTRICTIONS between

PA 413 & and U.S. 1 8 PM - 5 AM

10/2/17-10/3/17 PennDOT

*US 1 North (Lincoln Hwy.), Falls

Twp.

Large Sign Structure Repair: LANE SHIFTS between

Oxford Valley Rd & US 13 Interchanges. 9 AM - 3

PM.

10/2/17-10/4/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

*US 1 South (Lincoln Hwy.), Falls

Twp.

Large Sign Structure Repair: LANE SHIFTS between

US 13 & Oxford Valley Rd Interchanges. 9 AM - 3

PM.

10/2/17-10/4/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

Taylorsville Rd. S, Lower Makefield

Twp.

Large Sign Structure Repair: LANE SHIFTS between I-

95 interchnage to Highland Drive & Taylorsville Rd

Intersection. 9 AM- 3 PM

10/2/17-10/4/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

Taylorsville Rd. N, Lower Makefield

Twp.

Large Sign Structure Repair: LANE SHIFTS between

Highland Drive & Taylorsville Rd Intersection to I-95

interchnage. 9 AM- 3 PM

10/2/17-10/4/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

Marienstein Rd., Nockamixon,

Bridgeton twps.

Patching, Milling & Overlay: LANE RESTRICTIONS

between PA 611 (Easton Rd.) & PA 32 (River Rd.). 9

AM - 3 PM.

10/2/16-10/6/17 J.D. Morrissey $3.2 million

PA 611, SB Doyelstown Twp. Sign Structure Repair: LANE CLOSURES between

Lower State Rd. & PA 202 9 AM - 3 PM

10/2/17-10/6/17 J. D. Eckman, Inc. $2.7 million

Bristol-Oxford Valley Rd., Middletown

Twp.

Tree Brushing: LANE RESTRICTIONS between

Cobalt Ridge Drive North & Colbalt Ridge Drive South.

9 AM - 3 PM.

10/2/17-10/6/17 Asplundh

*US 1 North, Middletown Twp. Large Sign Structure Repair: LANE CLOSURES

between PA 213 & I-95. 9 AM - 3 PM.

10/2/17-10/6/17 J. D. Eckman, Inc. $2.7 million

U.S. 13 (Bistol Pike), Bristol,

Bensalem twps.

Patching, Milling & Overlay: LANE RESTRICTIONS

between Neshaminy Rd. & Newportville Rd. 7 PM - 5

AM

10/2/17-10/6/17 J.D. Morrissey $3,057,798.41

10/5/2017 Page 9 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 North, Middletown Twp. Bridge Deck Repairs & Paving: INTERMITTENT

LANE CLOSURES between New Falls Rd & Newton-

Yardly Interchange. 7 PM- 5 AM

10/2/17-10/6/17 James J Anderson

Construction

$29,633,134

PA 132 N & S (Steet Rd), Bensalem

Twp.

Mill and Pave: LANE RESTRICTIONS between

Mechanicsville Rd & Hulmeville Rd. 7 PM- 5 AM

10/2/17-10/6/17 J.D. Morrissey $4.3 million

I-95 South, Middletown Twp. Bridge Deck Repairs & Paving: INTERMITTENT

LANE CLOSURES between New Falls Rd & Newton-

Yardly Interchange. 7 PM- 6 AM

10/2/17-10/6/17 James J Anderson

Construction

$29,633,134

PA 132 W ( Street Road) Bensalem

Twp.

Large Sign Structure Repair: LANE SHIFTS between

Street Rd & Richlieu Rd intersection to US 1

interchange. 9 AM - 3 PM

10/4/17-10/6/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

PA 132 E ( Street Road) Bensalem

Twp.

Large Sign Structure Repair: LANE SHIFTS between

US 1 interchange & Street Rd & Richlieu Rd

intersection. 9 AM - 3 PM

10/4/17-10/6/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

U.S. 13 S (Bristol Pike) Falls Twp Large Sign Structure Repair: LANE SHIFTS between

US 1 & Tyburn Rd. interchanges. 9 AM- 3 PM

10/4/17-10/6/17 J.Fletcher Creamer &

Son, Inc

$644,888.00

U.S. 13 N (Bristol Pike) Falls Twp Large Sign Structure Repair: LANE SHIFTS between

Tyburn Rd. & US 1 interchanges. 9 AM- 3 PM

10/4/17-10/6/17 J.Fletcher Creamer &

Son, Inc

$644,888.00

Oxford Valley Rd., Falls Twp. Uitility Installation: LANE CLOSURE between Olds

Boulevard & Queen Anne Drive. Weekdays. 9 AM - 3

PM

10/4/17-10/12/17 Township of Falls

Authority

*US 1 North (Lincoln Hwy.),

Bensalem Twp.

Large Sign Maintenance: LANE SHIFTS between

Street Rd. & I-276/Pennsylvania Turnpike

Interchanges. 9 AM - 3 PM.

10/5/17-10/6/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

*US 1 South (Lincoln Hwy.),

Bensalem Twp.

Large Sign Structure Repair: LANE SHIFTS between I-

276/Pennsylvania Turnpike & Street Rd. Interchanges.

9 AM - 3 PM.

10/5/17-10/6/17 J.Fletcher Creamer &

Son, Inc.

$644,888.00

10/5/2017 Page 10 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Durham Rd., Nockamixon Twp Tree Removal: LANE RESTICTIONS at Traugers

Crossing Rd. 9 AM - 3 PM

10/5/17-10/6/17 Bustleton Services

Pine St., Langhorne Bor. Tree Removal: LANE RESTRICTIONS at Summit

Ave. 9 AM - 3 PM.

10/10/17 Bustleton Services

Callowhill Rd., New Britain Twp. Tree Removal: LANE RESTRICTIONS at Meyers Rd.

9 AM - 3 PM.

10/11/17-10/13/17 Bustleton Services

PA 32 (River Rd.), Lower Makefield

Twp.

Tree Removal: LANE RESTRICTIONS at Vickers

Way. 9 AM - 3 PM.

10/10/17-10/13/17 Asplundh

Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New

Rodger Rd. & New Falls Rd. 8 PM - 5 AM. DETOUR

POSTED.

10/11/17-10/13/17 Pennsylvania

Turnpike Commission

$142 million

Radcliffe St., Bristol Boro. Utility Installation: LANE CLOSURE between Mulberry

St. & Walnut St. Weekdays. 9 AM - 3 PM.

10/12/17-10/19/17 PECO Energy

Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New

Rodger Rd. & New Falls Rd. 8 PM - 5 AM. DETOUR

POSTED.

10/16/17-10/17/17 Pennsylvania

Turnpike Commission

$142 million

N. Pennsylvania Ave.,Morrisville

Boro

Utility Installation: LANE CLSOURE between

Hendrickson St. & Franklin St. 9 AM - 3 PM Weekdays

10/16/17-10/23/17 PECO Energy

N. Pennsylvania Ave.,Morrisville

Boro

Utility Installation: LANE CLSOURE between

Hendrickson St. & Franklin St. 9 AM - 3 PM Weekdays

10/25/17-11/1/17 PECO Energy

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between Plumbridge Drive & Bath Rd./Durham Rd. 8

PM - 5 AM. DETOUR POSTED.

8/20/17-11/10/17 Pennsylvania

Turnpike Commission

$142 million

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: LANE RESTRICTIONS & 15-

MINUTE STOPPAGES between Plumbridge Drive &

Bath Rd./Durham Rd. 7 AM - 3 PM.

8/20/17-11/10/17 Pennsylvania

Turnpike Commission

$142 million

10/5/2017 Page 11 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413

& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.

8/20/17-11/10/17 Pennsylvania

Turnpike Commission

$142 million

PA 611 (Easton Rd.), Warrington

Twp.

Utility Installation: LANE CLOSURE between Street

Rd. & Paul Valley Drive. Weekdays. 9 AM - 3 PM.

8/22/17-10/13/17 Warrington Township

Authority

$29.13 million

Main St., Dublin Bor. ADA Ramp Installation: CURB LANE RESTRICTIONS

between High St. & Manor Drive. 9 AM - 3 PM.

8/24/17-10/19/17 Dublin Borough $29.19 million

PA 263 (York Rd.), Warminster Twp. Milling & Paving: LANE CLOSURE between County

Line Rd. & Tennyson Drive. Weeknights. 7 PM - 5

AM.

8/14/17-10/31/17 Blooming Glen

Contractors, Inc.

$4.4 million

Loux Covered Bridge over Cabin

Run on Carver-Wismer Road,

Bedminster Township

CLOSED & DETOURED INDEFINITELY: Due to

structural damage sustained from an oversized

vehicle DETOUR POSTED

8/1/17-Indef. $29.1 million

Lower State Rd., Doylestown Twp. Multi-Use Trail Installation: LANE RESTRICTIONS

between US 202 & Memorial Drive. Weekdays. 9 AM

- 3 PM.

5/30/17-10/17/17 James D. Morrissey,

Inc.

$29.17 million

Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Hieter Rd. & Wentz Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

$29.10 million

Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Canary Rd. & Esten Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

$29.10 million

PA 152 (Limekiln Pike), Warrington,

Twp.

Utility Installation & Paving: CLOSED & DETOURED

between Westminster Drive & County Line Rd. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/16-10/12/17 James D. Morrissey,

Inc.

$14.8 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

East Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between

Bristol Rd. & Sugar Bottom Rd. 24-HOUR

RESTRICTIONS.

3/17/14-10/2017 J.D. Eckman, Inc. $31.6 million

Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between

Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

3/2/11-Indef. $29.2 million

10/5/2017 Page 12 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

CHESTER COUNTY

Swedesford Rd., Tredyffrin Twp. Milling & Patching: LANE CLOSURE between Old

Eagle School Rd. & Guthrie Rd. 8 PM - 6 AM.

9/25/17-9/30/17 Maintenance $29.30 million

Newark Rd., New Garden Twp. Widening: LANE RESTRICTIONS between New

Garden Rd. & PA 41 (Gap Newport Pike). 9 AM - 3

PM.

9/25/17-10/30/17 Allan Myers, LP $1.4 million

Woodview Rd., London Grove Twp. Bridge Replacement: CLOSED & DETOURED

between Ewing Rd. & W. Woodview Rd. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-12/2/17 Walsh Construction

Company

$29.2 million

W. Pothouse Rd., Schuylkill Twp. Utility Installation: LANE CLOSURE between State

Rd. & Gay Ave. Weekdays. 9 AM - 3 PM.

9/27/17-10/4/17 PECO Energy

Fernhill Rd., West Goshen Twp. Paving: LANE RESTRICTIONS between Phoenixville

Pike & Paoli Pike. 6 PM - 6 AM.

10/1/17-10/3/17 Allan Myers $3.7 million

Birmingham Rd, East Bradford Twp.. Pipe Replacement: ROAD CLOSURE between

Regimental Dr. & General Howe Dr. 9 AM - 2 PM

Detour Posted

10/2/17 Maintenance

PA 100 (Pottstown Pike) W.

Whiteland Twp

Utility Installation: LANE RESTRICTIONS between

Waterloo Blvd & Lincoln Hwy. 9 AM - 3 PM

10/2/17 PECO Energy

PA 29 (Morehall Rd.) East Whiteland

Twp.

Exploratory Drilling: LANE CLOSURES between

Yellow Springs Rd. & Flat Rd. Weekdays. 9 AM - 3

PM.

10/2/17-10/3/17 Allan Myers $2,592,555.00

Lenape Unionville Rd., Pocopson

Twp.

Paving: LANE RESTRICTIONS between Red Lion Rd.

& Lenape Rd. 9 AM - 3 PM

10/2/17-10/3/17 Allan Myers $3.7 million

*US 422, Lower Pottsgrove Twp. Sign Installation: RIGHT LANE CLOSED between

Sanatoga Exit and PA 724 Exit. 7 AM- 1 PM

10/2/17-10/3/17 J. D. Eckman, Inc. $29.3 million

PA 113 (Kimberton Rd), West

Pikelnad Twp

Tree Removal: LANE RESTRICTIONS between

Pikeland Rd. & Pickering Rd. 9 AM - 3 PM.

10/2/17-10/4/17 Knight Brothers

10/5/2017 Page 13 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

U.S. 30 (Coatsville-Downington

Bypass), East Caln, West Caln twps.

Tree Brushing: INTERMITTENT LANE CLOSURES

between PA 113 & PA 340 9 AM - 3 PM.

10/2/17-10/5/17 Knight Brothers

U.S. 30 WB (Coatsville-Downington

Bypass), East Caln, Caln twps.

Brushing Exit Signs: INTERMITTENT LANE

CLOSURES between PA 202 (Creek Rd.) &

Reeceville Rd. 9 AM - 3 PM.

10/2/17-10/5/17 Maintenance

U.S. 30 (Exton Bypass), West

Whiteland Twp.

Sign Structure Repair: LANE CLOSURES between

Quarry Rd. & PA 202 9 AM - 3 PM

10/2/17-10/6/17 J.D. Eckman, Inc. $2.7 million

Ramp from Devon Park Dr. to U.S.

422 W, Tredyffrin Twp.

Sign Structure Repairs: LANE CLOSURES between

U.S. 422 W/U.S. 202 N & Devon Park Drive. 9 AM - 3

PM

10/2/17-10/6/17 J.D. Eckman, Inc. $2.7 million

PA 41 (Gap Newport Pike), London

Grove Twp.

Barrier Installation: LANE CLOSURES between

Mosquito Lane and Penwyck Lane. 9 AM- 3 PM

10/2/17-10/6/17 Road-Con, Inc $1,055,526.00

Brandywine Creek Rd., East

Brandywine Twp.

Surface Treatment: LANE RESTRICTIONS between

Birmingham Rd. & S. Bridge Rd. 9 AM - 3 PM.

Saturday 7 AM - 5 PM.

10/2/17-10/6/17 J.D. Eckman, Inc. $4.8 million

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between Boot

Rd. & Kind Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between King

Rd. & Constitution Drive. Mon. thru Fri. 9 AM - 3 PM.

Saturday 7 AM - 5 PM.

10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million

Boot Rd., West Goshen Twp. Pipeline Maintenance: LANE CLOSURE between US

202 & Ship Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million

PA 29 (Morehall Rd.), East

Whiteland Twp.

Widening: LANE RESTRICTIONS at Great Valley

Parkway. Weekdays. 9 AM - 3 PM.

10/2/17-11/3/17 Liberty Property, LLC $29.3 million

PA 29 (Morehall Rd.) East Whiteland

Twp.

Exploratory Drilling: LANE CLOSURES between

Yellow Springs Rd. & Flat Rd. Weekdays. 7 PM - 6

AM.

10/3/17-10/6/17 Allan Myers $2,592,555.00

US 1 (Lincoln Ave.), Valley Twp. Trench Restoration: LANE RESTRICTIONS between

Rainbow Rd. & St. George St. 9 AM - 3 PM.

10/4/17-10/5/17 Terry Funeral Home

10/5/2017 Page 14 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Conestoga Rd., West Pikeland Twp. Utility Installation: LANE CLOSURE between Byers

Rd. & Walnut Lane. Weekdays. 9 AM - 3 PM.

10/4/17-10/11/17 PECO Energy

Baltimore Pike, Kennett Twp. Tree Removal: LANE CLOSURE between Parkersville

Rd & Woochuck Way 9 AM - 3 PM

10/5/17- 10/6/17 Knight Brothers

PA 29 (Morehall Rd.), East

Whiteland Twp.

Road Work: LANE CLOSURE between Yellow

Springs Rd. & Flat Rd. 7 PM - 6 AM.

10/8/17-10/13/17 Allan Myers $2,592,555.00

Embreeville Rd., Newlin Twp. Tree Removal: LANE RESTRICTIONS between

Brandywine Creek Rd. & Scott Rd. 9 AM - 3 PM.

10/9/17 Knight Brothers

Birmingham Rd. Birmingham, East

Bradford twps.

Paving: LANE RESTRICTIONS between Old

Wilmington Pike & Lenape Rd. 6 PM - 6 AM

10/9/17-10/12/17 Allan Myers $3.7 million

Kaolin Rd., New Garden, Kennett

twps.

Milling: LANE RESTRICTIONS between Ewart Rd. &

Red Clay Cr. Bridge. 6 PM - 6 AM.

10/9/17-10/12/17 Allan Myers $3.7 million

Kings Hwy, West Caln, West

Brandywine, Caln, Valley twps.

Milling: LANE RESTRICTIONS between Compass Rd.

& Lincoln Hwy. 7 PM - 5 AM.

10/10/17-10/12/17 Allan Myers

North Jennersville Rd., Penn Twp. Core Boring: LANE RESTRICTIONS between

Baltimore Pike & Sunnyside Rd. 9 AM - 3 PM.

10/9/17-10/10/17 Penn Township

Authority

W. Baltimore Pike, Penn Twp. Core Boring: LANE RESTRICTIONS between

Commerce Blvd. & Irving Drive. 9 AM - 3 PM.

10/9/17-10/10/17 Penn Township

Authority

Boot Rd., East Caln Twp. Soil Borings: LANE CLOSURE between Quarry Rd. &

Southwind Lane. 9 AM - 3 PM.

10/9/17-10/11/17 Navarro & Wright

PA 41 (Gap Newport Pike), London

Grove Twp.

Road Widening: LANE RESTRICTIONS between

Mosquito Lane & Penwyck Lane. 9 AM - 3 PM.

10/9/17-10/13/17 Road-Con, Inc. $1,055,526.70

PA 724 (Schuylkill Rd.), East

Pikeland Twp.

Utility Installation: LANE RESTRICTIONS at Ridge Rd.

Weekdays. 9 AM - 3 PM.

10/9/17-10/17/17 PECO Energy

10/5/2017 Page 15 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

East Nottingham, West Nottingham,

Upper Oxford, Lower Oxford, New

London, Londonderry twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 2:30 PM.

10/10/17-10/13/17 PennDOT $29.6 million

Business US 30 West, City of

Coatesville

Utility Installation: LANE RESTRICTIONS between

First Ave. & Church St. Weekdays. 9 AM - 3 PM.

10/10/17-12/15/17 Pennsylvania

American Water

Company

PA 724 (Sckuylkill Rd), North

Coventry Twp.

Utility Installation: LANE CLOSURE between Park Ave

& Vaughn Rd. 9 AM - 3 PM

10/17/17-10/24/17 PECO Energy

PA 282 (Wallace Ave.),

Downingtown Bor.

Sidewalk Installation: LANE SHIFT between

Pennsylvania Ave. & US 30 (Lancaster Ave.).

Weekdays. 9 AM - 3 PM.

9/11/17-11/30/17 Downingtown

Borough

US 30 East (Lancaster Ave.),

Downingtown Bor.

Utility Installation: LANE RESTRICTIONS at

Brandywine Ave. 8 PM - 6 AM.

9/5/17-10/6/17 PECO Energy

US 1 North, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between PA

41 (Gap Newport Pike) & Newark Rd. 24-HOUR

RESTRICTIONS.

9/6/17-11/7/17 Loftus Construction,

Inc.

$5.5 million

US 1 South, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between

Newark Rd. & PA 41 (Gap Newport Pike). 24-HOUR

RESTRICTIONS.

8/7/17-11/7/17 Loftus Construction,

Inc.

$5.5 million

West Baltimore Pike, Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Penns Manor Rd. & Mill St. Weekdays. 8 AM - 4 PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.50

West Cypress St., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Scarlett Rd. & Mill St. Weekdays. 8 AM - 4 PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.50

Rosedale Rd., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Walnut St. & MacFarlan Rd. Weekdays. 8 AM - 4

PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.00

Sugartown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between

Darby Paoli Rd. & Waterloo Lane. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

7/5/17-10/5/17 Aqua Pennsylvania

10/5/2017 Page 16 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Church Rd., Avondale Bor. Bridge Rehabilitation: LANE RESTRICTIONS between

Sherwood Drive & Polo Rd. Weekdays. 9 AM - 3 PM.

7/6/17-10/6/17 Loftus Construction,

Inc.

$5.5 million

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between Boot

Rd. & King Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

6/19/17-10/1/17 Sunoco Pipeline L.P. $29.1 million

PA 23 (Ridge Rd.), East Pikeland

Twp.

Utility Installation: CLOSED & DETOURED between

Hares Hill Rd. & PA 724 (Schuylkill Rd.). 24-HOUR

DETOUR. DETOUR POSTED.

5/15/17-11/15/17 Toll Brothers $29.15 million

PA 352 (Chester Rd.), East Goshen

Twp.

Pipe Installation: TRUCK DETOUR at Boot Rd. 24-

HOUR CLOSURE. DETOUR POSTED.

5/15/17-11/17/17 Sunoco Pipeline L.P. $29.17 million

Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green

Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.

3/3/17-Indef. Maintenance $29.3 million

*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

interchanges. 9 AM - 2 PM & 5 PM - 5 AM.

12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 7 PM - 1 PM.

12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million

Hollow Rd., West Vincent, East

Vincent twps.

Bridge Damage: CLOSED & DETOURED between

French Creek Rd. & Pughtown Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/20/16-Indef. PennDOT

Ross Fording Rd., West Fallowfield

Twp.

Bridge Damage: CLOSED & DETOURED between

Creek Rd. & Bryson Rd. 24-HOUR DETOUR.

DETOUR POSTED.

7/2/15-Indef. PennDOT $29.2 million

PA 724 ramp to US 422 East, East

Coventry Twp.

Ramp/Bridge Construction: RAMP CLOSED &

DETOURED. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, North Coventry

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

10/5/2017 Page 17 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 E & W, North Coventry

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

DELAWARE COUNTY

PA 3 (West Chester Pike),

Haverford, Upper Darby twps.

Curb Ramp Reconstruction: LANE CLOSURE at Brief

Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal

Square & Pennock Ave. 9 AM - 3 PM.

9/25/17-10/6/17 L.C. Costa

Contractors, Inc.

$5.9 million

PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Chatham Rd.; Forge Rd.; Copley Rd.; Terminal

Square & Millbourne Ave. 9 AM - 3 PM.

9/25/17-10/6/17 L.C. Costa

Contractors, Inc.

$5.9 million

E. Baltimore Ave., Lansdowne Bor. ADA Curb Ramp Replacement: LANE CLOSURE at

1st St.; 2nd St.; Baltimore St. & E. Baltimore St.;

Rigby St.; Lexington Ave.; Wildwood Ave.; Melrose

Ave.; Hirst Ave.; Maple Ave.; Legion Ter.; Lewis Ave.

& Third St. 9 AM - 3 PM.

9/25/17-10/6/17 L.C. Costa

Contractors, Inc.

$7.2 million

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Diamond St.; Madison St.; Woodlawn Ave.; Clifton

Ave. & Broadway Ave. 9 AM - 3 PM.

9/25/17-10/6/17 L.C. Costa

Contractors, Inc.

$4.1 million

US 1 (Baltimore Ave.), Clifton

Heights Bor.

Curb Ramp Reconstruction: LANE CLOSURES at

Church St.; Marple Ave.; Jackson Ave.; Springfield

Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.

9/25/17-10/6/17 L.C. Costa

Contractors, Inc.

$4.1 million

Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at

Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin

Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.

9/25/17-10/6/17 Lenni Electric $4.1 million

Baltimore Ave., Upper Darby Twp.,

Lansdowne Bor.

Traffic Signal Upgrade: LANE RESTRICTIONS

between Lansdowne Ave.; Penn Blvd./4th St.;

Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church

Lane. 9 AM - 3 PM.

9/25/17-10/6/17 Lenni Electric $4.1 million

Baltimore Ave., Clifton Heights Bor.,

Upper Darby Twp.

Road Widening: LANE RESTRICTIONS at Springfield

Rd.; Church Lane; Delmar Drive; Diamond St. &

Home Depot Drive. 9 AM - 3 PM.

9/25/17-10/6/17 Lenni Electric $4.1 million

10/5/2017 Page 18 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. 9 AM - 3 PM & 7 PM - 5 AM.

9/25/17-9/30/17 J.D. Eckman, Inc. $62.7 million

Sugartown Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS between

Poplar Ave. & Longwood Drive. Weekdays. 9 AM - 3

PM.

9/25/17-10/27/17 Aqua Pennsylvania $29.27 million

Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between

S. Devon Ave. & Lenoir Ave. 8:30 AM - 3 PM.

DETOUR POSTED.

9/25/17-10/31/17 PECO Energy $29.31 million

Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED

between 12th St. & 13th. DETOURED POSTED.

9/25/17-1/11/18 South State, Inc. $16.8 million

West South Ave., Glenolden Bor. Utility Installation: LANE CLOSURE between

MacDade Blvd. & Bonsall Ave. Weekdays. 9 AM - 3

PM.

9/27/17-10/4/17 PECO Energy

N. State Rd., Upper Darby Twp. Utility Installation: LANE RESTRICTIONS between

West Chester Pike & Parkview Rd. Weekdays. 9 AM -

3 PM.

9/27/17-10/4/17 PECO Energy

US 202 South (Wilmington Pike),

Concord Twp.

Pavement Markings: LANE CLOSURES between

Smithbridge Rd. & Beaver Valley Rd. 9 AM - 3 PM.

10/2/17 Concord Township

Sewer Authority

$29.26 million

Township Line Rd., Upper Darby,

Haverford twps.

ADA Ramp Construction: LANE RESTRICTIONS

between State Rd. & Harding Drive. 9 AM - 3 PM.

10/2/17 Allan Myers $1 million

*I-95 North, Tinicum, Ridley,

Chester, Upper Chichester, Lower

Chichester twps., Upland Bor.,

Chester City

Patching: INTERMITTENT LANE CLOSURES

between Delaware state line & Philadelphia County

line. 9 AM - 3 PM.

10/2/17 Maintenance

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM

10/2/17-10/6/17 Neshaminy

Constructors, Inc.

$3.7 million

Springfield Rd., Upper Darby,

Springfield twps.; Collingdale, Aldan

Clifton Heights bors.

Milling & Paving: LANE RESTRICTIONS between

MacDade Blvd. & Netherwood Drive. 7 PM - 5 AM.

10/2/17-10/6/17 Highway Materials,

Inc.

$2.5 million

10/5/2017 Page 19 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Church Lane, Marple Twp. Curb Ramp Reconstruction: LANE CLOSURE at

Georgian Ln. Sproul Rd. 9 AM - 3:30 PM.

10/2/17-10/6/17 Allan Myers $7.2 million

Marple Rd., Haverford Twp. Curb Ramp Reconstruction: LANE CLOSURE at

Darby Creek Rd. 9 AM - 3:30 PM.

10/2/17-10/6/17 Allan Myers $7.2 million

Upland Ave., Concord Twp. Curb Ramp Reconstruction: LANE CLOSURE at

Smithbridge Rd. & Temple Rd. 9 AM - 3:30 PM.

10/2/17-10/6/17 Allan Myers $7.2 million

Upland Ave., Concord Twp. Curb Ramp Reconstruction: LANE CLOSURE at

Smithbridge Rd. & Station Rd./Bethel Rd. 9 AM - 3:30

PM.

10/2/17-10/6/17 Allan Myers $7.2 million

*I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER

CLOSURES between I-476 & PA 352/320. 10 PM - 5

AM.

10/2/17-10/6/17 South State, Inc. $16.6 million

Radnor, Haverford, Upper Darby,

Springfield, Marple, Newtown twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 2:30 PM.

10/2/17-10/6/17 PennDOT

*I-476 N & S (Blueroute), Radnor,

Haverford twps,

Utility Installation: SHOULDER CLOSURES between I-

76 & I-95 9 AM- 3 PM

10/2/17-10/6/17 PennDOT

U.S. 1, Middletown, Upper

Providence, Marple twps.

Large Sign Maintenance: LANE CLOSURES between

PA 352 (Middletown Rd.) & PA 320 (Sproul Rd.) 8 PM

- 5 AM

10/2/17-10/7/17 Carr & Duff, Inc. $2.1 million

Conestoga Rd., Radnor Twp. Utility Installation: LANE CLOSURE between

Bloomingdale Ave. & Maplewood Ave. Weekdays. 9

AM - 3 PM.

10/2/17-10/9/17 PECO Energy $29.9 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: SIDEWALK CLOSED

between PA 320 (Spring Mill Rd.) & Ithan Ave. 24 hour

Closure

10/2/17-12/6/17 Neshaminy

Constructors, Inc.

$3.7 million

10/5/2017 Page 20 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South, Tinicum, Ridley,

Chester, Upper Chichester, Lower

Chichester twps., Upland Bor.,

Chester City

Patching: INTERMITTENT LANE CLOSURES

between Philadelphia County line & Delaware state

line. 9 AM - 3 PM.

10/3/17 Maintenance

U.S. 30 E & W (Lancaster Ave),

Radnor Twp.

Conduit Installation: ALTERNATING LANE

RESTRICTIONS between Banbury Way & Radnor

Chester Rd. 9 AM - 3 PM

10/3/17-10/9/17 Verizon

US 322 E & W (Conchester Hwy.),

Concord, Bethel, Upper Chichester

twps.

Patching: LANE CLOSURES between Baltimore Pike

& I-95. 9 AM - 3 PM.

10/4/17 Maintenance

Goshen Rd., Newton Twp. Utility Installation: ROAD CLOSURE WITH DETOUR

between Newton Street Rd. & Butler Dr. 9 AM - 3 PM.

DETOUR POSTED.

10/4/17-10/20/17 Aqua Pennsylvania

Smithbridge Rd., Concord Twp. Test Holes: LANE RESTRICTIONS between Station

Rd. & Baldwin Drive. 9 AM - 3 PM.

10/5/17-10/6/17 Concord Township

Sewer Authority

Station Rd., Concord Twp. Test Holes: LANE RESTRICTIONS between Hibberd

Rd. & Smithbridge Rd. 9 AM - 3 PM.

10/5/17-10/6/17 Concord Township

Sewer Authority

Bethel Rd.. Concord Twp. Curb Installation: LANE RESTRICTIONS between

Smithbridge Rd. & Featherbed Lane. Weekdays. 9

AM - 3 PM.

10/5/17-10/13/17 Valley Point Church

*I-476 North over Montgomery Ave,

Radnor Twp.

Beam Replacement: RIGHT LANE CLOSURE

between US 30 (Lancaster Ave.) & I-76 Interchanges.

5 AM Satuday- 5 AM Sunday

10/7/17-10/8/17 Loftus Construction,

Inc.

$6.8 million

Sweetwater Rd., Thornbury,

Edgemont twps.

Mill & Base Repair: LANE RESTRICTIONS between

Valley Rd. & Creek Rd. 6 PM - 6 AM

10/8/17-10/10/17 Allan Myers $4,098,777.00

Baltimore Pike, Upper Darby Twp.,

Lansdowne Bor.

Asphalt Paving Adjustments: LANE RESTRICTIONS

between Legion Terrace & First St. 9 AM - 3 PM.

10/9/17-10/13/17 Allan Myers $7.2 million

*I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER

CLOSURES between I-476 & PA 352/320. 10 PM - 5

AM.

10/9/17-10/13/17 South State, Inc. $16.6 million

10/5/2017 Page 21 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-476 N & S, Radnor, Haverford,

Marple twps.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

10/9/17-10/13/17 Wampole-Miller, Inc. $15 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) & PA

261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM

Saturday

10/9/17-10/14/17 J.D. Eckman, Inc. $62.7 million

Barren Rd. Middletown Twp. Utility Installation: LANE CLOSURES between Devon

Lane & County Village Way. Weekdays. 9 AM - 3

PM.

10/11/17-10/20/17 PECO Energy

Naamans Creek Rd., Concord Twp. Utility Installation: LANE CLOSURES between Pyle

Rd. & Shavertown Rd. Weekdays. 9 AM - 3 PM.

10/13/17-10/20/17 PECO Energy

Providence Rd., Upper Darby Twp. Utility Installation: LANE RESTRICTIONS between

Bishop Ave. & South Ave. Weekdays. 9 AM - 3 PM.

9/18/17-10/6/17 SEPTA $29.29 million

US 1 (City Ave.), Haverford Twp. Paving & Trench Restoration: LANE RESTRICTIONS

between Grove Place & Rolling Rd. Weekdays. 9 AM

- 3 PM.

9/18/17-10/6/17 Aqua Pennsylvania $29.6 million

Baltimore Pike, Springfield Twp. Conduit Repair: LANE RESTRICTIONS between East

Woodland Ave. & Thomson Ave. Weekdays. 9 AM -

3 PM.

9/18/17-10/13/17 Verizon $29.13 million

Kirk Lane, Upper Providence Twp. Utility Installation: LANE RESTRICTIONS at Oakcrest

Lane, Willowbrook Lane & W. 3rd St. Weekdays. 9

AM - 3 PM.

9/5/17-10/13/17 Aqua Pennsylvania

Burmont Rd., Haverford Twp. Utility Installation: LANE RESTRICTIOMS between

Glendale Rd. & Township Line 9 AM - 3 PM

Weekdays

9/5/17-10/27/17 Aqua Pennsylvania

S. Oak Ave., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between

Baltimore Pike & Providence Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

9/11/17-11/17/17 Aqua Pennsylvania

Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between

Lansdowne Ave. & PA 3 (West Chester Pike).

Weekdays. 9 AM - 3 PM. DETOUR POSTED.

9/11/17-11/17/17 Aqua Pennsylvania

10/5/2017 Page 22 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between

MacDade Blvd. & PA 13 (Chester Pike). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

8/22/17-11/24/17 Aqua Pennsylvania

Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between

13th St. & 12th St. 24-HOUR DETOUR. DETOUR

POSTED.

8/14/17-2/14/18 South State, Inc. $16.6 million

Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between

Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR

DETOUR. DETOUR POSTED.

8/7/17-10/20/18 Road-Con, Inc. $29.20 million

Chester Creek Rd., Middletown Twp. Concrete Barrier Placement: LANE RESTRICTIONS

between West Knowlton Rd. & Duttons Mill Rd. 24-

HOUR RESTRICTIONS.

8/1/17-9/30/17 Sunoco Pipeline L.P. $29.30 million

Creek Rd., Middletown Twp. Pipe Installation: LANE CLOSURE between Duttons

Mill Rd. & W. Knowlton Rd. 24-HOUR

RESTRICTIONS.

8/1/17-10/15/17 Sunoco Pipeline L.P. $29.15 million

Chester Creek Rd., Middletown

Twp., Brookhaven Bor.

Utility Installation: CLOSED & DETOURED between

Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

7/12/17-12/31/17 Middletown Township

Sewer Authority

$29.31 million

Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED

between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-

HOUR DETOUR. DETOUR POSTED.

6/20/17-10/20/17 South State, Inc. $16.6 million

Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between

Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.

6/12/17-11/3/17 Aqua Pennsylvania

S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED

between PA 320 (Sproul Rd.) & S. Ithan Ave.

5/30/17-12/15/17 Loftus Construction,

Inc.

$7.5 million

Creek Rd., Middletown Twp.,

Brookhaven Bor.

Pipe Installation: CLOSED & DETOURED between

Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

5/15/17-12/31/17 Middletown Township

Sewer Authority

Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. &

12th St.

3/27/17-11/29/17 South State, Inc. $16.6 million

10/5/2017 Page 23 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. Weekdays. 9 AM - 3 PM & 7 PM -

6 AM.

3/20/17-10/20/17 J.D. Eckman, Inc. $62.7 million

College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED

between Spring Mill Rd. & Haverford Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/29/16-5/2018 Road-Con, Inc. $5.2 million

MONTGOMERY COUNTY

Argyle Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between

Chatham Rd. & Wynnewood Rd. Weekdays. 9 AM - 3

PM.

9/26/17-11/30/17 Aqua Pennsylvania

Ford St., Bridgeport Bor. Utility Installation: LANE CLOSURE between 6th St. &

5th St. Weekdays. 9 AM - 3 PM.

9/27/17-10/4/17 PECO Energy

N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between

Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3

PM.

9/27/17-11/15/17 Bencardino

Excavating, Inc.

$155,000.00

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 9 AM.

9/29/17-9/30/17 J.D. Eckman, Inc. $21.1 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 5 AM.

10/1/17- 10/7/17 J.D. Eckman, Inc. $21.1 million

Montgomery Ave., Lower Merion

Twp.

Beam Replacement: CLOSED & DETOURED

between Old Gulph Rd. & Spring Mill Rd. 8 PM - 5 AM

Sunday-Friday. 5 AM Saturday - 5 AM Sunday.

DETOUR POSTED.

10/1/17-10/8/17 Loftus Construction,

Inc.

$6.8 million

PA 73 (Big Rd.), Upper Frederick

Twp.

Tree Removal: LANE RESTRICTIONS between

Clover Lane & Krause Rd. 9 AM - 3 PM

10/2/17-10/3/17 Asplundh

Collegeville Rd, Upper Providence

Twp.

Utility Installation: LANE RESTRICTIONS between

Black Rock Rd. & River Crest Drive. 9 AM - 3 PM & 6

PM - 6 AM.

10/2/17-10/5/17 Pennsylvana

American Water

10/5/2017 Page 24 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

US 422 E & W, Lower Providence,

Upper Providence, Limerick, Lower

Pottsgrove, North Coventry twps.

Maintenance: SLOW MOVING OPERATION between

PA 100 (Pottstown Pike) & PA 363 (Trooper Rd.)

9 AM - 3 PM     

10/2/17-10/5/17

PA 309 N, Montgomery, Lower

Gwynedd, Upper Dublin, Cheltenham

twps.

Maintenance: SLOW MOVING OPERATION

\between County Line Rd & Cheltenham Ave. 9 AM - 3

PM     

10/2/17-10/5/17 PennDot

Flint Hill Rd., Upper Merion Twp. Sidewalk Installation: LANE CLOSURE between

Brentwood Court & Hertzog Blvd. 9 AM - 3 PM.

10/2/017-10/6/17 GEI Enterprises Inc. $29.29 million

PA 611 (Old York Rd.), Abington

Twp.

Bridge Work: LANE RESTRICTIONS between Jericho

Rd. & Hamilton Ave. 9 AM - 3 PM.

10/2/17-10/6/17 J.D. Eckman, Inc. $3.6 million

Meyers Rd., Perkiomen Twp. Curb Installation and Grading: LANE RESTRICTIONS

between Seitz Rd. & Miller Rd. 9 AM - 3 PM.

10/2/17-10/6/17 H&K Group, Inc. $11.3 million

PA 29 (Gravel Pike), Perkiomen

Twp.

Pole Relocations: LANE RESTRICTIONS between

Miller Rd. & Harrison Ave. 9 AM - 3 PM.

10/2/17-10/6/17 H&K Group, Inc. $11.3 million

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St.;Franklin St.; Madison St.& Washington St. 9 AM -

3 PM.

10/2/17-10/6/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at

Washington St. 9 AM - 3 PM.

10/2/17-10/6/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at

Madison St. 9 AM - 3 PM.

10/2/17-10/6/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Franklin

St. 9 AM - 3 PM.

10/2/17-10/6/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St. 9 AM - 3 PM.

10/2/17-10/6/17 Road-Con, Inc. $13.3 million

10/5/2017 Page 25 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Norristown, Upper Providence,

Lower Providence, Limerick,

Whitemarsh twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 3 PM.

10/2/17-10/6/17 PennDOT $29.6 million

I-476 N & S (Blueroute), Lower

Merion Twp, West Conshohocken

Boro.

Utility Installation: SHOULDER CLOSURES between I-

76 & I-95. 9 AM - 3 PM.

10/2/17-10/6/17 PennDOT

US 422 East on-ramp from First

Ave., Upper Merion, West Norriton

twps.

Sinkhole Repair: RAMP CLOSED & DETOURED

between Gulph Rd. & US 422 East. 6:30 AM Monday

thru 5 PM Monday. DETOUR POSTED.

10/2/17-10/9/17 J.D. Eckman, Inc. $97.4 milion

West Main St., West Norriton Twp. Curb Removal: LANE RESTRICTIONS at Schuylkill

Ave. Weekdays. 9 AM - 3 PM.

10/2/17-10/20/17 L.F.T. Realty $29.20 million

Sandy Hill Rd., Plymouth Twp. Milling and Paving: LANE RESTRICTIONS between

Fairfield Rd. & Rollin Hill Dr. Weekdays 7 PM - 5 AM

10/2/17- 10/27/17 Glasgow, Inc. $4.5 million

Pleasant View Rd., Lower Pottsgrove

Twp.

Core Boring: LANE RESTRICTIONS between Ridge

Pike & High St. 9 AM - 3 PM.

10/3/17-10/5/17 Lower Pottsgrove

Sewer Authority

Edge Hill Rd., Upper Moreland Twp. Utility Installation: LANE CLSOURE between Quigley

Ave & Moreland Rd. 9 AM - 3 PM Weekdays

10/3/17-10/10/17 PECO Energy

Joshua Rd., White Marsh Twp. Pipeline Repair: LANE CLOSURE between Flower

Town Rd & Stenton Ave. 6 PM - 6 AM

10/3/17-10/14/17 Sunoco Pipeline L.P.

Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between

Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3

PM.

10/2/17-11/16/17 Pennsylvania

American Water

Company

Gypsy Lane, Upper Merion Twp. Bridge Deck Reconstruction: CLOSED & DETOURED

between South Gulph Rd. & Hughes Rd. Weekdays.

24-HOUR DETOUR. DETOUR POSTED.

10/2/17-11/15/17 Loftus Construction,

Inc.

$5.5 million

10/5/2017 Page 26 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Cowpath Rd., Telford Bor. Bridge Rehabilitation: CLOSED & DETOURED

between Hollow Rd. & Barndt Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

10/4/17-11/3/17 Loftus Construction,

Inc.

$5.5 million

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 9 AM.

10/6/17-10/7/17 J.D. Eckman, Inc. $21.1 million

US 422 East, Upper Merion, West

Norriton twps.

Bridge Steel Erection & Bridge Demolition: SINGLE

LEFT/RIGHT LANE CLOSURES & 15-MINUTE

STOPPAGES between US 202 & Trooper Rd.

Interchanges. 7 PM - 5 AM.

10/8/17-10/13/17 J.D. Eckman, Inc. $97.4 million

US 422 West, Upper Merion, West

Norriton twps.

Bridge Steel Erection & Bridge Demolition: SINGLE

LEFT/RIGHT LANE COSURES & 15-MINUTE

STOPPAGES between US 202 & Trooper Rd.

Interchanges. 9 PM - 6 AM.

10/8/17-10/13/17 J.D. Eckman, Inc. $97.4 million

*I-76 West, Lower Merion Twp. Survey Operation: LANE CLOSURE between US 1

(City Ave.) & Belmont Ave./Green Lane Interchanges.

9 AM - 11 AM.

10/9/17 Dawood Engineering

*US 422 West, Lower Pottsgrove

Twp.

Sign Installation: RIGHT LANE CLOSED between

Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7

AM - 1 PM.

10/9/17-10/11/17 J.D. Eckman, Inc. $73.3 million

Cheltenham Ave., Cheltenham Twp. Guide Rail Repair: RIGHT LANE CLOSED between

Old York Rd. & Sycamore Ave. 9 AM - 3 PM.

10/9/17-10/11/17 Long Fence, Co. $2.2 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 5 AM.

10/9/17-10/12/17 J.D. Eckman, Inc. $21.1 million

PA 611 (Old York Rd.), Jenkintown

Twp.

Conduit Installation: LANE RESTRICTIONS between

Harte Rd. & Baeder Rd. 9 AM - 3 PM.

10/9/17-10/13/17 Verizon

Radnor Street Rd., Upper Merion

Twp.

Paving: CLOSED & DETOURED between Croton Rd.

& Springbrook Lane. 9 AM - 3 PM. DETOUR

POSTED.

10/9/17-10/13/17 Aqua Pennsylvania

10/5/2017 Page 27 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Main St. Royersford Boro Curb, Sidewalk Installation: LANE CLOSURE between

3rd Ave & 4th Ave. 6 AM - 4 PM

10/9/17- 10/13/17 Borough of

Royersford

*I-476 N & S, Lower Merion Twp.,

West Conshohocken Bor.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

10/9/17-10/13/17 Wampole-Miller, Inc. $15 million

PA 73 (Skippack Pike), Whitpain

Twp.

Soil Testing: LANE CLOSURES between Crestline

Drive & Cathcart Rd. 9 AM - 3 PM.

10/9/17-10/13/17 Applied Geoscience

& Engineering, Inc.

PA 611 (Old York Rd.), Abington

Twp.

Bridge Work: LANE RESTRICTIONS between Jericho

Rd. & Hamilton Ave. 9 AM - 3 PM.

10/9/17-10/13/17 J.D. Eckman, Inc. $3.6 million

Bethlehem Pike, Springfield Twp. Utility & Sidewalk Installation: LANE RESTRICTIONS

between Windsor Rd. & Rich Ave. Weekdays. 9 AM -

3 PM.

10/9/17-10/20/17 Springfield Township

Authority

*I-76 West, Lower Merion Twp. Survey Operation: LANE CLOSURE between US 1

(City Ave.) & Belmont Ave./Green Lane Interchanges.

9 AM - 2 PM.

10/10/17 Dawood Engineering

PA 309 North, Montgomery, Lower

Gwynedd, Upper Dublin, Cheltenham

twps.

Litter & Debris Removal, Sweeping: MOVING

OPERATION between County Line Rd. & Cheltenham

Ave. 9 AM - 3 PM.

10/10/17-10/11/17 Maintenance

*I-76 E & W, Upper Merion, Lower

Merion twps., West Conshohocken

Bor.

Litter & Debris Removal, Sweeping: MOVING

OPERATION between I-276(PA Turnpike) & US 1

(City Ave.). 9 AM - 3 PM.

10/10/17-10/11/17 Maintenance

*I-476 N & S, Plymouth, Lower

Merion twps., West Conshohocken

Bor.

Litter & Debris Removal, Sweeping: MOVING

OPERATION between I-276(PA Turnpike) & County

Line Rd. 9 AM - 3 PM.

10/10/17-10/11/17 Maintenance

US 422 E & W, Lower Providence,

Upper Providence, Limerick, Lower

Pottsgrove, North Coventry twps.

Litter & Debris Removal, Sweeping: MOVING

OPERATION between PA 100 (Pottstown Pike) & PA

363 (Trooper Rd.). 9 AM - 3 PM.

10/10/17-10/11/17 Maintenance

US 422 West, Lower Pottsgrove

Twp.

Concrete Patching: LANE CLOSURES between

Evergreen Rd. & Armand Hammer Blvd. 9 AM - 3

PM.

10/10/17-10/11/17 Maintenance

10/5/2017 Page 28 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Kepler Rd., Pottsgrove Twp. Utility Installation: LANE CLOSURE between Doe Run

Lane & Wooded Way. Weekdays. 9 AM - 3 PM.

10/10/17-10/17/17 PECO Energy

*I-76 West, Lower Merion Twp. Survey Operation: LANE CLOSURE between US 1

(City Ave.) & Belmont Ave./Green Lane Interchanges.

12 PM - 2 PM.

10/11/17 Dawood Engineering

Washington Lane, Lower Moreland

Twp.

Utility Installation: LANE CLOSURE between Welsh

Rd. & Holcomb Rd. 9 AM - 3 PM. Weekdays. 9 AM -

3 PM.

10/11/17-10/18/17 PECO Energy

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 9 AM.

10/13/17-10/14/17 J.D. Eckman, Inc. $21.1 million

*I-476 North over Montgomery Ave,

Lower Merion Twp., West

Conshohocken Boro.

Beam Replacement: RIGHT LANE CLOSURE

between US 30 (Lancaster Ave.) & I-76 Interchanges.

5 AM Satuday- 5 AM Sunday

10/7/17-10/8/17 Loftus Construction,

Inc.

$6.8 million

Kepler Rd., Lower Pottsgrove Twp. Utility Installation: LANE CLOSURE between Doe Run

Lane & Wooded Way 9 AM - 3 PM Weekdays

10/10/17-10/17/17 PECO Energy

Washington Lane, Lower Moreland

Twp.

Utility Installation: LANE CLOSURE between Welsh

Rd. & Holcomb Rd. 9 AM - 3 PM Weekdays

10/11/17-10/18/17 PECO Energy

PA-113 (3rd Ave./Rahns Rd), Trappe

Borough, Perkiomen Twp.

Milling and Paving: LANE RESTRICTIONS between

Boro Line Road and PA-29 (Gravel Pike). 7 PM - 5

AM.

9/18/17-10/13/17 Glasgow, Inc. ECMS 107861

Bleim Rd., Lower Pottsgrove Twp. Utility Installation: LANE RESTRICTIONS between

New Hanover Square Rd. & Pleasantview Rd. 9 AM -

3 PM. Saturdays. 7 AM - 7 PM.

9/22/17-10/20/17 Borough of Pottstown

Church Rd., Upper Merion Twp. Utility Installation: CLOSED & DETOURED between

Gulph Ridge Rd. & Henderson Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

9/11/17-10/31/17 Aqua Pennsylvania

Blair Mill Rd., Horsham Twp. Install Curb & Road Widening: LANE RESTRICTIONS

between W. Moreland Ave. & Horsham Rd.

Weekdays. 9 AM- 3 PM.

9/5/17-10/6/17 Hampa Realty LLC

10/5/2017 Page 29 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 63 (Welsh Rd./Moreland Rd.),

Abington, Upper Moreland twps.

Milling, Paving & Utility Adjustments: LANE

RESTRICTIONS between Kimball Ave. & Edge Hill

Rd. 7 PM - 5 AM.

9/5/17-9/29/17 Glasgow, Inc. $4.5 million

Cheltenham Ave., Cheltenham Twp. Utility Installation: LANE RESTRICTIONS between

Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.

8/30/17-11/2/17 PECO Energy

Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between

Washington Lane & York Rd. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

8/24/17-12/29/17 Aqua Pennsylvania

PA 363 (Trooper Rd.), Lower

Providence Twp.

Road Widening & Utility Installation: LANE

RESTRICTIONS between Eisenhower Ave. &

Shannondell Blvd. Weeknights. 7 PM - 5 AM.

7/17/17-11/30/17 Forge 20 LLC

Matsonford Rd., Upper Merion,

Lower Merion twps.

Bridge Repair: CLOSED & DETOURED between

Montgomery Ave. & Old Gulph Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

7/10/17-10/10/17 SEPTA

PA 23 ramp to US 422 East, Upper

Merion, West Norriton twps.

Ramp Reconstruction: RAMP CLOSED &

DETOURED. 24-HOUR DETOUR. DETOUR

POSTED.

7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million

PA 63 (Welsh Rd.), Upper Dublin,

Upper Moreland twps.

Deck Rehabilitation: LANE CLOSURES between

Twining Rd. & Computer Ave. Weekdays. 9 AM - 3

PM.

7/6/17-9/30/17 Loftus Construction,

Inc.

$7.2 million

W. Wynnewood Rd, Lower Merion

Twp.

Utility Installation: LANE RESTRICTIONS between E.

County Line Rd. & Ballytore Rd. Weekdays. 9 AM - 3

PM.

6/5/17-10/27/17 Aqua Pennsylvania

Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at

Pleasantview Rd.; N. Washington St. & Mervine St. 9

AM - 3 PM.

5/30/17-10/20/17 Highway Materials,

Inc.

$4.8 million

Mervine St., Lower Pottsgrove Twp,

Pottstown Bor.

Curb Ramp Construction: LANE CLOSURE at N.

Franklin St. 9 AM - 3:30 PM.

5/30/1710/20/17 Highway Materials,

Inc.

$4.8 million

Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between PA 29 (Gravel Pike) & PA 73 (Skippack

Pike). 24-HOUR DETOUR. DETOUR POSTED.

5/2/17-10/2017 H&K Group, Inc. $11.3 million

10/5/2017 Page 30 of 31

LOCATION RESTRICTION DATE CONTRACTOR COST

Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR

DETOUR. DETOUR POSTED.

5/2/17-5/2019 H&K Group, Inc. $11.3 million

PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS

between PA 113 (Harleysville Pike) & Carrie Lane.

Weekdays. 9 AM - 3 PM.

3/15/17-11/1/17 Lower Salford

Township

$29.1 million

*US 422 East, Lower Pottsgrove

Twp.

Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

Interchanges. 5 PM - 5 AM.

1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, Lower Pottsgrove

Twp.

Road & Bridge Construction: WEEKEND LANE

CLOSURES between Sanatoga & PA 724 (Schuylkill

Rd.) Interchanges. 7 PM - 1 PM.

1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million

Edge Hill Rd., Abington Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Ferndale Ave. & Hamilton Ave. 24-HOUR

DETOUR. DETOUR POSTED.

1/9/17-11/1/17 J.D. Eckman, Inc. $3.6 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

Baligomingo Rd., West

Conshohocken Bor.

Slope Stabilization: CLOSED & DETOURED between

PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.

DETOUR POSTED.

6/27/15-Indef. $29.27 million

PA 724 ramp to US 422 East, Lower

Pottsgrove Twp.

Roadwork: RAMP CLOSED & DETOURED. 24-

HOUR CLOSURE. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, Lower Pottsgrove

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

Interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, West Pottsgrove

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS

between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM

Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

5/9/14-12/29/17 Valley Forge National

Historical Park

$29.29 million

10/5/2017 Page 31 of 31