DatabaseCompetence Centre
openlab Major Review Meeting 2012
2nd February 2012
Maaike LimperZbigniew Baranowski
Luigi GalleraniMariusz Piorkowski
Anton TopurovNicolas Bernard Marescaux
Outline
Progress on- Integrated Virtualization,
- Enterprise Manager 12c,
- Replication Technologies,
- 11g deployment for WLCG,
Outlook for openlab IV new projects
- New openlab fellow – Maaike Limper,
- Accelerator logging data-mining.
CERN openlab major review February 2012 2
Oracle Enterprise ManagerInfrastructure Provisioning,
Self Service Portal tests
EM 12c Infrastructure Provisioning
Clean install of EM 12 (released version) OVM 3.0 installed on 3 hosts Re-testing of problematic features
Most of the reported errors fixed Much faster setup then in Beta
CERN openlab major review February 2012 4
EM12 Structure
CERN openlab major review February 2012 5
EM 12 Self Service Portal
Not tested during Beta Allows end users to provision own VMs Self Service Admin controls available actions
VM images available for deployment Disk, memory and CPU allowances Scheduling windows, VMs expirations, etc
Works well from both admin and end user side
CERN openlab major review February 2012 6
7
EM 12 Self Service Portal
Self Service Portal
CERN openlab major review February 2012 8
Replication technologies update
Continuation of replication testing
Tested technologies Streams 11.2.0.3 GoldenGate 11.1.1.1.1 Active DataGuard 11.2.0.3
Goal Validation of above technologies with all CERN’s
streamed production workload Direct performance comparison On exact hardware and software configuration
• Same that will be used in production
CERN openlab major review February 2012 10
Final results
CERN openlab major review February 2012 11
LFC for LHCB workload description:-13 days of production data- redo volume 15G- 7,235,172 changes- ~2M transactions
ATLAS COOL workload description:- 3 days of production data- redo volume 22,4 G- 15,313,748 changes- 63,481 transactions
ATLAS PVSS workload description:- 3 days of production data- redo volume 11,1 G- 8,162,001 changes- 567,227 transactions
LO
WE
R - B
ET
TE
R
Final results
CERN openlab major review February 2012 12
LFC for LHCB workload description:-13 days of production data- redo volume 15G- 7,235,172 changes- ~2M transactions
ATLAS COOL workload description:- 3 days of production data- redo volume 22,4 G- 15,313,748 changes- 63,481 transactions
ATLAS PVSS workload description:- 3 days of production data- redo volume 11,1 G- 8,162,001 changes- 567,227 transactions
HIG
HE
R - B
ET
TE
R
Summary
All Oracle replication solutions had been validated with CERN’s production datasets ADG was the fastest one in each case
GoldenGate software is developing very fast all data types used by CERN are now supported!
We could not benefit from parallelism optimization Not compatible with production sets
Streams issues discovered during previous testing have been reported to Oracle Support fixes are included in latest Oracle version (11.2.0.3)
and we are ready for deployment…
CERN openlab major review February 2012 13
Next steps – Active Data Guard
ADG appears to be not only the fastest replication technology but also the easiest to establish and maintain
It makes it the best candidate for online – offline replication First production setup will be deployed for CMS and ALICE
in February
Opens possibilities for offline analysis (data mining) of large data sets like accelerator logs
CERN openlab major review February 2012 14
11g Deployment for WLCG
11g deployment overview
Narrow upgrade window during LHC shutdown (January – March) all experiments databases will be upgraded to 11g until
• middle of February at T0• beginning of March at T1
Additionally tested with RAT (Real Application Testing) Replication related challenges
due to tight schedule upgrades cannot be performed in order recommended by Oracle
upgrades of T1s targets requires coordination and actions on T0
Report covering problems experienced during Streams replication upgrades will be provided to Oracle
CERN openlab major review February 2012 16
11g deployment in worldwide databases distribution
ATLAS – the core is already running 11g
CERN openlab major review February 2012 17
11g
14.12.1117.01.12
STREAMS 11g
STREAMS 11g
STREAMS 11 g
STREAMS 11g
T1T0
10.01.12
11g
11g
11g 11g
11g
24.01.12
18.01.12
23.01.12
LHCB
CERN openlab major review February 2012 18
24.01.12
14.12.11
31.01.12
31.01.12
30.01.12
LHCB online database – 6th of February
11g deployment in worldwide databases distribution
11g
11g
11g
11g
11g
11g
11g
11g
01.02.12
01.02.12
31.01.12
Openlab IV projects
openlab IV
New Oracle Openlab fellow:
- Maaike Limper, started January 2012 Project outline:
- Investigate possibility of doing LHC-scale data reconstruction and physics analysis within an Oracle database Focus on Physics Analysis
Analysis mainly done from (root)-n-tuples Tree structure of root-n-tuples could be (easily?)
converted into database structure External procedure agent on database to handle
C++ physics analysis code
20CERN openlab major review February 2012
Physics Analysis and Databases
Challenges: Optimize database structure: physics objects can be defined
as vectors-of-vectors with varying length per event, could be stored as blobs or separate tables
Flexibility for different types of analysis: subsets of data objects could be defined through “views” for different physics groups (SUSY, Higgs, etc.)
Analysis time: large number of users to access same data at the same time, optimize performance to be competitive with current analysis scheme
Database size: could take significantly more space than root-files; data for results with many different versions of the reconstruction software to be stored
21CERN openlab major review February 2012
Accelerator logging data mining
Problem solving for early detection of the accelerator Identify non-optimal response: discharge
trajectory different from expected envelope Response of valves etc.
Make use of technology Active DataGuard to analyze data at the same
time as it is captured/loaded, RAC, parallel query for processing Large cache and high number of cores with fast
interconnect
22CERN openlab major review February 2012
Outreach
Presentations
“GoldenGate vs Oracle Streams for Worldwide Distribution of Experimental Physics Data” Eva Defonte Perez & Zbigniew Baranowski, UKOUG, Birmingham 5-7 December 2011
“Testing Storage for Oracle RAC 11g with NAS, ASM and SSD Flash Cache” Luca Canali & Dawid Wojcik, UKOUG, Birmingham 5-7 December 2011
“Oracle Enterprise Manager: The Key to Building a Virtualized Stack” Anton Topurov, UKOUG, Birmingham 5-7 December 2011
“Going deeper into Real Application Testing” Mariusz Piorkowski, UKOUG, Birmingham 5-7 December 2011
CERN openlab major review February 2012 24
Questions?
CERN openlab major review February 2012 25