Data collection
5 star hotel project
Architectural design – v11
-
8/19/2019 Data collection offivestarhotel 25277875
2/22
5 star hotel project
About 60,000 quality rooms are across the country in diferentstages o planning and development! most o these hotel shouldbe ready by "010# loo$ing at this potential in hotel business,international giants are %oc$ing &ndia ' orging joint venturesto earn there share in race#
(overnment o &ndia has approved )00 hotel projects nearlyhal o *hich are in lu+ury range# Demand supply scenariosuggest that hotel industry has great potential or investment#
e, the architects has the potential opportunities, in the -eld ohospitality ' tourism architecture.......
/he no# o tourists visiting &ndiato soar to 10 million by the year
"010 rom 5 million in "0002#
3ecent estimates sho* that&ndia has a shortage o 150,000rooms, uelling hotel room ratesacross the country#
-
8/19/2019 Data collection offivestarhotel 25277875
3/22
1# entry4e+its
the entry to the site should be sophisticated, *ell maintained andhaving *elcoming efect#
minimum *idth o the entrance should be proper enough toaccommodate " e class 0 vehicles at a time#
so the ideal *idth o the entrance is 5m to 6m#
a security pit should have been installed *ith all the proper securityinstruments# aving the dimension )m 7 )m#
the entrance should be *ell connected to the porch, open 4 basementas *ell as multi level par$ing i applicable#
all entrance points should have car scanners installed at every entry 4e+it points#
entry ' e+it points to the site should be same *ith one emergencyentry 8*idth 9m: and one service entry 8*idth 2m:
emergency entry should be mechanical as *ell as manual override incase o emergency#
service entries are very critical as ar as security is concerned so " ormore chec$ing pits 8 "m 7 "m: *ith highly trained staf is required#
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
4/22
"# par$ing
according to ;
-
8/19/2019 Data collection offivestarhotel 25277875
5/22
)# ?ntrance lounges rom the porch the main entry 8 56 mtr *ide: *ith automatic control
preerable the revolving door#
normal visitor tra@c # An allo*anceo 10 sq t or each visitor to be servedmay be used or space allocation
reception area *ith " boo$ing agents 85m 7 "#5: schoers rooms ) nos#8)m 7 )m:
seating place or at least 15 people 8visitor lounge:
seating place or at least "5 people 8guest lounge:
a small cofee house or bar i applicable# 89m 7 ):
height o the atrium *ould be ma+imum ) storey 81)#5 mtr:
e+press lits, %oor lits and staircase core *ould be adjacent not morethan 10 mtrs
straight *ay heading to the rooms or physically handicapped shouldbe on the ground %oor only#
a small dining hall *ith specialty restaurant provision *ith )5 person
eating space *ith a $itchen 860 sq m:
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
6/22
5 star hotel project
Data collection
9# Bacilities or handicapped
on the ground %oor 1"C rooms provision or > persons
rams provision also mandatory or every public place inside oroutside
building compound *ith slope 81"0:
=orridors *idth E15 mm
clear door opening 215 mm
lobbies 960 mm *ider than the door on latch side
closet doors either narro* or sliding
shelves 1)) mm high
bathrooms central turning space 15"0 mm, *idth "#5 m, vanitytops
260 mm high, 625 mm $nee space, mirror e+tending do*n to 100mm,
compromise toilet seat height 9)0 mm#
grab bars are needed on the head *alls or on the sides o the bathand toilet#
-
8/19/2019 Data collection offivestarhotel 25277875
7/22
5 star hotel project
Data collection
9# Bacilities or handicapped
standard bedroom )650 mm *ide
s*itches 1"00 mm high
space b4* bed ' urnitures E10 mm
beds 950500 mm high *ith toe space belo*
eye level rom a *heel chair 1#01#) mtrs
dressing table should allo*ed or this ' have 625 mm $nee space
lo* *indo* sills are also preerable#
-
8/19/2019 Data collection offivestarhotel 25277875
8/22
5 star hotel project
Data collection
5# (uest rooms
guest rooms are mainly o ollo*ing types
single bed
double bed
lu+ury suits
-
8/19/2019 Data collection offivestarhotel 25277875
9/22
5 star hotel project
Data collection
5# (uest rooms
-
8/19/2019 Data collection offivestarhotel 25277875
10/22
5 star hotel project
Data collection
5# (uest rooms
inimum 10 lettable rooms# All rooms *ith outside *indo*4ventilation#
inimum siFe o bedroom e+cluding bathroom in sq# t# "00 8"" sq m:
Gingle occupancy rooms may be "0 sq t less# 100 C Airconditioning
Airconditioning4 heating depends on climatic conditions ' architecture#
3oom temp should be bet*een "0 ' "2 Degrees =# Bor 9H, 5H and 5H
Delu+e #8the C is o the total no# o rooms:# A clean change o bed and bath linen daily ' bet*een chec$ins
otels may have a guest triggered system# Bor 1H ' "H on alternate
days# De-nitely required bet*een each chec$in#
-
8/19/2019 Data collection offivestarhotel 25277875
11/22
5 star hotel project
Data collection
5# (uest rooms
inimum bed *idth or single 8E0cm: and double beds 81)5cm:
attress inimum 10cm thic$ =oir, Boam or spring# Boam covered i
cotton# inimum bedding " sheets, pillo* ' case, blan$et, mattress protector4bed cover#
-
8/19/2019 Data collection offivestarhotel 25277875
12/22
6# restaurant4 catering
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
13/22
6# restaurant4 catering
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
14/22
6# restaurant4 catering
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
15/22
# $itchens
$itchen siFe is determined by the number o *or$stations, the spacerequired by the equipment, the range o meals ' the e+tent o oodpreparation#
thereore no# o seats, or no# o covers are not adequate guides# /heollo*ing table provides an appro+imate basis or initial estimates ospace requirement
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
16/22
# $itchens
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
17/22
# $itchens
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
18/22
# $itchens
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
19/22
-
8/19/2019 Data collection offivestarhotel 25277875
20/22
# 3estaurant $itchens
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
21/22
# 3estaurant $itchens
BI;=/&J;
5 star hotel project
Data collection
-
8/19/2019 Data collection offivestarhotel 25277875
22/22
5 star hotel project
Data collection
# 3estaurant $itchens 8 J3(A;&GA/&J;: