DART P ROJECT Unit Liaison Kick-off and Orientation October 22, 2010.
-
Upload
godwin-morton -
Category
Documents
-
view
213 -
download
0
Transcript of DART P ROJECT Unit Liaison Kick-off and Orientation October 22, 2010.
DART PROJECTUnit Liaison Kick-off and Orientation
October 22, 2010
LifelongEngagement
DARTDAC Replacement / DART Implementation
WELCOMEWELCOME
Introductions (30 mins)
The Game of DART (20 mins) Unit Liaison Program Overview (20 mins) Roundtable Discussion (35 mins) Recap & Reminders (10 mins)
2
DART Team Members Chrissi Rawak
Robin Sober Kelly Doonan-Reed
Lesly Sauceda Hanah Wilkins
DAC Replacement / DART Implementation
INTRODUCTIONSIcebreaker3
LifelongEngagement
DARTDAC Replacement / DART Implementation
FINDING COMMON GROUND
What do you hope DART will do for you? your team? U-M?
Discuss at your table Identify someone to be the reporter Use the provided sheet to list your ideas Mark the top 3 with a star
Share with the large group Each table share the top 3 items on their list
4
LifelongEngagement
DARTDAC Replacement / DART Implementation
5
VISIONVISION
Our long-term vision is to enhance and sustain the lifelong engagement of University of Michigan alumni, volunteers, donors, and prospective donors, through the disciplined,
respectful, and creative use of data.
LifelongEngagement
DARTDAC Replacement / DART Implementation
6
GUIDING PRINCIPLESGUIDING PRINCIPLES
Understanding & Awareness Shared Responsibility Transparency Efficiencies Continuous Improvement Do What is Right
LifelongEngagement
DARTDAC Replacement / DART Implementation
STRATEGIC INITIATIVES
Data Practices Data Acquisition & Cleansing
Wealth Screening Portfolio Data Analytics DART
7
What else are your teams doing that might contribute to achieving this vision?
LifelongEngagement
DARTDAC Replacement / DART Implementation
EXPECTATIONSEXPECTATIONS
University-wide investment to: Track all information about entities (constituents) seamlessly in one book of
record (enterprise wide system) Enable better information integration with the university’s financial system Enhance online giving to improve the alumni and donor experience Reduce supplemental and shadow systems Meet U-M compliance needs effectively (e.g., financial reporting)
8
DAC Replacement / DART Implementation
THE GAME OF DART9
LifelongEngagement
DARTDAC Replacement / DART Implementation
THE GAME OF DART
Select your category and question: One representative from each table/team will throw the
velcro bean bag at the large felt DART board The corresponding category and question will be posed to
the large group. Each team must find the correct answer among the cards on
their table. The first team to “squeak” and raise the correct card will be awarded points.
In the interest of time, the game will end after 15 min., regardless of the number of remaining category/questions.
The team with the most points at the end of the game is the winner (AND GETS A PRIZE!!!!!)
10
LifelongEngagement
DARTDAC Replacement / DART Implementation
DART BOARD
11
100
300
1K
BON
US
BONUSBONUS
BONUS 500
LifelongEngagement
DARTDAC Replacement / DART Implementation
100 POINT QUESTION
What does “DART” stand for (acronym)?
12
Donor and Alumni Relationship Tool
Back to the DART board
<<Would like to get a video clip of Jefferson asking this question>>
LifelongEngagement
DARTDAC Replacement / DART Implementation
300 POINT QUESTION
Which of the following is not a resource on the DART website? Newsletter FAQ Live chat Recorded demonstrations Recent presentations Subscribable news updates (RSS feed) Recent handouts
13
• Newsletter• FAQ• Live chat• Recorded demonstrations• Recent presentations• Subscribable news updates (RSS
feed)• Recent handouts
Back to the DART board
LifelongEngagement
DARTDAC Replacement / DART Implementation
500 POINT QUESTION 1
14
Who are the DART Project Directors and Manager?• Chrissi Rawak
AVP of Talent Management and Development OperationsOffice of University Development
• Deborah MeroDirector, Financial and DevelopmentInformation and Technology Systems
• Larry ChaffeeDART Assistant Director and Project ManagerInformation and Technology Systems
Back to the DART board
<<Would like to get a video of Debbie asking this question>>
LifelongEngagement
DARTDAC Replacement / DART Implementation
1000 POINT QUESTION
15
What program will be the most critical for preparing all our campus units for the DART transition?
Development Unit Liaison Program
Back to the DART board
LifelongEngagement
DARTDAC Replacement / DART Implementation
BONUS POINT QUESTION 1
16
How many design teams are on the DART Project?
Back to the DART board
14 design teams, and over 100 representatives from schools, colleges, and units.
<<Would like to get a video of Karen and Cathy asking this question>>
LifelongEngagement
DARTDAC Replacement / DART Implementation
BONUS QUESTION (1)
What e-mail addresses can staff use to submit questions about the DART Project?
17
Back to the DART board
LifelongEngagement
DARTDAC Replacement / DART Implementation
BONUS QUESTION (2)
Match the names + faces of the change management team.
18
Back to the DART board
A
B
C
D
E
•Jamie Anderson
•Kelly Doonan-Reed
•Lesly Sauceda
•Robin Sober
•Hanah Wilkins
Kelly
Robin
Lesly
Hanah
Jamie
This team coordinates
training, communications, and other support resources for the DART Project – including the
Development UL Program.
<<Need to get pictures of each team member>>
LifelongEngagement
DARTDAC Replacement / DART Implementation
BONUS QUESTION (3)
Everyone will stop using DAC and start using DART at the same time.
19
True or FalseTRUE
A copy of DAC will be available for reference after Go Live. However, there will be a clear switch from old to new. There are teams working on data conversion and clean-up now – to make sure that all the correct and appropriate data gets imported into the new system.
Back to the DART board
DAC Replacement / DART Implementation
UNIT LIAISON PROGRAMOverview20
LifelongEngagement
DARTDAC Replacement / DART Implementation
STARTING A DEVELOPMENT UL STARTING A DEVELOPMENT UL PROGRAMPROGRAM
Regional campuses
Colleges
Schools Unit Liaison Program
(Meetings, information exchanges,
etc.)Units
Design Teams
Central Office
Groups
Change Mgmt Teams
Key individuals within schools/colleges/units
Facilitate two-way communication between unit’s faculty/administrators/staff and project team
Help inform decisions about how changes are managed within a unit
21
LifelongEngagement
DARTDAC Replacement / DART Implementation
22
EXPECTATIONS FOR UNIT LIAISONSEXPECTATIONS FOR UNIT LIAISONS
Partner with the project team for success and support
Attend Unit Liaison meetings to represent all DART users from your unit
Inform all levels of your unit, including key leadership
Assess the change necessary in your unitReview current business processes, internal operating policies + procedures, system access roles, etc.
Identify necessary changes your unit must make to assure successful transition
Share feedback, special needs, and concerns of your units with the DART team
Identify staff members who will need training
Participate in a DART readiness assessment
Provide stabilization support
LifelongEngagement
DARTDAC Replacement / DART Implementation
UL ANTICIPATED TASKS & TIME UL ANTICIPATED TASKS & TIME COMMITMENTCOMMITMENT
23
8 – two-hour meetings 7-8 – homework assignments:
DART Project team consultants available to assist with homework
Time to complete assignment will vary based on unit size (15 minutes to 2 hours per assignment)
Homework assignments include: Provide progress report on the unit’s
preparation Identify staff to participate in testing Assist staff with system access set-up Connect staff to training resources Provide input on best training
approach for unit Identify business processes (work)
changes for unit Check-in to confirm unit is ready for
Go-Live
PreparationPreparation TrainingTraining Go LiveGo Live StabilizationStabilization
TestingTesting Readiness Assessment
-2 months-12 months +2 months
LifelongEngagement
DARTDAC Replacement / DART Implementation
24
PARTNERS FOR SUCCESS
University Leadership
DART Project Team (Training, Resources,
Consultations)
Your Manager
Other Unit
Liaisons
DAC Replacement / DART Implementation
ROUNDTABLE DISCUSSIONReaching closer collaboration with our finance partners25
LifelongEngagement
DARTDAC Replacement / DART Implementation
LIFE CYCLE OF THE GIFTLIFE CYCLE OF THE GIFT
27
Identified Needs Matched to Appropriate Identified Needs Matched to Appropriate GiftsGifts
M-pathways/General Ledger Tracks M-pathways/General Ledger Tracks Fund Availability and UtilizationFund Availability and Utilization
Development Enters GiftDevelopment Enters Gift
Match MadeMatch Made
LifelongEngagement
DARTDAC Replacement / DART Implementation
COLLABORATION COLLABORATION
28
LifelongEngagement
DARTDAC Replacement / DART Implementation
WHAT CAN WE DO TO BE BETTER PARTNERS AND HAVE CLOSER COLLABORATIONS?
Things to consider:Do you currently have a working relationship
with finance staff in your unit?What things are working well? What are some
areas that need improvement?What are some things we can do to address
these challenges?
29
DAC Replacement / DART Implementation
CLOSING REMARKS & REMINDERS
30
LifelongEngagement
DARTDAC Replacement / DART Implementation
STAY TUNEDSTAY TUNED
31
LifelongEngagement
DARTDAC Replacement / DART Implementation
STAY TUNEDSTAY TUNED
32
LifelongEngagement
DARTDAC Replacement / DART Implementation
ACTION ITEMS Connect with your Finance Unit Liaison
http://www.mais.umich.edu/groups/liaisonlist.html Introduce yourself, acknowledge that you’ll probably be
working together as the project progresses.
Send us your feedback Online Survey Email: [email protected]
Review some of the existing DART materials Share them with your team, if appropriate
33
Look for the PPT and Survey in
your email today.
Watch for the next meeting invitation (early 2011)
LifelongEngagement
DARTDAC Replacement / DART Implementation
QUESTIONS?