DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine...

9
TIAS lezing 2 Alexandra den Heijer 25 april 2013 more information: http:// www.managingtheuniversitycampus.nl 1 About the campus of the future and decisions of today: case BK city Alexandra den Heijer DASFrame – opdracht determine current match determine future match SUPPLY SIDE MATCH CURRENT demand CURRENT supply FUTURE supply FUTURE demand step by step plan DEMAND SIDE task 1 < assessing the current campus task 2 < exploring changing demand task 3 < generating future models task 4 < defining projects to transform exploring changing demand weigh and select alternative(s) 3 4 (de Jonge et al 2009 & den Heijer 2011) NORTH old campus focus RESIDENTIAL INCUBATORS RELATED FUNCTIONS SOUTH business campus Holland Science Port focus RELATED BUSINESSES CENTER university campus > 75% floor area focus EDUCATION & RESEARCH FIRE – foto’s

Transcript of DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine...

Page 1: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 1

About the campus of the future and decisions of today: case BK city

Alexandra den Heijer!

DASFrame – opdracht

determinecurrentmatch

determinefuturematch

SUPP

LY&SIDE

MATC

H

CURRENTdemand

CURRENTsupply

FUTUREsupply

FUTUREdemand

step/by/step/plan

DEM

AND&SIDE

task/1/<assessing&the&cu

rren

t&cam

pus

task/2/< exploring &chang ing &demand

task/3/<ge

neratin

g&future&m

odels

task/4/< defining &projects&to&transform

exploringchang ingdemand

weigh/andselect

alternative(s)

3

4 (de Jonge et al 2009 & den Heijer 2011)

NORTH old campus

focus

RESIDENTIAL INCUBATORS

RELATED FUNCTIONS

SOUTH business campus

Holland Science Port

focus RELATED

BUSINESSES

CENTER university campus > 75% floor area

focus EDUCATION &

RESEARCH

FIRE – foto’s

Page 2: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 2

Teletekst – bezoek minister

12

Dean & staff at Faculty of Applied Sciences

Page 3: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 3

Selection criteria 1.  relation to TU Delft campus; 2.  fitness for use – m2 & functions 3. contribution to the faculty's identity; 4. availability on September 1, 2008 5.  the availability for a period of several years; 6.  the costs 7.  flexibility for growth 8.  technical condition 9. procedures & process risks 10.  accessibility public transport, bicycle, car

(parking)

Foto redden stoelen collectie

Page 4: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 4

Aankondiging in Aula

ASSIGNMENT: relocate 3300 students and > 800 employees DEADLINE: renovate 32.000 m2< 6 months + new construction 4.000 m2 < next 6 months

Project group representing -  policy makers: board of executives -  dean -  controllers -  users -  architects that have known the faculty for years

1. professors and professionals 2. all parties have studied or worked at faculty 3. hands-on mentality

DASFrame – week 2

determinecurrentmatch

determinefuturematch

SUPP

LY&SIDE

MATC

H

CURRENTdemand

CURRENTsupply

FUTUREsupply

FUTUREdemand

step/by/step/plan

DEM

AND&SIDE

task/1/<assessing&the&cu

rren

t&cam

pus

task/2/< exploring &chang ing &demand

task/3/<ge

neratin

g&future&m

odels

task/4/< defining &projects&to&transform

exploringchang ingdemand

weigh/andselect

alternative(s)1

2.1

2.2 3

4 (de Jonge et al 2009 & den Heijer 2011)

Page 5: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 5

Foto’s bezoek Julianalaan

Page 6: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 6

Facts 150 participating companies 25 consultancy / architecture firms 350 construction workers on site 800 orders 15 km sprinkler / 5500 sprinklers 30.000 litres paint 220 km data cables 5200 wall outlets

luchtfoto gebouw

Fase%1%'%OOST:%!16.000!m2!bvo!!in!gebruik!september!2008!

Fase%2%'%WEST:%!16.000!m2!bvo!!in!gebruik!november!2008!

Fase%3%'%SERRES:%!4.000!m2!bvo!nieuwbouw!in!gebruik!mei!2009!

Challenge the future Delft University of Technology

42.000 m2 32.000 m2

Page 7: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 7

Challenge the future Delft University of Technology

•  space reduction – 25% •  more students expected •  Berlageweg was already too small for # students / staff •  need to change concepts •  demand for large public spaces “blokkenhal”

& modeling studies, workshop space

•  additional space demand: •  solution glasshouses •  many alternatives… by many different architects…

Brief in m2 Design the building as a city

footprint old ! new

Berlageweg 42.000 m2 bvo Julianalaan 32.000 m2 bvo

+ new glasshouses 4.000 m2 bvo = 36.000 m2

source: projectgroep BK city, programmateam

bvo = bruto vloeroppervlak =gross floor area (gfa) no = nuttig oppervlak = usable floor area (ufa)

PRIMARY FACTS

ORGANISATION

• 1400 BSc students

• 1675 MSc students

•  450 FTE staff

•  800 employees

•  170 0,0 fte

•  270 PARKING PLACES

AND MUCH MORE

BUILDING

• 700 BSC STUDIO DESKS

• 830 MSC STUDIO DESKS

• 470 DESKS

• 350 AVAILABLE EXTRA WORK SPACES

• 044 MEETING ROOMS

• 005 LECTURE HALLS

• 001 LIBRARY

• 001 RESTAURANT

• 003 BARS

2260

400

BUILDING-2011

GOALS ORGANISATION 1.  Community building 2.  More effective support of

education, research & management

3.  Creating the place to meet 4.  Stimulate social interaction

& intellectual interaction 5.  Flexible use of facilities 6.  Sustainable

Private ! Public space Contextual Concept: Connectivity and variety

Strategic

Financial

Physical

Adding value – doelen voor project BK city

•  flexibel voor groei •  bijdragen aan BK imago •  samenwerking stimuleren •  innovatie stimuleren

•  meer kwaliteit werkplek •  betere faciliteiten •  hogere tevredenheid?

•  lagere huur (minder gehuurde meters)

•  duurzame oplossingen

(BK city slim / BK city stay) •  meer mensen op minder meters •  multifunctionele ruimte

Functional

Page 8: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 8

strategisch

‘community building’, meer samenwerking, student terug op faculteit

functioneel

3300 studenten 800 medewerkers 10 ruimtefuncties

50 mln geinvesteerd

exploitatielasten …

financieel

36.000 m2 bvo redelijke technische

conditie

fysiek

BK city Julianalaan

focus op organisatie focus op vastgoed

stra

tegi

sch

oper

atio

neel

ingevuld voor BK city NORTH old campus

focus

RESIDENTIAL INCUBATORS

RELATED FUNCTIONS

SOUTH business campus

Holland Science Port

focus RELATED

BUSINESSES

CENTER university campus > 75% floor area

focus EDUCATION &

RESEARCH

tu delft ontwikkelingen van de afgelopen jaren (bron: Mecanoo 2009)

uitbreiding TNO

geotechnologie

mekelpark

studentenhuisvesting

hogeschool INHOLLAND

haagse hogeschool

studentenhuisvesting

tu delft toekomstige ontwikkelingen (bron: Mecanoo 2009)

learning centre

kantoren

kantoren

plint CITG

studentenhuisvesting

Four models: prof. Maurits de Hoog Building for Bouwkunde / Think tank 2009

luch;oto!campus!

Page 9: DASFrame – opdracht · 4/3/2011  · DASFrame – opdracht determine current match determine future match SUPPLY&SIDE MATCH CURRENT demand CURRENT supply FUTURE FUTURE demand step/by/step

TIAS lezing 2 Alexandra den Heijer 25 april 2013

more information: http://www.managingtheuniversitycampus.nl 9

DASFrame – “always be prepared for a crisis”

determinecurrentmatch

determinefuturematch

SUPP

LY&SIDE

MATC

H

CURRENTdemand

CURRENTsupply

FUTUREsupply

FUTUREdemand

step/by/step/plan

DEM

AND&SIDE

task/1/<assessing&the&cu

rren

t&cam

pus

task/2/< exploring &chang ing &demand

task/3/<ge

neratin

g&future&m

odels

task/4/< defining &projects&to&transform

exploringchang ingdemand

weigh/andselect

alternative(s)1

2.1

2.2 3

4 (de Jonge et al 2009 & den Heijer 2011) Challenge the future

Delft University of Technology

dean

construction architect facilities manager

controller

ICT

communication academic

+ program

professor + project

leader

architect

project managers

procurement

verkrijgbaar via [email protected]