Data Collectionand Quality Assurance

Ron Howard Jr., EI

Environmental Coordinator

Russell Koenig, PS, EISurveyor

DLZ Ohio, Inc.2008 Ohio GIS

Conference

September 10-12, 2008

Crowne Plaza North Hotel

Columbus, Ohio

Page 2: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

QUALITY ASSURANCE

Refers to planned and systematic processes that

provide confidence of a product’s or service’s

effectiveness.

Page 3: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Original

Hand Written

Document.

Drawbacks

• Difficult to read

• Not structured

• Must be retyped

• Open to interpretation

Page 4: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Palm Database Document

Benefits• Standardized

responses.

• Easy sorting and manipulation of data.

• Provide client with a document designed around their changing needs.

Page 5: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Palm Database Document

Benefits cont.• Check

boxes and drop down menus save time.

• Once entered document is complete.

• Greater quality final product.

Page 6: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Palm Database Document

Drawbacks• Special

Training.

• Greater learning curve for users.

• Field crew’s level of detail is visibly displayed whether good or bad.

Page 7: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.
Page 8: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.
Page 9: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Hours / Job Palm Hand Written Position Hourly RateField Work 267 481 Field Tech 21.00$ Retyping hand written forms 240 Administrative assistant 16.00$ Inserting forms into books 40 Intern 12.00$ Database development 40 Programmer 35.00$

Palm Hand Written SavingsTotal Hours 307 761 60%Total Cost 7,007$ 14,419$ 51%

Comparison and Savings between Electronic and Hand Written Data

Collection.Parcels / Day Palm Hand WrittenField Work 45 25Retyping hand written forms 0 50Inserting forms into books 0 300

Total Parcels

1502

Page 10: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Related Benefits1. Less people handling information relates to a higher quality product.2. Realistic deliverable 1 cd -vs- 13 3-inch binders3. Ability to sort specific information due to standardized inputs.4. Ability to generate reports relative to each client's particular need.5. Ability to attach a photo with pertinent data.6. Improved ability to check work for accuracy.7. Database development was more extensive in this case because it was our 1st project.8. Newer databases need approx 50% less work.

Note: Now that the client has increased ability to work with the data they will ask for extra database items. Therefore, don't reduce programmer time.

Page 11: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Brain power has to rise in proportion to the reduction in time, operational effort, and

muscle power.Joseph V.R. Paiva, PH.D., P.S.

Page 12: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Case Study: I-70/71

Existing Utility Location– Subsurface Utility Engineering (SUE)– Sewerage/Drainage

Page 13: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Project Approach

Combine Survey

Data with GIS Data

Collection methods

to produce a final

product with

maximum quality in

minimal time.

Page 14: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.
Page 15: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

707802.19, 1873544.62

987.12

70-71 MANHOLE INVENTORY

NAVD88

1000 STORM MH

Page 16: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

1

2

24” RCP

1000 STORM MH

8.10 1001

09-11-08

707802.19, 1873544.62 RH/RK

CONC

987.12

STEEL

GOOD

70-71 MANHOLE INVENTORY

NO

TRASH & SILT

24” RCP 8.42

NAVD88N

Page 17: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

24” NE RCP

1000 STORM MH

8.10 1001

DIR

09-11-08

707802.19, 1873544.62 RH/RK

CONC

987.12

STEEL

GOOD

70-71 MANHOLE INVENTORY

NO

TRASH & SILT

24” S RCP 8.42

NAVD881

2

N

Page 18: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

GIS Data Collection Advantages

• Upload coordinates for navigation• Customized drop-down menus• No lost, damaged, or illegible forms• Downloadable information

Page 19: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

GIS-Grade GPS

• Fast and effective– Navigation– Inventory

• Low accuracy– 30 feet un-processed– 1-3 feet post-processed

(using CORS)

Page 20: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Survey-Grade GPS

• Static (~0.03’)– Must Post-Process

Page 21: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Survey-Grade GPS

• Static (~0.03’)– Must Post-Process

• RTK (~0.10’)– Base Station

& Radio Waves– No Post-Processing

Page 22: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Survey-Grade GPS

• Static (~0.03’)– Must Post-Process

• RTK (~0.10’)– Base Station

& Radio Waves– No Post-Processing

• VRS (~0.10’)– CORS Network– “On the fly” results

Page 23: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Step 1: Survey

• Search for approximately 1900 structures– 770 located previously during SUE work

• Obtain accurate coordinates

Page 24: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Step 2: Report• Structure details & condition• Pipe information

– Direction, size, material, depth, connection• GIS-Grade GPS coordinate

Page 25: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

• Sewer Database spreadsheet (Excel)– Survey coordinates and GIS report data

• Compare GIS and survey coordinates• Calculate pipe invert elevations

Step 3: Assemble

Page 26: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Step 4: QC

• Database analysis– Identify missing or conflicting information

• Existing records– City of Columbus Sewer Atlas– Original construction and as-built drawings

• Additional field work– Stakeout, locate, and report missing

structures

Page 27: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Step 5: Deliver• The final report included

– 1458 located structures– 3177 reported inverts

• Bound book– Database was easy to format

• Organized into 3 sections– Structure Location– Structure Information– Pipe Information

Page 28: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Structure Location

Page 29: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Structure Information

Page 30: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Pipe Information

Page 31: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Additional Request – Pipe Drawing

• Create invert coordinates• Place all start & stop points in order• Add point number & survey linework codes

– BL*P = Begin Line “Pipe”– EL*P = End Line “Pipe”

• Run through drafting software– Lines were automatic and at true elevation

Page 32: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Pipe Point FilePOINT NORTHING EASTING ELEV

CODE

30000 711769.45 1827261.58 696.27BL*P1

30001 711778.66 1827277.52 696.27EL*P1

30002 711769.45 1827261.58 696.24BL*P2

30003 711778.29 1827093.73 695.56EL*P2

30004 711798.41 1827232.98 710.24BL*P3

30005 711792.29 1827244.84 709.55EL*P3

30006 711792.94 1827113.96 0.00BL*P4

30007 711792.29 1827244.84 708.36EL*P4

30008 711792.94 1827113.96 704.57BL*P5

30009 711787.09 1827114.39 704.45EL*P5

30010 711787.09 1827114.39 702.07BL*P6

30011 711786.62 1827092.33 701.14EL*P6

30012 711787.09 1827114.39 704.29BL*P7

30013 711424.05 1827187.41 703.43EL*P7

Page 33: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.
Page 34: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

Highlights

• Minimal field time• Structure & report verification• Automated calculations• No transposing errors• Easily formatted report

Page 35: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

The Future• Innovative process and

experience– More jobs of this type at very

low cost• Enhanced Sewer Database

spreadsheet– Automated calculations and

error messages– Faster and better

Page 36: Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc. 2008 Ohio GIS Conference.

THANKS!

Ron Howard Jr., EI

Environmental Coordinator

Russell Koenig, PS, EISurveyor

DLZ Ohio, Inc.

6121 huntley Road

Columbus, Ohio 43229

614-888-0040